Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration Sites Regulation 22 Information - Noise AAc/230382-03/R03 Issue | 3 March 2015 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 230382-03 Ove Arup & Partners Ltd 6th Floor 3 Piccadilly Place Manchester M1 3BN United Kingdom www.arup.com

Upload: others

Post on 13-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd

Lancashire Shale Gas Exploration Sites

Regulation 22 Information - Noise

AAc/230382-03/R03

Issue | 3 March 2015

This report takes into account the particular instructions and requirements of our client.

It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 230382-03

Ove Arup & Partners Ltd 6th Floor 3 Piccadilly Place Manchester M1 3BN United Kingdom www.arup.com

Page 2: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Contents

Page

Summary 1

1 Introduction 3

2 Noise Modelling Information 4

2.1 Calculations Methodology 4

3 Post-ES noise source model refinements and mitigation 8

3.1 Fracturing noise 8

3.2 Drilling noise 11

4 Acoustic characteristics 15

4.1 Impulsivity 15

4.2 Tonality 16

4.3 Low frequency noise 17

4.4 Summary 17

5 Noise Management Plan 17

Appendices

Appendix A

Jacobs' Technical Note

Appendix B

Spectra for plant source noise for tonality assessment

Appendix C

Horse Hill Drill Site Noise Study

Appendix D

Measurement Equipment Calibration Certificates

Page 3: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 1

Summary

This document sets out additional information in relation to noise from drilling and hydraulic fracturing at two proposed shale gas exploration sites: Preston New Road and Roseacre Wood.

The noise assessment in the Environmental Statement (ES) was undertaken using the methodology set out in British Standard BS5228: Part 1: 2009+A1: 20141, consistent with Government noise policy2 and other infrastructure projects. No significant effect due to noise was identified, provided that hydraulic fracturing pumping operations did not take place at night.

Subsequent discussions with Lancashire County Council Planning Officers (LCC) led to noise mitigation being proposed to reduce off site noise levels from drilling to meet night time noise levels based on the Government’s Planning Practice Guidance (PPG)3 and the Technical Guidance to the National Planning Policy Framework4 (NPPF) in relation to minerals workings. The levels that could be achieved were set out in emails to LCC in mid-January 2015.

Following the issuing of the Officer’s Report in January 2015 to the Development Control Committee additional information related to noise mitigation measures for the sites was submitted by Arup to LCC in two papers entitled ‘Noise Mitigation Proposals - Preston New Road Exploration’ and ‘Noise Mitigation Proposals - Roseacre Wood’ . This additional mitigation would further reduce noise to a level below the World Health Organization (Europe) Night Noise Guideline (NNG). With regard to Government noise policy, the NNG is described by WHO (Europe) as Lowest Observable Adverse Effect Level (LOAEL)5.

Arup’s two papers described the additional noise mitigation measures proposed by the applicant to achieve a night time noise level that would be lower than the level that Cuadrilla had already committed to in earlier email correspondence to LCC (in mid-January 2015) for both sites. This document provides further information on these additional mitigation measures as well as describing the noise modelling and other assessment work undertaken to inform the noise level that can be achieved with additional mitigation.

The outcomes of the mitigation of drilling noise are summarised in the following table. For each proposed site, the noise levels are assessed at the most exposed façade of the closest residential property: Staining Wood Cottages at Preston New Road; and Old Orchard Farm at Roseacre Wood.

1 BS5228: Part 1: 2009+A1: 2014. Code of practice for noise and vibration control on construction and open sites – Part 1: Noise 2 Noise Policy Statement for England, 2010; National Planning policy Framework (section 123), 2012; and Planning Practice Guidance | Noise, 2014. 3 http://planningguidance.planningportal.gov.uk/blog/guidance/minerals/assessing-environmental-impacts-from-minerals-extraction/noise-emissions/ 4 Department for Communities and Local Government, 2012. Technical Guidance to the National Planning Policy Framework. 5 World Health Organization, 2009. Night Noise Guidelines for Europe. The evidence for the LOAEL is long term exposure to permanent noise sources such as road traffic and aviation noise. There is no evidence this applies to temporary sources, and application to temporary sources is likely to be precautionary.

Page 4: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 2

Site and receiver location ES noise level Level with initial* mitigation

Level with additional** mitigation

Preston New Road: Staining Wood Cottages

44dBLAeq 42dBLAeq 39dBLAeq

Roseacre Wood: Old Orchard Farm

42dBLAeq 40dBLAeq 37dBLAeq

*Mitigation proposed in December 2014 **Additional mitigation proposed in January 2015, as described above

Free-field mitigated drilling noise levels compared with the ES predictions

At night, these may be compared with WHO Europe Night Noise Guidelines, which define a LOAEL of 40dBLnight,outside

6.

This document sets out information that was requested at a meeting between the applicant, LCC and Jacobs (5th February 2015) and as set out in a Jacobs’ Technical Note (dated 11 February 2015 and handed over at a meeting on the 18th February 2015 – see Appendix A). The information was formally requested in a letter from LCC (26th February 2015) under Regulation 22 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2011. This document contains:

Details of the noise modelling procedures and assumptions;

Refinements to the noise models submitted in the ES;

Description of how the efficacy of the noise mitigation measures has been calculated;

Details of additional noise mitigation proposed; and

An outline noise management plan, which would be completed in full should planning permission be granted.

LCC’s planning officers confirmed (at a meeting on the 5th February 2015 and at a subsequent meeting on the 18th February 2015) that no additional mitigation measures are required to reduce the noise levels at either of the two sites for fracturing during the day, as the noise levels that can be achieved during the day with the mitigation measures proposed (as set out in emails sent by the Applicant to LCC in mid-January 2015) are sufficiently low.

6 Defined as an ‘annual average’

Page 5: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 3

1 Introduction

This document sets out additional environmental information in relation to noise from drilling and hydraulic fracturing at two proposed shale gas exploration sites: Preston New Road and Roseacre Wood. Appendix A provides Jacobs’ technical note setting out the required information.

The noise assessment in the Environmental Statement (ES) was undertaken using the methodology set out in British Standard BS5228: Part 1: 2009+A1: 20147, consistent with Government noise policy8 and other infrastructure projects. No significant effect due to noise was identified, provided that hydraulic fracturing pumping operations did not take place at night.

