Annexes: Mid–Term Review of the Katine Community Partnerships Project August 2009 Hazel Slavin

Upload: lizford

Post on 12-Nov-2014

923 views

Category:

Documents


0 download

DESCRIPTION

Katine mid-term review report annexes

TRANSCRIPT

Page 1: Katine mid-term review annexes

Annexes:Mid–Term Review

of the KatineCommunity Partnerships Project

August 2009

Hazel Slavin

Page 2: Katine mid-term review annexes

iMid–Term Review Katine Community Partnerships Project, July 2009 — Annexes

Table of Contents

Acronyms ..................................................................................................................................... iiAnnex 1: Terms of Reference for the Mid–Term Review of the KCPP, July 2009.........................1Annex 2: Itinerary .........................................................................................................................5Annex 3: KCPP Bibliography/Timeline .........................................................................................9Annex 4: KCPP Visitors Log Sept 2007–July 2009 ......................................................................11Annex 5: Partner–oriented progress reporting in the KCPP .........................................................15Annex 6: KCPP achievements since January 2008 .....................................................................16Annex 7: Self–assessment ...........................................................................................................20Annex 8: Quick survey July 2009 .................................................................................................27Annex 9: Villages x project activities matrices ..............................................................................33Annex 10: Achievement rating scale (MTR) .................................................................................43Annex 11: A process review of the Mid–Term Review ..................................................................46

Page 3: Katine mid-term review annexes

iiMid–Term Review Katine Community Partnerships Project, July 2009 — Annexes

Acronyms

AIDS........................... AcquiredImmuno–deficiencySyndrome AMREF...................... AfricanMedicalandResearchFoundation ANC........................... AnteNatalCare ARVs.......................... Antiretrovirals ASRH......................... AdolescentSexualandReproductiveHealth DAC........................... DevelopmentAssistanceCommittee DEO........................... DistrictEducationOfficer DFID........................... DepartmentforInternationalDevelopment(UK) DSC........................... DistrictSteeringCommittee DWO.......................... DistrictWaterOfficer GoU............................ GovernmentofUganda HIV............................. HumanImmuno–deficiencySyndrome HSSP......................... HealthSectorSupportPlan HUMC........................ HealthUnitManagementCommittee ITNs.......................... InsecticideTreatedNets KCPP........................ KatineCommunityPartnershipsProject LC.............................. LocalCouncilor MDD........................... MusicDanceandDrama MDGs......................... MillenniumDevelopmentGoals M&E........................... MonitoringandEvaluation MTR........................... Mid–termreview MoU........................... MemorandumofUnderstanding NGO........................... Non–GovernmentalOrganisation NUSAF...................... NorthernUgandaSocialActionFund OOP........................... OutofPocketExpenses PTA............................. Parent/TeacherAssociation PDC.......................... ParishDevelopmentCommittee PEAP......................... PovertyEradicationActionPlan PHASE....................... PersonalHygieneandSanitationEducation PLWHA....................... PeoplelivingwithHIVandAIDS PREFA....................... ProtectingFamiliesforHIV/AIDS(anNGO) PM............................. ProjectManager PMC.......................... ProjectManagementCommittee(atsub–countylevel) PO.............................. ProjectOfficer PSC........................... ProjectSteeringCommittee(atDistrictlevel) PSC........................... ParishSanitationCommittee PTA............................ Parent/Teachers’Association RBA........................... RightsBasedApproach SMC.......................... SchoolManagementCommittee TASO......................... TheAIDSSupportOrganisation ToR............................ TermsofReference UGX........................... UgandanShillings UWESO.................... UgandaWomen’sEfforttoSaveOrphans VCT........................... VoluntaryCounselingandTesting VDC........................... VillageDevelopmentCommittee VHT............................ VillageHealthTeam VSLA......................... VillageSavingsandLoanAssociation WATSAN................... WaterandSanitation WSC........................... WaterSourceCommittee

Page 4: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �

Annex 1: Terms of Reference for the Mid–Term Review of the KCPP, July 2009

1. Backgroundtothereview

1.1 SummaryoftheprojectInpartnershipwiththeGuardianNewspaperandBarclaysBankandwithtechnicaladvicefromFARM–Af-rica,AMREF,ahealthbasedNGO,isimplementingathree–yearintegrateddevelopmentprojecttoimprovethelivesofpeoplelivingintheKatinesub–districtofnortheasternUganda,oneof17sub–countiesinSorotidistrictwhichhadtheworstindicatorsforpovertyandunderdevelopment.The£2.6mprojectoverthreeyearsisbeingfundedbydonationsfromGuardianreadersandBarclays.Theprojectbringssustainablebenefits to communities in Katine by improving access to health services, water, education, livelihoods and trainingandbystrengtheningitsciviccommitteesanddecision–makingstructures.Whatisunprecedentedisthatsimultaneously,astheprojectinterventionsarebeingdelivered,successesandpitfallsarebeingtrackedbyGuardainjournalists.Guardianreaderscandebate,blogandfollowthestoryofcommunitybaseddevelopmentviaamultimediawebsite(www.guardian.co.uk/katine)whereallprojectdocu-mentationcanbereviewedandcommentedon.

AMREFUK,basedinLondon,managestherelationshipswiththepartners,thefundraising,communica-tions,andadvocacycomponentsoftheprojectwithintheUK,workingwiththeGuardiantofacilitatereport-ing,whileAMREFUgandahasthetechnicalexpertiseanddeliverstheprojectonthegroundinKatine.

TheKatineCommunityPartnershipsProject(KCPP)addressesthekeyconstraintstosustainablecommu-nity development by taking an integrated approach. The specific objectives are:

ImprovedcommunityhealthImprovedaccesstoqualityprimaryeducationImprovedaccesstosafewater,sanitationandhygieneImprovedincome–generatingopportunities(alsoreferredtoasimprovinglivelihoods)*Communitiesempoweredtoengageinlocalgovernance

FARM–AfricaisatechnicaladvisortothelivelihoodscomponentoftheprojectwhichliesoutsideofAM-REF’scorecompetencies.

CAREInternationalandlocalimplementingpartnerUgandaWidowsEfforttoSaveOrphans(UWESO)aredelivering a community–based microfinance project complementary to KCPP. The CARE–UWESO ’Katine VillageSavingsandLoans’projectisfundedbyasmallgrantfromBarclaysandcontributestotheliveli-hoodscomponent.”

Expected outcomes include:Increasedcommunityawareness,accesstoandutilisationofhealthservicesincommunityandhealthfacilities.Improvedaccesstoqualityprimaryeducationforallchildrenandgreatercommunityinvolvementinschoolgovernance.Increasedcommunityaccesstoandutilisationofimprovedwaterandsanitationfacilities.Improvedhygienepracticesinhouseholds.Improvedoperationsandmaintenanceofwatersources.Recovery of livelihoods through diversified and improved sources of income.Strongerabilityofruralinstitutionstoaccessbothadvisoryservicesandmarketsfortheirproductsforincreasedproductionandincome.Increasedcommunitycapacitytoplanandbudgetforcommunityneeds.Strongercommunitycapacityfordatagatheringandutilisation.Communitydemandingandachievingtheirrightsandservices.

AMREF’skeydevelopmentgoalistoclosethegapbetweencommunitiesandbasicservicedeliverysys-temsthroughitsCommunityBasedDevelopment(CBD)approach.Thisisachievedthroughbuildingthecapacityofcommunities,strengtheningsystemsofservicedeliveryandundertakingoperationalresearchto

●●●●●

●●●●●

●●●

Page 5: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 2

develop,share,scaleupandadvocateforbestpolicyandpracticechanges.TheKCPPprojectisstrength-eningthefunctionalityofexistingcommunity–basedstructureslikewatersourcecommittees,VillageHealthTeams(VHTs)andParentTeacherAssociations(PTAs).Simultaneously,itworkswithandbuildsthecapac-itiesoflocalgovernmentstructuresliketheparishdevelopmentcommittees,theparishsanitationcommit-tees,thesub–countyhealthcommitteeandthefarmers’forumstoensurethattheyplaytheirroleseffec-tively.Theapproachalsoensuresthattheprojectcomponentsofhealth,waterandsanitation,education,livelihoodsandcommunityempowermentworktore–enforceeachothertoensureintegrateddevelopment.

TheprojectmanagementstructureAsub–countyprojectmanagementcommitteehasbeenestablishedtoprovideoversighttotheoperationalaspectsoftheproject.Thecommitteeisinvolvedintheprojectactivitiesandactionplansaresharedonaregularbasis.Itischairedbythesub–countychiefandco–chairedbytheAMREFDeputyCountryDirector.

Atthedistrictlevel,thedistrictsteeringcommittee’sroleistoensurethattheprojectisalignedtorelevantgovernmentpolicyandprogrammesincludingthedistrictdevelopmentplanandsectorstrategiesandhaseffective partnerships. It is chaired by the Chief Administrative Officer who is the head of the civil service at thedistrictlevel;theAMREFcountrydirectoralsoco–chairsthecommittee.

Atthemidtermpointoftheproject,AMREFwillworkwiththegovernancestructuresandprojectpartnerstodevelopexit,scale–upandsustainabilitystrategies.Theprojectwillstrengthenthemanagementandtech-nicalcapacityofthecommunity,sub–countyanddistrictstructures.Itwillalsostrengthenlinksanddialoguebetweencommunitygroupsandlocalgovernmentasabasisforadvocacy,betterplanningandraisingresourcesbeyondthelifespanoftheprojectasAMREF’sroledecreases.

1.2PurposeofthemidtermreviewThepurposeofthemid–termreviewistoassessprogressagainstobjectivesinall5componentstoassesstowhatextenttheprojectisontracktoimprovethequalityoflifeforthepeopleofKatine.TheMTRwillalsoprovidelessonslearnttodatewithclearrecommendationstoinformfutureimplementationandimproveprojectdeliveryfortheremainderoftheproject.Thereviewprocessshouldallowcommunities,localgov-ernment to reflect and learn from the approach to development with consideration of how the learning can beappliedtofutureplansandpolicies.

1.3Scopeofthemid–termreviewThescopeofthereviewshouldfocusoninterimresultsatoutcomelevelthatcontributetoachievingthelongertermgoalofimprovingthequalityoflivesforthepeopleofKatine,whathashelpedandwhathashindered(intermsofexpectedandunexpectedoutcomes)andalsoproviderecommendationsofhowtostrengthen outcomes for sustainability for the remainder of the project. The MTR should look at:

Changestopeople’slivesintheareasoflivelihoods,health,waterandsanitationandeducation.(con-sideringimpactandequityofapproachtodate).Changestocommunityandgovernmentstructuresintermsoftheircapacitiesandtheimpactthishasonthedeliveryoftheprojectandpeople’slivesi.e.areweseeingamoreactivecommunityorpolicychange?(consideringsustainabilityandeffectiveness). The contribution of: 1) AMREF’s activities 2) Partners activities e.g. UWESO, FARM–Africa, CARE (considering relevance, effectiveness and efficiency3) Role of other NGOs operating in Katine, consid-eringtowhatextentthepartnershipsandcollaborationshavehinderedorhelpedtowardsachievingtheendgoal.Thegenderdimensionsoftheprojectandhowgenderequitycanbeenhanced.Explorefactorsthataffectthedeliveryofprojectactivities.Reviewandidentifysustainabilitymechanisms,whatneedstohappenfrommidwayuntiltheendoftheprojectandaftertheprojectlifetimetoensuresustainabilityi.e.replicationofthemodel/scaleupandanexplorationofopportunitiestosupportthat.Noteunexpectedoutcomesoftheproject. Risks and assumptions: consider assumptions in initial design of project, what has been learnt to inform futureimplementation.

●●●

●●

Page 6: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �

2. Methodology

2.1.Basicmethodologyofthemid–termreviewThemid–termreviewerwillchoosethemethodologyforcollectingandanalysingtheinformationbasedonacceptedprofessionalstandards.Themid–termreviewshouldbeparticipatoryasmuchaspos-sibleandincludefeedbackfromthekeypartnersinUgandaandintheUK(Barclays,GuardianandFARM–Africa).TechnicalsupportonmethodologywillbeprovidedbytheexternalevaluatorRickDav-ies(seefurtherbelow).

Readingthekeysourcesofdocumentationandkeyinformantssuchascommunitysurvey,baseline,andprojectreportswillberequiredpreparation.

ThereviewerwillbeexpectedtoprovidethefullycompletedquestionnairestotheKCPPandallthemanu-alsforthetrainingandalltheotherrelatedrecordingsifany.

Itisproposedthatthemid–termreviewerfacilitatesaparticipatoryandconsultativeprocessinvolvingallstakeholders.

2.2.TentativetimetableThe mid–term review process is divided into five phases, specified below:

Phase 1: DevelopmentandagreementontheToR,agreementonmembershipofMTRteam,recruitmentandbrief-ingoftheteamleader–May

Phase 2: Leadconsultanttoprovideareviewtimetableandprocess.

Phase 3: Conductreview.

Phase 4:Briefing of key stakeholders at end of field work process.

Phase 5:FirstdraftofthereportsharedwithAMREFUgandastaffforinitialcomments(2ndweekofAugust)drafttobesharedelectronicallywithAMREFUKandAMREFHQforreview.

Phase 6:Second draft report shared with partners (Barclays, Guardian and FARM–Africa) for final comments (throughemail)

Phase 7:Finalreportproduced,emailedtoallpartnersfordisseminationontheGuardian,BarclaysandAMREFwebsitesandsharedina2dayActionPlanningworkshopinKatinewithprojectstakeholderson15thand16thSeptember2009.

The workshop will enable partners to internalise the findings and recommendations of the MTR, reach consensusonnextsteps,discusslegacyoptions.OutputswillbeastrategydevelopedforlegacyoptionsforKatinebasedonMTR.Theresultsoftheworkshopwillbesharedwithallstakeholdersanddissemi-natedasabove.

3. Expectedoutputs

Areportofabout25pageswithanexecutivesummarythatprovidesanoverviewofwhathasbeenachievedtodatetoimprovethelivesofthepeopleofKatine.Recommendationsonwhatstrategiestoadopttostrengthentheoutcomesoftheproject.

1.

2.

Page 7: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �

SuggestedoptionsforwhatnextpostKatine.

