lacip background paper
TRANSCRIPT
-
7/27/2019 LACIP Background Paper
1/35
Background
Paper
Livelihood Support & Promotion of Small Community Infrastructure Project
L A C I P
-
7/27/2019 LACIP Background Paper
2/35
1. INTRODUCTION................................................................................................1
2. PROGRAM OVERVIEW..............................................................................2 to 9
3. OTHER PROGRAMS IN THE PROJECT AREA (KP)..........................................10
4. PROGRAM AREAS................................................................................11 to 12
5. PROGRAM COMPONENTS...................................................................13 to 15
6. SUMMARY OF INVESTMENT..................................................................16 to 18
7. PARTICIPATING PARTNER ORGANIZATIONS.......................................19 to 37
2.1 Program Introduction2.2 Program Objectives2.3 Expected Outputs and Outcomes
2.4 Project Implementation Principles2.5 Program Activities2.6 Monitoring and Evaluation2.7 Steering and Coordination2.8 Reporting
5.1 Institutional Development (ID)5.2 Community and Physical Infrastructure (CPI)5.3 Livelihood Enhancement and Protection (LEP)5.4 Establishment of basic health and educational services (H&E)5.5 Disaster Preparedeness and Management measures (DPM)
6.1 Program Investment6.2 Apportionment by Districts6.3 Component wise Apportionment
3.1. Poverty Reduction through Rural Development in Balochistan, KhyberPakhtunkhwa and the Federally Administered Tribal Areas
3.2. KfW funded Development of Hydropower, Renewbale Energy &
Biodiversity Conversation Program in KPK
TABLE OF CONTENTS
-
7/27/2019 LACIP Background Paper
3/35
LIST OF ABBREVIATIONS
AKRSP Agha Khan Rural Support ProgramART Advisory Review Team
CPI Community Physical Infrastructure
CO Community Organization
CUP Community Uplift Program
DNH No no harm Approach
DPM Disaster Preparedness and Mitigation
DRR Disaster Risk reduction
ESMF Environment & Social Management FrameworkGBI Grants Based Interventions
HADAF Hazara Development and Advocacy Foundation
H&E Health and EducationKfW (German Development Bank)
KP Khyber Pakhtunkhwa
LACIP Livelihood Support and Small Community Infrastructure Project
LEP Livelihood Enhancement and Protection
MER Monitoring, Evaluation and Research
MIS Management Information System
MIED Mountain Institute for Educational Development
MGPO Mountain and Glacier Protection Organization
NRSP National Rural Support Program
NWFP North West Frontier Province
O&M Operation and Maintenance
PSC Poverty Score Card
PO Partner Organization
PPAF Pakistan Poverty Alleviation Fund
RDP Rural Development Program
SABAWON Social Action Bureau for Assistance in Welfare andOrganizational Networking
SIE Senior International Expert
SRSP Sarhad Rural Support Program
SWWS Support with Working Solutions
TOP Terms of Partnership
VO Village Organization
-
7/27/2019 LACIP Background Paper
4/35
Pakistan Poverty Alleviaon Fund (PPAF) as an instuon serves poor, marginalized and disadvantaged
households by facilitang their access to resources and opportunies. This considerable lack of
opportunies necessitated creaon of an intermediary apex organizaon equipped with the resource
backed capability to furnish nancial and non-nancial services to the impoverished and excluded secons
of the community, through a community-based framework.
As a lead apex organizaon of the country, PPAF works through 126 Partner Organizaons (POs), selected
through a stringent and comprehensive appraisal process. The enre infrastructure program of PPAF is
community based and demand driven. The POs interact intensively with the local communies in helping
them form into Community Organizaons (COs) through the process of social mobilizaon. Once the COs
are formed, they are given informed choices for the selecon and priorizaon of the projects to be
implemented through PPAF assistance. When the project is idened, the Terms of Partnership (TOP) are
signed, which clearly indicate the responsibilies of the PO and the CO.
The TOP inter alia includes the minimum share of the CO in the capital cost of the project and an
undertaking that the built facility will be maintained and operated by the CO with out any external support.
The CO also assumes the primary responsibility of construcon management, with the technical supportof the PO. For this purpose, it is mandatory to have in place a project management commiee, an accounts
commiee, an audit commiee and an operaon and maintenance (O&M) Commiee.
At a wider level, it is crical to cinch ownership, commitment, and parcipaon from diverse stake
holders for poverty reducon eorts to be successful over the long-term. To that end, PPAF has endeavored
to crowd-in partnerships (both nancial and non-nancial) with the public sector, private sector, and civil
society organizaons at internaonal, naonal and sub-naonal levels.
The unique role of PPAF, therefore, goes beyond mere nancing of civil society organizaons but extends to
sector development, market making, and quality assurance in terms of inclusion, outcomes, and impact.
The Background Paper consists of the following:
I. An outline of what LACIP comprises of in terms of the ve major components; instuonal
development at community level in project region, community and physical infrastructure, livelihood
enhancement and protecon of weakest secons of the populaon, establishment of basic health and
educaon services at grass root level and the preparaon of the communies to respond to natural
disasters in disaster prone areas.
II. A detailed investment program giving the yearly schedule of outlays, apporonment of cost by the pro-
gram components and at the district level.
1. INTRODUCTION
2
-
7/27/2019 LACIP Background Paper
5/35
2.1 Program Introducon
The Livelihood Support & Promoon of Small Community Infrastructure Project (LACIP) is co-nanced by
the Federal Republic of Germany through KfW and executed by PPAF over a period of three years. It aims to
reduce the poverty levels by increasing economic opportunies in the project region.
The project has started with the end of the Incepon Phase and the Funding Phase One in April 2012. The
project is mandated to work in Instuonal Development (ID), Community Physical Infrastructure (CPI)
development, Livelihood Enhancement & Protecon (LEP), Health & Educaon (H&E) and Disaster
Preparedness and Migaon (DPM) in the 5 selected districts (Chitral, Buner, Swabi, Charsadda and D.I.
Khan) of Khyber Pakhtunkhwa (see Annex 1). The esmated total cost underlying the project appraisal is
31.563 million Euros.
The LACIP acvies will be implemented in close coordinaon with the Partner Organizaons. Where ap-
propriate, the Consultant will coordinate acvies to ensure that the proposed standards, systems, meth-
ods, etc. are compable and complementary as much as possible, and to avoid duplicaon of eorts or
inconsistencies of the approach.
The implementaon of the LACIP required PPAF to adjust and develop its management systems and
structures to suit the implementaon of the projects; Project Management Unit (PMU) was established at
the end of August 2012.
Community Physical Infrastructure (CPI) will respond to the community basic needs and demands following
the Community Driven Development approach. In total approximately 2,350 CPI schemes (2000
convenonal and 350 innovave) will be implemented through the Project in the 5 target Districts.
In addion to the small infrastructure schemes, livelihood support is a major component in the Project.
PPAF has acquired useful and valuable experience in the livelihood sector with a limited number of well-tar-
geted iniaves. However, the seng up of this scale of livelihood support (7000 units) with successful
implementaon and eecve control of this overall component is considered to be a major challenge for all
the pares involved.
Through the Health and Educaon (H&E), support would be provided to villages with exisng health or
educaon facilies operated by the government or community organizaons requiring physical and
funconal improvements.
Disaster Preparedness and Migaon (DPM) is also a major focus to the Project not only to mainstream
DRR in the small community infrastructure schemes but also to enhance capacies of the communies toprepare for and cope with likely disasters.
PPAF has selected 20 Partner Organizaons (POs) and the rst 60 Union Councils (UCs) for the
implementaon of the Project acvies. PPAF has conducted a preliminary poverty assessment and has
also done preliminary social mobilizaon of the target communies.
During the Incepon Phase of the LACIP, the Consultant HELVETAS Swiss Intercooperaon had prepared the
Incepon Report, which provided an analysis of the current situaon of the LACIP, provided an updated
Project Implementaon Concept and reviewed the scope of the consulng services.
A baseline Survey has also been commissioned to an external consultant to be prepared for the LACIP. Thebaseline has covered the target UCs in all the 5 Districts of the LACIP.
2. PROGRAM OVERVIEW
3
-
7/27/2019 LACIP Background Paper
6/35
2.2 Program Objecves:
Populaon and poverty is to be reduced through the creaon of sustainable condions of social and
physical development, including income and producon capacity increase.
The overall objecve of the Project is to contribute to the improvement of the general living condions and
quality of life of the poor populaon in the Project region with a special focus on the poorest.
