    K K SPUN PIPES PVT. LTD.

    THE LEADING

    PRECAST CONCRETE INFRASTRUCTUREPROVIDERS

    Address:7/18A, Sarvpriya Vihar, New Delhi -110016

    Phone No. 41828557, 9810157899, 9810267226

    E-mail : [email protected]

  • 8/6/2019 Kksp Box Culvert Dial Project

    2/25

    COMPANY PROFILE

    K. K. Spun Pipes is one of the leading manufactures and suppliers of the R.C.C. Pipes,Pre cast Concrete Products, and telecom infrastructures. Mr. Promod Gupta establishedthe company in 1987. Er. Himanshu Gupta joined this company after completing hisstudies in 2003. The factory is situated at Tigaon Road, Ballabhgarh (Haryana) and isfully equipped with all the infrastructure, Plant and Machinery, Laboratory and state ofthe art Moulds to produce the goods of high quality.

    K. K. Spun Pipes is registered with Small Scale Industries Department, Haryana andpossesses the valid I.S.I. License to manufacture and supply NP2, NP3 & NP4 ClassR.C.C. Pipes of dia from 100mm to 2200mm confirming to I.S.I. codes andspecifications.

    The Company is fully equipped with all infrastructures and in-house fabrication team to

    develop and manufacture any type of customized Pre-cast Concrete Products, telecomtowers, shelters and other infrastructures for telecom and power sector.

  • 8/6/2019 Kksp Box Culvert Dial Project

    3/25

    List of Clients

    Bharti Telecom

    Hutch

    Tata Telecom

    V S N L Reliance

    Delhi Jal Board

    Haryana Urban Development Authority

    U.P. Jal Nigam

    Public Works Department

    Haryana State Industrial Development Corporation Limited Punjab Sewage Board.

    Larsen & Toubro

    International Metro Civil Contractors

    Ondeo Degremont India Ltd.

    Delhi Development Authorities.

    AIMIL Ltd.

  • 8/6/2019 Kksp Box Culvert Dial Project

    4/25

    Delhi International Airport Limited

  • 8/6/2019 Kksp Box Culvert Dial Project

    5/25

    PrefacePrefaceAs a technological leap, the

    construction of box culverts by

    precasting has taken over from

    conventional In-situ construction long

    back. At L&T, a majority of places

    particularly in Road sectors, we adoptthe precasting by Wet-casting.

    However, it has many drawbacks.

    The vertical casting method with dry

    mix is versatile and could be a

    trendsetter for the precasting we donow onwards

    At DIAL we have used the system and

    the result is very satisfying.

    The following few slides enumerates

    the process and result.

    Drawbacks in ConventionalPrecasting

    VerticalPrecastingwithDry mix

    DetailofProcess withphotographs

    Theway forward.

  • 8/6/2019 Kksp Box Culvert Dial Project

    6/25

    MajorDrawbacks in ConventionalPrecastingMajorDrawbacks in ConventionalPrecasting

    The shape of the precast pieces depends upon the fabrication accuracy of mould which

    varies from mould to mould.

    The vibration of concrete purely manual, hence the degree of compaction of

    concrete is always questionable.

    The shape of end connecting grooves varies piece to piece. Hence chances of

    mismatching between two adjacent pieces are high and requires site alterations.

    Requires huge manpower for handling of mould shutters, compaction ofconcrete, rebar tying, mould preparations etc

    Large area is required for casting as the pieces are kept on the bed for a at least 2 to 3

    days for the concrete to gain the strength.

    More area to cover for the concreting crew with the machines for covering more

    number of moulds.

    Area is always untidy due to movement of transit mixers and water from the curing.

  • 8/6/2019 Kksp Box Culvert Dial Project

    7/25

  • 8/6/2019 Kksp Box Culvert Dial Project

    8/25

    The Concept .The Concept .

    Concrete mix is prepared at a batching plant nearby with zero slump .

    Reinforcement is prefabricated and placed over a pallet. The inner mould is

    placed over the pallet and inserted into the outer mould as a single unit (bottom

    pallet, inner mould, rebar cage).

    The outer mould is fitted with a number of vibrators mounted on the surface and is

    controlled with a control panel.