3.1 FinalreportBothasoftcopyandhardcopyreportswillbesubmittedtoKCPP.

4. Expertise required / Reviewer

The reviewer is required to have the following qualifications and expertise:Goodknowledgeandgeneralfamiliaritywiththeimplementationofcommunitydevelopmentprojects.Knowledge&experienceofcarryingoutsimilarstudieswithreputableorganisations.Academicandworkingknowledgeintheareasofhealth,education,waterandsanitation,livelihoodsandcommunityempowerment.Familiaritywiththepolitical,economic,social,technologicallegalenvironmentandinstitutionalcondi-tionsinUgandaingeneral.Understandingoftheculturesoftheruralcommunitiesinthedevelopingcountries.Sensitivitytosocio–culturalandgenderissuesinSoroti.KnowledgeandexperienceinusingtheevaluationcriteriaofTransparency,Equity,effectiveness,ef-ficiency, impact, relevance and sustainability.Provenpracticalexperienceinproject/programmeevaluationparticularlyinparticipatoryevaluation.Abilitytoanalyseandsynthesiseandtowriteclearreports.Abilitytoseethewiderscopeoftheprojectintermsofit’sfocusoncrosssectorpartnershipfordeliveryandincontextoftheprojectbeingseenasmeansofcommunicatingdevelopment.FluencyinEnglishandpreferablyanabilitytounderstandAteso/Kumam.Readytoabidebytheethicalprinciplesthatguideresearchandstudies.

Thereviewershouldbefamiliarandconversantwithsuitabletechniquesforfacilitationofgroupdiscussionsandanalysisandhaveprovenpracticalexperienceonthis.Therevieweralsoneedsbeabletoworkunderpressureandinnot–optimalphysicalconditions.Theindependentconsultantshouldhaveexcellentreportwritingskillsandhavetheabilitytolisten,negotiateandcollaborateisessentialaswellastheabilitytobringtogetherdifferentpointsofview.

Roleoftheexternalevaluator

The(Guardiancontracted)externalevaluatorwillbeamemberoftheMTRteam,leadbythereviewercontractedbyAMREF.Hewillbepartofthereviewteamandcontributetothedesignandimplementationofthereview.ThereviewerwillberesponsibleforthepreparationoftheMTRreport.Hewillalsomonitorthereviewprocess,andprovideanannextotheMTRreportonthereviewprocess.Hisviewswillbesharedwiththereviewerduringthereview,andwiththeGuardianandothersonthecompletionofthereview.

Theexternalevaluatorandthereviewerwillbothacknowledgeminorityviewsifandwheretheyareimportant.

3.

1.2.3.

4.

5.6.7.

8.9.10.

11.12.

Page 8: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �

Annex 2: ItineraryHazelSlavin,MTRConsultant1

RickDavies,ExternalEvaluatorKatineProject2

10/06 Meeting HazelSlavin,MTRConsultantRickDavies,ExternalEvaluatorKatineProject

23/06 MeetingatAMREF,UK ClaudiaCodsi,AMREFGraceMukasa,AMREFMadeleineBunting,GuardianJoe Confino, GuardianHelenBarnes,CAREMaudeMassu,CAREEdWatkiss,FarmAfricaRickDavies,ExternalEvaluator(RD)HazelSlavin,MTRconsultant(HS)

24/06 TelephonecallwithHS

TelephonecallwithHS

LizFord,GuardianKatineWebsiteManager

Maude Massu, CARE, Microfinance Advisor

25/06 TelephonecallwithHS MadeleineBunting,Guardian

26/06 TelephonecallwithHS

TelephonecallwithHS

SarahBoseley,Guardian

HelenBarnes,CARE,CorporatePartnerships

29/06 MeetingatAMREF,Kampala JoshuaKyallo,AMREFCountryDirectorSusanWandera,DeputyCountryDirector

30/06 MeetingatCARE,Kampala

MeetingatUWESO,Kampala

GraceMajara,VSLAProgManager

BoscoEpila,Socio–economicProgManager

30/06 MeetingatAMREF,Kampala JoshuaKyallo,CountryDirectorSusanWandera,DeputyCountryDirector

01/07

DriveKampalatoSoroti/Katine

MeetingwithProjectTeam,Soroti OscarOketch,ProjectManagerOlwney Martha Kavuna, M&E officerLilian Viko, Project Officer, EducationAmeruaMolly,ProjectAssistant,EducationOtim Joseph, Project Officer, HealthOkurutAlfred,ProjectAssistant,HealthVenansio Tumuhaise, Project Officer, LivelihoodsOgwangDavid,ProjectAssistant,LivelihoodsKasule John Leonard, Project Officer, WATSANOkelloAnthony,ProjectAssistant,WATSANOpesenRichard,CommunityEmpowermentSimon Mugenyi, Communications Officer

1 Attend all meetings unless indicated2 Attend all meeting unless indicated until 09/07

Page 9: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �

02/07 MeetingswithRD,HSandteammembersSteeringCommittee

ManagementCommittee

OjomParishDevelopmentCttee

OjomaParishDevelopmentCttee

12men2women

21men4women

22men14women

22men10women

03/07 MeetingswithRD,HSandteammembers

AsstDHO&staff

OjumHealthCentre2RDmeetingHUMCHSmeetingVHTVisittoCentre

TiririHealthCentre4MeetingwithHUMC(RD)MeetingwithVHT(HS)VisittoCentre

DrOlhadhiCharlesStephen,AsstDHORosemary Anaso, Nursing Officer

4 members (3 men, 1 woman)16members(9men7women)LucyAriamo,Nursein–charge

2members(men)7members(5men2women)JuventineEmayu,sisterin–chargeAlibu Francis, Records Office

04/07 Work in Office

05/07 RandomwalksinMerokandKatinePar-ishes

RD,HS,ProjectDirector

06/07 MeetingswithRD,HSandteammembers

Deputy District Education Officer SchoolInspectorKatine

VisittoAdamasikoSchoolMeetingwithteachers(HS)MeetingSMCandPTA(RD)

OkelloEverestwithRDandteammemberCharlesOkirorwithHSandteammember

EngweduWilliam,Headmaster7 members (4 men 3 women)13 members (11 men 2 woman)

MembersofSchoolHealthTeam(RD/HS)

MeetingwithCentreCo–ordinatingTutor

MeetingwithusersofCommunityResourceCentre(HS)

HeadGirlandHeadBoy

JoshuaOkekeny

5 members (2 men, 3 women)JosephMalinga

07/07 VisittoOjomPrimarySchoolMeetingwithTeachers(HS)SchoolHealthCommittee(HS)MeetingwithSMCandPTA(RD)

EkotuFrancis,HeadTeacher7members(6men,1woman)HeadGirlandHeadBoy13 members (11 men, 2 women)

08/07 OmulaiWaterSourceCommittee

Sub–CountySanitationCommittee

OlwelaiParishSanitationCommittee

MataliWaterSourceCommittee

9members(5men,4women)

10members(9men,1woman)

13 members (12 men, 1 woman)

5 members (2 men, 3 women)

Page 10: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �

09/07 RickDaviesleavesUganda

District Water Office

Sub–countyHealthCommittee

OjamaParishSanitationCommittee

Peter Opwanya, District Water OfficerAdoaStephen,WO,HealthandSanitationFrancisOpolot,WO,CommunityEducationEpeetThomas,CWO,SorotiEmesuSimonPeter,CWO,SerereMulala Fabian, DWD TSU 3

15 members (13 men, 2 women)

7members(5men,2women)

10/07 Meeting at District Production Office

Soroti District Veterinary Office

OjemorunUnitedFarmersGroup

ObalangaAtamakisiFarmersGroup

OkettaWW,DistrictProductionCo–ordinatorEyudu P, District Veterinary OfficerAdutu Patrick, District Natural Resources OfficerOlupot Maurice, Community Development Officer

OpamaMoses,Para–vetAacoAngellaImmaculate,Para–vetEiduJoel,Para–vetEreuFelix,Para–vet

29members(9men,20women)

20members(8men,12women)&2non–mem-bers

11/07 UWESO Office, Soroti

AkiroPoteVSLAGroup

AcanmireVSLAGroup

Owera Jeffrey, Programme officerPatrick Osure, Programme officer

12members(5men,7women)

20 members (7 men, 13 women)

12/07 Preparationforde–brief&planning

13/07 De–briefandplanningmeeting OscarOketch,ProjectManagerOlwney Martha Kavuna, M&E officerLilian Viko, Project Officer, EducationAmeruaMolly,ProjectAssistant,EducationOtim Joseph, Project Officer, HealthOkurutAlfred,ProjectAssistant,HealthVenansio Tumuhaise, Project Officer, LivelihoodsOgwangDavid,ProjectAssistant,LivelihoodsKasule John Leonard, Project Officer, WATSANOkelloAnthony,ProjectAssistant,WATSANOpesenRichard,CommunityEmpowermentOchanLennox,AsstClerkofWorksNicodemusTumukwasibwe,ProjectManager,EUIntegratedProject,SorotiGeorgeEkochu,AMREFaccountant,Soroti

14/07 MeetingatFarmAfrica,Mbale

ReturntoKampala

ShamilahNamusisi,Training&AdvisoryUnitCoordinator

15/07 Preparationandwriting

Page 11: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �

16/07 De–briefAMREFKampala JoshuaKyallo,AMREFCountryDirectorSusanWandera,DeputyCountryDirector

17/07 HSleavesUganda

20/07 De–briefAMREFUK JoEnsorGraceMukasaClaudiaCodsi

Page 12: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 9

Annex 3: KCPP Bibliography/Timeline

RickDavies,July2009

Format: Year, Month, Document, Author

Unknowndate�Guardian Sponsored Village (invitation for proposals), Unknown Putting African Communities First. Enhancing Capacity and Participation to Close the Gap in Health Sys-tems AFRICAN MEDICAL & RESEARCH FOUNDATION Strategy 2007—2017,AMREFBoard

2007September�AMREF Katine (rural) Guardian proposal, Susie Hares Community Needs Assessment—Overview, Sonja Patscheke Community Needs Assessment (full report), Carol Idusso, Tim Bromfield (budget)

2007October�Engagement & Communications Plan, Sonja Patscheke Stakeholder Engagement and Communications Approach DRAFT, Graham KJ�KCPP�Conceptual�Framework,�Tim�Bromfield�(Accenture) Health Facility Database, Albert Killian Katine Outputs Tracking Database, Rebecca Copeland Village Health Team database, Rebecca Copeland Contract between Guardian and Rick Davies Online survey of expectations of external evaluator, Rick Davies Draft workplan, Rick Davies Guardian: Opening of KCPP, Alan Rusbridger

2007November�Initial Action Plan (Quick Wins), unknown Community Survey: In November 2007, a survey was carried out to obtain information on what re-sourcesexistedinthetargetcommunitiesatprojectstart–upintheareasofinterestinhealth,waterandsanitation, education, and livelihoods. The Community Survey had three components: a Village Survey, Health Facility Survey, and a School Survey. Information was collected from all 65 villages, 13 schools andthreehealthunits.RebeccaCopeland�Partnership Workshop: 27th November 2007, Manny Amadi Comments on Community Needs Assessment—Overview, RickDavies

2007December�M&E Plan, Rebecca Copeland �Three�year�costed�plan,�Tim�Bromfield��Three�year�implementation�plan,�Tim�Bromfield� 1st quarter implementation plan, unknown�Katine:�It�starts�with�a�village:�(basic�information�briefing�for�Barclays Comments on the KCPP Monitoring and Evaluation Plan Version 3 29/11/2007, RickDavies

2008January�Baseline survey, Rebecca Copeland and Uganda Bureau of Statistics Year 1 Implementation plan, Unknown Impact Assessment report on SUSTAIN, Xavier Nsabagasani et al Uganda Country Strategic Plan 2007–2011, RebeccaCopelandandKathyAttawell

2008February FARM–Africa staff visit to Katine Village Project 28th January to 1st February 2008, Martin Roberts

2008March VSLA proposal for Barclays, Aguga�Draft:�A�project�by�UWESO�in�partnership�with�CARE�International�Community–led�financial�services�for�the Katine community in Uganda, Unknown and undated

3 With AMREF Katine team and Sarah Majota4 With AMREF Katine team (and Sarah Majota

●●

●●●

●●●●●●●●●●

●●

●●

●●●●●●

●●●●

●●

Page 13: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �0

The Katine Community Partnerships Project (KCPP) First Visit Report, by the M&E Consultant—January 2008, Rick Davies

2008April�Katine stakeholder meeting and Preliminary project steering committee meeting. Soroti Hotel April 3, Carol Idusso Minutes of 16 April district partners meeting with AMREF Uganda, Carol Idusso KCCP—UK Partnership meeting April 30th 2008–05–02, Claudia Codsi Comments on Baseline Community Survey January 2008, RickDavies

2008June�Minutes of 2nd KCPP Project Management Committee meeting held on 13/06/2008 at Katine Sub County Lukiiko Hall, Richard Opesen Katine Community Partnerships Project 6 MONTHS PROGRESS REPORT (OCT 2007 TO MARCH 2008) Submitted to: The Guardian and Barclays, OscarOketchandClaudiaCodsi

2008July�M&E Framework, Becky Copeland Care Uganda Proposed Budget To Barclays Bank For Implementation Of VSLA In Katine Soroti, Korus�Minutes Of The 1st KCPP Project Steering Committee Meeting 14/07/08 From 10:30–15:30 Soroti Dis-trict, RichardOpesen

2008October�Monitoring The Katine Community Partnerships Project (KCPP)The Second Visit Report by Independent M&E Consultant. August 2008, RickDavies

2008November�AMREF�Reflections�On�2nd�External�Evaluation�Of�KCPP,ClaudiaCodsi

2008December�Report of the Baseline Survey of the Village Savings and Loans Associations in Katine Sub county, So-roti District. Prepared for SUSTAIN, Kemigisa Margaret Katine Community Partnerships Project Annual Narrative Report Submitted to: The Guardian and Bar-clays Project Duration: Three Years. October 2007–September 2010, OscarOketch

2009January�Report On Katine Partnership Orientation Attended By CARE—AMREF And UWESO Staff Katine Sub-county–Soroti District Eastern Uganda Region 19th To 22nd January 2009, SylviaKaawe

2009February�Report On Katine Field Visit By CARE Uganda Pd And CARE UK MF Advisor Katine Subcounty–Soroti District Eastern Uganda Region10th To 12th February 2009

2009March�CARE—UWESO FIELD VISIT FOLLOW UP MEETING held on 2nd�March�2009�at�UWESO�head�office

2009June�Katine Community Partnerships Project 6 Month Narrative Report October 2008–March 2009 Duration: Three Years. October 2007–September 2010, OscarOketchandClaudiaCodsi�Comments on the 6 Month Narrative Report October 2008—March 2009, RickDavies