The project objecves are:
(i) Increased access to and sustainable ulizaon of social and economic infrastructure by thepopulaon of the Project region;
(ii) Increased employment and income opportunies, especially for the poor
(iii)Strengthening of the local civil society and enhanced parcipaon of the populaon in thedecision making process and its disaster preparedness capacies at the local level.
The Project shall be regarded successful if during the nal project review - approximately 3 years aerProject compleon the following three goals are reached:
At least 60% of the infrastructure schemes nanced through the Project are used, stay resistant to natural
disasters and are operated and maintained by the target communies;
At least 40% of the target groups have an increased income of 20% as compared to a baseline value
baseline and reference me e.g. annually or over a mul-annual period which sll needs to be dened
based on the ndings of the inial poverty assessment at the beginning of the Project.
At least 33% of the community organizaons supported through the Project connue to be acvely
involved in the planning and implementaon of local development iniaves, have access to externalsupport programmes and their capacity is built to cope with natural disasters.
2.3 Expected Outputs and Outcomes:
The Project Outputs are as follows:
1. Populaon in project areas is mobilized and organized in the form of community organizaons 2. Community Physical Infrastructure is built
3. Assets are transferred and especially the poorest communies are trained
The intermediate Outcomes are as follows:
1. Community instuons (COs/VOs and clustered bodies) formed and funconing sasfactorily 2. Living standards of targeted households improved and vulnerability to shocks reduced 3. Poor communies gained increased access to quality infrastructure services 4. Access to quality educaon is improved and ulized by all primary school age children in PPAF
priority areas
5. Men, women and children gain increased access to quality primary, prevenve and maternalhealth services.
4
-
7/27/2019 LACIP Background Paper
7/35
2.4 Project Implementaon Principles
PPAF follows implementaon principles and approaches which can be characterized as pro-poor,
community-driven/boom-up, parcipatory and with special support to marginalized groups within the
communies.
2.4.1 Pro-Poor Approach
The project region and beneciaries will be selected by using methodologies such as the poverty score
card. Wherever possible, priority shall be given to community physical infrastructure schemes which are
labor intensive and thus create provision for a source of income for local unskilled labor above any
community contribuon provided in kind.
Furthermore, local contributors in cash or kind to any intervenon scheme shall be in general accordance
with PPAFs standard procedures as outlined in the Operaonal Manual but with more exibility towards
poorer communies and beneciaries. There will be 0% local contribuon for the rst scheme in very poor
communies, 10% for the second and third scheme and 20% for any addional schemes. However, in case
of a natural disaster or war hit zones, the community contribuon may be waived for a maximum period of
two years from the occurrence of the disaster.
2.4.2 Parcipatory Approach
All project intervenon proposals are idened by the communies, as such the project is demand driven
in nature. Therefore, communies have to be organized in the form of groups to take collecve decisions,
undertake implementaon of projects and then accept responsibility for operaon and maintenance of
development intervenons, whether infrastructure, educaon or health or any other form of development
intervenon. During community mobilizaon, special support will be given to marginalized groups within
the communies.
2.4.3 Integrated approach
The LACIP Project follows an integrated approach, which means that a range of intervenons will be carried
out simultaneously in selected union councils and villages. The number of project intervenons per village
shall be based on a comprehensive needs assessment. A minimum of ve intervenons shall be
implemented per village. At least 30% of villages in a union council shall be covered by the Project. Based
on the minimal rao of ve intervenons per village, Project acvies will be limited to a maximum of 60
union councils in the ve selected Project districts.
2.4.4 Do no harm approach
All project intervenons will be planned and implemented in a conict sensive manner. PPAF will avoid
any negave impact on the conict. Regular results monitoring compliant with Do No Harm criteria and
the relevant reporng will be carried out.
5
-
7/27/2019 LACIP Background Paper
8/35
2.5 Program Acvies:
The Total Cost and Financing of the LACIP is EUR 31.5 million, comprising of Programme Costs of EUR 27.5
million, Administrave Costs PPAF of EUR 1.060 million, Internaonal Consultant Costs of EUR 1.8 million
and Conngencies of EUR 1.006 million.
The total budget of the Program is 31.5 million Euros that will be used by PPAF has been shown in Table 1
and Figure 1 in accordance with the component wise breakdown:
Sr. No Program Component Investment Allocaon (EUR) %age
1 Small and Medium Scale Infrastructure (CPI) 13,765,400 49.86%
2 Livelihood Enhancement & Protecon (LEP) 4,910,657 17.79%
3 Health & Educaon Services (H&E) 2,000,000 7.24%
4 Disaster Preparedness and Migaon (DPM) 1,000,000 3.62%
5 PO Implementaon Cost (Including ID Cost) 5,934,482 21.49%
Total 27,610,539 100.00%
6
49.86
17.79
7.24
3.62
Investment Allocation
Small and Medium Scale
Infrastructure
Livelihood Enhancement
& Protection
Health & Education
Disaster Preparedness &
Mitigation
-
7/27/2019 LACIP Background Paper
9/35
2.6 Monitoring and Evaluaon
The POs report on outputs, achievements and budgets on the basis of indicators developed for the Project
on monthly and quarterly basis using standard formats of PPAF. Performance monitoring and evaluaon is
conducted at bi-annual basis by the Advisory Review Team (ART) jointly with PPAF. The focus of bi-annual
reviews is to review processes and overall progress. During regular bi-annual reviews by the ART the
following acvies are performed:
Field visits and discussions with PPAFs sector Units and the Senior Management, Partner Organizaons,
Community Organizaons and local communies
Review of LACIP acvies and their eecveness in coordinaon with PPAF, with regard to achieving the
Project objecves
Development of and/or review of specic proposals to adjust or further opmize Project performance,
presentaon and transparency, etc.
The Consultant may also support PPAF in Impact Assessment and Evaluaon tasks as outlined in the PPAF
OPs Manual. Apart from reviews and progress reports, regular audits by internal and external audits arealso conducted.
2.7 Steering and Coordinaon
The coordinaon between PPAF, KfW and HELVETAS Swiss Intercooperaon is done through the project
PMU, the regular Tuesday Meengs and other mechanisms of exchange (see also Incepon Report,
chapter 3.4). The organizaonal Chart is aached in Annex 2.
The implementaon of the project is technically supported by an internaonal consultant, HELVETAS Swiss
Intercooperaon. The team is led by a Team Leader based in Switzerland. The Pakistan team comprisestwo full-me and one half-me employees and support sta. The services consist of support to the PPAF in
technical, social and monitoring tasks (with a change in focus of experse from engineering to livelihood for
the SIE) and will be complemented through a combinaon of short term internaonal and naonal experts
and through Advisory Review Team (ART) assignments. The pool of internaonal and naonal experts can
also be drawn from to conduct Special Studies (ref. Annex 9 of Incepon Report, which are budgeted
separately).
2.8 Reporng
PPAF reports KfW on monthly and quarterly basis; these reports are jointly prepared by PPAF and theConsultant. PPAF has charged the Consultant to write the progress reports but provides all required data
and comments on reports and acknowledge its content by countersigning the reports. Review and advisory
reports are also prepared by the consultant. Project Compleon report will be developed at the end of the
project.
7
-
7/27/2019 LACIP Background Paper
10/35
There are two other projects being either started or going to start during 2012 in the project area of Khyber
Pakhtukhwa, Balochistan and FATA. PPAF is being the implementaon agency for both of these projects,
and will provide technical and nancial assistance.
3.1 Poverty Reducon through Rural Development in Balochistan, Khyber Pakhtunkhwaand the Federally Administered Tribal Areas
The proposed program Poverty Reducon through Rural Development in Balochistan, KP and FATA to be
nanced by the Government of Italy through the Directorate General for Development Cooperaon aims at
contribung to poverty reducon for the populaon of Balochistan, Khyber-Pakhtunkhwa and FATA
(Federally Administered Tribal Areas). These provinces bordering with Afghanistan are suering from
poverty, as well as from on-going conicts and they have to be considered the most vulnerable areas of the
country.
The Italian program will be nanced by the Italian Cooperaon with a provision of 40 million Euros so
loan facility and a grant of 380,739.00 Euros for provision of Italian technical assistance. The so loan willbe transferred to PPAF by the Pakistani Government for nancing social, livelihood and rural development
acvies. In line with the PPAF model, all intervenons will be operated through Partner Organizaons.
3.2 KfW funded Development of Hydropower, Renewable Energy & Biodiversity Conservaon Program in KP
This project is ancipated to start in (2012) in 10 selected districts (Chitral, Dir (upper & lower), Swat, Bun-
er, Swabi, Bannu, Lakki-Marwat, Hangu & Karak) of Khyber Pakhtunkhwa.
