kl geotech-ret wall 2.0-3.0m
TRANSCRIPT
-
7/30/2019 Kl Geotech-ret Wall 2.0-3.0m
1/8
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : [email protected]
1GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
SRI SRI 28th Dec 2011
Retaining Wall Design : Ver W2.5.07 - 24 Aug 2011Title : RETAINING WALL 2.00m To 3.00
C14Input Data
Wall Dimensions Unfactored Live Loads General Parameters Design Parameters
H1 (m) 4 C (m) 0.35 W (kN/m) 0 Soil frict () 33 SF Overt. 2
H2 (m) 0.8 F (m) 0.3 P (kN) 0 Fill slope () 25 SF Slip 2.0
H3 (m) 0 xf (m) 1.00 xp (m) 0 Wall frict () 15 ULS DL Factor 1.4
Hw (m) 1.35 At (m) 0.25 L (kN/m) 0 Conc kN/m3 24 ULS LL Factor 1.6
Hr (m) Ab (m) 0.35 xl (m) 0 Soil kN/m3 19 Pmax (kPa) 150
B (m) 1.7 Cov wall mm 50 Lh (kN/m) 0 fcu (MPa) 25 Soil Poisson 0.1
D (m) 0.2 Cov base mm 50 x (m) 0.1 fy (MPa) 460 DL Factor Ovt. 0.9
Seepage not allowed
Active pressure NOT applied on back of shear key for sliding
Theory : Coulomb
Wall type : Cantilever
SEISMIC ANALYSIS SETTINGS:
Seismic Analysis ON/OFF:OFF
Hor Accel. (g)
Vert Accel. (g)
Include LL's
VALUES OF PRESSURE COEFFICIENTS:
Active Pressure coefficient Ka :0.403 (User Defined)Passive Pressure coefficient Kp :5.854 (User Defined)
Base frictional constant :0.649 (User Defined)
FORCES ACTING ON THE WALL AT SLS:All forces/moments are per m width
FORCES (kN ) and their LEVER ARMS (m )
Description F Horizontal Lever arm F Vertical Lever arm
left (+) down (+)
Destabilizing forces:
Total Active pressure Pa 59.169 1.333 15.854 2.050
Triangular W-table press Pw 5.337 0.450 0.000 2.050
Hydrostatic pressure on bot 0.000 1.125
of base: uniform portion
Hydrostatic pressure on bot 0.000 1.500
of base: triangular portion
Stabilizing forces:
Passive pressure on base Pp -35.592 0.267
Weight of the wall + base 47.700 1.554
Weight of soil on the base 26.668 1.441
Hydrostatic pressure on top 1.962 2.150
of rear portion of base
Hydrostatic pressure on top 0.000 0.850
of front portion of base
EQUILIBRIUM CALCULATIONS AT SLSAll forces/moments are per m width
1.Moment Equilibrium
Point of rotation: bottom front corner of base.
-
7/30/2019 Kl Geotech-ret Wall 2.0-3.0m
2/8
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : [email protected]
2GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
SRI SRI 28th Dec 2011
For Overturning moment Mo calculate as follows:
Mo = Sum(hor. forces x l.a.) - Sum(vert. forces x l.a.)
For Stabilizing moment Mr calculate as follows:
Mr = -Sum(hor. forces x l.a.) + Sum(vert. forces x l.a.)
where l.a. = lever arm of each force.