Subsequent discussions with Lancashire County Council Planning Officers (LCC) led to noise mitigation being proposed to reduce off site noise levels from drilling to meet the night time noise levels based on the Government’s Planning Practice Guidance (PPG)9 and the Technical Guidance to the National Planning Policy Framework10 (NPPF) in relation to minerals workings. The levels that could be achieved were set out in emails to LCC in mid-January 2015.

Following the issuing of the Officer’s Report to the Development Control Committee for the sites, two papers, entitled ‘Noise Mitigation Proposals - Preston New Road Exploration’ and ‘Noise Mitigation Proposals - Roseacre Wood’ were submitted by Arup to LCC on the 22nd January 2015.

Drilling is required to be a 24-hour process. With additional mitigation, noise at night from drilling operations at each of the two proposed sites would be further reduced to a level below the World Health Organization (Europe) Night Noise Guideline (NNG). With regard to Government noise policy, the NNG is described by WHO (Europe) as Lowest Observable Adverse Effect Level (LOAEL)11.

This document provides information on the additional mitigation measures that was first requested at a meeting between the applicant, LCC and Jacobs (5th February 2015) and as set out in a Jacobs’ Technical Note (dated 11th February 2015 handed over at a meeting on the 18th February 2015 – see Appendix A). The information was formally requested in a letter from LCC (26th February) under Regulation 22 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2011.

In response to the request for further information, this document contains:

Details of the noise modelling procedures and assumptions;

Refinements to the noise models submitted in the ES;

7 BS5228: Part 1: 2009+A1: 2014. Code of practice for noise and vibration control on construction and open sites – Part 1: Noise 8 Noise Policy Statement for England, 2010; National Planning policy Framework (section 123), 2012; and Planning Practice Guidance | Noise, 2014. 9 http://planningguidance.planningportal.gov.uk/blog/guidance/minerals/assessing-environmental-impacts-from-minerals-extraction/noise-emissions/ 10 Department for Communities and Local Government, 2012. Technical Guidance to the National Planning Policy Framework. 11 World Health Organization, 2009. Night Noise Guidelines for Europe. The evidence for the LOAEL is long term exposure to permanent noise sources such as road traffic and aviation noise. There is no evidence this applies to temporary sources, and application to temporary sources is likely to be precautionary.

Page 6: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 4

Description of how the efficacy of the noise mitigation measures has been calculated;

Details of additional noise mitigation proposed; and

An outline noise management plan, which would be completed in full should planning permission be granted.

LCC’s planning officers confirmed (at a meeting on the 5th February 2015 and at a subsequent meeting on the 18th February 2015) that no additional mitigation measures are required at either of the two sites to reduce the noise levels for fracturing during the day, as the noise levels that can be achieved during the day with the mitigation measures proposed (as set out in emails sent by the Applicant to LCC in mid-January 2015) are sufficiently low.

2 Noise Modelling Information

2.1 Calculations Methodology The assessment in the ES was based on data taken from Spectrum Acoustics’ reports describing the determination of the sound power levels, as referenced in the ES12,13. For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site.

The ES reported no significant effects from noise, and as such it would not be necessary to provide additional noise mitigation, other than restricting the hours during which hydraulic fracturing pumping could operate. This was on the basis of the assessment undertaken using the ABC method described in BS5228-1, which showed compliance with, or only slight exceedence of, the criteria defined using this method and only a small number of affected properties.

Subsequently, noise mitigation options have been investigated, for which more detailed noise source models were created, using data for individual items of plant and discrete noise sources. This enabled the effects of screening and other mitigation options to be investigated. The following describes the assessments undertaken and the assumptions made.

2.1.1 Environmental Statement: Point source noise models

These models were based on measurements made by Spectrum Acoustics (SA) at Cuadrilla’s earlier drilling and hydraulic fracturing sites in Lancashire, as noted above (Section 2.1).

SA reported a series of measurements around the site perimeter from which they had calculated a single sound power level for the whole site operation using standard methods. In addition, SA took measurements at more distant locations.

Arup found that SA’s calculated sound power level based on site perimeter measurements led to an under-prediction of the noise levels at SA’s more distant measurement locations. A correction was therefore applied to the point source 12 Sound Power Assessment. Drillmec HH-220 Drilling Rig Operated by Cuadrilla Resources Limited, Report Ref PJ2809/PJ/10193, September 2010 13 Sound Power Assessment. Frac Operations. Preese Hall Exploration Site, Report Ref PJ2877/PJ/10193, September 2010

Page 7: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 5

noise level to make predictions consistent with the more distant data, leading to a conservative assessment, by increasing the assumed source noise level by:

+3.7dB for drilling

+5.0dB for fracturing

The data from SA provided octave band spectra and these have been used in the noise modelling, for fracturing and for drilling. The source corrections were applied equally at all frequencies.

2.1.2 Directivity

SA’s report on drilling noise from the HH-220 drilling rig (referred to above – reference 12 of the preceding page) summarises the drilling noise measurement results, the data showing the sound level to have some directivity, described as follows:

Based on the apparent sound power levels applicable to each side of the well site, the following approximate directivity factors can be established:

Side Main equipment item on side Directivity (dB)

A Workshop / Stores -2

B Mud Tank / Shaker Tables 0

C Drill Pipe Carousel -2

D Generators +3

As described in Section 2.1.1 above, a correction was applied to ensure the point source model was consistent with the more distant measurements. To do this, a correction was applied that is greater than the reported directivity in any direction and therefore compensates for directivity, albeit more in some directions than in other directions.

Directivity of fracturing noise was addressed in a similar way and based on SA’s report on the Preese Hall site (referred to above - reference 13 of the preceding page).

Based on the apparent sound power levels applicable to each side of the exploration site, the following approximate directivity factors can be established:

Side Main equipment item on side Directivity (dB)

A Water tanks -1

B Workshop / Site offices +2

C Service Rig -1

D Separator +2

Page 8: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 6

2.1.3 Propagation and attenuation of sound

Noise modelling and the propagation of sound from the site used SoundPlan14 software, which is a well-established, industry-standard, 3D noise modelling package that implements ISO 9613-2:199615

1 and has the following features:

Distance attenuation

Ground absorption

Assumes down wind conditions

Source directivity

Atmospheric attenuation

Diffraction

A 3D model was created that includes not only the sound sources, but also the topography, ground cover and buildings.

