kizu-river integrated reservoir management office · outline of integrated reservoir management...

18
TAKAYAMA Reservoir HINACHI Reservoir NUNOME Reservoir MUROU Reservoir KIZU-River Integrated Reservoir Management Office KIZU-River Integrated Reservoir Management Office SYORENJI Reservoir

Upload: others

Post on 23-Jan-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

TAKAYAMA Reservoir

HINACHI Reservoir

NUNOME Reservoir MUROU Reservoir

KIZU-River Integrated Reservoir Management Office

KIZU-River Integrated Reservoir Management Office

SYORENJI Reservoir

●Outline of YODO (KIZU) River Basin YODO River Basin includes six prefectures, MIE, SHIGA, KYOTO, OSAKA, HYOGO and NARA. Upsteam of the River is divided into UJI-River, KIZU-River and KATSURA-River. YODO-River flows to OSAKA bay after confluence of these 3 rivers at south-east of KYOTO. Headwaters of KIZU-River is from SUZUKA and NUNOBIKI mountain rage. KIZU-River meets NABARI-River at OKAWARA after through mountanous vally and UENO area. KIZU-River meets WAZUKA-River at KAMO after confluence of NUNOME-River at KASAGI. Finaly, KIZU-River reaches to confluence point of three rivers at south-east of KYOTO. KIZU-River is 1st class river (management by Natinal Governemnt), Catchment area is 1,596km2. It occupy 21.9% of total catchment area of YODO-River. On KIZU-River basin, TAKAYAMA Dam, SYORENJI Dam, MURO Dam, NUNOME Dam and HINACHI Dan was constructed, these dams have reduced flood and storm risk and suppied water for drinking, industry and agriculture. NABARI-River flows from TAKAMI mountain range. NABARI-River is 1st class river, catchment area is 615km2. Basin includes three prefectures, KYOTO, NARA and MIE

For Rich Living of People Outline of KIZU-River Basin

Ratio of YODO-River Catchment area Catchment area and Length of rivers

8,240km

INA-River 4.6%

Lake BIWA 46.7%

UJI-River 6.1%

KIZU-River 19.4%

KATSURA-River 13.4%

Downstream of YODO-River 9.8% River

Lake BIWA UJI-River

KIZU-River NABARI-River

Others KATSURA-River

Downstream of YODO INA-River

TOTAL

Catchement Area

Length of River (km)

●Water Supply Development of water resources by reservoirs dams had been implemented for increase of water demands for domestic and industry during and after high economic growth period (1960s). And, we supply irrigation water for agriculture filed along NABRI-River and KIZU-River from reservoirs.

Domestice water supply plan by reservoirs Domestic water supply area

Area / Reservoir

OSAKA pref. KYOTO pref. NARA pref.

OSAKA city HIRAKATA city

MORIGUCHI city

HANSHIN area AMAGASAKI city

NABARI city

NARA city YAMAZOE village

TSUGE village TOTAL

TAKAYAMA SYORENJI MURO NUNOME HINACHI KYOTO Pref.

HYOGO Pref.

OSAKA Pref.

NARA Pref.

SHIGA Pref.

MIE Pref.

1

Map of KIZU-River Basin

2

For Effective Management Outline of KIZU-River Basin

●Outline of Integrated reservoir management office KIZU-River Integrated Reservoir Management Office has managed five reservoirs on upstearm of KIZU-River effeciency and effectively for water resources management. And integrated office have roles as a core office to comunicate with related agency for management.

Organazational Structure

Dire

ctor

Vice

-Dire

ctor

(G

enra

l Affa

irs)

Vice

-Dire

ctor

(E

ngin

eerin

g Af

fairs

) General Affairs Division

Reservoir Management Division

Electricity and Telecommunication Division

Machiner Division

TAKAYAMA Reservoir Operation and

SORENJI Reservoir Operation and

MURO Reservoir Operation and

NUNOME Reservoir Operation and

HINACHI Reservoir Operation and Maintenance office

Flow Chart of Communication

KIZU-River Integrated Reservoir Management Office

-Collect and Transfer information -Disaster Response

MLIT YODO-River Integrated

Reservoir Management Office KIZU-River Upstream River

Management Office

Japan Water Agency Kansai Regional

Japan Water Agency

Information Direction of operation

Information

cooperation

Information

weather Forecast Radar Hydrological data Monitoring Camera

TAKAYAMA Reservoir

SYORENJI Reservoir

MURO Reservoir

NUNOME Reservoir

HINACHI Reservoir

Operation and Patrol Maintenance oacilities

3

Telecommunication System for Integrated Reservoir Management

●Outline of Telecommunication System KIZU-River Integrated Reservoir Management Office has communication line with not only five reservoirs but also YODO-River Integrated Reservoir Management Office, KIZU upstream River Management office and Japan Water Agency Headquators and Kansai Regional Office. These communication lines are consist of strong radio signal that is stable against disaster. we manage reservoirs effectively and effeciency with collecting hydorological data (Water Level, Rainfall, etc) for water supply and flood control.

Telephone line and Network

Radar, (Rainfall observation)

Telemer (Water Level, Rainfall data)

Optical Fiber Cable (Monitoriing Video

4

Leg

end

5

Data and Information Management for Interated Reservoir Management

It is necessary for 5 reservoirs integrated management to observe and collect hydrological data(River Water Level, Rainfall, Reservoir data) on Real-Time. We manage the information and data through telecommunication control facility for 24 hours.