Total project investment is 22.5 million Euros which will be implemented in two phases; 10 million Euros
will be spent during Phase-I of the Project on Social Mobilizaon, Instuonal Development and Water &
Renewable Energy infrastructures. The remaining 12.5 million Euros will be spent during Phase-II of the
project on Renewable Energy projects and Biodiversity & Conservaon acvies.
Although the Renewable Energy (RE) Project is purely technical and innovave in nature but the two proj-
ects together will certainly create synergies in terms of social mobilizaon, capacity building and infrastruc-
ture development of the local communies in at least 2 combine districts (Lakki-Marwat & D.I Khan) of
Khyber Pakhtunkhwa.
3 Other Programs in the Project Area (KP)
8
-
7/27/2019 LACIP Background Paper
11/35
The Project covers 5 target Districts of Khyber Pakhtunkhwa, namely Chitral, Swabi, Buner, Charsadda and
D.I. Khan. The selected Districts represent topographical dierences varying from high altudes in the north
to irrigated plains in the central valley and dry lands in the south. The total area covers 26,580 sq. km with
a populaon of more than 4 million people. Generally, land holdings are relavely small and self-operated.
With the excepon of Charsadda, these Districts are spaally and economically marginalized, but all experi-
enced recurring natural disasters.
These districts are selected on the basis of their poverty ranking and deprivaon. The ve Project districts
selected are presently considered sensive due to recent history of violent conict and a likely risk of being
engulfed with such troubles again. Large areas in these districts were also aected by oods of 2010. It is
expected that a tangible improvement of the living condions of the poor in these districts will contribute
to reducing the risk of further social and polical unrest, instability, further marginalizaon of poor and an
exponenal increase in poverty.
The Idencaon and selecon of Union Councils, Villages and Target Communies is carried out using the
Poverty Score Card technique. A situaon analysis of the infrastructure and an analysis of instuons pres-
ent in the idened UCs has also been carried out. At least 50% coverage of the rural households is manda-tory in a selected UC to comply with the saturaon approach spulated by PPAF.
A workshop in regard to the Mul Sectoral Approach was conducted by PPAF. The POs parcipated in the
workshop, and a number of key lessons and perspecves were shared for the benet of the LACIP. This
was the rst me that parcipants from dierent organizaons worked together for the same area in the
district, and in the process, informal learning was imparted to each other
Geography:
Khyber-Pakhtunkhwa, formerly known as the North-West Froner Province (NWFP), is located in thenorth-west of the country. It borders Afghanistan to the north-west, GilgitBalstan to the north-east, Azad
Kashmir to the east, the Federally Administered Tribal Areas (FATA) to the west and south, Balochistan to
the south and Punjab and the Islamabad Capital Territory to the south-east. The main ethnic group in the
province is the Pashtuns; other smaller ethnic groups include most notably the Hindkowans, Gujjars and
Chitralis. The principal language is Pashto. The provincial capital is Peshawar.
Khyber Pakhtunkhwa is largely located on the Iranian plateau and Eurasian land plate, while peripheral
eastern regions are located near the Indian subconnent and this has led to seismic acvity in the past. It
covers an area of 74,521 km (28,773 sq mi). According to the 1998 census, the total populaon of Khyber
Pakhtunkhwa was approximately 17 million out of whom 52% are males and 48% females. The density of
populaon is 187 per km.
Geographically the province could be divided into two zones: the northern one extending from the ranges
of the Hindu Kush to the borders of the Peshawar basin; and the southern one extending from Peshawar to
the Derajat basin.
The northern zone is cold and snowy in winters with heavy rainfall and pleasant summers with the excep-
on of Peshawar Basin, which is hot in summer and cold in winter. It has moderate rainfall. The southern
zone is arid with hot summers and relavely cold winters and scantly rainfall. Its climate varies from very
cold (Chitral in the north) to very hot in places like D.I. Khan. The major rivers that cross the province are
Kabul River, Swat River, Chitral River, Panjgora River, Bara River, Karam River, Gomal River and Zob River.
4 PROGRAM AREAS
9
-
7/27/2019 LACIP Background Paper
12/35
Its snow-capped peaks and lush green valleys of unusual beauty aract tourists from far and wide while
its art and architecture is no less known than the historic Khyber Pass. Once the cradle of Gandhara civi-
lizaon, the area is now known for its devout Muslims who zealously guard their religion and culture and
the way of life that they have been following for centuries. The region varies in topography from dry rocky
areas in the south to forests and green plains in the north. Given the extremes in weather, agriculture
remains important and viable in the area. The hilly terrain of Swat, Kalam, Upper Dir, Naran and Kaghan is
renowned for its beauty and aracts a great many tourists from neighboring regions and from around the
world. Swat-Kalam is also termed a piece of Switzerland as there are many landscape similaries between
it and the mountainous terrain of Switzerland.
10
-
7/27/2019 LACIP Background Paper
13/35
The Project follows an integrated approach, which means that a range of intervenons will be carried out
simultaneously in the selected Union Councils and Villages. The selecon of intervenons will be
determined in a demand based, parcipatory process by the communies with the support of the POs and
in accordance with PPAFs Operaonal Policies Manual for Grant-Based Intervenons. Special focus will be
given to marginalized and women-headed households entailing the formaon of women community
organizaons and their acve parcipaon.
The Project will nance the following components:
5.1 Instuonal Development
Instuonal Development (ID) has been included a component (approx. EUR 2 million) to help POs achieve
their objecves by increasing capacies of individuals, enabling them to take advantage of available
opportunies and choose for themselves an opon that could help them come out of the vicious circle of
poverty to the virtual cycle of opportunies.
5.2 Community Physical Infrastructure (CPI)
Community Physical Infrastructure will respond to a community demand and follow a Community Driven
Development approach. Approximately 50% of the overall investment cost budget of approx. EUR 15
million will be used for the provision of CPI projects. In total approximately 2,350 CPI schemes
(2000 convenonal and 350 innovave) will be implemented through the Project in the 5 target Districts.
Local contribuon to any intervenon scheme shall be in accordance with PPAF standard procedures,
but with more exibility towards poorest communies; in general this comprises 0% contribuon in very
poor communies for the rst scheme, 10% for the second and third scheme and 20% for any addional
schemes. However, in the case of natural disaster or in war hit zones the CO contribuon may be waivedbut on the average a 10-15% contribuon is expected.
CPI projects include both convenonal and innovave schemes as follows:
The Convenonal CPI include the construcon and/or rehabilitaon of i) irrigaon water management
schemes, ii) road sector, iii) soil conservaon, DRR, migaon and preparedness structures, iv) water supply
and sanitaon, v) school buildings and renovaon and /or repair of exisng school infrastructures vi) health
center buildings and renovaon and or/ repair of exisng health infrastructures.
Preference will be given to rehabilitaon, modernizaon and/or extension of exisng schemes. Where not
possible, new schemes will be implemented using low cost local materials. Such schemes are relavelysimple and can be constructed to a great extent by the communies themselves with technical support of
the POs. The Average cost is assumed to be EUR 6000.
The innovave CPI schemes require more technical assistance and in some cases are larger in scale and
they are usually more costly. These schemes include i) solar and wind pumps, ii) wind turbines, iii) mini/
micro hydro-electric power projects up to 200 Kw capacity, iv) slope stabilizaon, v) drought migaon, vi)
high eciency irrigaon systems (including drip and sprinkler etc).
An average cost of EUR 9000, excluding community contribuons, has been allocated for such schemes.
Due to the higher cost and complexity and the lower involvement of unskilled labor in the construcon of
these schemes, their number shall be limited to a maximum of 15% (350 units) of the overall number of
schemes or 20% of overall costs (EUR 3.15 million).
5 PROGRAM COMPONENTS
11
-
7/27/2019 LACIP Background Paper
14/35
An Operaon and Maintenance (O&M) plan for each scheme will be established and discussed with the CO
beforehand to ensure sustainability of the intervenons. Consultants and PPAF will inspect the operaon
and maintenance of projects during their joint eld visits. The exisng monitoring procedures will be
reviewed, e.g. by using the PPAF O&M Technical Guidelines. These guidelines will be updated and/or
developed with the assistance of the Consultant. This applies parcularly to complex and innovave CPI
projects, as well as to health and educaon facilies.
5.3 Livelihood measures including Skills Training of Beneciaries (LEP)
Livelihood iniaves have been included within the project (approx. EUR 5 million). Measures include
targeted and appropriate skills, enterprise trainings (Ustaad-Shagird or Teacher-Student Principle) and
targeted asset transfers for beneciaries with Poverty Score Card scores less than 18.
