Nickel Production and Exploration in TimminsChris Stewart, President & CEO
Q2/ 2012
TSX: LBE
Forward-Looking Statement
This presentation contains “forward-looking information” and “forward-looking statements” within the meaning of applicable securities laws. This information and statements address future activities, events, plans, developments and projections. All statements, other than statements of historical fact, constitute forward-looking statements or forward-looking information. Such forward-looking information and statements are frequently identified by words such as “may”, “will”, “should”, “anticipate”, “plan”, “expect”, “believe”, “estimate”, “intend” and similar terminology and reflect assumptions, estimates, opinions and analysis made by management of Liberty in light of its experience, current conditions, expectations of future developments and other factors which it believes to be reasonable and relevant. Forward-looking information and statements involve known and unknown risks and uncertainties that may cause Liberty’s actual results, performance and achievements to differ materially from those expressed or implied by the forward-looking information and statements and accordingly, undue reliance should not be placed thereon. Risks and uncertainties that may cause actual results to vary include but are not limited to the speculative nature of mineral exploration and development, including the uncertainty of reserve and resource estimates; operational and technical difficulties; the availability of suitable financing alternatives; fluctuations in nickel and other commodity prices; changes to and compliance with applicable laws and regulations, including environmental laws and obtaining requisite permits; political, economic and other risks arising from Liberty’s activities; fluctuations in foreign exchange rates; as well as other risks and uncertainties which are more fully described in our annual and quarterly Management’s Discussion and Analysis and in other filings made by us with Canadian securities regulatory authorities and available at www.sedar.com. No invitation to purchase securities is being made. Liberty disclaims any obligation to update or revise any forward-looking information or statements except as may be required by law.
2
Investment Highlights
• New senior leadership team with turnaround strategy
• Only nickel mill/concentrator facility within the Shaw Dome
region
• Off-take agreement with Xstrata
• Strategic relationship with Jilin Jien Nickel Industry Co. (JJNICL)
• Targeted nickel production of 4.0 million lbs in 2012
• Solid pipeline of exploration projects
• Strong nickel market fundamentals
3
• JJNICL – list on the A-Share market of the
Shanghai Stock Exchange with stock code
600432
– Current Market Cap of approx. $2.0 Billion CDN
• Largest Liberty shareholder
– Currently @60% ownership
• Fully supportive of the “new” Liberty Mines
• Current Debt with Jilin Jien – approx. CDN$80
Million – friendly debt with 10% interest rate
• Discussions are underway to restructure the
debt to align with revised business plan
Our Strategic Partner
4
Expand Current Tailings Storage Facility (TSF)
5
Current TSF Upgrade
• Meets environmental standards
• 3 year life
Proposed New TSF
• Construction in 2014 - Provide 15+ year tailings storage capacity
Our Assets
• Redstone Mill and Nickel Concentrator – 2,000 tonnes per day
capacity – currently permitted @ 1,500 tpd
• McWatters Mine – 791,000 tonnes @ 0.61% Ni
• Hart Deposit – 1,546,000 tonnes @1.40% Ni
• Redstone Mine – 737,000 tonnes inferred @ 1.57%Ni
• Groves Property – 500,000 tonnes historic @ 1.5% combined
Ni/Cu (non 43-101 compliant)
• Croxall Property – historic drill hole intercept verified in 2011
Combining Production and Exploration
6
Liberty Mines – Property Locations
7
Timmins, ON
Safe, Mining-friendly Jurisdiction
Upcoming Milestones & Objectives
Short-term Long-term
Q1 2012• Restart mining and milling operations
• Expand exploration program