Table 1 to Table 4 present the parameters used in the SoundPlan model.

Ground absorption Applicable to: Used in the model for:

G = 0 100% hard ground such as asphalt, water or industrial sites

Roads, water bodies

G = 1 100% soft ground such as fields, forests or grass

All other areas

Table 1 Ground absorption parameters

Parameter Value

Reflection order 1

Max search radius (m) 5000

Max reflection distance from receiver (m) 200

Max reflection distance from source (m) 50

Allowed tolerance (dB) 0.001

Table 2 SoundPlan calculation parameters

14 See http://www.soundplan.eu/english 15 ISO 9613-2: 1996 Acoustics - Attenuation of sound during propagation outdoors - Part 2: General method of calculation

Page 9: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 7

Parameter Two Storey Single Storey

Height of building (m) 8.00 3.50

Height of first receiver above ground floor (m) 1.50 1.50

Height of floors (m) 2.80 2.80

Number of floors 2 1

Number of basement floors 0 0

Table 3 SoundPlan buildings properties

Parameter Value

Air pressure 1013.3 mbar

Rel. Humidity 70.0%

Temperature 10.0°C

Meteorological Correction. Zero (worst case assumption)

Table 4 SoundPlan atmospheric properties (SoundPlan default values)

For the fracturing noise assessment, noise levels are calculated and presented at 1.5m above ground level, since the noise would generally be experienced outdoors or in ground floor rooms during the day. Drilling noise was calculated at an elevation of 4m above ground level to determine noise impacts at first floor level to assess noise impacts at bedroom windows.

2.1.4 Error and uncertainty

The approach taken to modelling and the predicted noise levels are considered to provide a reasonable worst case for each scenario for the following reasons:

Noise propagation assumes downwind conditions in all directions from the noise source(s).

As noted in Section 2.1.1 above, the source noise levels from SA’s reports were adjusted to match the more distant measured noise levels rather than those at the site perimeter by adding 3.7dB for drilling and 5.0dB for fracturing.

The assessments all focus on the most exposed façade of the single closest residential dwelling to each site. At properties at greater distance from the site and at facades without a direct line of sight to the site, noise levels will be lower than those tabulated/reported.

Night time noise levels are calculated at first floor window level; daytime calculated levels reflect outdoor living space and ground floor rooms.

Page 10: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 8

3 Post-ES noise source model refinements and mitigation

The mitigation options that have been proposed since the ES was produced are described and assessed below. To enable the mitigation options to be quantified, the point source noise models were refined as set out in this section. Again, a conservative approach to prediction was taken, including:

The source noise level is assumed to be that for the drilling phase of the process, whereas other phases of the process cause lower noise levels.

The assumed efficacy of much of the mitigation is conservative.

Additionally, the noise barrier heights assessed in the noise modelling are at the low end of the ranges presented in the visualisation study report and therefore present a conservative assessment of the mitigation that could be achieved.

3.1 Fracturing noise Mitigation in the form of noise barriers has been proposed in relation to a request from Natural England to reduce noise levels so as to avoid disturbance to wildfowl in fields adjacent to the proposed sites. This required individual noise sources to be established and attributed with locations and source noise levels. The model was based on the layout of plant as shown in SA’s Preese Hall report, which is reproduced in Figure 1 below.

Figure 1 Fracturing site layout (from SA’s Preese Hall report)

The refined noise model assumed six fracturing pumps, each consisting of a pump, fan and engine (generator). Arup’s in-house library of sound measurement

Page 11: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 9

data was used to define spectrum shapes and relative noise levels for each of these three source types. The proxy equipment used was:

Fan – 15kW cooling tower fan from Baltimore Aircoil Company

Pump – Mach 4 Freightliner fire engine pump; engine revving to drive pump

Generator – 630KVA Detroit V16 diesel engine

The spectra are given in Table 5.

Source Octave band centre frequency (Hz) dB(A)

63 125 250 500 1000 2000 4000 8000

Fan 115 116 113 112 110 104 98 93 114

Pump 88 94 102 105 103 100 94 90 96

Engine 103 112 111 112 111 112 106 100 105

Table 5 Fracturing pump elements noise spectra – point source sound power levels.

3.1.1 Mitigation of fracturing noise

The combined noise level from six pumps was adjusted to replicate the distant unmitigated point source noise levels presented in the ES. Mitigation was then designed in the form of a noise barrier positioned 2m from the pumps. The height of the barrier was determined to protect birds in the adjacent fields identified by the ecological assessment. The solution was found to be a solid noise fence, 5m high and topped with a 1m return angled at 45° projecting into the enclosure.

Page 12: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 10

Figure 2 Noise maps for mitigated fracturing noise (top – Preston New Road; bottom – Roseacre Wood)

Table 6 summarises the maximum noise reduction that is achieved at the closest dwellings by the proposed screening of the fracturing pumps. The amount of reduction depends on the location within the proposed exploration site of the fracturing pumps, but no scenarios lead to higher noise levels at the closest dwellings than those presented in the ES.

Page 13: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 11

Site and receiver location

Free field noise level from the ES (no mitigation) (dBLAeq)

Predicted maximum noise level reduction due to barrier (dBLAeq)

Noise level with barrier in place (dBLAeq)

Preston New Road: Staining Wood Cottages

62 -9 53

Roseacre Wood: Old Orchard Farm

54 -2 52

Table 6 Noise reduction at closest dwellings due to fracturing noise barrier

3.2 Drilling noise To quantify the relative noise emissions of the elements of the drilling equipment, measurements were made at the Horse Hill drill site, Horley, East Sussex16 (Figure 2), where the same HH-220 drilling rig that is proposed for use in Lancashire was operating. Details of the measurements, measurement locations and results are given in Appendix C; a brief summary is provided below.

The site was an operational drill site, operated by a third party. The measurements were therefore necessarily made without interference with or interruption of the drilling process. Individual items of plant could not be tested separately, so noise measurements were made close to each but in the presence of other site noise.

The measured noise levels made close to the sources were used to create a three dimensional noise model of the entire drill site (Figure 3) as follows.

The drilling rig layout was reproduced in the noise model using three dimensional ‘building’ objects, ‘noise barrier’ objects, horizontal ‘screens’ and area sources. The measurement locations grouped into two categories: measurements close to a single piece of equipment; and more distant measurements around the site, which 16 Details of the site and planning approval are at http://www.horsehilldev.co.uk/company-detail/2304135-the-plan

Figure 2 Horse Hill drill site (left – taken from planning application documents; right – © GoogleEarth). Scale bar from site to closest dwelling is approximately 350m.