Households with scores up to 18 and those with scores up to 23 on the Poverty Score Card (PSC) are eligible
for trainings but not asset transfers. Iniaves include advice on agricultural intensicaon, local job oppor-
tunity analyses, etc.
PPAF supports innovave approaches to promote best pracces and a thorough value chain analysis. The
experiences of HELVETAS Swiss Intercooperaon in livelihoods enhancement approaches and value chainswill add value to this component.
The iniaves in the LEP component will include i) job market trends analysis, ii) vocaonal trainings , iii)
agricultural intensicaon, iv) asset transfer, and v) business plans.
All these measures are part of the overall strategy to help the targeted communies and families to
graduate out of poverty.
5.4 Community Health and Educaon Schemes and Intervenons (H&E)
H&E intervenons have also been included in the project (approx. EUR 2 million).Through this component,support would be provided to villages with exisng health or educaon facilies operated by the
government or community organizaons requiring physical and funconal improvements. New schools or
health facilies would only be provided in rare cases (e.g. if there is no facility within a 2 km radius) and if
the sustainable operaon of the facilies can be guaranteed.
PPAFs strict and very specic criteria about when to support such investments must be applied to ensure
sustainability and to avoid replacing the role of the Government. Prior to construcng new health and/or
educaon facilies coordinaon with the relevant district and provincial departments is mandatory.
However, some innovave intervenons may be introduced with interested communies to iniate
establishing self-operated schools. To this eect, services of the reputed model school will be engaged for
skills training.
The schemes to be iniated under Health will include i) health management commiees, ii) sta trainings,
iii) rehabilitaon of BHUs, iv) provision of labs and medicines, and v) health awareness.
The schemes to be iniated under Educaon will include i) school management commiees, ii) teach-
ers training programmes, iii) lab equipment and libraries, iv) toilet facilies, v) addional rooms, vi) play
grounds, vii) boundary walls, and viii) water tanks.
12
-
7/27/2019 LACIP Background Paper
15/35
5.5 Disaster Preparedness and Migaon measures (DPM)
Disaster Preparedness and Migaon (DPM) has been added to the project in view of its importance coun-
try-wide (approx EUR 1 MIllion) Focus will also be put on strengthening disaster preparedness capacies
of the vulnerable communies (men, women and youth) in the target Districts by introducing a package of
acvies such as i) raising community awareness on DPM, ii) formaon/training of Emergency Response
Teams, iii) systemac vulnerability assessments and iv) implementaon of early warning systems.
13
-
7/27/2019 LACIP Background Paper
16/35
The overall me frame for the execuon of the Project is 36 months starng from February 1, 2012 com-
prising of four phases. The planned compleon of the Project is thus end of May 2015.
6.1 Program Investment
The proposed program will be completed in 3 years comprising of four phases. The rst 3 months of thestarng year had been devoted mainly to the eld appraisal of the partner organizaons (POs) and their
approvals by the PPAFs in-house Credit Commiee and the PPAF Board of Directors, followed by signing of
nance agreements between PPAF and various parcipang POs.
The POs then carried out social mobilizaon in the areas of their operaon, in order to establish communi-
ty organizaons (COs), village organizaon (VOs) and sign Terms of Partnership (TOP) with them, following
which the work on implementaon of the project was started.
The total Cost and Financing of the LACIP is EUR 31.508 million comprises Programme Costs of EUR 27.6
million, Administrave Costs PPAF of EUR 1.060 million, Internaonal Consultant Costs of EUR 1.8 million
and Conngencies of EUR 1.006 million.
The summary of the investment program has been provided in the Table 2 and the year wise cost allocaon
has been shown in Figure 1 below:
Table 2: Summary of Investment Program
Summary of Investment Program (Million Euros)
Sr# Project Component Year 1 Year 2 Year 3 Year 4
%
Distribuon
A: Program Cost
1Construcon and Improvement of small-scale
Community Infrastructure
3.44 5.51 4.82 13.76 43.87%
2 Livelihood Enhancement and Protecon 1.23 1.96 1.72 4.9 15.54%
3Establishment of Basic Health and Educaon
Services
0.50 0.80 0.70 2.00 6.35%
4 Disaster Preparedness 0.00 0.60 0.40 1.00 3.17%
5 PO Implementaon Cost (Including ID Cost) 1.48 2.37 2.08 5.93 18.80%
Sub-Total (A) 6.65 11.24 9.71 27.61 87.73%
Year wise % Distribuon 24% 40.7% 35.3% 100%
B: Operang Costs of PPAF 1.06 3.36%
C: Consultancy Services 1.80 5.70%
D: Conngency 1.01 3.20%
Total (A+B+C+D) 31.53 100.00%
6 SUMMARY OF INVESTMENT
14
-
7/27/2019 LACIP Background Paper
17/35
Figure 2: Year wise Investment Program
The investment program of LACIP with the amounts allocated for all four phases and POs involved for theparticular time span has been given in the Table 3 below:
Table 3: Allocated amount for Funding Phase I-IV
Funding PhaseAmount
(Million Euros)No. of POs Name of POs Time Span
One (Commied) 12.13 6 AKRSP, SRSP, NRSP,
SWWS, RDP, SERVE
Apr 2012 to Sep 2014
Two (Commied) 5.87 6 SABWON, HADAF, CUP,
MGPO, MIED, SDF
Jul 2012 to Dec 2014
Three (Proposed) 4.22 8 EPS, CIE, SDF, GBTI, AHO,
CGN-P, SPADO
Oct 2012 to Sep 2014
Four 4.34 6 Performance based
selecon of POs
April 2013 to March 2015
Total 27.6 20
0.50 1.5
2
8
14
4
10
16
66.65
11.24
9.71
12
18
1 2 2.5 3.53
MillionEuros
Years
15
-
7/27/2019 LACIP Background Paper
18/35
Sr. No District No of UCs Phase-1 Phase-2 Phase-3 Phase-4Total
Million Euros
(Apr 2012
to
Sep 2014)
(Jul 2012
to
Dec 2014)
(Oct 2012
to
Sep 2014)
(Jan2013
to
Jun 2015)
1 Buner 8 0.64 2.52 1.42 2.6 6.8
2 Charsadda 7 2.71 0 0.54 2.6 6.9
3 Sawabi 7 4.37 1.1 1.63 0 5.5
4 Chitral 7 3.84 0.2 0 0 4.0
5 DI Khan 7 0.56 2.1 0.62 0.80 4.4
Total 36 12.13 5.92 4.21 5.34 27.6
Table 4: District wise apporonment of Program Cost
6.2 Apporonment by Districts
The amount of KfW investments in each district for Phase I, II, III and IV of Khyber Pakhunkhwa province
is given in Table 4 and Figure 2 shows the district wise apporonment of KfW and PPAF investments. The
more funds were allocated for the districts where less funds were disbursed under previous PPAF inia-
ves.
16
-
7/27/2019 LACIP Background Paper
19/35
There are around 20 matured/specialized partner organizaons of PPAF who will be working in the selected
districts for intervenons under KfW funded project for Phase I-III. Due to the diverse nature of interven-
ons (Instuonal Development, Infrastructure, Water & Energy, Health & Educaon and Livelihood En-
hancement & Protecon) under this project, more than one partner organizaons will be working in some
districts to undertake dierent acvies. e.g. there will be specialized POs working for the implementaon
of engineering (infrastructure, water & energy) acvies while acvies relang to the establishment ofbasic Health & Educaon services will be implemented through dierent POs in the same district.
The intervenons being carried out by the POs are based on the plaorms of Community Organizaons,
Village Organizaons and the Local Support Organizaons. Every PO is designated target Union Councils in
which they iniate schemes and intervenons for the various components of LACIP.
The UC based distribuon of the Funding Phase I-III POs is as follows:
Charsadda
The district covers an area of 996 square kilometers. Charsadda is administravely subdivided in to 2 Tehsilswhich contain a total number of 46 Union Councils.
District Charsadda UC No of Ucs
SRSP
Dhakay
3Mandani
Hisra Nehri
SPADO 1
Total 4
Swabi
The total area of Swabi comprises of 1,543 square kilometers. There are 5 Tehsils in Swabi.
District Swabi UC No of Ucs
SWWSChecknodha
2Anbar
NRSP
Asota
3Bachai
Parmolai
SDF
Sara Cheena
5
Yaqobi
Yarhussain Gharbi
Sudher
Dhobian
GBTIKota
2Batakra
Total 12
7 PARTICIPATING PARTNER ORGANIZATIONS
17
-
7/27/2019 LACIP Background Paper
20/35
DI Khan
DI Khan has an area of 7,326 square kilometers. The district is subdivided into 3 Tehsils.