●●●

●●●

Page 14: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Annex 4: KCPP Visitors Log Sept 2007–July 2009Estimatedhoursspentwithvisitors�

Date NameofVisitor Organisation StaffInvolved Activities Hoursspent

12–17Sept07 JohnVidal Guardian CarolIdussoHellenAkitengJosephEpuru

Fieldvisits 96

9–11Oct07 AlanRushbridgerLindsayMackieDanChungBenGreenXanRiceJoEnsorSueHollickRachaelBarber

GuardianGuardianGuardianGuardianGuardianAMREFUKBarclays

AllKatine Field and office visits

128

25–26Oct07 SarahMargiottaDr.MikeMarksSarahThurston

ManagementCon-sultantDirectReliefInter-national

RichardOpesen

ChrisEmeu

Fieldvisits 14

07–14Nov07 SarahBoseley Guardian CarolIdussoHellenAkitengEpuruJoseph

Fieldvisits 70

8–9Nov07 Dr.FlorenceMuli–MusiimeDr.PeterNgatiaDr.DarausBukenyaBobKioko

AMREFHQ HellenAkitengJosephEpuruRichardOpesen

Fieldvisits 28

14–16Nov07 GibBulochPhoebeBennett

Accenture–ADPPartnerships

HellenAkitengJosephEpuru

Fieldvisits 14

14–26Jan08 RickDavies GuardianEvalu-ator

Allstaff Field and office visits

140

20Feb08 MarieWittsLindsayPouton

GuardianFilms Allstaff 15

30 Apr 08 FlorenceMusiime AMREF Allstaff Fieldvisit 15

9May08 WilliamDurban BarclaysUK Comms officer Fieldvisit 15

14May09 JimSampsonDavidWattsKennyEbonySusieHares

IndividualBar-claysstaffandtwopartnersonprivatevisit

Allstaff Office and field visit

15

15May08 BarclaysVice–ChairmanGarryHoffman,MadeleineBuntingandteam(7)

Barclays/Guard-ian

Allstaff Fieldvisit 42

7–10Jul08 MartinGodwin Guardian KatineStaff Mobilisingcom-munityFacilitatingtransportInterpretationGeneralfacilita-tion

21

5 Time spent is roughly estimated as 7 hours for each day for one member of staff. Number of days/staff is underestimated to err on the side of caution.

Page 15: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �2

Date NameofVisitor Organisation StaffInvolved Activities Hoursspent

9Jul08 CathyBryantandteam(4). LEMUresearchers Allstaff Researchers 21

30 Jul 08 BaraDelFieiro EU Commsstaff Fieldvisit 15

28–31 Jul 08 AnnePerkins Guardian Katinestaff Briefing staff on thevisitMobilisingareaofcoverageGeneralfacilita-tionFacilitationintransport

28

25Jul–8Aug08

RickDavies GuardianInde-pendentEvaluator

KatineStaff Briefing from staffMobilisingpos-sibleareatovisitUpdatesbycomponentsMeetingswithcommunitystructuresGeneralfacilita-tionFacilitationintransport

140

13–15 Aug 08 LianeFarrer AMREFUK/HQ DriverCommunicationsofficersPM

Getgeneraloverviewofprojectarea

28

12–25Sep08 SarahNason Guardian ChrisEmeuComms Officer DavidOgwangAlfredOkurut

Gather film re-sourcesfortheGuardianXmasappeal

150

25–27Sep08 ClaudiaCodsiCraigPollard

AMREFinUK AllStaff Briefing FieldvisitsUpdatesbycomponentsMeetingswithcommunitymembersGeneralfacilita-tionFacilitationintransport

32

06–14Oct08 SarahBoseleyMartinGodwinDavidSmith

Guardian/Ob-server

PMDriversComms OfficerM&E officerLivelihoods offic-ersHealthAssistant

Fieldvisit 105

27–30 Oct 08 JohnVidal Guardian M&E officerComms officeLivelihoods offic-ersDriver

Fieldvisit 30

Page 16: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Date NameofVisitor Organisation StaffInvolved Activities Hoursspent

27–29Oct08 AlistairBoyd Ex–BoardMemberAMREF

Allstaff AdvisoryFieldvisitsUpdatesbycomponentsGeneralfacilita-tion

21

10–11Dec08 AMREFHQ(5)ledbythedeputydirectorgeneralFlorenceMusiime

AMREFHQ Allstaff FieldvisitsUpdatesbycomponentsGeneralfacilita-tion

28

Dec2008 DanChung Guardianphotog-rapher

Comms officer and driver

Generalfacilita-tion

32

12–15Jan09 PragnaGandesha BarclaysBankStafffromUK

AllStaff FieldvisitsUpdatesbycomponentsGeneralfacilita-tion

21

20–21Jan09 DFIDUgandacountrydirectorJohnTurkington,AlistairRobb,JoLofthouseWorldBankCountryMan-agerandteam

DFIDUganda PMComms officerEducation officersHealth officersM & E officer

FieldvisitsUpdatesbycomponentsGeneralfacilita-tion

14

28Jan09 Farm–AfricaUKpro-grammedirectorGeorgeMukath

Farm–AfricaUKprogrammedirec-tor

PMLivelihoodsstaff,M & E officerDrivers

FieldvisitsUpdatesbycomponentsGeneralfacilita-tion

14

3 Feb 09 SorotiDistrictViceChair-manMichaelEwamuCommunity Devt Officer

SorotiDistrictof-ficials

AllStaff FieldvisitsUpdatesbycomponentsGeneralfacilita-tion

12

12Feb09 IvanLewisMP,MinisterforAfricanDevelopmentDFIDUgandaCountryDirectorJohnTurkington,AlistairBoydandteam

UKMinisters PMHealth officersEducation officersComms officerDrivers

Generalfacilita-tion

18

18 Feb–3 Mar 09

GeorgeOmonposah Guardian film maker

LivelihoodsstaffPMDriversComms Officer

Generalfacilita-tion

140

23–28 Feb 09 Jo ConfinoLaurence Confino video-grapher,LizFordWebsiteeditor

Guardian Allstaff FieldvisitsUpdatesbycomponentsGeneralfacilita-tion

60

23–26 Feb 09 AnnieKelly–freelancejour-nalistforthewebsite

Guardian Allstaff FieldvisitsUpdatesbycomponents

21

Page 17: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Date NameofVisitor Organisation StaffInvolved Activities Hoursspent

Mar09 CountryManagerNathanWassolo

GSK Allstaff UpdatesbycomponentsGeneralfacilita-tion

10

24–27Apr09 SarahBoseley Guardian DriverComms officer

Generalfacilita-tion

21

29Apr–1May09

MadeleineBunting Guardian Allstaff UpdatesbycomponentsGeneralfacilita-tionFieldvisit

35

29–30 Apr 09 FourUN–MDVStaff.Dr.RichardAyam,Dr.JohnOkorioJoelleBassoul.

TheMillenniumDevelopmentVil-lageProject

Allstaff UpdatesbycomponentsGeneralfacilita-tionFieldvisit

21

27Apr–4May09

LaurenceTopham,Filmmaker

Guardian DriverComms officer

Generalfacilita-tion

49

20May09 GraceMukasa,ClaudiaCodsi

AMREFUK Allstaff 14

7–14Jun09 PaulandDanChung Guardian DriverComms officer

Generalfacilita-tion

49

13 Jun 09 LillianByrauhanga,MichaelKaddhu

BarclaysUganda Comms OfficerEducation Officer

Fieldvisit 12

15Jun09 ChairmanBarclaysBank,MarcusAgiusandTeam(9)

Barclays Allstaff Fieldvisit 35

1–13Jul09 HazelSlavinRickDavies

AMREF/Guardian Allstaff MidtermreviewBriefing from staffUpdatesbycomponentsMeetingswithcommunitystructuresGeneralfacilita-tionFacilitationintransport

251

14–18Jul09 SarahBoseleyMartinGodwin

Guardian Driver–EugeneHealth Officer

Collectingstoryonhowtheprojectaffectschildren

35

15Jul09 GSKPresidentAndrewWittyandteamAnd7others

GSK Allstaff Fieldvisits 35

Estimatedtotalhours 2110

Page 18: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Annex 5: Partner–oriented progress reporting in the KCPPRickDavies,7July2009

The last 6 Month Narrative Report was 32 pages long, excluding annexes. Within that the main section describingprogressagainstplansis16pageslong(pages11–27).Theheadingsandsub–headingsofthatsectionarebasedontheAMREFKCPPworkplanheadingsandsub–headings.AsaresultthesearefocusedondifferentcategoriesofAMREFactivities.

Thealternativeistostructuretheheadingsandsub–headingsofthissectionaroundthetypesofpartnersAMREFisworkingwith,anddifferencesamongstthesepartners.Thiswouldmakethewholereportmuchmorepartner–oriented,buildingontheusefulsection5whichprovidesagoodoverviewof“partnershipandcoordinationwithotherbodies”.

Some examples of how the “Progress of Activities” section could be restructured:Educationsectorpartners(previously“Improvedaccesstoqualityeducation”)CommunitySchoolsTeachersSchoolManagementCommitteesParentTeachersAssociationsSchoolHealthCommitteesGovernmentSchoolsTeachersSchoolManagementCommitteesParentTeachersAssociationsSorotiPrimaryTeachersCollegeDistrict Education OfficeEducationSectorCoordinationMeetingsgroup

Under each of these headings and sub–headings AMREF could describe: (a) how it has been work-ingwiththatpartner,includingthetypesofassistancegiven,and(b)evidenceofdevelopmentofthatpartner’scapacities.

Muchofthematerialinsection5on“partnershipandcoordinationwithotherbodies”couldbeincludedinthisre–structuredsection.

Inthe“Healthsectorpartners”sectioninformationaboutthecommunity’shealthstatuscouldbede-scribedinthesub–sectiononthehealthcentres,inparagraphsdealingwithwhatthehealthcentreknowsaboutcommunityhealthstatus.

Annexescouldbeincludedofthetypebeingdevelopedthisweek,providingdetailedsupportinginfor-mationonwhattypesofAMREFsupportedinputshavebeenprovidedtowhichvillages,schoolsandhealthcentres.

A final note: If AMREF 6 months narrative report is shared with partners in Soroti district then partner–orientedprogressreportingmightbemakethereportmuchmorereadabletothem.

1.

2.

3.●●●●●●●●●●●●●

4.

5.

6.

7.

8.

Page 19: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Annex 6: KCPP achievements since January 2008

Component InfrastructureandHardware Training Results

Health Fridgeandcoldchainfacilities

Bicyclesprovided

LaboratoryatOjomHealthCentre11

15Communityvaccinators

272VHTs

78TraditionalBirthAttendants(TBAs)

130 Community medicinedistributors

5labtechnicianstrained

27healthworkers

3 Health Unit ManagementCommittees

Increased immunisation coverage for <5 (43% at project start) to 89.3%(againstpolio,TB,whoopingcough,hepatitisB,tetanus, diphtheria and haemophilus influenzae)

Increasedknowledge/awarenessonHIV/AIDSPsycho–socialsupportforPLWHACounseling/testingforHIVpromoted(874pregnantwomen,145children>181,441adults)Referralsofsickpersonstohealthcenters(9outof10comparedto2outof10atstartup)DiseasesurveillanceincreasedReduction in cases of diarrhoea (from 38% at baseline to 6% children >5 and 1.4% <5

Promotionoffamilyplanningmethodshasnotbeenasuccess

Promotion of deliveries by skilled attendants (33% at baseline to 3%) has reduced the number of deliveries by TBAs (38% at baseline to 27%)

Home–basedcareofchildhoodillnessImproveddiagnosisandtreatmentofTB,HIV,STIs,malaria,URTI,anaemia,worms.Increaseinuptakeofservices.

ITNsprovidedtohighriskgroups

RefreshertrainingonPMTCT

Managementprocesses,planning,budgeting,monitoring,infectioncontrol,drugmanagement,leadingtoimprovedmanagementandnolossofstaff

Page 20: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Component InfrastructureandHardware Training Results

Education Rehabilitation

KatineP/s–5classes, 1 office, 1storeOchuloi–8classes, 1 office, 1storeOimai–4, 1 office, 1storeOjama–library,1class

ConstructionAmorikot–7classes, 1 office, 1store

3161 Text books

510Desks

Sportskitssuppliedto13 schools kit includes–(2javelins,2discuses,2shortputs,1volleyball,2netballsrings,2footballnets,1volleyballnet,2footballsand2netballs)2setsofrelaybatonsforsub–county

4bicyclestoKatinebest2girlsandbesttwoboysinPLE

15setsofMDDequipmentsetincludes(10T/shirtsfordancers,12 rafia skirts,5rollsofkitengematerial,Ibigdrum,1mediumdrum,1smalldrum,1 tube fiddle, 1bigthumbpiano,1smallthumbpiano,1handshaker,1xylophone)

26teacherstrainedingamesandsports102teacherstrainedinChildtochild,Rightsofthe child PIASCY andAdolescentreproductivehealth

90teacherstrainedinPHASE

26femaleteacherstrainedingenderasrolemodelsforgirls

26teacherstrainedinMDD

63 PTA members trainedonrolesandresponsibilities

72SMCmemberstrainedonrolesandresponsibilities

12teachersguided270parentsindevelopinglocalteachingmaterial

1800parentsattendedsensitisationralliesonOVCandUPE

300 children trainedandparticipatedinPHASEevent

Katinehas15primaryschoolscomparedtobaselineof13. ( 2 schools Ojom and Ogwolo were pre–schools during baselinenowupgradedtoPrimaryschools)

School enrollments of 361, Ojom and 362 at OgwoloSchool enrollment increased from 7531 at baseline to 9071.

NumbersdecreaseatP.7to426

BookssuppliedtoOchuloi,Oimai,Ojama,Ojago,Katine,KatineTirirri,Adamasiko,Olwelai,Ajonyi,Merok,Obyarai,Amorikot, Kadinya and wall charts for 13 schools

DesksdeliveredtoAmorikot,KadinyaKatineTiririri,Katine,AdamasikoOchuloiandOimaischools

Advocacyforincreasingfemaleteachersinschoolsandparticipationinleadershiprolesinthecommunity

15PTAcommitteesstrengthenedtoimproveschoolmanagement

15SchoolManagementCommitteesstrengthened,formonitoringandsupervision

Productionoflocalteachingmaterials

Improvedlessonplanning

Reductionofteacherabsenteeism

Page 21: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Component InfrastructureandHardware Training Results

WATSAN 5boreholesrehabilitated, 3 repaired,8newboreholeswithhandpumps,5shallowwellsconstructed and 3 springsprotected.

