know how and solutions

33
1

Upload: others

Post on 06-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

1

1

Content: 1. Brief overview of CSI Ingenieros, and the water area Our clients Know how and solutions The team

2. Different Stormwater projects 3. Carrasco Hydrodynamic Model – Montevideo Master Plan

DIFFERENT CASES APPLIED IN URUGUAY

UNIDAD AGUA Y SANEAMIENTO

3

1 - Brief overview of CSI, and the water area

2

CSI is a worldwide service and consulting engineering company which is focused on emerging countries

Mission Improve quality of living in communities we work for

CSI Ingenieros

Over the years the firm developed a wide range of capacities on different engineering and architectural disciplines, some o f them are:

WATER AND WASTEWATER TRANSPORT PORTS AND WATERWAYS ENVIRONMENT

INDUSTRIAL URBAN DEVELOPEMENT CIVIL ENGINEERING ENERGY

Since 1980, CSI participated in more than 800 projects for governments, international organizations and public and

private sector enterprises in more than 20 countries.

WATER AND WASTEWATER

Water is one of the most precious resources of our planet. Since the mid-eighties, we have worked with our customers to provide safe, reliable and sustainable: water, sanitation and storm systems. Customers of public and private trust us to improve their systems and operations. Combining experience with technology, our team achieved economic and sustainable solutions.

Our clients belongs to the public and private sector, as well as well as international organizations

Water and Wastewater

5

Solutions Feasibility studies Master Plans Preliminary Studies Detailed Designs Tender Documents Technical assistance at works Socio economic and financial assistance

With more than 30 years of experience we are capable of providing international class solutions in order to preserve the hydric resource and promote resilient and sustainable cities taking into account social, technical, economic and financial aspects.

6

Water and Wastewater

Know How Drinking Water production and distribution Domestic Wastewater collection, transport and

treatment Storm Water systems Flooding control Hydraulic Works Industrial wastewater collecting and treatment

Preliminary Studies Strategic Planning Design Procurement

UNIDAD AGUA Y SANEAMIENTO

8

2 – Different Stormwater projects

Sewer and Rainwater Network of Sayago Norte, Peñarol and Ferrocarril Neighborhoods (Montevideo) - 1995

Population to be served at the end of the design period (year 2035) is 30.000 inhabitants. Served Area: 650 hectares.

Modification of Weirs and Auxiliary Works of the Paraguay Wastewater System (Montevideo)- 1997

CSI first projects in stormwater design: 90’s

Hydraulic model: CAREDAS (Sogreah) of the combined sewer network of the Paraguay functional unit (2.920 hectares). The goal of the project is to eliminate discharges to the bay as overflowing during rainfall.

Sewage and Pluvial Network Cerro Norte - La Paloma (Montevideo, 2002)

Storm water projects in vulnerable socio-economic areas

Area: 490 hectares Population: 52.000 inhabitants. Four small streams cross public and private grounds, and are in part flanked by precarious homes, with obstructions and overflow problems caused by garbage and fills without planning.

Sewage and Pluvial Network Rincón del Cerro – Casabó (Montevideo, 2003)

Area: 304 hectares. Population: 34.000 inhabitants A main stream, a dam and several affluents. Precarious homes in the margins, problems of obstructions and overflow.

Plan Set of the Sanitation, Pluvial Waters and Street System of Ciudad de la Costa (Canelones, 2011)

Projects including stormwater retention

Area: 2.150 hectares Population: 99.200 inhabitants. Extremely flat topography. • Retention ponds • Ditch retention

Storm Drainage Project Arroyo Seco y Quitacalzones Basins (Montevideo, 2013)

Area: 1.500 hectares. • 5 closed lamination tanks between

2.000 and 11.000 m3.

Final Plan Set of a Storm Drainage System in Libertad Neighborhood, Juan Lacaze (Colonia, 2013)

• Stormwater pumping station; 3,6 m3/s • A lamination tank of 1500 m3.

Urban Water Plan Ciudad del Plata. (San José)

Projects being developed

Area: 13.000 hectares Population: 30.000 inhabitants. General Objective: long term goals and middle and short term action plan.

Montevideo Sanitary and Urban Drainage Master Plan

Area: 430 km2 Population: 1.350.000 inhabitants.

UNIDAD AGUA Y SANEAMIENTO

13

3 – Carrasco Hydrodynamic Model _ Montevideo Master Plan

Montevideos’ Sewage and Urban Drainage Master Plan

Montevideo Sewage and Drainage towards year 2050

Using integrated modelling as a decision support tool

Most important basins numerically modelled Pantanoso

Miguelete

Paraguay-Costero

Carrasco

Model used: InfoWorks ICM

14

InforWorks ICM from Innovyze

Integrated modeling Precipitation

Hydrology/Subcatchments

Sewer pipes & pump stations

Storm water pipes

Surface flows in streets & inlets

River reaches

Full integration of 1D&2D hydrodynamic simulation techniques

Real Time Control

Water quality and sedimentation

15

Carrasco Catchment Squematization

16

• 135 pluvial subcatchments

• 135 sewage subcatchment

• 99 km of river reaches

• 1441 cross sections (1/68m)