District DI Khan UC No of Ucs
SERVE Shorekot 1
CUP
Korai
2Yarik
SABAWONDaraban
2Chaudhwan
AHO Mehra 1
CIE
Korai
4Yarik
Daraban
Chaudhwan
Total 6
Chitral
The total area of Swabi comprises of 1,4850 square kilometers. There are 2 Tehsils in Chitral.
District Swabi UC No of Ucs
SRSP Shishikoh 1
AKRSP
Yar Khoon
6
Khot
OveerMulkhow
Chitral II
Koh
MIED
Yar Khoon
6
Khot
Oveer
Koh
Mulkhow
Chitral II
Total 7
Buner
The district of Buner is divided into two Tehsils. Buner comprises of a total area of 1,865 square kilometers.
District Buner UC No of Ucs
RDP Gulbandi 1
HADAF Mukhranai 2Amazai
MGPO Chagalai2
Ghorghosto
18
-
7/27/2019 LACIP Background Paper
21/35
List of the 12 parcipang POs for Funding Phases I, II and III
Sr. No District No of UCs Parcipang Organizaons (POs)
1 Buner 7
Rural Development Program (RDP)
Hazara Development And Advocacy Foundaon
(HADAF)
Mountain and Glacier Protecon Organizaon
(MGPO)
Childrens Global Network- Pakistan (Guarantee) Ltd.
(CGN-P)Environmental Protecon Society (EPS)
2 Charsadda 4Sarhad Rural Support Programme (SRSP)
Sustainable Peace and Development Organizaon
(SPADO)
3 Swabi 12
Support with Working Soluons (SWWS)
Naonal Rural Support Program (NRSP)
Salik Development Foundaon (SDF)
Ghazi Brotha Taraqia Idara (GBTI)
4 Chitral 7
Sarhad Rural Support Program (SRSP)
Aga Khan Rural Support Programme (AKRSP)
Mountain Instute for Educaonal Development
(MIED)
5 D.I. Khan 6
SERVE
Community Upli Program (CUP)
Social Acon Bureau for Assistance in Welfare and
Organizaonal Networking (SABAWON)
Asia Humanitarian Organizaon (AHO)
Change In Educaon (CIE)
Performance Based Selecon of Partner Organizaons will be carried out for the Fourth Phase of the LACIP.
EPSKoga
2Nawagai
CGN-P
Mukhranai
3Amazai
Gulbandi
7
19
-
7/27/2019 LACIP Background Paper
22/35
GOVT.
OF
PAKISTAN
Annex
1:OrganizationalChart
WORLDBANK
PPA
F
Funding
P.P.A.F
Funding
ContractualIssue
Coordinaon
-ProjectManagement
-Monitoring
-QualityControl
-BackUp
HELVETAS
SwissIntercooperaon
SKAT
(Sub-Contractor)
ProjectCoordinatorandAR
Tleader
SeniorInternaonal
Expert/Dep.
Team
Leader
SeniorNaonal
Expert
SeniorNaonal
Expert(50%)
InDistrictsof
Chitral,Buner,Charsadda,SwabiandD
.IKhan,NowsheraandHaripur
in
KhyberPakhtunkhwa(Province)
ConsorumHelvetas-Intercoopera
on-SkatSwitzrland
ConsorumProjectOfceIslam
abadatPPAF
ProjectExecung
Agency(PEA)
TARGETCOM
MUNITIES
K.F.W
PAKISTAN
ChrisMorgan
K.F.W
GERMANY
ART
ExpertPool
(Internaonal)
ART
ExpertPool
(Naonal)
Sh
ortTerm
ExpertPool
(Inte
rnaonal)
Sh
ortTerm
ExpertPool
(N
aonal)
Coordinaon
Monitoring
ConsulngServicesto
P.P.A.F
ConsulngServicesto
P.O
sthroughP.P.A.F
PartnerOrganizaons(P.Os)
Localcoordinaon
20
-
7/27/2019 LACIP Background Paper
23/35
Annex 2: The Logical Framework Analysis
Overall
Objecve
Project
Objecves
(Apr 2012 Mar
2015)
Project
Objecve
Indicators
Frequency
Means
of
Vericaon
Risks for the
Achievement of
project
objecves
Contribuonto the
improvement
of the
general living
condions
and quality
of life of the
poor
populaon in
the project
region
Increase access to and
sustainable ulizaon
of social and econom-
ic infrastructure by
the populaon of the
project region
At least 60% of
infrastructure
schemes nanced
through
the project
are used,
operated and
maintained
by the targeted
communies
Bi-annual
Periodic
progress
Reports, Field
Visits, Survey
reports,
Databases
Weak and/or
deteriorang
Security
situaon
Increased employ-
ment and income
opportunies,
especially for the
poor
At least 40% of
the target group
have an increased
income of 20%
as compared to a
baseline value
Bi-annual
Periodic
progress
Reports, Field
Visits, Survey
reports,
Databases
Natural
disasters (e.g.
oods,
earthquakes,
etc.)
Strengthening of the
local civil society and
enhanced parcipa-
on of the populaon
in the decision mak-
ing at the local level
At least 33% of the
community organi-
zaons supported
through the projectconnue to be
acvely involved in
the planning and
implementaon of
local development
acvies and/or
have gained access
to project external
services.
Bi-annual
Periodic
progress
Reports, Field
Visits, Survey
reports,
Databases
Shortcoming in
operaon and
maintenance of
infrastructureschemes due to
poor security
situaon and/
or insucient
human capaci-
es on the part
of communies
or specialized
operators.
Intermediate
Outcomes
Intermediate
Outcome
Indicators
FrequencyMeans of
Vericaon
Risks for the Achieve-
ment of project objec-
ves
Social Mobiliza-
on and Capacity
Building:
At least 50% of the
households in each
priority Union Council
are members of COs.
Bi-annualSample surveys,
Databases Weak and/or
deteriorang Security
situaon and people
are not able to aend
COs meengs and
connue to engage as
group.
At least 60% of COs are
viable and sustainable.Annual Sample surveys
At least 75% of thehouseholds in each
targeted village are
members of COs.
Bi-annual
External studies/
assessments, Data-
bases
21
-
7/27/2019 LACIP Background Paper
24/35
Intermediate
Outcomes
Intermediate
Outcome
Indicators
FrequencyMeans of
Vericaon
Risks for the Achieve-
ment of project objec-
ves
Social
Mobilizaon and
Capacity Building:
At least 60% of poor/
poorest households in
targeted communies
are members of COs.
Quarterly
External studies/
assessments,
Databases
Weak and/or
deteriorang Security
situaon and people
are not able to aend
COs meengs and
connue to engage as
group.
At least 40% of allcommunity instuon
members in every
priority Union Council
are women.
QuarterlyDatabases, Periodic
Progress Reports
At least 50% of the
community organiza-
ons engaged with POs
possess nancial, tech-
nical (context oriented)
and managerial skillsand capabilies.
AnnualExternal studies/
assessments
Training manuals pre-
pared by POs/PPAF/
Project for COs are
used by 90% of social
mobilizers when en-
gaging with groups.
QuarterlyDatabases, Periodic
Progress Reports
LivelihoodsEnhancement and
Protecon:
Living standards of
targeted
households
improved and
vulnerability to
shocks reduced.
a) At least 50% of the
poorest households
in the targeted UCs
have (a) developedlivelihood plans and/or
received the livelihood
grants.
b) At least 70% of
those who have
received skills training
and/or assets are using
them producvely
Bi-annualDatabases, Periodic
Progress Reports
Lack of equal
parcipaon of
ultra-poor households
and women due to
cultural environment
of KP.
At least 50% of liveli-
hood grant recipients
are women.
Quarterly Periodic ProgressReports, Field Visits
1. A village is a clustered human selement or community, larger than a hamlet, with the populaon rang-
ing from a few hundred to a few thousand; though oen located in rural areas, the term urban village isalso applied to certain urban neighborhoods.
2. Poor (extremely, chronically and transitory poor) households will be idened using the Pov-
erty Scorecard (Score Range 0-24). This score range has been labeled with the Populaon Quar-
le/ Poverty Bands taken from Centre for Research on Poverty Reducon & Income Distribuon
(CRPRID) and by the RSPs for Naonal Level UC Based Poverty Reducon Programme (UCBPRP).