2013-2014• Expand Liberty beyond the ShawDome area
Q4 2012• Generate positive operating cash flow
2014•Construction of a new Tailings Pond Facility
2012• Produce 4.0 million lbs of Nickel
• Increase resources
2015•Double current resources to provide 12+ years of operating life
8
Current Operational Status
Redstone Mill• Production restarted – ramping up to full production• Concentrate shipped to Xstrata in Sudbury
9
Current Operational Status
McWatters Mine• Mine fully operational
• 1,500 tpd production
10
New 8yd Scooptram
Loading Underground Haul Truck
6yd Scooptram Mucking Drawpoint
11
Redstone Mine
Lower Zone Resource
737,000 tonnes Inferred @
1.57%– High Potential &
High Grade
Deposit is open at Depth
Production Rate
300 tpd from Q1/2014
Redstone Mine
Lower Zone Resource
737,000 tonnes Inferred @
1.57%– High Potential &
High Grade
Deposit is open at Depth
Production Rate
300 tpd from Q1/2014
McWatters Mine
791,000 tonnes @ 0.61% Ni
Production Rate
1,500 tpd Q1/2012
McWatters Mine
791,000 tonnes @ 0.61% Ni
Production Rate
1,500 tpd Q1/2012
Hart Mine
1,546,000 tonnes @ 1.40% Ni
Production Rate
250 tpd starting Q1/2014 ramping
up to 750 tpd by 2016
Deposit is open at Depth
Hart Mine
1,546,000 tonnes @ 1.40% Ni
Production Rate
250 tpd starting Q1/2014 ramping
up to 750 tpd by 2016
Deposit is open at Depth
Redstone Mill
2,000 tpd design capacity
Permitted @ 1,500 tpd now
Redstone Mill
2,000 tpd design capacity
Permitted @ 1,500 tpd now
Vision for our operations
Current Resources and Reserves
DepositResource / Reserve Category
TonnesGrade (Ni%)
Contained Ni (lbs)
Hart Resource Indicated 1,546,000 1.40% 47,716,860
Inferred 322,000 1.27% 9,015,585
McWatters Reserve
Proven &
Probable791,000 0.61% 10,637,526
Redstone Reserve
Proven &
Probable50,252 1.48% 1,644,248
Resource Inferred 737,000 1.57% 25,509,472
Grand Total 3,446,252 1.24% 94,523,692
12
Potential for resource and reserve expansion through targeted exploration program
Shallow Mine –
Ramp to Surface
Shallow Mine –
Ramp to Surface
Infrastructure in place -
multiple draw points on
multiple levels
Infrastructure in place -
multiple draw points on
multiple levels
Surface Elev.
McWatters Mine
13
Redstone Mine – Resource Drilling – At Depth Potential
1600ft level
14
Hart Mine & Hart East Deposit Potential
Gabbro D
ykeOpen
Open
15
780m
550m
650m
Hart East sits 300m away from the main Hart Deposit
16
Opportunities for new exploration
Claims in the Shaw Dome
Hart & Hart East Deposits
Redstone Mine & Mill
Croxall
McWatters Mine
Additional Drill Targets
Shaw Dome Area
17
A6
Exploration Program 2012
Primary Focus Secondary Targets
Hart & Redstone Properties Croxall, Groves and McAra
Properties
•Deep drilling on Hart, Hart
East and Redstone to
increase resources
• New drilling on prospective
targets on Hart property
•Underground drilling to
confirm ore resources at
Redstone
•Complete further geophysics
work
•Identify additional drill targets
18
19
Public markets and mining experience
Mr. Wu Shu, Director & Chairman of the Board – CEO of Jilin Jien Nickel Industry Co. Previously President of Jilin Haorong Nonferrous Metal Group Co., Ltd. and CFO and a Director of JJNICL.
Mr. John Pinsent, Lead Director - Founding partner in St. Arnaud Pinsent Steman Chartered Accountants. 10+ years of experience with Ernst & Young LLP. Significant mining industry experience.
Dr. Tao Li, Director - Specialist in geotechnical engineering and is the director and principal of an independent consulting company. 30+ years of mining and engineering experience (Mount Isa Mines, WMC Resources, Gold Fields and Newcrest Mining)
Mr. Kim Oishi, Director - 17 years of capital markets experience, serving as an officer and director of a number of public companies, and focused on China since 2004.
Dr. Shu Zhang, Director - President & COO of Jien International Investment Ltd. (JIIL). He is a mining engineer with 38+ years of mining industry experience working in China, Australia and Canada.