    Concrete is placed directly from the batching plant into the mould and vibrated

    through the surface vibrators. (at some cases, vibration tables are also used).

    The vibration gives so much energy that the piece can be immediately removed from

    the outer mould. Further, the pieces are cured by covering it with a jacket or by plastic

    wrapping.

    The Mould is ready within 20 minutes for casting of next piece.

  • 8/6/2019 Kksp Box Culvert Dial Project

    9/25

    Batching Plant

    Collection

    Hopper

    Radial

    Placer

    Radial

    Distributor

    Control Panel

    Profiler

    Mould

  • 8/6/2019 Kksp Box Culvert Dial Project

    10/25

    Precast Cagebeingprepared

    Precast Cage lowered over Pallet

    Bottom Pallet

  • 8/6/2019 Kksp Box Culvert Dial Project

    11/25

    InnerMould

    InnerMouldbeinginsertedoverthe Cage

    Internal Mould with pallet and rebar

    cage inserted into Outer Mould

    Outer Mould

  • 8/6/2019 Kksp Box Culvert Dial Project

    12/25

    Concrete BeingPouredon theMould

  • 8/6/2019 Kksp Box Culvert Dial Project

    13/25

    After concrete is over, the hydraulic profiler gives the groove shape

  • 8/6/2019 Kksp Box Culvert Dial Project

    14/25

    The Box culvert is immediately pulled out from the outer mould

  • 8/6/2019 Kksp Box Culvert Dial Project

    15/25

    The Box culvert Being madeupside down with Turning Table

  • 8/6/2019 Kksp Box Culvert Dial Project

    16/25

    The Pieces are shifted to the stacking location

  • 8/6/2019 Kksp Box Culvert Dial Project

    17/25

    Pieces are ready for dispatch

  • 8/6/2019 Kksp Box Culvert Dial Project

    18/25

    Forklift being used for handling the pieces atstock yard

    Pieces are loaded with forklift on to the

    trucks.

  • 8/6/2019 Kksp Box Culvert Dial Project

    19/25

    Advantages.Advantages.

    Drastic reduction of Manpower for Precasting.

    Factory like environment and complete control on rate of pouring and

    compaction levels.

    Transportation of concrete completely omitted hence reducing the chances of loss of

    strength of concrete during transit.

    Concrete placing machinery are nil , hence a tidy place .

    CNC profiled moulds gives accuracy in the shape of precast pieces and uniform for

    entire batch of casting.

    Grooving arrangement is done with the help of hydraulic profiler, which is

    uniform and gives match-casting type accuracy.

    No Curing involved , hence tidy work environment.

  • 8/6/2019 Kksp Box Culvert Dial Project

    20/25

    It overcomes almost all disadvantages of Wet-casting.

    The Concept is quite versatile and can be used for a large variety of precasting we

    do in projects (Some of the culverts as big as 6.0m X 4.0m are also being done

    elsewhere).

    Pipes are also cast with similar concept and is covered under BIS.

    Since the technology is quite versatile, can be used for any shape of the

    precasting.

  • 8/6/2019 Kksp Box Culvert Dial Project

    21/25

  • 8/6/2019 Kksp Box Culvert Dial Project

    22/25

    Pre-Cast Foundations

    KKSPmanufacturesPre-cast Foundationsystems forfixing

    poles, transformers orutility boxes. Thesefoundation systems aretough, andeasy to

    install. They require nomessy collection ofmaterials on site.

  • 8/6/2019 Kksp Box Culvert Dial Project

    23/25

    Cable Trenches and U sections

    Wemanufacturepre-castconcrete cable trenches alongwith covers ofvarious sizes tobe usedforlayingofcables.This is the clean, convenient,

    andmost effectiveway oflaying cables and avoids therepeateddiggingofland torepairor add the cables on thesameroot. They areveryconvenient and necessary forallfactories, 5 starhotels,Multiplexes, andmultistorybuildings andmajorprojects

  • 8/6/2019 Kksp Box Culvert Dial Project

    24/25

    BoundaryWallPanels.

    KKSPmanufactureready toinstallpanels forboundarywalls or temporary roomconstructions.

    They arevery economical,reusable & easy toinstall.

    They are aesthetically goodhas morelife than brickwalls.