Stabilizing moment Mr : 126.25 kNm
Destabilizing moment Mo : 48.79 kNm
Safety factor against overturning = Mr/Mo = 2.588
2.Force Equilibrium at SLS
Sum of Vertical forces Pv : 92.18 kN
Frictional resistance Pfric : 59.83 kN
Passive Pressure on shear key : 31.70 kN
Passive pressure on base : 35.59 kN
=> Total Horiz. resistance Fr : 127.12 kN
Horizontal sliding force on wall Fhw : 64.51 kN
Horizontal sliding force on shear key Fht : 0.00 kN=> Total Horizontal sliding force Fh : 64.51 kN
Safety factor against overall sliding = Fr/Fh = 1.971
*** SAFETY FACTOR IS LOWER THAN SPECIFIED MINIMUM OF 2.00 ***
FORCES ACTING ON THE WALL AT ULS:All forces/moments are per m width
FORCES (kN ) and their LEVER ARMS (m )
Description F Horizontal Lever arm F Vertical Lever arm
left (+) down (+)
Destabilizing forces:Total Active pressure Pa 82.836 1.333 22.196 2.050
Triangular W-table press Pw 7.472 0.450 0.000 2.050
Hydrostatic pressure on bot 0.000 1.125
of base: uniform portion
Hydrostatic pressure on bot 0.000 1.500of base: triangular portion
Stabilizing forces:
Passive pressure on base Pp -32.033 0.267
Weight of the wall + base 42.930 1.554
Weight of soil on the base 24.001 1.441
Hydrostatic pressure on top 1.766 2.150
of rear portion of base
Hydrostatic pressure on top 0.000 0.850
of front portion of base
EQUILIBRIUM CALCULATIONS AT ULSAll forces/moments are per m width
1.Moment Equilibrium
Point of rotation: bottom front corner of base.
For Overturning moment Mo calculate as follows:
Mo = Sum(hor. forces x l.a.) - Sum(vert. forces x l.a.)
For Stabilizing moment Mr calculate as follows:
Mr = -Sum(hor. forces x l.a.) + Sum(vert. forces x l.a.)
where l.a. = lever arm of each force.
Stabilizing moment Mr : 113.63 kNmDestabilizing moment Mo : 68.31 kNm
Safety factor against overturning = Mr/Mo = 1.663
-
7/30/2019 Kl Geotech-ret Wall 2.0-3.0m
3/8
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : [email protected]
3GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
SRI SRI 28th Dec 2011
2.Force Equilibrium at ULS
Sum of Vertical forces Pv : 82.97 kN
Frictional resistance Pfric : 53.84 kN
Passive Pressure on shear key : 28.53 kN
Passive pressure on base : 32.03 kN=> Total Horiz. resistance Fr : 114.41 kN
Horizontal sliding force on wall Fhw : 90.31 kN
Horizontal sliding force on shear key Fht : 0.00 kN
=> Total Horizontal sliding force Fh : 90.31 kN
Safety factor against overall sliding = Fr/Fh = 1.267
SOIL PRESSURES UNDER BASE AT SLS
Maximum pressure : 72.08 kPa
Minimum pressure : 9.87 kPa
Maximum pressure occurs at left hand side of base
WALL MOMENTS (ULS) AND REINFORCEMENT TO BS8110 - 1997
Position from Moment Front Reinforcing Back Reinforcing Nominal (0.13%)
base top (m ) (kNm ) (mm/m ) (mm/m ) (mm/m )
0.00 79.97 0.00 658.03 457.60
0.07 75.28 0.00 623.75 455.00
0.15 71.17 0.00 593.78 452.40
0.22 67.03 0.00 563.15 449.80
0.29 62.92 0.00 532.29 447.20
0.37 58.88 0.00 501.64 444.60
0.44 54.97 0.00 471.69 442.00
0.51 51.24 0.00 442.84 439.40
0.58 47.69 0.00 415.20 436.80
0.66 44.33 0.00 388.74 434.200.73 41.14 0.00 363.42 431.60
0.80 38.12 0.00 339.20 429.00
0.88 35.25 0.00 316.04 426.40
0.95 32.54 0.00 293.91 423.80
1.02 29.97 0.00 272.76 421.201.10 27.54 0.00 252.56 418.60
1.17 25.25 0.00 233.31 416.00