22
-
7/27/2019 LACIP Background Paper
25/35
At least 70% of live-
lihood asset transfer
and skills training
recipients report
improved economic
opportunies, estab-
lished linkages with
markets, and/or im-proved quality of life
Annual
External studies/as-
sessments/ sample
surveys
Water, Energy and
Infrastructure:
Poor communies
gained increased
access to quality
infrastructure ser-vices.
Minimum ERR of 20%
and FRR of 25% for
project investment in
water and
infrastructure
Annual
External studies/as-
sessments/ sample
surveys
Natural disasters (e.g.
oods, earthquakes,
etc.)
At least 90% of PPAF
funded infrastructure
schemes are main-
tained at a funconallevel and benet at
least 60% of COs (at
least 50% beneciaries
should be women).
Annual
External studies/as-
sessments/ sample
surveys
Educaon:
Access to quality
educaon is im-
proved and ulized
by all primary
school age childrenin PPAF priority
areas.
Net student reten-
on rate in a prima-
ry educaon cycle
in PPAF-supported
schools of at least 80%
per annum maintainedover the project peri-
od.
Annual
External studies/as-
sessments/ sample
surveys
At least 50% of stu-
dents in PPAF-support-
ed schools are girls.
Quarterly Databases
At least 80% of the par-
ents of students of tar-
geted project schools
report sasfacon with
PPAF supported educa-on intervenons.
Annual
External studies/as-
sessments/ sample
surveys
At least 40% of SMC
members of PPAF-sup-
ported schools are
women.
QuarterlyDatabases, Prog-
ress Reports
At least 70% of stu-
dents report improved
reading, wring and
arithmec skills, as
well as report theirschool environment
has improved.
Annual
External studies/as-
sessments/ sample
surveys
23
-
7/27/2019 LACIP Background Paper
26/35
Health:
Women and chil-
dren gain increased
access to quality
primary, preven-
ve and maternal
health services.
At least 70% of the
beneciaries report
sasfacon with PPAF
supported health facil-
ies.
Annual
External studies/as-
sessments/ sample
surveys
At least 50% of liveli-
hood grant recipients
are women.
QuarterlyDatabases,
Progress Reports
At least 40% of Health
Management Com-
miee members in
targeted project health
centers are women
QuarterlyDatabases,
Progress Reports
All HMCs are linked to
(integrated with) the
Govt supported village
health commiees (if
exisng) so that noparallel structures are
created.
QuarterlyDatabases,
Progress Reports
24
-
7/27/2019 LACIP Background Paper
27/35
1. Aga Khan Rural Support Program (AKRSP)
AKRSPs programme area is comprised of the seven districts of Gilgit-Balstan and the Chitral district of Khyber
Pakhtunkhwa province of Pakistan. The organizaon has rich experience in designing, implemenng and moni-
toring of community based infrastructure projects. AKRSP has presence in the districts namely; Gilgit, Skardu,
Astore, Ghanche, Ghizar, Diamir and Chitral. The basic principles of parcipatory rural development which havebeen employed by AKRSP, to achieve its above menoned goal and underlying objecves, include: (i) collecve
management of resources through social mobilizaon, (ii) capital-building through regular savings, and (iii)
upgrading human skills through training to the community organizaons and acvists. In pursuit of the goal of
poverty reducon and improving the quality of life of the rural community of GBC, AKRSP has consolidated its
programmes into three major components; i.e. (i) Instuonal Development, (ii) Resource Development, and
(iii) Market Development. The issues of gender and poverty have been programmed as cross-cung themes.
2. Sarhad Rural Support Program (SRSP)
Formerly SRSC (Sarhad Rural Support Corporaon) was established in 1989. Subsequently renamed as Sar-
had Rural Support Program (SRSP) and registered under companys ordinance 1984, SRSP is the largestnon-prot/non-government organizaon of KP. The organizaon has a proven track record in planning, im-
plementaon, management, steering, monitoring and evaluaon of community development, improvement
in physical infrastructure, micronance, human resource development and gender awareness and main-
streaming in rural areas of KP. It is planned to entrust SRSP with the responsibility to serve the deprived
communies of the poverty stricken districts of KP through community physical infrastructure Projects.
SRSP has in-house technical capability and over 10 years of experience in the community physical in-
frastructure sector. SRSP, through its mainstream programme, is operaonal in 17 out of the 24 dis-
tricts in KP. These 17 districts include Kohat, Karak, Hangu, Peshawar, Nowshera, Charsadda, Hari-
pur, Abboabad, Mansehra, Baagram, Chitral, Kohistan Upper Dir, Lower Dir, Shangla, Swat, Bunerand Mardan. Up ll now Sarhad Rural Support Program has completed 2,515 infrastructure projects
under dierent phases of PPAF funding. These infrastructure projects include drinking water sup-
ply, sanitaon, irrigaon, roads & bridges, micro hydroelectric units and ood protecon walls etc.
3. Naonal Rural Support Programme (NRSP)
Established in 1991, NRSP is the largest Rural Support Program in the country in terms of outreach, sta
and development acvies. It is a not for prot organizaon registered under Secon 42 of Companies Or-
dinance 1984. NRSPs mandate is to alleviate poverty by harnessing peoples potenal and undertake de-
velopment acvies in Pakistan. It has a presence in 46 Districts in all the four Provinces including Azad
Jammu and Kashmir through Regional Oces and Field Oces. NRSP is currently working with more thanhalf a million poor households organized into a network. With sustained incremental growth, it is emerg-
ing as Pakistans leading engine for poverty reducon and rural development. NRSP supports rural com-
munies through training, micro-credit, infrastructure development, natural resource management and
producve linkages. NRSP intends to serve the deserving communies of the poverty stricken districts of
KP through renewable energy projects like solar lights and Integrated Water Ecient Irrigaon Projects.
The Physical Infrastructure and Technology Development (PITD) at NRSP works with a mission that the Com-
munity Physical Infrastructure (CPI) by its appearance, funcon, and locaon should posively contribute
to the environment and well-being of the rural communies. Naonal Rural Support Program has complet-
ed 4,470 infrastructure projects under dierent phases of PPAF funding. These infrastructure projects in-
clude drinking water supply, sanitaon, irrigaon, roads & bridges, wind energy, solar energy, bio gas and
ood protecon works etc. NRSP has remained acvely engaged in promong the technological
Annex 3: Partner Organization (POs) Profles
25
-
7/27/2019 LACIP Background Paper
28/35
innovaons in parcipaon with the local communies for improving their livelihoods. Imple-
mentaon of solar energy, wind energy projects are the major areas of the technological in-
novaons being under taken by NRSP to meet the priority needs of the community. Current-
ly NRSP works in Charsada, Malakand, Mardan, Nowshera, Swabi and Swat districts of KP.
4. Support with Working Soluon (SWWS)
Swabi Women Welfare Society (SWWS) was established in 1991 and was registered on 26 November 1992 as
a non-government organizaon, based at Nawan Kalley (renamed as Kernal Sher Kalley), working in Swabi Dis-trict. SWWSs vision is to improve socio-economic status of people (disadvantaged group including unskilled,
skilled & semi-skilled rural poor both male & female of target area) and be acvely involved in development.
5. Rural Development Project (RDP)
Rural Development Project (RDP) is a non-prot and non-governmental organisaon working for the em-
powerment of poor and vulnerable communies in Pakistan. Established in 1992 by a set of highly mo-
vated, socially commied and like-minded individuals, the organizaon was registered under sociees
Act of 1860 in December 1993. RDP started its acvies in 1992 on mutual help basis by mobilizing and
organizing the masses for disaster management, poverty alleviaon, gender-discriminaon and protec-on of human rights. Currently RDP is a naonal level humanitarian organizaon working in Khyber Pukh-
toonkhawa and Sindh provinces. Its operaonal districts are Haripur, Mansehra, Charsadda, Nowshera,
Mardan, Swabi, Buner and Peshawer in KP, Muzaarabad in AJK and Jamshoro and Dadu in Sindh.
Being rights based humanitarian organizaon, RDP was able to respond the catastrophic earthquake of October
8, 2005, IDPs crisis 2009 and Pakistan oods 2010-2011. In all such responses, RDP was able to support and facili-
tate the poor and vulnerable families in dierent phases of emergency response, early recovery and reconstruc-
on. RDPs response mechanisms are based on its twenty years of experience of disaster risk reducon and man-
agement. Major crosscung themes envisaged for the well-being of masses are peace, democracy, knowledge
building, rights and livelihoods. To achieve its mission RDP has designed programs like Emergency humanitarian
response in emergencies, Food Security and sustainable livelihoods, Community based disaster risk reducon
management, hygiene promoon, Poverty Alleviaon, and community physical infrastructure development
6. SERVE
SERVE Pakistan iniated its operaon in 1998 aer it got registered with the Social Welfare Department,
Government of NWFP as an independent organizaon. The District of DI Khan has remained a high pov-
erty pocket and ranks much lower, relave to other districts against the socio-economic develop-
ment indicators. The populaon of D. I. Khan district is poorest of the poor and the area has always re-
mained neglected where Government and non-government agencies have provided no or very lile
support. Hence some like-minded people of the area got together and formed an organizaon by the
name of SERVE to work with poor and develop strategies to address the causes of poverty in the region.