Page 14: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 12

included contributions from multiple sources. These measurement locations were reproduced in the model and source levels were added as area sources to the sides and top of corresponding building objects based upon the near field equipment measurements. The measurements identified the principal noise sources to be:

Main rig and hydraulic power unit

Shale shakers

Generators and

Mud pumps

The model was then iteratively run with adjustments made to each of the area source levels until the results at the more distant measurement locations were reproduced as closely as possible to provide a calibrated noise model. Table 6 compares the calibrated noise model with the more distant measurements.

Measurement location*

Measured level (dBLAeq)

Calibrated model level (dBLAeq)

Difference dB(A)

5 74.6 75.9 +1.3

6 69.2 69.4 +0.2

7 73.0 72.7 -0.3

8 81.0 80.5 -0.5

15 83.4 83.8 +0.4

16 75.1 75.6 +0.5

17 65.1 67.9 +2.8

18 66.7 68.6 +1.9

21 76.0 74.9 -1.1

*See site layout plan in Appendix C

Table 6 Calibrated noise model 

In addition to the measurements described above, a noise logger was installed on the earth bund towards one corner of the site which logged statistical noise levels every minute for approximately 19 hours. These logged noise levels were compared with the drilling operations log and separated into three classes: sliding, drilling or other. Drilling refers to use of the top drive to rotate the drill string, whereas sliding is progressing the bore without use of the top drive. For each operation class, an LAeq,1h was calculated from the logged noise level. These levels are summarised in Table 7.

Operation Noise level at logger (dBLAeq,1h)

Sliding 60.4

Drilling 62.3

Other 61.1

Table 7: Operation noise levels at the corner of the site 

The location of the remote noise monitor was reproduced in the noise model and, after the equipment levels were calibrated in the noise model, resulted in a drilling noise level at the logger of 62.4dBLAeq.

Page 15: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 13

It should be noted that the noise logger was downwind of the drilling rig, so the calibration has been made to a level that will provide conservative (i.e. high) predicted impacts.

Figure 3 3-dimensional noise model

The calculated sound power levels for each of the items of the drilling equipment used in the noise model are given in Table 8.

Drilling equipment

Octave band centre frequency (Hz) dB(A)

31.5 63 125 250 500 1000 2000 4000 8000

Generator Sets 90 87 92 80 76 74 68 62 55 80.4

Generator Louvres

86 83 88 66 64 63 56 48 42 73.1

Mud Pumps 84 86 86 89 83 79 76 75 68 85.9

Shale Shaker 95 92 89 83 80 78 76 75 71 84.2

Drilling Rig 87 83 83 92 80 75 69 66 61 85.1

Drill Head 87 86 83 86 84 81 76 69 63 85.7

HPU 82 81 83 86 79 73 72 69 62 81.8

HPU Louvres 81 81 84 87 77 73 72 69 61 81.8

Table 8 Drilling plant calibrated sound power levels per metre, dB

The drill site noise model was incorporated into the same three dimensional digital terrain model for each proposed drill site as used in the ES.

3.2.1 Mitigation of drilling noise

Various mitigation options were investigated. In addition to the measures applied to individual elements of the plant, noise barriers around the site perimeter and the

Page 16: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 14

location of the drilling equipment within the proposed site boundary were also investigated.

Table 9 and Table 10 summarise the mitigation options assessed and the reductions in noise levels attributable to each.

Mitigation Benefit / noise reduction

Justification

4m high noise barrier fence

Variable depending on the source and receiver locations

Conventional noise barrier calculation implemented by SoundPlan

Sound absorption in enclosures to drilling rig shale shakers (doors closed)

Source level reduced by 5dB

Horse Hill measurements were with shale shaker doors open; these would be closed.

The BS5228-1 guidance on enclosures is as below

Sound absorption in enclosures to generators, including louvres

Assumed 4dB Generators as measured were partially enclosed. Mitigation taken to be lower than the reductions quoted by BS5228-1

Enclosures to drilling rig mud pumps

No reduction included in the model but some effect expected

BS5228-1 Table B.1 5-10dB for engine enclosures BS5228-1 Table B.4 gives ≥6dB for partial enclosures (with sound absorption)

Rubber bushings to reduce pipework vibration

Not quantifiable but some beneficial effect expected

No reduction made in source noise levels. Any reduction would be over and above that assumed

Table 9 Initial methods for drilling noise mitigation

Mitigation Benefit / noise reduction

Justification

7m high sound barrier around the main rig and hydraulic power unit

5dB(A) Based on PowerClad17 system (900gsm) transmission loss data. The applicant’s proposals are a more substantial system, so 5dB is likely to be a cautious estimate

Interventions to the hydraulic power unit (e.g. acoustic louvres); attenuators to generator exhausts, etc.

1dB(A) Model includes a modest reduction for additional mitigation to various elements.

BS5228-1 Table B.4 shows even an open sided shed (at the open side) treated with sound absorbing material will reduce noise emission by 1dB

Table 10 Methods for additional mitigation of drilling noise

Site and receiver location ES noise level Level with initial* mitigation

Level with additional** mitigation

17 See http://www.itpltd.com/en/product/powerclad-acoustic-insulated-sheeting

Page 17: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 15

Preston New Road: Staining Wood Cottages

44dBLAeq 42dBLAeq 39dBLAeq

Roseacre Wood: Old Orchard Farm

42dBLAeq 40dBLAeq 37dBLAeq

*Mitigation proposed in December 2014 **Additional mitigation proposed in January 2015 in response to recommendation for refusal, as described above

Table 11 summarises the drilling noise levels achieved at the most exposed facades of the closest dwellings.

The additional mitigation would further reduce noise levels to below the WHO’s Night Noise Guideline, also defined as the LOAEL, of 40dBLAeq.