TAKAYAMA, SYORENJI, MURO, NUNOME, HINACHI

Hydro-data Video Rainfall River Water

Meteorology Earthquake Rainfall-Density

Reservoir Telemeter Meteorological Radar

Water Inflow

Discharge Intake

Upstream

Others Others

Downstream Reservoir Rainfall

31 stations River Water Level

30 stations

Satellate Rainfall

Forecast Typhoon

Whole country KINKI Region

YODO-River Basin Forecast

Warning

Seismic Intensity

Rainfall History

Reservoir River

YODO-River Integrated Reservoir Managemenrt Office (MLIT)

Water Inflow

Discharge Intake

Flow

Others Rainfal

System

Hydro-data

KIZU- River Upstream Managemenrt Office (MLIT)

Japan Water Agency KANSAI Regional Office

Flood

Reservoir Data

Reservoir Video

Water Inflow

Discharge Intake

Upstream

Others Others

DownstreaWater

Mobile data communication

River Montoring Reservoir data

Reservoir Data River Flow Meteorological Data Radar

KIZU-River Integrated Reservoir Management Office

Telecommunication

Server Display of Reservoir data, River Flow and Reservoir Monitoring Video

6

Location Map of Rainfall and Water Level Stations

Water Level Station

Rainfall Station

Water Level Station

Rainfall Station

7

●Flood Control (Refer to "Hydrograph of Flood Control Plan) ●Irrigation and Conservation of River Environment -Surpply Irrigartion Water (Max 4.8m3s) at OKAWARA point for 3,300ha along KIZU-River -Discharge maintenance flow for river environment ●Domestic Water Surpply domestic water (5.0m3/s) to OSAKA and KOBE area ●Hydro-power 6,000kW (Max 14.0m3.s) managed by KANSAI Electricity Power Company

Hydro-Graph of Flood Control Plan

TAKAYAMA Reservoir

Design High Water 3,400m3/s

Start of Flood Control 1,300m3/s

Max. Discharge 1,800m3/s

Reservoir area

Hight of Dam Body Lenght of Dam Body

Volume of Dam Body Reservoir Area

Allocation of Reservoir Capacity

8

Total Reservoir Capacity

Usage Reservoir Capacity

9

●Flood Control (Refer to "Hydrograph of Flood Control Plan) ●Irrigation and Conservation of River Environment -Supply Irrigartion Water (Max. 1.3m3s) at OKAWARA point for 3,300ha along KIZU-River -Supply Irrigation Water (Max. 1.66m3/s) for 125ha along KIZU-River in NABARI area -Discharge maintenance flow for river environment ●Domestic Water -Supply domestic water (2.3m3/s) to OSAKA and KOBE area -Supply domestic water (0.19m3/s) to NABARI-city ●Irrigation Water -Supply irrigation water (1.72m3/s) to NABARI area ●Hydro-power 2,000kW (Max 3.9m3.s) managed by MIE Prefecture

Hydro-Graph of Flood Control Plan

SYORENJI Reservoir

Inflow

Discharge

Reservoir area

Hight of Dam Body Lenght of Dam Body

Volume of Dam Body Reservoir Area

Allocation of Reservoir Capacity

10

Total Reservoir Capacity

Usage Reservoir Capacity

11

●Flood Control (Refer to "Hydrograph of Flood Control Plan) ●Irrigation and Conservation of River Environment -Supply Irrigartion Water (Max. 2.3m3s) at KADAKA point for 348ha along UDA-River -Discharge maintenance flow for river environment ●Domestic Water -Supply domestic water (1.6m3/s) to NARA Prefecture (SAKURAI Water Treatment Plants) ●Hydro-power for Reservoir Management Generate power for reservoir operation and manintenance works -Max. flow 1.8m3/s -Effective Head 43.80m -Max. Output 560kW

Hydro-Graph of Flood Control Plan

MURO Reservoir

Inflow

Discharge

Reservoir area

Hight of Dam Body Lenght of Dam Body

Volume of Dam Body Reservoir Area

Allocation of Reservoir Capacity

12

Total Reservoir Capacity

Usage Reservoir Capacity

13

●Flood Control (Refer to "Hydrograph of Flood Control Plan) ●Irrigation and Conservation of River Environment -Discharge maintenance flow for river environment including irrigation water ●Domestic Water -Supply domestic water (1.136m3/s) to NARA-city ●Hydro-power for Reservoir Management Generate power for reservoir operation and manintenance works -Max. flow 2.2m3/s

-Effective Head 56.87m -Max. Output 990kW

Hydro-Graph of Flood Control Plan

NUNOME Reservoir

Reservoir area

Hight of Dam Body Lenght of Dam Body Volume of Dam Body

Reservoir Area

Allocation of Reservoir Capacity

Design High Water 460m3/s

Start of Flood Control 100m3/s

Max. Discharge 150m3/s

14

Total Reservoir Capacity

Usage Reservoir Capacity

15

●Flood Control (Refer to "Hydrograph of Flood Control Plan) ●Irrigation and Conservation of River Environment -Discharge maintenance flow for river environment including irrgation water in NABARI area ●Domestic Water -Supply domestic water (1.5m3/s) to NABARI-city,KYOTO prefecture and NARA-city ●Hydro-power 1,800kW (Max 3.7m3.s) managed by MIE Prefecture ●Hydro-power for Reservoir Management Generate power for reservoir operation and manintenance works -Max. flow 0.3m3/s

-Effective Head 38.41m -Max. Output 77kW

Hydro-Graph of Flood Control Plan

HINACHI Reservoir

Inflow

Discharge

Reservoir area

Hight of Dam Body Lenght of Dam Body

Volume of Dam Body Reservoir Area

Total Reservoir Capacity

Usage Reservoir Capacity

Allocation of Reservoir Capacity

16

17