Since its establishment, SERVE Pakistan has been acvely involved in addressing causes of poverty in the
most disadvantaged areas and has contributed a great deal in facilitang the poor in creaon of community
based organizaons, developing their capacies and empowering them to address their needs collecvely.
SERVE Pakistan has succeeded in facilitang formaon of eecve farmer organiza-
ons, women organizaons, CBOs and a number of networks of partners. With joint ef-
forts SERVE Pakistan has been able to make a major breakthrough in addressing causes of pov-
erty and empowerment of the communies to undertake their own development agenda.
SERVE Pakistan envisages socio-economic and polical change that leads to poverty reducon and provides
equal opportunies for all cizens of the country for the realizaon of human potenal and guarantee peace,jusce and democracy in Pakistan.
26
-
7/27/2019 LACIP Background Paper
29/35
7. Salik Development Foundaon (SDF)
Salik Development Foundaon (SDF) is a non-prot civil society organizaon registered with social welfare
department under social welfare act 1961. Salik Development Foundaon is Mardan based organizaon,
established in 1989 and its regional oces are in Mansehra, Muzaarabad and Neelum districts. SDF sup-
ports community organizaons through Physical Infrastructure, Capacity Building, improvement of health
& educaon facilies, improved natural resources, advocacy for peace and Relief and Rehabilitaon eorts
in case of natural disasters and accidents. Salik Development Foundaon is working in Peshawar, Swabi,
Mardan, Mansehra, Batagram and Kohistan districts of KP along with Muzaarabad and Neelum districts of
AJK. Apart from this SDF has successfully completed IDPs support program in dierent camps like Jalala and
Benazir camps for implementaon of water supply & sanitaon schemes and skill trainings for IDPs.
SDF is working in the community for the last twenty years. During this period SDF has developed close
connecons with the communies and successfully implemented infrastructure projects. Up ll now Salik
Development Foundaon completed 172 infrastructure projects under dierent phases of PPAF funding.
These infrastructure projects include drinking water supply, sanitaon, irrigaon and roads & bridges etc.
8. Mountain and Glacier Protecon Organizaon (MGPO)
MGPO was established in August 2001 as a voluntary non-prot organizaon. It is registered un-
der the Registraon and Control Ordinance 1961 (XLV of 1961) in Gilgit in August 2001. Under clause
three of its constuon MGPO can operate anywhere in Pakistan where there are mountains and gla-
ciers including the Northern Areas of Pakistan and Azad Kashmir. MGPOs strategy is based on an inte-
grated management approach towards conservaon in order to manage both the environmental sus-
tainability and the improvement of economic and social benets in favor of the local communies.
It operates on the principle that sustainable development and environmental protecon are part of
the development process through which the indigenous culture, heritage, ecology, wildlife and re-
sources are ulized for the benet of the local populaon and in accordance with their aspira-
ons. MGPO has developed an integrated management plan to address all aspects of conservaon.
These include: Campsite development ( to provide facilies within a designated area for camping), Protecon
of the environment (removal of degradable and non-degradable pollutants), Protecon of the habitat (Foresta-
on and increase in agriculture and range land), Protecon of bio- diversity ( training and patrolling of wildlife
guards), Community welfare ( educaon, primary health care, hygiene, sanitaon, clean drinking water and pro-
vision of micro hydel power as an alternate to using rewood for fuel) MGPO was the major PPAF partner for the
CECP (Commiee Encouraging Corporate Philanthropy) funded US$ 12million Health and Educaon BOT proj-
ect in the earthquake aected areas of AJK and KP. MGPO was responsible for the reconstrucon and two years
operaon of 9 out of the 16 facilies of the project. Working in trying circumstances, the MGPO produced high
quality work which was appreciated by all stakeholders including the provincial governments, ERRA and CECP.
9. Community Upli Program (CUP)
The Community Upli Program (CUP) is registered as a non for prot, naonal level development organi-
zaon on 29th Jan 2001 under Secon 42 of the Companies Ordinance 1984. The governance structure of
CUP comprises a two-er system; Board of Directors (BoDs) and the Management Team. Its current area of
operaon is Bannu, Lakki Marwat, D.I.Khan, Kohat, Peshawar and Shangla districts for KP.
CUP has undertaken to follow a democrac, non-polical and a transparent system, with the overarching
principle of promong equal opportunies for women. CUP has completed 143 infrastructure projects un-
der dierent phases of PPAF funding, beneng 7,373 households and 56,245 persons. All the completed
projects have been handed over to the local stakeholders for post compleon operaon and maintenance.CUP is a naonal indigenous soluon for implemenng poverty alleviaon and humanitarian assistance
projects with themac areas of; (a) mother & child health, (b) educaon, (c) livelihoods and, (d) community
infrastructure. CUP has also developed an intrinsic capacity to oer one-window management services,
27
-
7/27/2019 LACIP Background Paper
30/35
which includes project management, monitoring & evaluaon, baseline and research studies/surveys, and
capacity building services, to development organizaons, government agencies, donors, Internaonal NGOs
and the private sector.
10. Social Acon Bureau for Assistance in Welfare and Organizaonal Networking(SABAWON)
SABAWON stands for Social Acon Bureau for Assistance in Welfare and Organizaonal Networking. It is
a civil society organizaon created in September 1994, and is registered with the Government of Pakistanunder the Sociees Act of 1860. SABAWON is working for a society, free of all kind of discriminaon and
providing an enabling environment to poor community for ensuring sustainable livelihood. Movated by
our concern for the countrys poverty, aecng mostly women and children, SABAWONs mission is to pro-
vide access to primary educaon, infrastructure, health resources, prevent diseases and promote devel-
opment, in social sector, through dynamic partnerships that build local capacity in ecient and measur-
able ways. Currently SABAWON is implemenng projects in the KPK and Punjab provinces with UNICEF,
Plan Pakistan, PPAF, EC, IWP, AKU/MoWD, Abt.Inc/USAID, Ministry of Industries Govt: of Pakistan and NEF.
The Partnerships are in the eld of Educaon, Health, Water & Environmental Sanitaon, Community Physical
Infrastructures, Rights, Good Governance and Instuonal Development Sectors. SABAWON considers inter-venon in these sectors essenal to reduce poverty and ensure gender balanced sustainable development.
11. Mountain Instute for Educaonal Development (MIED)
Mountain Instute for Educaonal Development MIED Pakistan, a non-prot naonal, was established
in the year 2003. For the implementaon of its educaonal programs MIED has been working with var-
ious organizaons. It entered into an agreement with PPAF in November 2009 to implement School Im-
provement Program in 30 govt. primary and secondary schools (boys & girls) in District Batagram of KPK.
MIED has been considered one of the top Three Quality Educaonal Organizaons to build the ca-
pacity of Provincial and Regional Instute of Teacher Educaon selected by USAID for Pre-STEP proj-ect in Pakistan. In line with the Financing agreement, MIED provided with missing facilies to 30 proj-
ect schools and worked with local communies and school PTCs and build their capacity for their role
in school improvement. MIED also organized teachers training programs through quality trainers and
training NGOs. In December 2009, MIED entered with another Financing Agreement with PPAF as PO
for SIP in Ghizer district of Gilgit-Balstan. It targeted 21 govt. and 9 community managed schools
in year 2010 and 2011. In March 2010, MIED through PPAFs support started intervenons in Mian-
wali on request of the corporate sector (Nighngale Foundaon). It is working with 4 SIP schools.
12. Hazara Development and Advocacy Foundaon (HADAF)
HADAF was established in 2003 as a non-prot and non-governmental (NGO) public interest organizaon
and registered under the Sociees Act of 1860. HADAFs goal is to mobilize community members so that
they can become agents of change in their villages. HADAF works with a wide range of stakeholders that
include civil society groups, media, policy makers, government line agencies and opinion makers. HADAF
has organized and strengthened community organizaons in more than 146 villages as part of its social
mobilizaon program. During the course of its acvies HADAF has gained diversied and rich experiences.