Site and receiver location ES noise level Level with initial* mitigation

Level with additional** mitigation

Preston New Road: Staining Wood Cottages

44dBLAeq 42dBLAeq 39dBLAeq

Roseacre Wood: Old Orchard Farm

42dBLAeq 40dBLAeq 37dBLAeq

*Mitigation proposed in December 2014 **Additional mitigation proposed in January 2015 in response to recommendation for refusal, as described above

Table 11 Summary of free-field mitigated drilling noise levels and comparison with the ES predictions

4 Acoustic characteristics

Noise characteristics were not discussed in the ES. The following provides further supporting information to demonstrate that this does not affect the outcomes of the assessment. Characteristics considered are impulsivity, tonality and low frequency noise.

4.1 Impulsivity Jacobs’ letter to LCC dated 16 December 2014 noted:

…it is implied that during normal drilling operations there are no impulsive aspects to the noise.

This is taken to be in relation to the SA report describing the determination of the sound power levels, as referenced in the ES18.

SA’s report from the Anna’s Road19 site also states:

18 Sound Power Assessment. Drillmec HH-220 Drilling Rig Operated by Cuadrilla Resources Limited, Report Ref PJ2809/PJ/10193, September 2010 19 Noise Impact Assessment for Lateral drilling of Sidetrack Borehole Anna's Road Exploration Well Site, Westby, Blackpool, Report Ref PJ3084/12320, January 2013

Page 18: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 16

… noise emission from the drilling operations is essentially steady…, During the overnight period there were occasional higher noise ‘spikes’ produced by transient or impulsive events at the well site, however, only 4 of these produced noise levels 10dB(A) above the steady LAeq noise level of 65dB(A).

Impulsive events are commonly defined as ‘regular’ if they occur 10-15 times over a period (reference WHO guidelines for community noise), so in this case the transient or impulsive events, would be best described as occasional.

This indicates that there are no impulsivity characteristics that would change the assessment approach for noise associated with drilling. Another SA report, on the impacts of drilling noise on wintering birds20, supports this:

Whilst there will be occasional higher LAmax levels above the 50dB(A) significant effect level, such higher levels of impulsive, or transient, noise from drilling operations have been shown to be an occasional, rather than a regular occurrence.

At the Horse Hill drill site, observations and measurements were made of the drilling process in the vicinity of each element of the drilling rig. Subjectively, little impulsivity was observed for the majority of the plant, with the exception of the process for adding a new pipe to the drill string. This created only a small number of intermittent impulses, which were confined to a period of a few minutes as each additional pipe was added.

It is our professional opinion that, at the distance of the closest dwellings, such impulsive characteristics of drilling noise are very unlikely to have any impact.

With regard to the fracturing process, impulsive noise events are not associated with the main sources of noise (diesel engine, pump, fan) required for the process.

4.2 Tonality

The evidence available at the time of preparing the ES, taken from SA’s reports, indicated no tonal content to the noise. SA’s report from Anna’s Road21 stated:

Tonal noise emission is not generally associated with well site operations, with the major equipment items having a broadband noise signature.

To investigate this further, the Horse Hill measurement data taken by Arup have been considered, both in terms of subjective assessment and by reference to BS4142:2014. The measurements made close to each source provide a worst case, since, as noted in BS4142, “The prominence of tonal or impulsive sound from a source can be masked by residual sound”. The one-third octave objective method from Annex C of BS4142 has been used, which is as follows:

“For a prominent, discrete tone to be identified as present, the time-averaged sound pressure level in the one-third-octave band of interest is

20 Noise Impact Assessment on Wintering Birds. Anna's Road Exploration Well Site, Westby, Blackpool, Report Ref PJ3056/12320, October 2012 21 Noise Impact Assessment for Lateral drilling of Sidetrack Borehole Anna's Road Exploration Well Site, Westby, Blackpool, Report Ref PJ3084/12320, January 2013

Page 19: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 17

required to exceed the time-averaged sound pressure levels of both adjacent one-third-octave bands by some constant level difference. The level differences between adjacent one-third-octave bands that identify a tone are: • 15 dB in the low-frequency one-third-octave bands (25 Hz to 125 Hz); • 8 dB in the middle-frequency one-third-octave bands (160 Hz to 400 Hz); and • 5 dB in the high-frequency one-third-octave bands (500 Hz to 10 000 Hz)”

For each of the main sources of noise, Appendix B illustrates the spectral content. Subjectively, much of the plant had no tonal quality, however there was a tonal content to some items, which generally appears as in the 200Hz 1/3 octave band and associated with the hydraulic power unit. The source was not identified in detail on site, but appeared to be radiated from hydraulic pipework. It is therefore expected that this could be readily mitigated if the tonal characteristic were to exist and be discernible at distances as great as the closest properties.

No data were acquired during the Horse Hill study to enable the noise character at distance to be assessed. However, given the low levels of noise predicted at the closest dwellings, it is considered that any tonal content will not have any impact.

4.3 Low frequency noise Concerns have been expressed about the possible effects of low frequency noise.

All the relevant standards and guidance recommend that A-weighted sound pressure levels should be used to rate and assess noise impacts. The frequency content associated with the proposed fracking and drilling processes is similar to that of other sources of sound covered by the guidance and there is nothing to suggest that a separate consideration of low frequency noise is necessary. In fact, problems associated with low frequency noise are quite infrequent if not rare.

In view of the nature of the noise sources and the low levels of noise predicted it is concluded that low frequency noise is very unlikely to give rise to any adverse effect.

4.4 Summary It is concluded from the above that there are no noise characteristics that would change the impact of the noise associated with the proposed works.

5 Noise Management Plan

All Best Practicable Means, as defined by Section 72 of the Control of Pollution Act 1974, will be used to control and minimise noise from the site. This will ensure that significant adverse effects will be avoided and that any adverse impacts will be minimised as far as is reasonably practicable. The following provides a draft framework for a noise management plan for discussion with LCC.

Page 20: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 18

1. General

2. Working Hours

Normal working hours

Start up and shut down periods

Repair and maintenance works

Extended working hours – foreseeable specific activities

Extended working hours – emergency or unforeseen activities

3. Noise Control

Plant selection

Inventory of plant and noise levels

Operating practices

Maintenance and repair of equipment

Noise trigger levels (including time dependency)

- Warning levels

- Action levels

Noise mitigation

4. Prediction of Noise Levels

5. Noise Monitoring

Equipment specification

Calibration procedures

Noise sensitive receptors

Monitoring locations

Data recording and reporting

Access to data

6. Complaints procedure

Community liaison and on-site contact

Escalation procedure

7. Pre-mobilisation existing noise levels survey

Page 21: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page 19

Page 22: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Appendix A

Jacobs' Technical Note

Page 23: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page A1

A1 Jacobs’ Technical Note

The following provides the text from Jacobs’ Technical Note, which set out the additional information required. Text in bold italics identifies where within Arup’s report the information is provided.