13 panel toilets inschools,9fourstanceVIPlatrineswithwashrooms,andurinalsin8PrimarySchoolsand9Ecosanlatrinesin9schools.

8rainwaterharvestingtanksinschools

240sanitationkits to 13 schools andcommunitiestoaidinlatrinediggingandconstruction.

4Districtstaff

172VHTs21WaterSourceCommittees6ParishSanitationCommittees.

40Communitymasons(10forlatrines,24forsanplats,6forwaterjars).

3 Hand–pump mechanics

Watersourcecommittees

6Parishsanitationcommittees

2856householdswithaccesstosafe,cleanwaterwithin1.5klms, improved access to 65.5%.

WaterqualitysurveillancetoWHOandGoUstandards.

Facilitiesforgirlshasimprovedattendance

3 equipped with Hand pump tool kit, trained on data collectionandmaintenanceskills.

21established&trainedinmanagementofwatersource,monitoring,administrationoffunds.

6established&trained.

Livelihoods 450bagsofimprovedcassavavarieties8000kgsgroundnutseeds1200kgsuplandrice(50geachoftomatoes,cabbageandonions,18setsofnurserybedmanagementimplements–36 wheel barrows, 36 watering cans, 36 rakes,54spades,36 forked hoes, and1850m–tapemeasure.

18FarmersGroups

7paravets

20ExtensionstaffthroughTOTtrainings(4subcounty,9districtand7community)

VisittoNationalAgriculturalResearchStationInnovationsinagriculture,businessskillsandmarketing

18Farmersgroups/VSLAsetup

Livelihoodsstakeholdersforumestablished(IncludesCCF,UWESO,TPO,governmentprogrammessuchasNAADS,sub–countyanddistrictrepresentatives,PAG(PentecostalAssembliesofGod).)

Skillsinimprovedplanning

Nurserybedsestablishedin18farmersgroups

Groupdemonstrationgardensestablishedforcassava,groundnuts,anduplandrice

Individualfarmersaccesstoimprovedplantingmaterialsfromthecassavademonstrationgardens(bothmembersandnon–membersofthegroups)

Increasedsavingcultureamongstgroupmembers

Increasedborrowingforinvestmentamonggroupmembers

Page 22: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �9

Component InfrastructureandHardware Training Results

17Radiotalkshows

MediaCentreequippedwith4desktopcomputers

30 IEC working group

62membersin6parishdevelopmentcommittees

16ProjectManagementCommittee(PMC)

11ProjectSteeringCommittee(PSC)(15members)

100+communitymembers30 persons40schoolchildren

MediaCentreCommittee

18communitymembersVideofilming training run bytheGuardian

Developmentofposterswithkeymessages

ReachbeyondtheDistrictwithcallersfromneighbouringarea

Development plans reflecting priorities from villages upwards

5meetings–ensuresinvolvementofDistrictstaff,providesguidancetoandmonitorsProject

1meeting

basictrainingincomputerskills

25persons,onaverage,usethemediacentreeachday

VideosofKatineonGuardianKatinewebsite

Page 23: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 20

Annex 7: Self–assessment

ObjectivesandActivities Comments Year2 %achievedbyJune09

%achievedbySept09

1 ImprovedCommunityHealth

1.1 Improvecommunity–basedprevention,treatmentandcareforHIV/AIDS,malaria,TB,RH,andchildhoodillnesses

1.1.1 StrengthenthecapacityofVillageHealthTeams(VHTs)

1.1.1.1 ProvidetrainingtoVillageHealthTeamsonfamilyplanningmethods 1VHTpervillagefor

66 100 100

1.1.1.2 ProvidetrainingtoVillageHealthTeamsonissuesofmonitoringdrugadher-ancerelatedtoHIV/AIDS,malariaandTB(throughCBDOTS—CommunityBasedDirectlyObservedTreatmentServices)

2VHTspervillage

132 100 100

1.1.1.3 ProvidetrainingtoVillageHealthTeamsoncounselingandofferingpsychosocialsupportforpeoplelivingwithHIV/AIDSandtheirfamilies

5peopleparish

30 100 100

1.1.1.4 ProvidesupporttoVHTsonhomebasedmanagementchildhooddisease,includingmalaria(fever),pneumonia,diarrhoeadiseases,skinandeyeinfec-tions,immunization,growthmonitoring,nutrition.

0

1.1.1.5 TraincommunityvaccinatorsinEPIandrecordkeepingandsupportimmuni-zationoutreach

onemeetingper 3 months

4 75 100

1.1.1.6 Supporttoactivitiesoftraditionalbirthattendantsi.eoncommunitymobiliza-tionandreferralsystem

4 100 100

1.1.2 StrengthenCommunityOutreachInitiatives

1.1.2.1 StrengthentimelycommunityoutreacharoundservicesprovidedbyCom-munityHealthCentres(suchasChildImmunizationdaytoimprovechildhoodimmunizationcoverage,HIVtests,VHTservices)

134 95.5 100

1.1.2.3 Establishacommunity–basedITNdistributionsystemprioritisingtheU5s,pregnantwomenandPLWAemphasiswillbeonre–treatmentofITNs

1 100 100

1.1.2.4 Supportvillagehealthteamsonfamilyplanning(includingcondomuseforHIVprevention)

10 75 100

1.2 ImprovequalityofhealthservicesforHIV/AIDS,malaria,TB,RH,andchild-hoodillnesses

1.2.1 StrengthenCommunityHealthCentrelabfacilitiesforimproveddiagnosticsandtreatmentofHIV/AIDS,TBandmalaria

1.2.1.1 ProvideCommunityHealthCentreswithequipmentandsuppliesfordiagno-sisofHIV/AIDS,TB,andmalaria(e.g.HIVtestkits)

1 100 100

1.2.1.2 Trainlabpersonnelforimproveddiagnosticsandtreatment(ofHIV/AIDS—in-cludingOIsandSTIs,TB,malaria,urinarytractinfections,anaemia,meningi-tis,worms,diabetes,eclampcia,hypertensionandsyphilis)

0 100 100

1.2.1.3 RenovateandimproveCommunityhealthcentresHCIVandHCIIs 1 0 100

1.2.2 Strengthenhealthcareserviceprovision

1.2.2.1 ProviderefreshertrainingforCommunityHealthCentreworkersonmanage-mentandtreatmentofHIV/AIDS(includesART),malaria(includingseveremalaria,IPTandACTs),TBCBDOTS

2 100 100

1.2.2.2 TrainCommunityHealthCentreworkerstopromotecounsellingandtestingservicesrelatedtoHIV/AIDS

1

1.2.2.3 TrainCommunityHealthCentreworkersonPMTCT—PreventionofMothertoChildTransmissionofHIV/AIDS

1 100 100

1.2.2.4 ProviderefreshertrainingtoCommunityHealthCentreworkersonIntegratedManagementofChildhoodIllnesses(IMCI)throughonjobtraininginformofsupportsupervision

4 75 100

1.2.2.5 Traincommunityhealthcentreworkers(includingmidwives)onsafedeliverymethodsandemergencyobstetriccare(EMOC)

1 0

1.2.2.7 TrainCommunityHealthCentreworkerstoensurepropermethodsofinfec-tioncontrolandmedicalwastedisposal

1 100 100

1.2.2.8 Facilitatecommunityhealthcentrestaffandhealthunitmanagementcommit-teesonlogisticsmanagementofessentialmedicinesandlabsuppliesandprocurementofequipment(toincludetrainingonroles&responsibilities)

1 100 100

1.2.2.8 AMREFcorporatetechnicalsupport

1.3 Strengthenruralhealthsystems

1.3.1 Strengthenhealthinformationandmanagementsystems

HealthComponent—SelfAssessmentofAchievement

Page 24: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 2�

ObjectivesandActivities Comments Year2 %achievedbyJune09

%achievedbySept09

1.3.1.1 TrainVHTsonplanningandbudgetingforcommunityhealthneedstocontrib-utetodistrictdevelopmentplans

0

1.3.1.2 TrainVHTsoncommunity–basedinformationsystemsincludingimmunizationcoverage,birthanddeathregistration

66 128 128

1.3.1.3 TrainCommunityHealthCentreHealthUnitManagementCommitteeonmanagement processes—planning, budgeting, financial, performance man-agement,monitoringqualityofcare,infectioncontrol,medicalwastedisposal,accesstodrugsanddrugmanagement

1 100 100

1.3.1.4 Strengthensystemforregularmeetings,supervision,andreportingofVHTsathealthcentre,parishandHSDlevels

12 75 100

1.3.2 StrengthenreferralandsupplysystemsbetweenVHTsandtheappropriatelevelofthehealthfacility

1.3.2.1 ConductjointtrainingofVHTsandhealthcentrestaffonreferralsystemandVHTsupplysystem(e.g.HOMAPAK,condoms)

1 100 100

1.3.2.2 StrengthenreferralsystemfromVHTtoappropriatelevelofhealthfacilityandtrackreferrals

0

1.3.2.3 Provideamulti–purposebicycletoeachVHTmemberasaformoftransporttotheCommunityHealthCentre

0 0 0

1.3.2.4 ProvideeachVHTwithadrugstoragekit 0 0 0

1.3.2.5 StrengthenproceduresfortrackingandreplacingVHTdropouts 4 50 75

1.3.2.7 ExploreoptionsforfundingmotivationpackageforVHTs(e.g.torch,gum-boots,umbrella,books,pens)

1080

ObjectivesandActivities Year2 %achievedbyJune09

%achievedbySept09

2 ImprovedAccesstoQualityEducation

2.1 Improveteachingandlearningenvironment

2.1.1 Trainteachersonchildcentredmethodologiestoimproveacademicperformance 1 100 100

2.1.2 Trainteacherstopromoteadolescentfriendlyreproductivehealthcounselling. 3 67 100

2.1.3 Provideteachingmaterialstoteacherstofacilitateteachingandlearning(includingmaterialsforreproductivehealth)

4 50 100

0 Trainteacherstodeveloplocalmaterialstofacilitateteachingandlearning—localmaterialsdevelopment

1 100 100

2.1.5 Supportsupervisionandfollowupofteachertraining 6 67 100

2.1.6 Rehabilitateexistingclassrooms 15 50 100

2.1.7 Increaseseatingfacilities 13 100 100

2.1.8 Constructnewclassrooms 10 50 100

2.1.9 Establishcommunitycommitteestooverseetheconstructionofclassrooms 6 100 100

2.1.10 Strengthenlinkagesbetweenschoolsandthecommunitiestopromotepersonalhygieneandsanitationeducation–phase

6.5 100 100

2.1.11 Improvesanitationfacilitiesforgirlsandboys,providingaccessibilityforthedisabledandspecialfacilitiesforgirls(includingbathshelters,changingrooms)

0 0 0

2.1.12 Sourceaffordablesanitarypadsortraingirlsonhowtomaketheirown 1 100 100

2.1.13 Usemusic,drama,sportsandotheractivitiestostrengthenthecapacityofschoolhealthclubsinhygienepromotion

3 67 100

2.1.14 AMREFCorporatetechnicalsupport £–

2.2 Promoteinclusiveeducationofgirls,disabledchildren,orphans,andvulnerablechildren

2.2.1 Sensitisecommunitiesabouttheimportanceofenrollingandsupportingmarginalisedchil-dren,especiallyorphansandvulnerablechildren,andchildrenwithdisabilities(throughchildrightstrainingandsensitisationcampaigns)

6 100 100

2.2.2 Conductanadvocacyforumwithfemaleteacherstoberolemodelsforgirls 3 100 100

2.2.3 Promoteschooldrama,musicfestivals,andsportseventstoattractchildrentostayinschool(e.g.providesmallinputssuchassoccerandvolleyballballs,nets)

0 0 0

2.2.4 Promotedisability–friendlyteachingmethodsandmaterials,andschoolinfrastructure 0 0 0

2.3 Strengthencommunityownershipoverschoolsupervision

EducationComponent—SelfAssessmentofAchievement

Page 25: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 22

ObjectivesandActivities Year2 %achievedbyJune09

%achievedbySept09

2.3.1 Facilitateinformationsharingforumsbetweenschoolmanagementcommitteesandinspec-torstoimproveperformance

3 67 100

2.3.2 TrainParentTeachersAssociationsforimprovedcommunitymanagementofschoollearningandteachingprocessesandtoempowerthecommunitytoadvocateforimprovementstoschoolsatthedistrictlevel