Board of Directors
20
Mining and operational experts
Chris Stewart, President & CEO – Professional engineer with 20+ years of mine development and mine operations experience. Bachelor of Science from Queen’s University. Successful track record in mining services and operations. Recently came from BHP Billiton where he was the Project Manager - Shafts at the Jansen Project. Former VP of Ops for Lake Shore Gold in Timmins.
David Birch, CFO – 20+ years of experience in corporate finance and accounting. Certified Public Accountant (CPA) and Certified Management Accountant (CMA) with an Economics Degree from York University. Previous Vice President of Finance & Operations for McClelland Premium Imports. He has also held various senior financial positions with Labatt Breweries and InBEV.
Heather Miree, VP Exploration – 25+ years of exploration and mining project experience in Canada and the United States. A graduate of the University of Waterloo with an Honours Bachelor of Science in Earth Science, Ms. Miree is a registered as a Professional Geologist in Ontario and Alberta. She has held senior positions for companies such as FNX Mining Company, Lake Shore Gold, St. Andrews Goldfields and most recently she was the VP Exploration at Excellon Resources.
Kevin Fearn, VP Human Resources & Communication – 28+ years of experience in the mining, construction and consumer goods industries. Mr. Fearn holds a business degree from Laurentian University, university certificates in labour relations, safety and health, alternative dispute resolution and negotiations.
Keyvan Salehi, VP Corporate Development– Professional engineer with 10+ years of experience in the mining industry. Obtained his MBA through Kellogg/Schulich program at York University. Previous positions include Chief Engineer for Lake Shore Gold at the Bell Creek Complex and Project Manager for DMC Mining on various projects in the Sudbury area.
Brendan Zuidema, General Manager – 20+ years of experience in the mining industry. He has held various senior positions including Operations General Foreman at the Montcalm Mine, Mine Manager at Lake Shore Gold’s Timmins Mine and most recently Area Manager for Dumas Contracting in Timmins.
Management team
21
Trading Symbol: LBEListing: TSX
Recent share price: $0.1052-Week Range $0.065 - $0.22Shares outstanding 214.2 million
Market Capitalization $20.65 millionFiscal year end Dec. 31
Market Data
Investment Highlights
• New senior leadership team with turnaround strategy
• Only nickel mill/concentrator facility within the Shaw Dome
region
• Off-take agreement with Xstrata
• Strategic relationship with Jilin Jien Nickel Industry Co. (JJNICL)
• Targeted nickel production of 4.0 million lbs in 2012
• Solid pipeline of exploration projects
• Strong nickel market fundamentals
22
Appendix
23
24
Nickel Ore gets
trapped in
embayments with
sources of sulphur in
footwall rocks
Nickel Ore gets
trapped in
embayments with
sources of sulphur in
footwall rocks
Footwall rock –
iron formation
(Hart) or
graphite (W4)
Footwall rock –
iron formation
(Hart) or
graphite (W4)
Typical Deposit Structure in the Shaw Dome
A6 Project – 2012 VTEM & Geochem Target
25
26
10 km road access
Historic resource (non 43-101) of 500,000 tonnes of 1.5% combined Cu/Ni.
Completed a 13 hole drill program totally 1,245 meters in 2011
Best drill hole intercept from GR-11-05 which graded 1.69% Ni, 1.66% Cu and 0.73 G/T Au over drilled width of 15.50 meters
Refer to Liberty’s press release 16-11 issued on October 25, 2011 for more details on drill results
Groves Project
2011 follow up drill hole - 25m
east of the Mustang discovery
returns with 0.92% Ni over 4.20m
Mustang Minerals 2005
nickel discovery of 0.63%
Ni over 3.34m
Croxall
27
28
Ore Sources
*Source: RBC
Nickel market trends
• Nickel demand is growing*:
– 17.1% in 2010
– 8.4% in 2011
– 9.5% in 2012
• China is main driver for growth
• Nickel consumption is dominated by the stainless steel sector
– accounts for more than half of the global consumption of nickel