1. Purpose To enable LCC to fully appraise the further information on noise submitted by the applicant in response to the Regulation 22 request, all input data, any assumptions used in computer models (or spreadsheets), and the mitigation proposals must be clearly set out. This technical note is intended as a checklist to assist the applicant when providing this information. Where the information on this checklist is not available or otherwise cannot be provided, the applicant is advised to consult with LCC at the earliest opportunity.

2. Overview An overview of the proposed drilling rig, ancillary equipment and processes is required. This should include:

Descriptions of proposed drilling rig and ancillary equipment: see Section 3.2, Figure 4 & Appendix C1.3.

Proposed operational procedures / methods of working: see Section 3.2.

Identification of the primary sources of noise emissions: see Section 3.2, Appendix C1.3 & Table C.1.

3. Noise sources Details of the noise measurements undertaken at the operational drilling rig at the Horse Hill site:

Equipment used for the measurements: see Appendix C1.2.1 & C1.2.2.

Records of equipment calibration: see Appendix D.

Weather conditions: see Appendix C1.2.3.

Measurement general procedure: see Appendix C1.2.4 & C1.2.5.

Measurement locations, durations and measured 1/1 or 1/3 octave band Sound Pressure Levels (dB ref 2 x 10-5 Pa): see Appendix C1 Figure C1-2: Noise Measurement Locations & Table C1.

Corrections applied to measured levels for the influence of other noise sources: see Section 3.2 & Table 7.

Page 24: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page A2

The procedure adopted for converting Sound Pressure Levels to Sound Power Levels (dB ref 1 x 10-12 W): see Section 3.2 & Table 7.

4. Modelling

Details regarding the layout of the proposed drilling rig and selected calculation parameters:

CAD files of the drilling rig layout (including any external references, in AutoCAD DWG or DXF format), geo-referenced to British National Grid coordinates (OSGB36 projection) and in metre units: see Section 3.2, Figure 4 & Appendix C1.3 Figure C1-2.

Heights for each item of plant / building / structure, specifying at which stage they will be installed at the site. Each structure to be clearly marked on the plant layout drawings: see Section 3.2, Figure 4 & Appendix C1.3 Figure C1-2.

Selected calculation methodology (e.g. ISO 9613-2): see Section 2.1.3.

Parameters for the calculation methodology (e.g. ground effect values for

surfaces, air temperature, relative humidity): see Section 2.1.3.

The operating scenarios included in the modelling, indicating times/frequency of occurrence, the mechanical equipment that will be operating for each scenario: see Section 3.2 (Drilling) & Section 3.1 (Fracturing).

A schedule of the noise sources in the model identifying:

o Sound Power Levels (dB ref 1 x 10-12 W): see Section 3.2 Table 9 (Drilling) & Section 3.1 Table 5 (Fracturing).

o The operation of plant (e.g. continuous or intermittent) and any on-time corrections: see Section 3.2 (Drilling) & Section 3.1 (Fracturing).

o Dimensions of noise source including the heights, and whether it is modelled as a point line or area noise emitter: see Figure 4 & Appendix C Figure C1-2 (Drilling) & Figure 1 (Fracturing).

o Identification of any noise sources exhibiting intermittent, tonal or other identifiable acoustic characteristics: see Section 4.2.

Receptor locations and heights above ground: see Section 2.1.3.

Predicted noise levels at receptors for the operational scenarios considered, clearly identifying if a façade correction is included in the predicted level: see Section 3.2.1, Table 11 (Drilling) & Section 3.1.1, Table 6 (Fracturing).

A statement on how measurement and prediction error is considered: see Section 2.1.4.

Page 25: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page A3

5. Noise Mitigation It is recommended that the applicant summarises the measures to be employed to mitigate noise. Information that would support this includes:

A schedule of the proposed noise mitigation measures, indicating the expected reduction in predicted levels that each measure may achieve: see Section 3.2.1, Table 10, Table 11 (Drilling) & Section 3.1.1, Table 6 (Fracturing).

An indicative noise management plan as a form of ongoing noise mitigation: see Section 5.

6. Objector Concerns It is recommended that the applicant takes the opportunity to consider the concerns raised by objectors in respect of noise. Sam Williams Technical Director, Acoustics +44 (0)117 917 0811 [email protected]

Page 26: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Appendix B

Spectra for plant source noise for tonality assessment

Page 27: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page B1

B1 Spectra for plant source noise for tonality assessment

40

50

60

70

80

90

100

16

20

25

32

40

50

63

80

100

125

160

200

250

315

400

500

630

800 1k

1.25k

1.6k

2k

2.5k

3.15k

4k

5k

6.3k

8k

10K

12.5k

Sound pressure level (dB)

Frequency (Hz)

Mud Pumps ‐ Location 5

40

50

60

70

80

90

100

16

20

25

32

40

50

63

80

100

125

160

200

250

315

400

500

630

800 1k

1.25k

1.6k

2k

2.5k

3.15k

4k

5k

6.3k

8k

10K

12.5k

Sound pressure level (dB)

Frequency (Hz)

Shale Shaker ‐ Location 9

40

50

60

70

80

90

100

16

20

25

32

40

50

63

80

100

125

160

200

250

315

400

500

630

800 1k

1.25k

1.6k

2k

2.5k

3.15k 4k

5k

6.3k

8k

10K

12.5k

Sound pressure level (dB)

Frequency (Hz)

On Drill Derrick Platform 2m from drill string ‐ Location 12

40

50

60

70

80

90

10016

20

25

32

40

50

63

80

100

125

160

200

250

315

400

500

630

800 1k

1.25k

1.6k

2k

2.5k

3.15k 4k

5k

6.3k

8k

10K

12.5k

Sound pressure level (dB)

Frequency (Hz)

Beside Hydraulic Manifold ‐ Location 14

40

50

60

70

80

90

100

16

20

25

32

40

50

63

80

100

125

160

200

250

315

400

500

630

800 1k

1.25k

1.6k

2k

2.5k

3.15k

4k

5k

6.3k

8k

10K

12.5k

Sound pressure level (dB)