13. Asian Humanitarian Organizaon (AHO)
The Asia Humanitarian Organizaon (AHO) is not-for-prot and non-governmental organizaon registered
under the Joint Stock Companies and Sociees Act XXI of 1860 in May 2003. Its working in the eld ofsocial, economic and infrastructure development and for the rights of the marginalized communies. It be-
lieves that sustainable development can only be achieved when communies are enabled to realize their
full potenal and empowering them to strive for their collecve rights and solving their collecve problems
28
-
7/27/2019 LACIP Background Paper
31/35
by cooperang and parcipatory manner. AHO is working to achieve the vision with prime focus on mo-
bilizing/organizing and delivering services to poor and deprived communies without extending any dis-
criminaon against social origin, sex, race, caste and religion. Therefore, AHO includes all vulnerable
groups such as women& disabled, all ethnic groups, all sects, all religions, all castes etc in its programs
and benets of the project intervenons with special parity towards the most vulnerable human beings.
14. Childrens Global Network-Pakistan (Guarantee) Ltd.
CGN-P was established in September 2005 and is registered with Securies and Exchange Commissionof Pakistan under secon 43 of Companies Ordinance 1984.CGN-Ps mission is in line with the EFA and
MDG goals and the objecves of the Naonal Educaon Policy, Educaon Sector Reforms (ESR) and Pro-
vincial Reforms Program. CGN-P is a lead stakeholder in the educaon sector of Pakistan working in close
collaboraon with the government at federal, provincial and local level. It focuses on providing equitable
quality educaon to the marginalized segments of society creang best learning opportunies for their
children, exposing teachers to research based teaching methods, making learning fun for children by pro-
viding acve learning material to the class rooms and making parents a partner in their childs educaon.
15. Change in Educaon
Change - in Educaon is a non-governmental and not-for-prot autonomous registered organizaon un-
der Secon 42 of the Companies Ordinance 1984, under the regulatory supervision of Securies and Ex-
change Commission of Pakistan. Change - in Educaon is a social and development sector iniave by
Pakistans leading private educaon system to help sponsor educaonal change across public educa-
on system, born out of blazing passion for reformaon of Educaon thus bridging the public and pri-
vate sector quality divide. As educaon in Pakistan is no more an urban elite phenomenon, our core
purpose is to revoluonize the public and community educaon system and connect by bridging the qual-
ity gaps. Change - in Educaon has been founded to deliver quality, aordable yet sustainable educaon.
Change in Educaon has experience in schooling of children, capacity building, preparaon and pre-
sentaon of Audio Visual aids (AV aids), curricular and co-curricular teaching and learning ac-vies. Academic acvies of Change in Educaon focus on improving condence of children
and leadership skills. It has a strong governance structure and an ecient second line of man-
agement with demonstrated experience in handling community driven development projects.
16. Environmental Protecon Society (EPS)
Environmental Protecon Society (EPS) is a non-governmental organizaon (NGO). Since incepon in 1991 ll
1997 its main acvies and projects were concentrated in District Swat. The Society earned a good name and
started its journey towards professionalism as well and extended its intervenons to the districts of Buner, Up-
per Dir, Lower Dir, Shangla, Kohistan,Malakand and other parts of KPK, where EPS has already developed good
working relaons with most of the organizaons and the line departments of these areas. The Society maintained
the tempo of work ll 2008, when the Execuve Board of the Society took the decision to expand EPS area of
operaon and work for the upli of other areas throughout the country and establish a new oce in Islamabad.
Due to the man induced complex disaster, Malakand Division, specically District Swat and Bun-
er were confronted with a lot of damages and more than 2.5 million people were displaced from
their place of origin. On July 20, 2009 some of the areas of Malakand Division were declared
safe by the concerned line agencies and the early stage of recovery iniated. EPS closed its Is-
lamabad Oce and focused on Malakand Division to play its due role for the upli of the area.
EPS has a General Body and a Council of nine members. Natural Resource Management is its programmacarea and it has ve units- Finance and Administraon Unit, Human Resource Unit, Technical Unit, Moni-
toring & Evaluaon Unit and Research and Publicaon Unit which provide technical support to the core
29
-
7/27/2019 LACIP Background Paper
32/35
acvies and projects executed by EPS. Founded in 1991, EPS was registered in 1994 under the Sociees
Registraon Act, 1860. It is a non-prot and non-ethnic organizaon concerned with the physical, social and
cultural environment of the Country.
Natural Resource Management is the programmac area of EPS and So far, the Society has suc-
cessfully executed more than seventy projects in partnership with dierent naonal and interna-
onal organizaons. EPS remained a partner of CHIP for ve years and got experse in the eld of
social mobilizaon which is now its eld of disncon. EPS established community organizaons-
for the eecve implementaon of Malakand Rural Development Project in whole of Swat district.
The other elds of experse of the Society are HID, livelihood, WASH, CPI, health, DRM, disability, gender and
development rural and urban management etc., and implemented a good number of projects with focus on
these themac areas. Currently, EPS is execung three projects- one on agriculture in partnership with FAO
in Dir Upper, second on WASH in collaboraon with German Agro Acon (GAA) in Shangla and Kohistan and
the third on integrated development in partnership with PPAF in district Swat. The project in partnership with
PPAF has ve components- Social mobilizaon, HID, CPI, disability and health. Out of the ve components
health and disability are successfully accomplished and the other three components are sll in progress. More-
over, in Buner EPS in collaboraon with Handicap internaonal executed a project on WASH in two phases.
EPS has a good knowledge of the area, its topography, norms & values and good working relaon with the
line agencies of the area. The Society has worked at the grassroots level in the area and has earned a very
good name. It is therefore, pernent that EPS relevant work experience in the project area will be helpful to
make the project a success.
17. Ghazi Barotha Taraqia Idara (GBTI)
Ghazi Barotha Taraqia Idara (GBTI) is not-for-prot and non-governmental organizaon registered under the
secon 42 of companies ordinance 1984on October 08, 1995. Its working with a vision of alleviang poverty
and improving quality of life of the rural people aected by the Ghazi Barotha Hydropower Project (GBHP) inPunjab (District Aock) and KP (District Haripur and Swabi). Their main focus is on social mobilizaon and inte-
grated development through community physical infrastructure, natural resource management, micro-credit,
enterprise development and capacity building. GBTI is working in 20 union councils. It believes that sustainable
development can only be achieved through instuonal development of rural communies and to enable
them to realize their full potenal and solving their collecve problems by cooperang& parcipatory manner.
GBTIs was mandate to facilitate a mul stakeholder consultaon and interacon mechanism to help in
achieving the desired Ghazi Barotha Hydro Power Project objecves and work as a catalyst, promong par-
cipatory development of the aected communies to bring about lasng improvements in the quality of
lives of the people of the Project area.
30
-
7/27/2019 LACIP Background Paper
33/35
18. Sustainable Peace& Development Organizaon (SPADO)
SPADO is a non-prot, non-polical organizaon registered in 2002 with the Government of Paki-
stan under the societys registraon act of 1860. The organizaon is working for a peaceful environ-
ment. It has a wide coverage in KP & FATA. SPADO has worked with more than 60 local NGOs and CBOs,
it has strong linkages with the local communies in FATA and KPK that include religious scholars, po-
lical leaders, media, academic instuons and youth. SPADO has established a youth network en-
gaging potenal youth for peace and development. The network has hundreds of members in KPK.
It has good nancial systems. The board consists of members from local government and the development
sector. Its Core experse, as the name indicates, is conict resoluon in conict aected areas, youth mo-
bilizaon, small business grants and water and sanitaon projects. It has also implemented some health
and educaon projects. In health, they have established a welfare hospital in Swat through philanthro-
pist funding of 0.4 million and operated it for one year aer which the community has been running it
through its own resources as well as the income generated from the services of the hospital. In educa-
on, SPADO has strengthened 61 government schools in District Batagram through funding from UNICEF.
The long term strategic plan of SPADO is based on sustainable structure, where the internal strengths, human
and material resources are used in a manner of self-help supporng the running costs of the organizaon. In thisregard the organizaon has already started working on the core ideas of organizaonal sustainability. SPADO is
not only an organizaon but rather a campaign, acve at local, regional and internaonal levels. The organiza-
on has already established sound long term partnerships with many leading internaonal organizaons that
will help a lot to further build its capacity and provide a solid basis for the sustainability of the organizaon.
31
-
7/27/2019 LACIP Background Paper
34/35
Pakistan Poverty Alleviaon Fund
1,Hill View Road, Banigala, Islamabad
UAN,+92-51-111-000-102, Fax. +92-51-261-3931-33
Website: www.ppaf.org.pk
-
7/27/2019 LACIP Background Paper
35/35