1.24 23.08 0.00 214.97 413.40
1.31 21.05 0.00 197.54 410.80
1.39 19.13 0.00 181.00 408.20
1.46 17.34 0.00 165.34 405.60
1.53 15.66 0.00 150.54 403.00
1.61 14.10 0.00 136.59 400.40
1.68 12.64 0.00 123.46 397.80
1.75 11.29 0.00 111.15 395.201.83 10.03 0.00 99.62 392.60
1.90 8.88 0.00 88.87 390.00
1.97 7.81 0.00 78.87 387.40
2.04 6.84 0.00 69.61 384.80
2.12 5.95 0.00 61.05 382.20
2.19 5.14 0.00 53.19 379.60
2.26 4.40 0.00 46.00 377.00
2.34 3.74 0.00 39.45 374.402.41 3.15 0.00 33.53 371.80
2.48 2.63 0.00 28.20 369.20
2.56 2.17 0.00 23.44 366.60
2.63 1.76 0.00 19.23 364.00
2.70 1.41 0.00 15.53 361.40
2.77 1.11 0.00 12.33 358.80
2.85 0.85 0.00 9.58 356.202.92 0.64 0.00 7.27 353.60
2.99 0.47 0.00 5.35 351.003.07 0.33 0.00 3.79 348.40
-
7/30/2019 Kl Geotech-ret Wall 2.0-3.0m
4/8
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : [email protected]
4GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
SRI SRI 28th Dec 2011
3.14 0.22 0.00 2.56 345.80
3.21 0.14 0.00 1.63 343.20
3.29 0.08 0.00 0.95 340.60
3.36 0.04 0.00 0.49 338.00
3.43 0.02 0.00 0.21 335.40
3.50 0.01 0.00 0.06 332.80
3.58 0.00 0.00 0.01 330.203.65 0.00 0.00 0.00 327.60
BASE MOMENTS (ULS) AND REINFORCEMENT TO BS8110 - 1997
Position from Moment Top Reinforcing Bot Reinforcing Nominal (0.13%)
left (m ) (kNm ) (mm/m ) (mm/m ) (mm/m )
0.00 -0.00 0.00 0.00 455.00
0.05 -0.05 0.00 0.42 455.00
0.09 -0.20 0.00 1.67 455.00
0.14 -0.45 0.00 3.75 455.00
0.18 -0.80 0.00 6.67 455.00
0.23 -1.26 0.00 10.42 455.00
0.27 -1.81 0.00 15.00 455.00
0.32 -2.46 0.00 20.42 455.00
0.36 -3.22 0.00 26.67 455.00
0.41 -4.07 0.00 33.75 455.00
0.45 -5.03 0.00 41.67 455.00
0.50 -6.09 0.00 50.42 455.00
0.54 -7.24 0.00 60.00 455.00
0.58 -8.50 0.00 70.42 455.00
0.63 -9.86 0.00 81.67 455.00
0.68 -11.32 0.00 93.75 455.00
0.72 -12.87 0.00 106.67 455.00
0.77 -14.53 0.00 120.42 455.00
0.81 -16.29 0.00 135.00 455.00
0.85 -18.15 0.00 150.42 455.00
0.90 -20.12 0.00 166.67 455.00
0.94 -22.18 0.00 183.75 455.00
0.99 -24.34 0.00 201.67 455.00
1.03 -26.60 0.00 220.42 455.00
1.08 -28.97 0.00 240.01 455.00
1.13 -31.43 0.00 260.42 455.00
1.17 -34.00 0.00 281.67 455.001.22 -36.66 0.00 303.76 455.00
1.26 -39.43 0.00 326.67 455.00
1.30 -42.29 0.00 350.42 455.00
1.35 -45.26 0.00 375.01 455.00
1.40 -48.33 0.00 400.43 455.00
1.44 -51.50 0.00 426.68 455.00
1.49 -54.77 0.00 453.76 455.00
1.53 -58.14 0.00 481.68 455.00
1.57 -61.61 0.00 510.43 455.00
1.62 -65.18 0.00 540.01 455.001.67 -68.85 0.00 570.43 455.00
1.71 -72.62 0.00 601.68 455.00
1.75 -76.49 0.00 633.76 455.00
1.80 -80.47 0.00 666.68 455.00
1.84 -84.54 0.00 0.00 455.00
1.89 -88.71 0.00 0.00 455.00
1.94 -90.84 0.00 0.00 455.00
1.98 5.18 0.00 0.00 455.002.02 3.51 0.00 0.00 455.00
2.07 2.58 21.39 0.00 455.00
2.12 1.79 14.85 0.00 455.00
2.16 1.15 9.50 0.00 455.00
2.21 0.65 5.35 0.00 455.00
2.25 0.29 2.38 0.00 455.00
SHEAR CHECK AT WALL-BASE JUNCTION TO BS8110 - 1997
Shear force at bottom of wall V = 76.0 kN
-
7/30/2019 Kl Geotech-ret Wall 2.0-3.0m
5/8
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : [email protected]
5GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
SRI SRI 28th Dec 2011
Shear stress at bottom of wall v = 0.26 MPa OK
Allowable shear stress vc = 0.41 MPa (based on Wall tensile reinf.)