• 14 bridges

• 18 pump stations

• 301 sewage pipes

• 195 streets

• 233 pluvial pipes

• 430 stormwater inlets

Carrasco Catchment Squematization

17

Bridge – Route 102 over Toledo stream

Carrasco – Validation – February 2014

18

Calle Sección Cota relevada (m Wh) Cota modelada (m Wh) Diferencia (m)

Santos Dumont 1410 9.07 9.12 0.05

Abrevadero Manga 1185-1084.2 8.68 8.66 -0.02

B. de la Torre 911 8.61 8.46 -0.15

Calle “N” 787 8.31 8.44 0.13

Bartolomé de los Reyes 787-617 8.26 8.43 0.17

Carrasco - Validation – November 2014

19

Calle Sección Cota relevada (m Wh) Cota modelada (m Wh) Diferencia (m)

Abrevadero Manga 1185-1084.2 7.55 7.82 0.27

B. de la Torre 911 7.61 7.26 -0.35

Bartolomé de los Reyes 787-617 6.64 7.18 0.54

Carrasco – Subcatchments’ specific flows

20

Área TR2 TR10 TR100

Área rural 15.5 24.9 42.9

Área semi-urbana 1 31.1 46.4 75.8

Área semi-urbana 2 22.3 35.3 61.9

Área urbana 1 77.7 108.5 162.1

Área urbana 2 71.4 101.1 153.0

Specific flow (l/s/ha)

Carrasco - Fluvial Dynamics

21

Long Sections

Carrasco

Manga

Chacarita

Canteras

Carrasco – Fluvial Dynamics

22

Rio de la Plata Level Influence

Carrasco – Fluvial Dynamics

23

Hydrograph propagation

Carrasco – Fluvial Dynamics

24

Puente TR2D6h TR100D6h

Ruta 102 sobre A°. Toledo 0.04 0.15

Av. Italia sobre A°. Carrasco 0.13 0.25

Av. Rambla sobre A°. Carrasco 0.46 0.83

Ruta 102 sobre A°. Manga 0.95 0.70

Cno. Repetto sobre A°. Manga 0.23 0.55

Cno. Repetto sobre Afl. A°. Manga 0.32 0.47

Obstructions / Head losses

Carrasco – Stormwater Pipes Networks

25

Caudales Perfiles Restricciones Captaciones (con/sin restricciones de bocas de tormenta) Intrusión pluvial

Capacity / Surcharged (%) Velocities (m/s)

Caudales (m3/s)

Pluvial TR2 TR10 TR100

Canteras Sur 7.9 9.0 9.8

Canteras Centro 7.5 10.3 12.0

Canteras Norte 2.0 2.2 2.4

Chacarita Sur 8.7 9.4 10.1

Chacarita Norte 26.6 33.7 38.5

Flows (cms)

Capacity(%)

Green 0.5-1.0

Red > 1.0

Vel (m/s)

Green 0-1

Yellow 1-2

Orange 2-3

Red > 3

Chacarita Norte

Carrasco – Stormwater Pipes Networks

26

Caudales Perfiles Restricciones Captaciones (con/sin restricciones de bocas de tormenta) Intrusión pluvial

Canteras Central

Caudales (m3/s)

27

Carrasco – Surface affectations

Depth of water in streets

Carrasco – Surface affectations

28

Mancha de inundación Permanencia Gráficos de V x D (captura en algún lugar crítico) Inundación / No Inundación

Velocities

Depth (m)

Blue 0.2-0.5

Green 0.5-1.0

Red > 1.0

Vel (m/s)

Green 0-1

Yellow 1-2

Orange 2-3

Red > 3

29

Mancha de inundación Permanencia Gráficos de V x D (captura en algún lugar crítico) Inundación / No Inundación

Hazard

Time flooded

Carrasco – Surface affectations

30

Mancha de inundación Permanencia Gráficos de V x D (captura en algún lugar crítico) Inundación / No Inundación

Spectrum of events affectation

0

10

20

30

40

50

60

70

80

90

100

0 3 6 9 12 15 18 21 24

Inte

nsi

dad

(mm

/h)

Duración (hs)

Tr= 2 años Tr=5 años Tr=10 años

Tr=25 años Tr=50 años Tr=100 años

Veracierto y Saenz de Zumaran Veracierto y Campomar Veracierto y Timoteo Aparicio

Cochabamba y Puntas de Soto Nery y Palencia

NOTA: Veracierto y Saenz de Zumaran, Veracierto y Timoteo Aparicio, y Veracierto y Campomar se inundan para eventos con una recurrencia superior a la analizada.

Carrasco – Surface affectations

Carrasco – Pluvial intrusion

31

Chacarita Sewage Pipe long section

DWF WWF

Infl

ow

P

um

ped

Carrasco – Final comments

Integrated catchment modelling achieved

Model is a tool capable of assessing

DWF

WWF

CSO’s and SSO’s

Land use planning

Identify flood prone areas

Pump station/energy optimization

Structural/non-strucural flood mitigation measures

32

Soriano 1180 Tel.: +598 2902 1066 Fax: +598 2901 9058 E-mail: [email protected] www.csi-ing.com Montevideo 11.100 - Uruguay

33

Thank you for your time

Carla Baldo E-mail: [email protected] Santiago Symonds E-mail: [email protected]