latlat beam test workshop 20th march 2006 1 glast program beam test workshop cu outer shipping...

11
20th March 2006 1 GLAST Project L A T Beam Test Workshop GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera [email protected]

Upload: sydney-wilkerson

Post on 12-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LATLAT Beam Test Workshop 20th March 2006 1 GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera michele.pinchera@pi.infn.it

20th March 2006 1 GGLASST Project

LAT

Beam Test Workshop

GLAST ProgramBeam Test Workshop

CU Outer Shipping Container

Michele Pinchera [email protected]

Page 2: LATLAT Beam Test Workshop 20th March 2006 1 GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera michele.pinchera@pi.infn.it

20th March 2006 2 GGLASST Project

LAT

Beam Test Workshop

CU OSC - Overview

Purpose and Design Requirements

Overall Design

Design Criteria

Verification

Schedule

Page 3: LATLAT Beam Test Workshop 20th March 2006 1 GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera michele.pinchera@pi.infn.it

20th March 2006 3 GGLASST Project

LAT

Beam Test Workshop

CU OSC - Purpose

• The CU Outer Shipping Container must be capable of transporting and storing the Beam Test CU without damage per the requirements stated in the LAT and MIL applicable documents

Page 4: LATLAT Beam Test Workshop 20th March 2006 1 GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera michele.pinchera@pi.infn.it

20th March 2006 4 GGLASST Project

LAT

Beam Test Workshop

CU OSC –Design Requirements

• Transportation Environment1. Transport Accelerations vs CU allowable accelerations

Analysis assumes applied environmental load occurs simultaneously in all three axes

Wire ropes isolators in compression/roll orientation

2. Temperature and HumidityThe container shall maintain temperature and humidity requirements as required for the

instrument per LAT-MD-00404, "LAT Contamination Control Plan“

GN2 overpressure inside OSC

Mode Logitudinal Acceleration

Lateral Acceleration

Vertical Acceleration

CU Max Allowable +/- 1.25 g +/- 1.25 g +/- 3.0 g Truck +/- 3.5 g +/- 2.0 g +/- 6.0 g

Mode CU Limit Temperature +5 °C to +40 °C

Humidity less than 50 RH

Page 5: LATLAT Beam Test Workshop 20th March 2006 1 GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera michele.pinchera@pi.infn.it

20th March 2006 5 GGLASST Project

LAT

Beam Test Workshop

CU OSC – Design Requirements (continued)

• CU-ISP Interface• Mounting Interface for the ISC interface plate• Adequate clearance between CU shipping volume and inside of the OSC

cover to allow for:1. Safe cover removal and installation2. Predicted dynamic motion of the CU-ISC

• Transport Truck Payload Limits

OSC mass limit = 750kg OSC volume limit (lateral x longitudinal) = 2000 x 3000 mm

Mode Standard truck limits Payload mass 1500kg

Payload volume 2000 x 3500 mm

Page 6: LATLAT Beam Test Workshop 20th March 2006 1 GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera michele.pinchera@pi.infn.it

20th March 2006 6 GGLASST Project

LAT

Beam Test Workshop

CU OSC – Overall Design

Cover

2 Breather Valves

Humidity Indicator

GN2 Connector

Cover aligment pin

Pressure Gauge

GN2 Connector

OSC external surface protection: clear anodization

ZY

XLAT coordinate ref. system

• OSC Transport Configuration

2.3 m1.85 m

1m

Page 7: LATLAT Beam Test Workshop 20th March 2006 1 GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera michele.pinchera@pi.infn.it

20th March 2006 7 GGLASST Project

LAT

Beam Test Workshop

CU OSC – Overall Design

Base Plate Pallet

Lifting Fixture(Steel)

O-ring Groove

ZY

XLAT coordinate ref. system

OSC Lifting Stems

• OSC Primary Structure

Page 8: LATLAT Beam Test Workshop 20th March 2006 1 GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera michele.pinchera@pi.infn.it

20th March 2006 8 GGLASST Project

LAT

Beam Test Workshop

CU OSC - Overall Design (continued)

• CU-ISC Integration within the OSC

Wire Ropes Isolators

ISC Interface Plate

CU-ISC

OSC-ISC Interface Plate

Z Y

XLAT coordinate ref. system

Page 9: LATLAT Beam Test Workshop 20th March 2006 1 GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera michele.pinchera@pi.infn.it

20th March 2006 9 GGLASST Project

LAT

Beam Test Workshop

CU OSC – Design Criteria

• Base Plate and Pallet act as primary structure carrying load of OSC

• Loads determination and stresses analysis by means of Hand Calculations and FEA Model for:

– Cover– Base plate and Pallet– Lifting Fixture– Interface Plate– Bolted and Welted Joints

• Mass Properties of ISC Payload– Mass 750 kg, MAX– CG (45 mm, -152 mm, 182 mm) from Interface Plate on respect of OSC CG

• Factors of Safety– Yield Design Load FS = 3.0– Ultimate Design Load: FS = 5.0

• Structural Margins of Safety Must be Positive

Page 10: LATLAT Beam Test Workshop 20th March 2006 1 GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera michele.pinchera@pi.infn.it

20th March 2006 10 GGLASST Project

LAT

Beam Test Workshop

• Proof Load Test– Lifting equipment proof test

• Test items: Base plate, pallet and lifting fixture

• Test with a dummy load as close as possible to, but not exceeding 125% of the rated load

• Edgewise Drop (FED STD. 101C)

• Test items: OSC, ISC, grid simulator, mass simulators

• Height of drop: 0.23m (9 inches)

• Leaks Test• Test item: cover, base plate

• Load cycles from min overpressure of 0.05atm (value at INFN integration building, 2m altitude) to max overpressure of 0.2 atm (value at max INFN-CERN route altitude, 1381 m)

• Static leaks test at min overpressure (<0.1atm). Duration of at least 30min with no leaks

CU OSC - Verification

dummy

9”

GN2

6”sill

Page 11: LATLAT Beam Test Workshop 20th March 2006 1 GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera michele.pinchera@pi.infn.it

20th March 2006 11 GGLASST Project

LAT

Beam Test Workshop

CU OSC - Schedule

Milestones:

Ready for Proof Tests by May 15

Ready for Integration by May 22