3 67 100

2.3.4 Providetrainingtothestakeholders,includingchildren,tocollectdataandmonitorprogressinschools

3 67 100

2.3.5 Supporttheestablishmentofeducationmanagementinformationsystemsintargetschoolsandlinktothedistricteducationsystem

0 0

Additionalactivitiesundertakenbutnotinthe2ndyearplan % achieved byJune09

% achieved bySept09

Femaleinvolvementinfootballtournament 20

Educationsectorcoordinationmeetings 10

KatineChildrenschat 5

ParishMonitoringCommittee/DistrictSteeringcommitteemeetings 10

SMC/PTAmeetings 50

PreparationforthevisitofBarclaysbankchairpersonvisit 10

Communityresourcemobilisation 80

Interviewsforskilledmasons 10

Timetakenbyadditionalactivities,asapercentageofallworkdoneinOct2009–June2009 x%

ObjectivesandActivities Targetsyear2

%achievedbyJune09

%achievedbySept09

3 Improvedaccesstosafewater,sanitation,andhygiene

3.1 Increaseaccesstosafewater

3.1.1 Rehabilitateexistingboreholes 0

3.1.2 Drillnewboreholesandinstallwithhandpumps 0

3.1.3 Identifyandtraincommunityhandpumpmechanics 0

3.1.4 Procurehandpumptoolkits&protectiveware 0

3.1.5 Install10,000litrePVCrainwatertanksinschools 5 60 60

3.1.6 Constructhouseholdwaterjarsforharvestingrainwater 8 12.5 12.5

3.1.7 Provideon–the–jobtrainingtocommunitymemberstoconstructwaterjars 8 100 100

3.1.8 Protectopensprings 0

3.1.9 Rehabilitateprotectedsprings 1 0 0

3.1.9.1 Constructshallowwells 0

3.1.9.2 Waterqualitysurvailance 0

3.1.9.3 WaterQaulityconsumables 1 0 0

3.1.9.4 WatertestingKit 0

3.2 Increaseratesofpersonalhygieneandaccesstobasicsanitation

3.2.1 Construct4stancepaneltoiletsinprimaryschools 13 69 100

3.2.2 Construct 3 stance Ecosan toilets for primary schools 5 80 100

3.2.3 Provideschoolswithsanitationkitsfordigginglatrines. 0

3.2.4 Provideparisheswithsanitationkitsonamonthlyloanbasis 0

3.2.5 Provideslabstosupporthouseholdlatrineconstruction 120 100

3.3 Facilitatecommunityempowermenttoeffectivelymanagewatersources

3.3.1 Establishandtrainsubcountyhealthcommittees 0

3.3.2 Facilitatesubcountymonthlyhealthcommitteemeetings 0

3.3.3 StrengthentheSub–CountyOperation&Maintenanceworkinggroup 0

3.3.4 StrengthentheSub–CountySanitationworkinggrouponO&Mofsanfacilities 0

3.3.5 StrengthentheSub–Countyhygieneworkinggroupinhygienepromotion 0

3.3.6 Establishparishsanitationcommittees 0

3.3.7 Strengthentheparishsanitationcommittees 0

WATSANComponent—SelfAssessmentOfAchievement

Page 26: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 2�

ObjectivesandActivities Targetsyear2

%achievedbyJune09

%achievedbySept09

3.3.8 Providebicyclestocommitteesandmechanics 0

3.3.9 ProvidetrainingtoVHTsonhygieneandsanitationpromotion 0

3.3.9.1 supportVHTstoconducthomevisitsprovidinghygiene&sanitationpromotion 0

3.3.9.2 Suppportsub–countysanitationworkingcommitteestosuperviseandmonitoractivities 0

3.3.9.3 EstablishwatersourcecommitteesaspartofCASHE 11 100

3.3.9.4 TrainWaterSourceCommittees 11 50 50

3.3.9.5 Establishsubcountywatersourceaccounts 11 0 0

3.3.9.6 TrainWaterSourceCommitteesinmanagingwateruserfeeaccounts 11 50 50

3.3.9.7 IECMaterials 0

3.3.9.8 Quarterlyjoint–monitoringvisits 0

3.3.9.8 Quarterlyjoint–monitoringvisits 4 75 100

Additionalactivitiesundertakenbutnotinthe2ndyearplan % achieved byJune09

% achieved bySept09

Waterqualitysurvailance 33 100

Waterandsanitationcoordinationmeetings 75 100

Participatedintheregionallaunchingoftheinternationalyearofsanitation 100

LocalisingmillenniumdevelopmentgoalsforWATSAN 100

Operationalisingsparepartssupplychain 50 50

supportVHTstoconducthomevisitsprovidinghygiene&sanitationpromotion 66 68

Organisingdramaclubstoperformduringthefootballtournament 100

Timetakenbyadditionalactivities,asapercentageofallworkdoneinCct2009–June2009 x%

ObjectivesandActivities Comments Year 2 % achieved byJune09

% achieved bySept09

4 Improvedincomegeneratingopportunities

4.1 Increasecapacityofruralinnovationgroups(RINGS)tomanagethemselvesforimprovedandsustainablelivelihoods

4.1.1 Groupformation

4.1.1.1 Selection of villages (3/parish) for group formation 0

4.1.1.2 Conductcommunityvillagemeetingstocreateawarenessandseekcommit-ment

0

4.1.1.3 Selectionofgroupmembers(incl.wealthranking) 0

4.1.1.4 Conductbaselineassessmentanddocumentationofgroupandindividualmembercapacity

0

4.1.1.5 BasicTrainingingroupdynamics 0

4.1.1.6 Electionofgroupmanagementcommittees 0

4.1.2 Groupmanagementcapacitybuilding

4.1.2.1 Traininginneedsassessmentskills 0

4.1.2.2 Groupmanagement,groupdynamicsandgenderconcerns 1 0 100%

4.1.2.3 Leadership and communication skills training, conflict resolution, Group financial management,

1 0 100%

4.1.2.4 Groupplanning,visioning,monitoringandevaluation 1 0 100%

4.1.2.5 Ongoingsupportandcapacitymonitoring Groupreviewmeetings

18 0 100%

4.1.2.6 TOTtrainingforextensionstaff 1 0 100%

4.2 Rurallivelihoodsstakeholdersforumestablishedforsustainablecoordinationoflivelihoodsactivities

4.2.1 InitialdevelopmentofTOR

4.2.2 Consultativemeetingwithotherstakeholdersandformationoftheforum 0

4.2.3 FirstmeetingtoagreeTORs,advocacypriorities,etc 0

4.2.4 Quarterlymeetingsinvolvingrepresentativesfortwokeycommodities 4 50% 75%

4.3 Technologyisharnessedtoimprovefoodsecurity,nutritionandincomegeneration

LivelihoodComponent—SelfAssessmentOfAchievement

Page 27: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 2�

ObjectivesandActivities Comments Year 2 % achieved byJune09

% achieved bySept09

4.3.1 Basicsforimprovementintechnologyharnessingandutilization

4.3.1.1 Diagnosticsurveyofgroupandcommunitytechnologyneedsandpriorities 0

4.3.1.2 Agree areas of need and cooperation with NARS (Serere, Tororo) and finalize MOU

0

4.3.1.3 Farmers’visittoSerereand/orotherresearchstations 1 0 100%

4.3.2 Supportfarmerinnovationsforcropproduction

4.3.2.1 Technicaltrainingonon–farmtrialsanddemonstrations,soilerosioncontrol,fertilitymanagement,fodderproductionetc

2 50% 100%

4.3.2.2 Ongoingtrainingoncropmanagement,IPM,etc 2 50% 100%

4.3.2.3 Establishmentoffarmerledon–farmtrialsanddemonstrationsincludinginputacquisition

18 100%

4.3.2.4 OFT open days for farmer innovations: Public presentation and displays 1 0 100%

4.3.4 Supportforcommunityanimalhealthservices

4.3.4.1 Baselineassessmentofanimalhealthservicesinthesubcountyandcounty(byFARMAfricaTAU)

TocontractFARMAfricaTAU(Mbale)

0

4.3.4.2 AgreeonanMOUwithFARM–AfricaTAUonCAHWtrainingandselecttwoCAHWspergroup

0

4.3.4.3 Training needs assessment and development of training program: contract TAUFARMAfrica

0

4.3.4.4 TrainingofCAHWsbyTAU 1 0 100%

4.3.4.5 Provisionofdrugkits Kitstoalsoincludebicycle

7 0 100%

4.3.4.6 CAHWexchangevisitwithMbalecounterparts. 0

4.3.4.7 Ongoing support and refresher trainings: Logistics, DVO Soroti 1 0 100%

4.3.4.8 Coordinationandexperiencesharingmeeting 2 0 100%

4.4 Business&marketingskillsareenhancedtoaccessbettermarketsfortheirproducts

4.4.1 Supporttoagro–enterprisedevelopment

4.4.1.1 Farmerexchangevisitsforexperiencesharingonagriculturalinnovations&marketing(Nakasongola–cassavaprocessing,StJudeFamilyProjectMasaka,LiraCooperatives,NyabyumbaUnitedFarmersAssociationKabale)andasuccessfulFarmerssavingandloangroup

1 0 100%

4.4.1.2 Businessmanagementtrainingsforallgroupmembers 2 0 50%

4.4.1.3 Agriculturalmarketingtrainingsincludingcollectivemarketing 2 0 50%

4.4.1.4 Groupmeetingsforenterpriseselection 0

4.4.1.5 Farmerledparticipatorymarketresearch/survey 0

4.4.1.6 Marketvaluechainanalysis(i.e.enterprisedevelopmentofoneselectedcommodity)

1 0 100%

4.4.1.7 Supportforgroupstorageandprocessingtodevelopbestpractice DiscusswithDistrictpdnof-fice on parish orsubcountylevelstore

1 0 100%

4.4.1.8 Discussion/agreementwithgroupsandotherstakeholdersonco–fundingonprocessing&marketinginitiatives

1 100%

4.4.1.9 Establishmentofmarketinformationsystem(MIS) 0

4.4.2.1 IdentifyexistingandpotentialalternativeIGAs

4.4.2.2 Providetechnicalsupporttoexistinglivelihoodalternatives/IGAs 2 50% 100%

4.4.2.3 Co–funding of alternative livelihoods (livelihood diversification) e.g. craft making

Needtoreviewhowtobestusethismoney(withDistrictpdnoffice)

18 0 100%

4.4.3 Microfinance Support withUWESO/CARE

Livelihoodsannualimpactassessment 1 0 100%

Additionalactivitiesundertakenbutnotinthe2ndyearplan % achieved byJune09

% achieved bySept09

WeeklyVSLAcoordinationmeetingswithUWESO 5%

Page 28: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 2�

ObjectivesandActivities Comments Year 2 % achieved byJune09

% achieved bySept09

Attendingtovisitorsincludingjournalists 10%

Attendingmeetingsorganisedbydistrictpartners 5%

Respondingtocommentsonthewebsite 5%

Participatinginproposalwriteup 5%

Timetakenbyadditionalactivities,asapercentageofallworkdoneinOct2009June2009

x% 30%

ObjectivesandActivities Year 2 Target

% achieved byJune09

% achieved bySept09

5 Communitiesempoweredtoengageinlocalgovernance

5.1 Strengthenlocalgovernance

5.1.1 FacilitatecommunityinformationsessionswithIECmaterialsonthecommunity’srightstobasicservicessuchaswater,health,education

5.1.1.1 Sub–CountylevelconsulativemeetingsonIECmaterials 5 0 60

5.1.1.2 WorkshopwithkeydistrictpartnerstoreviewandidentifyrequiredIECmaterials/keymessages 2 50 100

5.1.1.3 VillagelevelFGDstopretesttheapplicabilityofIECmaterials 1 0 100

5.1.1.4 FeedbackmeetingwithkeydistrictpartnersontheIECmaterialsdeveloped 1 0 100

5.1.1.5 ProcurementoftheIECmaterials 200 0 50

5.1.1.6 Parish level meeting for identification of trainees to desiminate IEC materials/messages 2 50 100

5.1.1.7 TraininginIECuse 1 100 100

5.1.2 CarryoutlocalradioprogrammestoinformcommunitiesaboutVHTs

5.1.2.1 VHTDataAsessment

5.1.2.3 DevelopmentofVHTKeyMessagesforRadioprogrames 1 0 100

5.1.2.4 ConductingVHTRadioprogrammes 5 100 100

5.2 Enhancecommunityplanningtobettermeetcommunityneeds

5.2.1 Trainrelevantcommunitystructures(PDCs,Sub–CountyTechnicalCommittee,SMCs,PTAs)toplanandbudgetforfeasibleandcost–effectivebasicservices

5.2.1.1 Assesment&Selectionofthetrainees

5.2.1.2 PDCtraining 1 100 100

5.2.1.3 SMCandPTAtraining 0

5.2.1.4 SCTCtraining 1 0 100

5.2.2 Pilotamodelofcommunitypartneringfromarights–basedapproachthatcanbereplicatedbyAMREF,governmentandotheractors

5.2.2.1 AMREFStafforientationonRBA 0

5.2.2.2 ConsultativeMeetingforSelectionofpotentialRBApartners 1 0 100

5.2.2.3 RBAorientationatParish&Sub–Countylevel 1 0 100

5.2.2.4 RBAquarterlyCommunitySensitizationMeetings 4 0 0

5.2.2.5 RBAStakeholdersWorkshopsatdistrictlevel 1 0 100

5.2.3 Trainteachers,CommunityHealthCentreworkers,extensionworkersoninformationmanage-ment

5.2.3.1 Assesment&Selectionofthetrainees

5.2.3.2. Jointtrainingforteachers,HCstaffandextworkers 3 0 30

5.2.4 Installcommunity–basedinformationsystems

5.2.4.1 ProcurementandinstalationofITsystems(desktopcomputersandprinters) 1 100 100

5.2.5 TrainkeyusersinbasicITskillsformanagingcommunity–basedinformation

5.2.5.1 Jointtrainingforteachers,CHCworkres&extworkersinbasicITskills 4 50 75

5.2.6 Set up office and comm. resource center

5.2.6.1 Establishment of functional Office and Comm. resource center 0

5.2.7 SetupRadioHub

5.2.7.1 Establishment of functional radio hub in office 0

5.2.8 AMREFCorporatetechnicalsupport 1

5.2.9 Governacemeetings

GovernanceComponent—SelfAssessmentOfAchievement

Page 29: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 2�

ObjectivesandActivities Year 2 Target

% achieved byJune09

% achieved bySept09

5.2.9.1 Districtstakeholedersmeetings 1 0 100

5.2.9.2 ProjectSteeringCommitteequaterllymeeting 4 75 100

5.2.9.3 ProjectManagementcommitteemonthllymeeting 8 63 100

% achieved byJune09

% achieved bySept09Additionalactivitiesundertakenbutnotinthe2ndyearplan

1 Footballcompetetion 100 100

2 RBAstaffOrientation/Training 30 100

Timetakenbyadditionalactivities,asapercentageofallworkdoneinCct2009–June2009 x%

Page 30: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 2�

Annex 8: Quick survey July 2009N=�3

NAMEOFVILLAGE

NAME : M = 34 F = 19

Who are you? Father = 32 Mother = 19 Other = 2 teachers

AGEunder24 9

25–34 12

35–44 16

45–54 12

55–64 3

65+ 1

Total 53

Havetheirbeenanychangesinyourandyourfamily’slifeinEDUCATIONsincethestartof2008?

Prompts: Does your child talk about things happening in school? YES=51 NO= 2

Ifso,what?(tick)—DO NOT READ OUT THIS LIST — TICK ONLY IF MENTIONED

Schoollatrine 35

Footballcompetition 34

Renovatedschool 31

Newdesks/seats 28

Textbooks 26

Newschoolconstruction 15

Watertanksinplace 11

Newtrainingforteachers 10

MDDkits 7

Sanitationkits 6

ActivePTA 5

Schoolkitchengarden 2

Other?...Footballs/footballpitchCleanandwellorganisedcompoundsImprovedteachingmethodsIncreasedschoolenrolmentFilmshowTalkingcompoundTrainingforsanitation/hygiene—healthclubsActiveSMC

●●●●●●●●

Page 31: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 2�

GamesuniformGoodteachingandtimekeepingbyteachers/nolongerdrink

Whichisthemostimportantandwhy?School/classroomrenovation21Schoolconstruction8Latrineconstruction5Textbooks5Desks 3Increased school enrolment 3Watertankatschool(waterislife)ImprovededucationalperformanceMDDkits–enhanceperformanceIncreased school enrolment 3WatertanksActivePTAFootball

Comments:WithschoolrehabilitationparentscansavemoneyforteachershousesChildrenwillbeattractedtoschoolifithasnewclassroomsNomorestudyingunderatreeTherainwon’tcomein2ImproveslearningenvironmentHelpschildrenstudyOurchildrenarestudyingwellEverythinghashelpedchildrentostayatschoolinagoodlearningenvironmentandsportsClassrooms–goodlearningenvironmentforourchildrenSchoollatrinespreventspreadofdiseasesImprovesqualityandschoolenrolmentClosedclassroomleadstoconcentrationDesksmeanchildrencansitproperlyanddon’tdirtyuniform

Havetheirbeenanychangesinyourandyourfamily’slifeinHEALTHsincethestartof2008?