Sketch of Wall
1.3
5
0.10
0.3
0
0.8
0
4.0
0
0.3
5
25.00
1.70
0.25
0.350.20
1.00
15
.00
33.00
Wall type: CantileverTheory: Coulomb
Design code: BS8110 - 1997
SFovt = 2.59SFovt (ULS) = 1.66
SFslip = 1.97SFslip (ULS) = 1.27
Ka=0.40 (User defined)Kp=5.85 (User defined)
V= 76.0kNv= 0.26MPavc= 0.41MPa
=0.65 (User def.)
72.1kPa
9.9kPa
-
7/30/2019 Kl Geotech-ret Wall 2.0-3.0m
6/8
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : [email protected]
6GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
SRI SRI 28th Dec 2011
Wall Bending Moments
Wall Moments
Momentmax=79.9
7kNm@
-.3
50m
.500
1.00
1.50
2.00
2.50
3.00
3.50
0.0
0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
Height(m)
Bending moment (kNm)
Base Bending Moments
Base Moments Moment max = -90.84kNm @ 1.88m
-90.0
-80.0
-70.0
-60.0
-50.0
-40.0
-30.0
-20.0
-10.0
.100
.200
.300
.400
.500
.600
.700
.800
.900
1.0
0
1.1
0
1.2
0
1.3
0
1.4
0
1.5
0
1.6
0
1.7
0
1.8
0
1.9
0
2.0
0
2.1
0
2.2
0
Bendingmoment(kNm)
Position (m)
-
7/30/2019 Kl Geotech-ret Wall 2.0-3.0m
7/8
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : [email protected]
7GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
SRI SRI 28th Dec 2011
Wall Reinforcement
Wall Reinforcement
Reinf.max=658.0mm/[email protected]
0m
.200
.400
.600
.800
1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.203.40
3.60
100
200
300
400
500
600
Height(m)
Reinforcement (mm/m)
Front
Nominal
Back
Base Reinforcement
Base Reinforcement Reinf. max = 666.7mm/m @ 1.76m
50.0
100
150
200
250
300
350
400
450
500
550
600
650
700
.100
.200
.300
.400
.500
.600
.700
.800
.900
1.0
0
1.1
0
1.2
0
1.3
0
1.4
0
1.5
0
1.6
0
1.7
0
1.8
0
1.9
0
2.0
0
2.1
0
2.2
0
Reinforcement
(mm/m)
Position (m)
Nominal
Top
Nominal
-
7/30/2019 Kl Geotech-ret Wall 2.0-3.0m
8/8
SheetJob Number
Job Title
Client
Calcs by Checked by Date
Software Consultants (Pty) Ltd
Internet: http://www.prokon.com
E-Mail : [email protected]
8GEO-6
RETAINING WALL 2.00m to 3.00m high
KL GEOTECHNIC SDN.BHD
SRI SRI 28th Dec 2011
Schematic Reinforcement
Y12@200
Y12@200 (EF)Y12@200 (EF)
Y16@300 (NF)
Y12@200 (Hor)
Y12@200 (FF)
Y12@200 (Hor)
1-R10/m2 clips
1-R10/m2 clips
Y12@200 starters
Y16@250 starters
Y12@200 (T1)
Y12@200 (T2)
Y16@300 (B1)
Y12@200 (B2)
SECTION
FRONT