Frequency (Hz)

Beside Vent Louvre of Hydraulic Power Pack ‐ Location 15

40

50

60

70

80

90

100

16

20

25

32

40

50

63

80

100

125

160

200

250

315

400

500

630

800 1k

1.25k

1.6k

2k

2.5k

3.15k

4k

5k

6.3k

8k

10K

12.5k

Sound pressure level (dB)

Frequency (Hz)

Drill Motor Noise ‐ Location 18

40

50

60

70

80

90

100

16

20

25

32

40

50

63

80

100

125

160

200

250

315

400

500

630

800 1k

1.25k

1.6k

2k

2.5k

3.15k

4k

5k

6.3k

8k

10K

12.5k

Sound pressure level (dB)

Frequency (Hz)

5m from Generators ‐ Location 21

40

50

60

70

80

90

100

16

20

25

32

40

50

63

80

100

125

160

200

250

315

400

500

630

800 1k

1.25k

1.6k

2k

2.5k

3.15k

4k

5k

6.3k

8k

10K

12.5k

Sound pressure level (dB)

Frequency (Hz)

Hydraulic Supply Pipes ‐ Location 26

Page 28: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Appendix C

Horse Hill Drill Site Noise Study

Page 29: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page C1

C1 Horse Hill Survey

C1.1 Introduction A noise survey was undertaken of the Cuadrilla Drilling Rig No.50 whilst operating at Horse Hill near Gatwick. The survey was undertaken by Dr David Hiller and Mr Andrew Officer of Arup on 8 and 9 October 2014.

The purpose of the survey was to measure noise from individual items of plant within the drill site, to provide data for a three dimensional noise model. This would then allow detailed assessment of possible mitigation options for the proposed Lancashire exploration sites.

In addition, a continuous recording of the sound levels was made to provide a detailed picture of how the total noise from the site varies with time.

C1.2 Survey equipment and methodology The following instrumentation was used. Calibration certificates are appended at Appendix D.

C1.2.1 Attended measurements Bruel & Kjaer 2260 ‘Investigator’ – Class 1 precision sound level analyser

Bruel & Kjaer 4189 ½” Pre-polarised condenser microphone

Bruel & Kjaer 4231 Class 1 sound pressure level calibrator

C1.2.2 Unattended logger measurements RION NL-32 Class 1 sound level meter/logger

RION UC-53A ½” Pre-polarised condenser microphone

RION NA-74 Class 1 sound pressure level calibrator

C1.2.3 Meteorological conditions

Weather conditions, whilst not ideal, were satisfactory for undertaking measurements close to plant. Occasional squally showers accompanied by a south to south-south westerly wind briefly interrupted some of the measurements.

The wind direction during the survey was from the site and generally towards the logging sound level meter throughout, providing a worst case assessment. When the logger was set up, the wind was recorded as being from the south gusting occasionally up to 5.5m/s. When the logger was recovered the following morning, the wind was still blowing from the same direction at 2-3m/s with gusts occasionally up to 5m/s. Figure C1-1 provides a partial record during the night

Page 30: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page C2

time and early morning of Thursday 9th October 2014 from Gatwick Airport, approximately 3km south of the drill site.

These conditions, while not ideal for environmental noise surveys, were such that they would not be expected to reduce the measured noise levels compared with those that would have been recorded under more favourable conditions.

Figure C1-1: Partial record of weather during survey from Gatwick airport

C1.2.4 Attended survey methodology

For the measurements of individual items of plant, the 2260 sound level analyser was used to collect broadband and ⅓ octave band spectra. The meter was either set on a tripod 1.5m above local ground or hand held where a tripod could not be used.

Measurement durations were dependent upon the time variability of the source or activity being recorded but in all cases were of sufficient duration to be representative of the plant or process.

C1.2.5 Unattended (logger) survey

For the unattended noise survey, the RION NL-32 logger was set up on the perimeter bund at the north east corner of the drill site (see Photograph C1-1). This logged 1 minute noise samples throughout the day and night whilst the drill site was active. The logger automatically stored the LAeq, LA10F, LA90F and LAmaxF

indices.

Page 31: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page C3

Photograph C1-1: Noise logger on the perimeter bund, NE corner of site

C1.2.6 Instrumentation calibration

All of the sound measurement equipment used conforms to IEC/BS 61672-1:2003 class 1 standard. The calibration of the sound measurement instrumentation (sound level meters, pre-amplifiers and microphones) were checked before and after each survey period to confirm that there was no significant drift at the calibration level and frequency.

All Arup instrumentation is calibrated annually by accredited laboratories to national and international standards. Calibration certificates for the equipment used are at Appendix D.

C1.3 Measurement locations A total of 26 noise measurement locations were used, some close to equipment to identify source noise levels and others at greater distances from individual plant but within the drill site compound. Figure C1-2 below, illustrates these locations.

Page 32: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page C4

Figure C1-2: Noise Measurement Locations

Page 33: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page C5

The following photographs illustrate a selection of the measurement locations:

Location 1: 1m from Mud Pump No.2 (electric motor end)

Location 3 - between Mud Pump No.1 and 2, alongside pumps

Location 5 – Approximately 9m from Mud Pump No.3 (Mud Pump noise dominant noise source)

Page 34: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page C6

Location 8 – Shale Shaker

Location 9 – Side on and 1m from Shale Shaker (enclosure hatch open)

Location 12 – approx. 4m from drill string

Page 35: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page C7

Location 19: Outside Doghouse, approx. 2m from drill string

Page 36: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page C8

C1.4 Results

Table C1 presents the broad band noise data measured at each equipment location.

Figure C1-3: Noise profile recorded at NE corner of drill site on perimeter bundillustrates a time history of the 1 minute samples collected at the unattended logger. Figure C1-4 presents separately the LAeq time history for clarity. The noise profile is from 13:14hrs on 8 October to 08:15hrs on 9 October 2014.

Figure C1-3: Noise profile recorded at NE corner of drill site on perimeter bund

Figure C1-4: Noise profile recorded at NE corner of drill site on perimeter bund (LAeq only)

Page 37: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page C9

Date Loc No.