Prompts: Child immunised? Attending for ante–natal care? YES 52 NO 1

Ifso,what?(tick)—DO NOT READ OUT THIS LIST — TICK ONLY IF MENTIONED

Immunisation/vaccination 48

Treatedbednet 42

VisitfromVHTmember 35

TrainedTBA 14

VHTadvisingonIMCI 14

SchoolHealthCommittee 2

VHTgivingFPadvice 13

VHTprovidingCounselling 13

Renovatedhealthcentre 8

SchoolHealthCommittee 2

●●

●●●●●●●●●●●●●

●●●●●●●●●●●●●

Page 32: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes 29

Other?...CleanhomesteadMothersforante–natalcarePitlatrinesBuildingsheltersDe–wormingofchildrenandadultsReduced illnesses eg: malaria, diarrhoeaGettingdrugsfromVHT(eg;albendazolandformalaria)4BicyclesforVHTs

Whichisthemostimportant?Immunisation17Treatment for worms 2 and filariasis Mosquitonets8Drugs for malaria 3VHTtrainingandvisits–reducedfrequencyofgoingtohospitals/educatedonillnessprevention,betterinformed/broughthealthservicescloser/VHTshavingdrugs7Construction of health centre at Ojom 3Health Centre 3TeachingourchildrenBed nets 3DrugsathealthcentresHouseholdhygieneandsanitation

Comments:My grandchildren benefited, they sleep under an net and they don’t fall sick and the family is happy

Havetheirbeenanychangesinyourandyourfamily’slifeinWATERANDSANITATIONsincethestartof2008?

Prompts: Clean water available nearer to home; Latrines constructed

YES 52 NO 1

Ifso,what(tick)—DO NOT READ OUT THIS LIST — TICK ONLY IF MENTIONED

Sanitationkit 36

VisitfromVHTmember 30

Latrineconstructed 29

Boreholerehabilitated 18

Newborehole 12

Handpumpmechanicstrained 9

Mosquitobreedingsitesremoved 5

Wellsrehabilitated 3

Springsprotected 2

Other?...SensitisationoncleanhomesteadsDryingracksBathingshelterNUSAFboreholeSanitation and hygiene education 3Improvedhygieneinhomestead2Whichisthemostimportant?

●●●●●●●●

●●●●●

●●●●●●

●●●●●●●

Page 33: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �0

ImprovedhygieneBorehole/cleanwater19SchoolboreholeLatrine construction 13LatrineconstructioninschoolhadimprovedhygienegreatlySanitationkits5IdealhomesteadsVeryhappytohavecleanwaterHygieneeducationtopreventdiseasesThevisitfromVHTmemberwhichenabledlatrinebuilding4Dryingracks2

Comments:HomeiskeptcleanandnotsmellingCleanwatersomaynotfallsickofwaterdiseasesFaecesspoilthecompound

Havetheirbeenanychangesinyourandyourfamily’slifeinyourFARMINGsincethestartof2008?

Prompts: New types of seeds; Irrigation methods YES 38 NO 15

Ifso,what?(tick)—DO NOT READ OUT THIS LIST — TICK ONLY IF MENTIONED

JoinedaVSLA 24

Improvedgroundnutseeds 20

Newcassavastrain 20

FarmersGrouptraining 15

Improvedvegetableseeds 12

Schoolkitchengarden 6

Tools 5

Improvedriceseeds 1

Other?...PlantedorangesStudyvisittoSerereNAADSgroupmemberCIDIgavecowsandseedlingsHeardaboutnewcassavastrain,FarmersGrouptrainingandVSLAsHeardaboutVSLA

Whichisthemostimportant?Improvedcassavastrainseed/cuttings6Ground nut seeds 3Seeds2VSLA5HeardthatVSLAmembershavemoney/helpsyousaveFarmers group/training is very important 3FarminputsSchoolkitchengardensochildrencanhavesomethingtoeat2ImportanceofgoodcassavaTools2

●●●●●●●●●●●

●●●

●●●●●●

●●●●●●●●●●

Page 34: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

AreyouoranyofyourfamilyamemberofanyCOMMUNITYCOMMITTEES YES 27 NO 9

Which?(tick)—DO NOT READ OUT THIS LIST — TICK ONLY IF MENTIONED

VHT 9

SchoolHealthCommittee 3

PDC 7

VDC 0

SMC 2

HUMC 0

PTA 5

FarmersGroup 8

LC, 1, 2, 3 10

VSLAorothercreditgroup 16

Church Youth Leader 2

ClanCommitteemember 3

WaterSourceCommittee 2

Other?...ChurchdevelopmentcommitteeHomevisitorforCCF(NGO)FuneralCommittee(2)UWESOCommitteePalamioTradingCentreDevelopmentCommitteeReligiousLeaderCatholicChurchCommitteeCaretakerNUSAFBoreholeCIDIcontactfarmerTreasurer,footballclubSanitationgroup

●●●●●●●●●●●

Page 35: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �2

Anycomments?

Whathasn’tchangedthatyouhadexpectedtochange? Whatchangeswouldyouliketosee?

Clean water/bore hole drilled/repair of spring well 23Farmtoolslikehoes,pangas10Oxen,cowsandgoats10New,nearbyhealthcentre8Seedsandsupplies6VHTsshouldhavemalaria/drugs4Moreclassrooms4Construction of teachers houses 3Nurseryschool2Improvedhouseholdincome2Drugsatthehealthcentre2NoschoolfeedingprogrammeDrugs for children under fiveCMDswithmalariadrugsNo skills training eg: tailoringIncome generation projects eg: poultry rearingWantedblanketsforchildrenSpecialsupportfortheelderlySpecialsupportforwidowsandorphansTrainingofPDCsCommunitiestoreceivefoodSomecommunitymembershavecompletelyrefusedtoimprovesanitation&hygieneRefreshertrainingforVHTsLongerprojectdurationScholasticmaterialsSupportforthedisabled2Farminghasn’tchanged–onlyafewvillagesIncomeisstilllowReducepriceofslabsFootballs/goal posts/football boots/sports fields

Clean water/bore holes 23Reductioninfamine/foodsecurity/betternutrition–eatthreemealsaday10Bulls/Oxen/Goats/Cows/poultry10Nearerhealthcentre/services6DrugsdistributedbyVHTs6Improvedhouseholdincome/standardofliving4Drugsatthehealthcentre4Livinginapermanenthouse5Farminputs–tools,ploughs5Teachershouses5Healthycommunities/improvedHealth/absenceofsick-ness 3Seeds 3Latrineineveryhome2Pre–schoolforchildren2MoretrainingforVHTsIdealhomesteadsFocusonpeoplewithdisabilityintermsoftreatment&educationCleanhomesRenovationofschoolsIncomegeneratingactivitiesforyouthNewbednetsSchoolfeedingprogrammeMorefarmersinthefarmersgroupsMalariadrugsavailableMorepumpmechanicsSparepartsforpumpsSupportchildrentogotoschool

Page 36: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Annex 9: Villages x project activities matrices

Parish VillageO

ldV

illag

eH

ealth

Tea

ms

refo

rmed

VH

Tm

embe

rstr

aine

din

fam

ily

plan

ning

VH

Tm

embe

rstr

aine

din

HIV

/A

IDS

cou

nsel

ling

VH

Tm

embe

rstr

aine

das

com

-m

unity

med

icin

edi

strib

utor

s/v

acci

nato

rs

VH

Tm

embe

rstr

aine

din

inte

grat

ed

man

agem

ento

fchi

ldho

odil

lnes

s

TBA

sw

hoh

ave

rece

ived

trai

n-in

gfro

mA

MR

EF

Imm

unis

atio

nca

mpa

ign

Hou

seho

lds

rece

ived

inse

cti -

cide

trea

ted

nets

Bic

ycle

sfo

rthe

VH

Tm

embe

rs

VH

Tm

embe

rstr

aine

don

ref -

fera

lfro

mA

MR

EF

VH

Tm

embe

rstr

aine

don

com

-m

unity

bas

edh

ealth

info

rmat

ion

man

agem

ents

yste

ms

VH

Tm

embe

rsw

hoh

ave

rece

ived

T–S

HIR

TSfr

om

VH

Tm

embe

rsw

ithd

rug

stor

-ag

eki

ts

Katine Obiol 4 1 1 2 4 2 4 70 4 4 2 4 2Katine 4 1 1 2 4 3 4 57 4 4 2 4 2Ajobi 4 1 1 2 4 1 4 55 4 4 2 4 2Olocoi 4 1 1 2 4 1 4 55 4 4 2 4 2Omulai 4 1 1 2 4 2 4 59 4 4 2 4 2AwidiangB 4 1 1 2 4 1 4 55 4 4 2 4 2Omariai 4 2 2 2 4 1 4 61 4 4 2 4 2

Ojama Obalanga 4 1 1 2 4 4 4 58 4 4 2 4 2Ojama 4 1 1 2 4 4 4 56 4 4 2 4 2Oomai 4 1 1 2 4 0 4 59 4 4 2 4 2Abia 4 1 1 2 4 0 4 61 4 4 2 4 2AtirirB 4 1 1 2 4 0 4 55 4 4 2 4 2AtirirA 4 1 1 2 4 0 4 58 4 4 2 4 2Orieta 4 2 2 2 4 2 4 56 4 4 2 4 2Abarilela 4 1 1 2 4 0 4 56 4 4 2 4 2

Merok AgoraA 4 1 1 2 4 0 4 84 4 4 2 4 2Aputon 4 1 1 2 4 0 4 81 4 4 2 4 2Abata 4 2 2 2 4 1 4 90 4 4 2 4 2Agule 4 1 1 2 4 1 4 73 4 4 2 4 2Omolokony 4 1 1 2 4 1 4 84 4 4 2 4 2Ojwiny 4 1 1 2 4 0 4 80 4 4 2 4 2Merok 4 1 1 2 4 3 4 79 4 4 2 4 2Aber 4 1 1 2 4 1 4 73 4 4 2 4 2Oyimai 4 1 1 2 4 2 4 75 4 4 2 4 2Orechoi 4 1 1 2 4 0 4 80 4 4 2 4 2

Ochuloi Acam 4 1 1 2 4 0 4 54 4 4 2 4 2AwidiangA 4 1 1 2 4 0 4 53 4 4 2 4 2Agaja 4 1 1 2 4 0 4 53 4 4 2 4 2AbariA 4 1 1 2 4 0 4 53 4 4 2 4 2AbariB 4 1 1 2 4 0 4 52 4 4 2 4 2AjonyiA 4 1 1 2 4 1 4 55 4 4 2 4 2AjonyiB 4 1 1 2 4 1 4 53 4 4 2 4 2ObyaraiB 4 1 1 2 4 0 4 56 4 4 2 4 2ObyaraiA 4 1 1 2 4 0 4 61 4 4 2 4 2Ogur 4 2 2 2 4 0 4 52 4 4 2 4 2Adamai 4 1 1 2 4 2 4 55 4 4 2 4 2Olano 4 1 1 2 4 1 4 53 4 4 2 4 2Ojago 4 1 1 2 4 0 4 62 4 4 2 4 2Omodoi 4 1 1 2 4 0 4 55 4 4 2 4 2

HealthComponent

Page 37: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Parish Village

Old

Vill

age

Hea

lthT

eam

sre

form

ed

VH

Tm

embe

rstr

aine

din

fam

ily

plan

ning

VH

Tm

embe

rstr

aine

din

HIV

/A

IDS

cou

nsel

ling

VH

Tm

embe

rstr

aine

das

com

-m

unity

med

icin

edi

strib

utor

s/v

acci

nato

rs

VH

Tm

embe

rstr

aine

din

inte

grat

ed

man

agem

ento

fchi

ldho

odil

lnes

s

TBA

sw

hoh

ave

rece

ived

trai

n-in

gfro

mA

MR

EF

Imm

unis

atio

nca

mpa

ign

Hou

seho

lds

rece

ived

inse

cti -

cide

trea

ted

nets

Bic

ycle

sfo

rthe

VH

Tm

embe

rs

VH

Tm

embe

rstr

aine

don

ref -

fera

lfro

mA

MR

EF

VH

Tm

embe

rstr

aine

don

com

-m

unity

bas

edh

ealth

info

rmat

ion

man

agem

ents

yste

ms

VH

Tm

embe

rsw

hoh

ave

rece

ived

T–S

HIR

TSfr

om

VH

Tm

embe

rsw

ithd

rug

stor

-ag

eki

ts

Awaca 4 1 1 2 4 0 4 51 4 4 2 4 2Ocholai 4 1 1 2 4 1 4 51 4 4 2 4 2

Ojom Oyama 4 1 1 2 4 0 4 59 4 4 2 4 2Ominit 4 1 1 2 4 0 4 56 4 4 2 4 2Onongo 4 1 1 2 4 0 4 58 4 4 2 4 2Odwogai 4 1 1 2 4 3 4 70 4 4 2 4 2Ojemorun 4 1 1 2 4 0 4 59 4 4 2 4 2Obongoi 4 1 1 2 4 1 4 57 4 4 2 4 2Agora 4 1 1 2 4 0 4 55 4 4 2 4 2Adamasiko 4 1 1 2 4 1 4 55 4 4 2 4 2Obochoi 4 1 1 2 4 1 4 61 4 4 2 4 2Olusai 4 1 1 2 4 0 4 55 4 4 2 4 2Matali 4 1 1 2 4 1 4 55 4 4 2 4 2Alungar 4 2 2 2 4 0 4 55 4 4 2 4 2

Olwelai Olwelai 4 1 1 2 4 1 4 87 4 4 2 4 2Amorikot 4 1 1 2 4 0 4 89 4 4 2 4 2Samuk 4 1 1 2 4 2 4 84 4 4 2 4 2Oderai 4 2 2 2 4 3 4 91 4 4 2 4 2Alere 4 1 1 2 4 0 4 87 4 4 2 4 2AgoraC 4 1 1 2 4 0 4 89 4 4 2 4 2Ojiji 4 1 1 2 4 3 4 89 4 4 2 4 2Amutur 4 1 1 2 4 2 4 88 4 4 2 4 2Kalela 4 1 1 2 4 1 4 87 4 4 2 4 2Oburitok 4 1 1 2 4 1 4 85 4 4 2 4 2Ogwolo 4 1 1 2 4 1 4 89 4 4 2 4 2Kadinya 4 1 1 2 4 5 4 89 4 4 2 4 2

KeySamplednon–livelhoodsSampledlivelihoodsNon–sampledlivelihoods

Notes: The ITNS targeted only children under five and people living with HIV.Fourimmunisationcampaignshavesofarbeendonethisexcludestheroutinestaticandout–reaches.Campaignsincludechildhealthdaysandmassmeaslesandpoliocampaign.

●●

Page 38: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Parish Village School

Sch

oolM

anag

emen

tTea

mtr

aine

d

Par

entT

each

erA

ssoc

iatio

nstr

aine

d

Sch

ools

with

teac

hers

trai

ned

inA

RH

Sch

ools

with

teac

hers

trai

ned

finan

ce

ndp

lann

ing

Sch

ools

with

teac

hers

trai

ned

inlo

cal

mat

eria

lsd

evel

opm

ent

Sch

ools

with

teac

hers

trai

ned

inle

sson

pl

anni

ng

Sch

ools

with

teac

hers

trai

ned

inP

HA

SE

(p

erso

nalh

ygie

nea

nde

duca

tion)

Sch

ools

with

fem

ale

teac

hers

trai

ned

re

role

mod

els

forg

irls

Sch

ools

pro

vide

dw

ithM

DD

mat

eria

ls

and

train

ing

Sch

ools

with

new

cla

ssro

oms

Sch

ools

with

repa

ired

clas

sroo

ms

Sch

ools

with

boo

kss

uppl

ied

Sch

ools

with

des

kss

uppl

ied

Chi

ldto

chi

ldte

achi

ngm

etho

ds

Them

atic

cur

ricul

um

Rig

hts

ofth

ech

ild

Gui

danc

ean

dco

unse

lling

Sch

ools

pro

vide

dw

iths

ports

mat

eria

ls

and

train

ing

Katine Obiol Katine 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Katine 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Ajobi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Omulai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Olocoi KatineTiriri 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1AtirirB 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1AtirirA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Omariai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1AwidiangB 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Obiol 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Abia 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Omunyal 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Ojama Obalanga Ojama 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Ojama 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Oomai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Orieta 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Abarilela 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1AgoraA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Merok Aputon Merok 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Merok 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Agule 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Omolokony 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Ojwiny 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Aber Oimai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Oimai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Orechoi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Abata 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1Agora 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Ochuloi AwidiangA Ajonyi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1AjonyiB 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Omodoi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1AjonyiA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1AbariB Obyarai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1AbariA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1ObyaraiB 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Ocholai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1ObyaraiA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Awaca 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Ogur 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Omodoi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

EducationComponent

Page 39: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Parish Village School

Sch

oolM

anag

emen

tTea

mtr

aine

d

Par

entT

each

erA

ssoc

iatio

nstr

aine

d

Sch

ools

with

teac

hers

trai

ned

inA

RH

Sch

ools

with

teac

hers

trai

ned

finan

ce

ndp

lann

ing

Sch

ools

with

teac

hers

trai

ned

inlo

cal

mat

eria

lsd

evel

opm

ent

Sch

ools

with

teac

hers

trai

ned

inle

sson

pl

anni

ng

Sch

ools

with

teac

hers

trai

ned

inP

HA

SE

(p

erso

nalh

ygie

nea

nde

duca

tion)

Sch

ools

with

fem

ale

teac

hers

trai

ned

re

role

mod

els

forg

irls

Sch

ools

pro

vide

dw

ithM

DD

mat

eria

ls

and

train

ing

Sch

ools

with

new

cla

ssro

oms

Sch

ools

with

repa

ired

clas

sroo

ms

Sch

ools

with

boo

kss

uppl

ied

Sch

ools

with

des

kss

uppl

ied

Chi

ldto

chi

ldte

achi

ngm

etho

ds

Them

atic

cur

ricul

um

Rig

hts

ofth

ech

ild

Gui

danc

ean

dco

unse

lling

Sch

ools

pro

vide

dw

iths

ports

mat

eria

ls

and

train

ing

Adamai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Olano Ojago 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Ojago 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Acam 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Adamai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Acam Ochuloi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Agaja 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Awaca 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1AjonyiA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Olano 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Ojom Ojom Ojom 1 1 1 1 1 1 1Ominit 1 1 1 1 1 1 1Onongo 1 1 1 1 1 1 1Odwogai 1 1 1 1 1 1 1Alungar 1 1 1 1 1 1 1Agora 1 1 1 1 1 1 1Adamasiko Adamasiko 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Olusai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Ojemorun 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Obochoi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Obongoi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Matali 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Olwelai Olwelai Olwelai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Amutur 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Oderai 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1AgoraC 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Amorikot Amorikot 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Samuk 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Alere Ogwolo 1 1 1 1 1 1Ojiji 1 1 1 1 1 1AgoraC 1 1 1 1 1 1Ogwolo 1 1 1 1 1 1Kalela Kadinya 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Oburitok 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Kadinya 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

KeySamplednon–ivelhoodsSampledlivelihoodsNon–sampledlivelihoods

Page 40: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

WATSANComponent

Parish Village

New

Wat

erS

ourc

eC

omm

ittee

sfo

rmed

Old

Wat

ers

ourc

eC

om-

mitt

ees

treng

then

ed

Bor

ehol

esd

rille

d

Bor

ehol

esre

habi

litat

ed

Wel

lsc

onst

ruct

ed

Wel

lsre

habi

litat

ed

Spr

ings

pro

tect

ed

Han

dpu

mp

mec

hani

cs

train

ed

“Com

mun

ityb

ased

m

ason

s”tr

aine

d

Rec

eive

dsa

nita

tion

kits

Par

ish

sani

tatio

nco

m-

mitt

ees

train

ed

Sch

ooll

atrin

esc

on-

stru

cted

Rai

nwat

erja

rs

Con

stru

ctio

nof

san

d -pl

ats

Rai

nwat

erta

nks

in

scho

ols

Katine Obiol 1 1Katine 1 1 1 1 1 1 1 1Ajobi 1 1 1 1 1Olocoi 1 1Omulai 1 1 1 1AwidiangB 1 1Omariai 1 1 1 1

Ojama Obalanga 1 1 1 1 1Ojama 1 1 1Oomai 1 1Abia 1 1 1 1AtirirB 1 1 1AtirirA 1 1 1 1Orieta 1 1 1 1Abarilela 1 1

Merok AgoraA 1 1 1Aputon 1 1Abata 1 1 1 1Agule 1 1Omolokony 1 1Ojwiny 1 1Merok 1 1 1 1 1 1 1Aber 1 1Oyimai 1 1 1 1 1Orechoi 1 1

Ochuloi Acam 1 1 1AwidiangA 1 1Agaja 1 1AbariA 1 1 1 1 1AbariB 1 1AjonyiA 1 1 1 1AjonyiB 1 1ObyaraiB 1 1 1 1ObyaraiA 1 1 1 1Ogur 1 1Adamai 1 1Olano 1 1 1Ojago 1 1 1 1 1 1Omodoi 1 1 1 1Awaca 1 1Ocholai 1 1

Ojom Oyama 1 1Ominit 1 1 1 1Onongo 1 1

Page 41: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Parish Village

New

Wat

erS

ourc

eC

omm

ittee

sfo

rmed

Old

Wat

ers

ourc

eC

om-

mitt

ees

treng

then

ed

Bor

ehol

esd

rille

d

Bor

ehol

esre

habi

litat

ed

Wel

lsc

onst

ruct

ed

Wel

lsre

habi

litat

ed

Spr

ings

pro

tect

ed

Han

dpu

mp

mec

hani

cs

train

ed

“Com

mun

ityb

ased

m

ason

s”tr

aine

d

Rec

eive

dsa

nita

tion

kits

Par

ish

sani

tatio

nco

m-

mitt

ees

train

ed

Sch

ooll

atrin

esc

on-

stru

cted

Rai

nwat

erja

rs

Con

stru

ctio

nof

san

d -pl

ats

Rai

nwat

erta

nks

in

scho

ols

Odwogai 1 1 1Ojemorun 1 1Obongoi 1 1Agora 1 1 1 1 1 1Adamasiko 1 1 1 1 1 1 1Obochoi 1 1Olusai 1 1Matali 1 1 1 1Alungar 1 1

Olwelai Olwelai 1 1 1 1 1Amorikot 1 1 1 1 1 1 1Samuk 1 1Oderai 1 1Alere 1 1 1 1 1AgoraC 1 1Ojiji 1 1Amutur 1 1 1 1 1Kalela 1 1Oburitok 1 1Ogwolo 1 1 1Kadinya 1 1 1 1 1

KeySamplednon–livelhoodsSampledlivelihoodsNon–sampledlivelihoods

Notes: TwonewWSCofKatineandAbokaformedinKatinevillageThreeHPMstrainedtocovertheentiresubcountyTencommunitymasonstrainedtoconstructECOSANtoiletsprimaryschoolsinthesubcountyTwentyfourcommunitymasonstrainedonproductionnofsanplats/slabs,4perparishSixcommunitymasonstrainedonconstructionofwaterjars,1perparishSixcommunitymasonstrainedonspringprotetion,2persite.Sanitationkitswererotatedtoallvillagesonloanbasisthenlaterdistributedtoindividualvillages.Allvillagesarerepresentedintheparishsanitationcommittee.Onerainwaterjarconstructedduringtrainingoflocalmasons.One casting yard for sanitation platform/ slab identified per parish

●●●●●●●●●●

Page 42: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �9

LivelihoodComponent

Parish Village

Farm

ers

Gro

ups

form

ed

Firs

ttra

inin

gin

Sav

ings

&

Loan

Rep

aym

ent

New

VS

LAg

roup

sfo

rmed

Old

VS

LAg

roup

sre

–sta

blis

hed

Trai

ning

inV

SLA

co

ncep

t

Impr

oved

var

ietie

sof

ca

ssav

a

Trai

ned

para

vets

Impr

oved

upl

and

rice

seed

dis

tribu

ted

Impr

oved

veg

etab

le

seed

sdi

strib

uted

Impr

oved

gro

undn

ut

seed

dis

tribu

ted

Equ

ipm

ents

etfo

rnur

s-er

ybe

dm

anag

emen

t

Trai

ning

inim

prov

ed

farm

ing

Trai

ning

inb

uisn

ess

and

mar

ketin

g

Trai

ning

inn

atur

al

reso

urce

sm

anag

emen

t

Par

ticip

atio

nin

ex-

chan

gev

isits

Trai

ning

ing

roup

fo

rmat

ion

and

Mgt

Trai

ning

inM

&E

,P

lann

ing,

Visi

onin

g

Katine Ajobi 1 3 3 3 1 1 1 1 1 1 1 1 1 1 3 1AwidiangB 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0Katine 1 2 2 2 1 1 1 2 1 1 1 1 1 1 2 1Obiol 0 5 5 5 0 1 1 0 0 0 0 0 0 0 5 0Olocoi 1 2 2 2 1 1 1 1 1 1 1 1 1 1 2 1Omariai 0 3 3 3 0 1 0 1 0 0 0 0 0 0 3 0Omulai 0 3 3 3 0 1 0 0 0 0 0 0 0 0 3 0Okwetai 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Owayai 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0

Merok Abata 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Aber 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0AgoraA 1 2 2 2 1 1 1 1 1 1 1 1 1 1 2 1Agule 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Aputon 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Merok 1 3 3 3 1 1 1 2 1 1 1 1 1 1 3 1Ojwiny 1 2 2 2 1 1 1 1 1 1 1 1 1 1 2 0Omolokony 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Orechoi 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Oilmai 0 4 4 4 0 1 0 1 0 0 0 0 0 0 2 0Anyeri 0 1 1 1 0 1 0 0 0 0 0 0 0 0 4 0Obiol 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Olel 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0

Ochuloi AbariA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1AbariB 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Acam 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Adamai 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Agaja 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0AjonyiA 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0AjonyiB 1 2 2 2 1 1 1 2 1 1 1 1 1 1 2 1Awaca 0 2 2 2 0 1 0 0 0 0 0 0 0 0 1 0AwidiangA 0 2 2 2 0 1 0 0 0 0 0 0 0 0 1 0Obyarai 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0ObyaraiA 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0ObyaraiB 0 1 1 1 0 1 0 1 0 0 0 0 0 0 1 0OchuloiRock 0 2 2 2 0 1 0 1 0 0 0 0 0 0 2 0Ogur 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Ojago 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Olano 0 3 3 3 0 1 0 0 0 0 0 0 0 0 3 0Omodoi 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Agule 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Ocolai 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Ajonyi 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0

Ojama Abarilela 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Abia 1 2 2 2 1 1 1 1 1 1 1 1 1 1 2 1

Page 43: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �0

Parish Village

Farm

ers

Gro

ups

form

ed

Firs

ttra

inin

gin

Sav

ings

&

Loan

Rep

aym

ent

New

VS

LAg

roup

sfo

rmed

Old

VS

LAg

roup

sre

–sta

blis

hed

Trai

ning

inV

SLA

co

ncep

t

Impr

oved

var

ietie

sof

ca

ssav

a

Trai

ned

para

vets

Impr

oved

upl

and

rice

seed

dis

tribu

ted

Impr

oved

veg

etab

le

seed

sdi

strib

uted

Impr

oved

gro

undn

ut

seed

dis

tribu

ted

Equ

ipm

ents

etfo

rnur

s-er

ybe

dm

anag

emen

t

Trai

ning

inim

prov

ed

farm

ing

Trai

ning

inb

uisn

ess

and

mar

ketin

g

Trai

ning

inn

atur

al

reso

urce

sm

anag

emen

t

Par

ticip

atio

nin

ex-

chan

gev

isits

Trai

ning

ing

roup

fo

rmat

ion

and

Mgt

Trai

ning

inM

&E

,P

lann

ing,

Visi

onin

g

AtirirA 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0AtirirB 1 2 2 2 1 1 1 1 1 1 1 1 1 1 2 1Obalanga 1 2 2 2 1 1 1 1 1 1 1 1 1 1 2 1Ojama 0 1 1 1 0 1 0 1 0 0 0 0 0 0 1 0Omulai 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Orieta 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Oimai 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Olochoi 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Omunyol 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0AtirirT/C 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0

Ojom Adamasiko 1 2 2 2 1 1 1 2 1 1 1 1 1 1 2 1Agora 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Alungar 0 2 2 2 0 1 0 1 0 0 0 0 0 0 2 0Matali 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Obochoi 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Obongoi 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Odwogai 1 4 4 4 1 1 1 1 1 1 1 1 1 1 4 1Ojemorun 1 3 3 3 1 1 1 1 1 1 1 1 1 1 3 1Olusai 0 3 3 3 0 1 0 0 0 0 0 0 0 0 3 0Ominit 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Onongo 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Oyama 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Damasiko 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0

Olwelai AgoraC 1 2 2 2 1 1 1 1 1 1 1 1 1 1 2 1Alere 0 3 3 3 0 1 0 0 0 0 0 0 0 0 3 0Amorikot 0 2 2 2 0 1 0 1 0 0 0 0 0 0 2 0Amutur 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Kadinya 0 3 3 3 0 1 0 1 0 0 0 0 0 0 3 0Kalela 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0Oburitok 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0Oderai 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0Ogwolo 1 2 2 2 1 1 1 2 1 1 1 1 1 1 2 1Ojiji 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Olwelai 1 4 4 4 1 1 1 2 1 1 1 1 1 1 4 1Samuk 0 1 1 1 0 1 0 0 0 0 0 0 0 0 1 0Alere–Angai 0 2 2 2 0 1 0 0 0 0 0 0 0 0 2 0

KeySamplednon–livelhoodsSampledlivelihoodsNon–sampledlivelihoods

Notes: One para–vet per parish; 6 in all; 1 extra managing drug store conflicts and conflicts resolution, constitution making, 4 household per village 2 = farmers group and school; 1 = farmers group only records Group formation and mgt training = Group formation, record and record keeping, conflict and conflict resolution, leadership, constitutionmaking.ThevillagessetinbluearenewvillagesappearinginUWESORECORDSbutnotinKCPPdatabase.Thevillagessetinred appear in Ochuloi parish but look like part of either Ajonyi A or Ajonyi B; clarification needed from UWESO.