Time Noise Level, dB (A) Comments

Start Finish L90 L10 Lmax Leq

08.10.14 1 13:53 13:54 90.8 91.6 92.3 91.3 1m from Mud Pump No.2

08.10.14 2 13:55 13:56 90.4 91.6 92.8 91.1 Between Mud Pump No.1 and 2, at pump end

08.10.14 3 13:58 13:59 92.4 93.0 93.5 92.7 Between Mud Pump No.1 and 2, at electric motor end

08.10.14 4 14:01 14:02 90.8 91.6 92.3 91.4 Between Mud Pump No.2 and 3, at electric motor end (Pump 3 not working)

08.10.14 5 14:03 14:04 73.8 75.0 76.9 74.6 Approx. 9m from Mud Pump No.3 (Tonal LF component, ‘pulsing’ in character, noticeable at all above locations).

08.10.14 6 14:08 14:13 68.2 70.0 71.5 69.2 At corner of site near silos. Banging* noise from mix/active plant. LF increase at c.2 minutes – extra plant started up in direction of SET. Approximately 7m from closest corner of tanks.

08.10.14 7 14:16 14:21 71.8 73.8 75.8 73.0 Banging* as at 6, LF from pump-maybe guy cleaning walkway with pressure hose 8m from closest edge of plant.

08.10.14 8 14:23 14:24 80.2 81.6 83.0 81.0 Banging* as 6 & 7 plus contours. Noise from separators and associated plant. Sources ~ 4m above ground; banging* sounds lower than platform (@4m)

08.10.14 9 14:28 14:29 82.2 83.0 83.7 82.7 Handheld c.1m from side of Shale Shaker (housing access panel open)

08.10.14 10 14:30 14:31 82.6 83.2 83.7 83.0 Inside Shale Shaker housing, end on to shaker.

08.10.14 11 14:32 14:33 80.2 80.8 81.4 80.6 Other side of Shale Shaker, drill rig side. (housing access panel open)

08.10..14 12 14:49 14:50 78.0 79.4 80.5 78.8 On drilling platform, approx. 2m from drill string. All noise is perceived to be coming from the platform superstructure, not from top drive, whilst drilling

08.10.14 13 15:08 15:09 78.0 80.0 82.6 79.0 On walkway between drill and hydraulics. Tonal, perceived as pulsating noise character.

08.10.14 14 15:10 15:10 81.8 83.0 84.4 82.5 Close to hydraulic manifold, level with and adjacent to drill platform.

08.10.14 15 15:17 15:18 82.8 83.8 86.0 83.4 Beside louvres on hydraulic pumps. Bottom is 2m above ground; top 4m.

08.10.14 16 15:54 15:56 74.4 75.4 77.1 75.1 Tanker lorry uploading content from cuttings tank ~2m from lorry pump

Page 38: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page C10

Date Loc No.

Time Noise Level, dB (A) Comments

Start Finish L90 L10 Lmax Leq

08.10.14 17 15:59 16:04 63.6 66.4 76.1 65.1 Wind gusting up to ~3m/s blowing towards measurement position. Whining from top drive just audible. Banging* from clearly audible. Top drive becoming increasing audible. Dominant noise towards end..

08.10.14 18 16:10 16:11 64.2 66.4 73.4 65.7 Top drive dominant noise. Pipe handler working but no noise audible – until couple of bangs. c.25-30m from edge of pipe handler

08.10.14 18 16:19 16:23 64.9 68.4 70.8 66.7 Whining of top drive; generators etc more audible than Pos 17. Wind now quite light. Top drive is below top of pipe handler frame.

08.10.14 19 16:26 16:27 77.2 79.4 80.8 78.5 Outside doghouse. 2m from drill. Top drive c.7-8m above us.

08.10.14 19 16:48 16:49 78.6 82.8 84.2 80.9 Top drive ~2m above platform

08.10.14 19 16:52 16:57 71.0 82.2 100.0 79.3 Start of process to make new connection

08.10.14 19 16:58 17:01 64.2 76.8 102.9 81.0 Connecting new pipe

08.10.14 19 17:01 17:03 64.8 72.0 87.5 70.6 Pipe handling process. Bumps and few clangs from machinery

08.10.14 20 17:12 17:13 85.6 91.6 94.3 89.4 Wilden Pump running (without muffler attached) @ approx. 5m

08.10.14 21 08:43 08:44 75.0 76.8 80.0 76.0 Approximately 5m from generators (generator enclosure containers are approx. 2.5m high, sat directly onto ground)

08.10.14 22 08:46 08:47 78.0 79.0 79.9 78.6 Approximately 1m from generator; alongside side access doors

08.10.14 23 08:49 08:50 79.4 81.6 83.8 80.8 Approximately 0.5m from generator air intake louvres

08.10.14 24 08:50 08:50 75.4 79.6 82.1 77.9 At rear of Generator set 3, whilst top drive and pipe string being lifted up to insert new pipe section

08.10.14 25 08:53 08:54 75.6 77.2 78.5 76.4 End of generator set 2 (mud pump now running too – just been switched on)

08.10.14 26 10:01 10:02 68.2 70.0 71.4 69.3 Tonal noise – from hydraulics? Drill in ‘Sliding’ mode now.

08.10.14 10:13 10:13 76.6 78.2 79.4 77.5 Halfway up stairs from Koomey – mud system pipes noisy

08.10.14 10:14 10:15 82.4 83.2 84.1 82.9 At bottom of same stairs. Drill still in ‘Sliding’ mode

Page 39: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page C11

Date Loc No.

Time Noise Level, dB (A) Comments

Start Finish L90 L10 Lmax Leq

08.10.14 15 10:20 10:21 82.6 83.2 83.9 83.0 Next to HPU louvres

* Pump that was banging was running temporarily to pump out drainage ditch; off @ 16:08

Table C1 Drill site measurements (8 October)

Page 40: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Appendix D

Measurement Equipment Calibration Certificates

Page 41: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page D1

D1 Bruel and Kjaer – attended measurements

Page 42: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page D2

Page 43: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page D3

Page 44: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page D4

Page 45: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page D5

D2 Rion – unattended measurements

Page 46: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page D6

Page 47: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page D7

Page 48: Lancashire Shale Gas Exploration Sites · 2015. 12. 2. · For both drilling and hydraulic fracturing, the modelling reported in the ES assumed a point source for the whole site

Cuadrilla Bowland Ltd Lancashire Shale Gas Exploration SitesRegulation 22 Information - Noise

AAc/230382-03/R03 | Issue | 3 March 2015

Page D8