●●

Page 44: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

GovernanceComponent

Parish Village

Indi

vidu

als

have

bee

ntra

ined

inIT

ski

lls

Par

ish

Dev

elop

men

tCom

-m

ittee

mem

bers

trai

ned

Loca

lCou

ncill

ors

1tra

ined

Rep

rese

nted

inP

MC

m

eetin

gs

Rep

rese

nted

inS

C

Rep

rese

nted

inIE

Cc

om-

mitt

ees

Rep

rese

nted

inth

eR

e-so

urce

Cen

terC

omm

ittee

Mem

bers

trai

ned

inIE

C

Dev

elop

men

t/Use

Katine Obiol 1 1 1 1 4 1Katine 1 1 1 1 4 1Ajobi 1 1Olocoi 1Omulai 1 1 3,4 1AwidiangB 1 1Omariai 1 1 1 4 1

Ojama Obalanga 2 1 4 1 1Ojama 1 2 1 1 3,4 1Oomai 1 1 3,4 1Abia 1 1 1 4 1 1AtirirB 1 1AtirirA 1 1 1Orieta 2 1Abarilela 1 1 1 4 1

Merok AgoraAAputon 1 1Abata 1 1 1 3,4 1Agule 1 1 1Omolokony 1 4 1Ojwiny 1 1 1MerokAber 1 1 1Oimai 1 3,4 1 1Orechoi 1 1

Ochuloi Acam 4 1AwidiangAAgajaAbariA 1 1 1AbariB 1 4 1AjonyiA 4 1 1AjonyiB 1 1 1 3,4ObyaraiBObyaraiA 1 4 1OgurAdamaiOlano 1 1 1OjagoOmodoiAwaca 1 1 1 1 1Ocholai

Ojom OyamaOminit 1 1

Page 45: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �2

Parish Village

Indi

vidu

als

have

bee

ntra

ined

inIT

ski

lls

Par

ish

Dev

elop

men

tCom

-m

ittee

mem

bers

trai

ned

Loca

lCou

ncill

ors

1tra

ined

Rep

rese

nted

inP

MC

m

eetin

gs

Rep

rese

nted

inS

C

Rep

rese

nted

inIE

Cc

om-

mitt

ees

Rep

rese

nted

inth

eR

e-so

urce

Cen

terC

omm

ittee

Mem

bers

trai

ned

inIE

C

Dev

elop

men

t/Use

Onongo 1 1 4 1Odwogai 1 1Ojemorun 1 1 4 1 1ObongoiAgoraAdamasiko 1 1 1 1 4 1Obochoi 1OlusaiMatali 1 4 1Alungar 1 3,4 1

Olwelai Olwelai 1 1 3,4 1Amorikot 1 1Samuk 3,4 1Oderai 1 1 4 1Alere 1 1 1AgoraCOjijiAmutur 1 1 1 4 1 1KalelaOburitokOgwolo 1Kadinya 1 4 1

KeySamplednon–livelihoodsSampledlivelihoodsNon–sampledlivelihoods

Notes: 2 = PDC Village reps trained 3 = IEC sub–county committee members 3, 4 both IEC sub county and IEC parish committee 4 = IEC parish Committee members

●●●●

Page 46: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Annex 10: Achievement rating scale (MTR)1 = fully achieved, very few or no shortcomings2 = largely achieved, despite a few shortcomings3 = only partial achievement, benefits and shortcomings finely balanced4 = very limited achievement, extensive shortcomings5 = not achieved

KCPPObjectives Summary

Improvedcommunityhealth All five key objectives have been addressed in the first 18 months of the KCPP. Keyoutputsareshownbelow.

UnplannedoutputsincludedtheFootballtournament,repairingtheroofoftheCatholic–fundedhealthcentreandtheneedtoreplaceplasticpanellatrinesthatwerenotabletowithstandstrongrains.

Droughthascausedsevereproblemsforfarmers

Appropriateness: all outputs are appropriateQuality: mostly good but variable (bore holes/school building problems), training qualityappearsgoodSufficiency: quantity training is good, not enough infrastructure (water sources, classrooms,desks)Efficiency and timeliness: some outputs slow and no rights–based training.

Overall score = 2.9

Improvedaccesstoqualityprimaryeducation

Improvedaccesstosafewater,sanitationandhygiene

Improvedincome–generatingopportunities(alsoreferredtoasimprovinglivelihoods)

Communitiesempoweredtoengageinlocalgovernance

Expectedoutcomes Outputs Comments Rating

Increasedcommunityawareness,accesstoandutilisationofhealthservicesincommunityandhealthfacilities.

KnowledgeofHIVincreasedthroughtrainedVHTs.Increase in VCT: 874 pregnant mothers, 145 children between 5–18yearsand1441adultsReferralstohealthcentresincreasedfrom2/10to9/10Reduction of diarrhoea from 38% at baseline to 6% for children > 5 years, 1.4% for children < five by CMDs work at household levelTraining of VHTs in FP; no significant changeImprovedhealthplanningandbudgetingthroughVHTtrainingIncrease in immunisation; 89.3% of children > 5 from 80% in the year 1 and from 43% at baseline Increase in access to ANC 92% compared to baseline 36%Reduction in deliveries by TBAs to 27% from 38% at baseline Increase in births in health centre to 53% from 33% at baseline RenovatedandequippedlaboratoryatOjomH/CIIfordiagnosisofTB,HIV,STIsmalariaandotherdiseasesARVandTBdrugadherenceimprovedthroughVHTtrainingImproveddrugstockmanagementaftertrainingIITNsprovidedtohighriskgroupsimprovementsstaffmanagementafterrefreshertrainingfor45membersofHUMCsImprovedaccesstoPMTCT874expectantmothersaccessedPMTCTVCTofwhich57motherstestedHIV+(prevalence6.5%) and seven HIV+ mothers received ARVs (coverage 12.3 %).Provisionofequipmenttomakevisits(T–shirts,gumboots)andbicyclesProvisionofequipmenttooTBAs(gumboots)

MoreintensiveworkneedstotakeplaceonFP

Thisisalmostatnationaltargetof90%

TrainingTBAstorecognisedangersignsandreferforANCisverysuccessful

Laboratoryrequirestrainedstaff

Drugstockoutsstillexist

ExpansionofPMTCTservicesisnecessary

MoreequipmentforVHTsneeded

2.0

Page 47: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Expectedoutcomes Outputs Comments Rating

Improvedaccesstoqualityprimaryeducationforallchildrenandgreatercommunityinvolvementinschoolgovernance

2 community schools built increasing number form 13 at baselineto15Increased school enrolment from 7351 at baseline to 9071IncreasednumberofOVCattendingschoolIncreasednumbertakingPrimaryleavingexams,reducednumber unable to sit exams from 5% at baseline to 2.5% and total passed from 300 to 426ImprovedlessonplanningafterteachertrainingReductionofteachersabsentfromschoolProductionoflearningaidsTextbooksdeliveredto9schoolsReduction in desk sharing from 10:1 at baseline to 6:1ClassroomsrenovatedIncreaseinuptakeofsport,26teacherstrainedIncreasedinMDDEffectivemanagementinschoolsincreasedthroughactivePTAsandSMCsestablishedandmemberstrained

DesksharingstilldoubleGoUtarget

SMCsrecognisedasbeingsuccessful

2.5

Increasedcommunityaccesstoandutilisationofimprovedwaterandsanitationfacilities

Increased safe water access from 42% at baseline to 63%Decreaseinwalkingtimetosourcefrom2.5klmsatbaselineto1.5klmsresultsinmoretimeavailableforgirlsandwomenIncrease in latrines built to 43% of households from 7% at baselineIncrease in hygiene coverage in schools from 25% at baseline to 75%Increaseinschoollatrinesin8schoolsDemonstrationECOSANlatrinesin4schoolsIncreaseinsanitaryfacilitiesforgirlsIncreaseinrainwaterharvestingtanksinschools

Lawenshrinedtofine those without latrines

3.0

Improvedhygienepracticesinhouseholds

Sanitation & hygienic practices in households increased from 7% at baseline to 43%IncreaseinrainwaterharvestinginthehomethroughtrainingofcommunitymasonstoproducejarsIncreaseinnumberofdryingracks350 sanplats bought and in place

Improvedoperationsandmaintenanceofwatersources

Revised GoU targets for 100% access to waterHandPumpmechanicstrainedandoperatingFunctioningWSCs

KCPPnotequippedtomeetthistargetwithcurrentresourcesNotallWSCsperformingefficiently and effectively

Recoveryoflivelihoodsthrough diversified and improvedsourcesofincome

Established18farmergroupsmovingfromproductiontomarketingFunctioningFarmer’sGroupVSLAPlannedproducestoretobesetupwithco–fundingPlantingofnewcrops(strainsofcassava,groundnuts,uplandriceetc)Establishmentofnurserybeds

VSLAgroupssavedup to 3 million UGX and diversified business

3.5

Strongerabilityofruralinstitutionstoaccessbothadvisoryservicesandmarketsfortheirproductsforincreasedproductionandincome

Trainedpara–vetsforbetteranimalhusbandrySimpleequipment(hoesetc)deliveredRan2studytoursforfarmers

Para–vetsstillwithoutappropriatekit

Page 48: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Expectedoutcomes Outputs Comments Rating

Increasedcommunitycapacitytoplanandbudgetforcommunityneeds

Establishedandtrainedcommitteesacrosssub–countyatalllevelsfromDistricttoVillageforplanningandbudgeting

3.5

Strongercommunitycapacityfordatagatheringandutilisation.

CollectionofdatabyVHTs/healthcentres/schoolsandParishlevelcommittees

Communitydemandingandachievingtheirrightsandservices

DebateonrightsandservicesenhancedwithinandoutsideKatinethroughradiotalkshowsFunctioningandusedmediacentre

NoRights–basedtrainingstarted

Page 49: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Annex 11: A process review of the Mid–Term Review of the Katine Community Partnerships ProjectRickDavies,ExternalEvaluator,Wednesday,12August2009

Contents

1.Whyhaveaprocessreview?2.Theprocessreview—aquicksummary3. Issues arising—about the MTR process4.Issuesarising—abouttheKCPPproject5. DFID “Quality at Exit” checklist: An assessment of the MTR Report

1.Whyhaveaprocessreview?

Inmyexperienceatleast,mostMid–TermReviews(MTR)arecontractedbythedonororganisationfund-ingtheprojectunderreview.Inthisrespectthe2009MTRoftheKatineCommunityPartnershipsProject(KCPP)isunusual.TheKCPPMTRwascontractedbytheprojectmanageri.e.AMREF.Althoughunusual,thisstepwasconsistentwithaprocessproposedtotheGuardianin2008,thattheroleoftheGuardiancontractedexternalevaluatorshouldbeprogressivelyreducedovertime.Behindthisproposalweretwoas-sumptions: (a) that the M&E capacities of the KCPP project staff would be improving as the project devel-oped, through the efforts of the M&E Officer in Katine, supported by an M&E officer at the AMREF head-quarters in Nairobi, (b) that the Guardian would gain confidence over time in AMREF’s ability to objectively monitorandevaluateitsownworkinKatine.

InpracticetheamountofM&EsupportprovidedbytheNairobiHQseemstohavebeenlimited1.Norhas dedicated M&E support been available from the Uganda country office2. However, the London office has had a very significant role, both in refining the draft six monthly narrative reports and in drafting the TermsofReference(ToR)fortheMTR.AMREFUgandahasexperiencewiththemanagementofMTRs.TherehavebeenaleastfourotherMTRsofAMREFprojectsinUgandaoverthepastfewyears.IneachcaseithasbeenAMREFwhohascontractedtheMTRconsultant,notthedonor.

The MTR can be considered as an evaluation, given that DFID (amongst others) have defined an evalu-ationas“Thesystematicandobjectiveassessmentofanon–goingorcompletedproject,programmeorpolicy, its design, implementation, and results in relation to specified evaluation criteria”3.WithinthelifespanoftheKCPPitisprobablythemostimportantevaluationevent,moresothanan“end–of–project”evalua-tionthatmightexpecttobescheduledaroundtheendof2010.ThisisbecausetheMTRresultshavethepotentialtonotonlyaffectthecourseoftheprojectintheperiodremaininguntiltheendof2010,butalsothedecisionsaboutwhat,ifanything,shouldhappenbeyondthatdate.An“end–of–project”evaluationinlate 2010 will be too late to influence judgments about activities (and funding thereof) in the post–2010 pe-riod.Fundingdecisionswillneedtobemadewellbeforethen.

WiththisviewinminditwasproposedthatwhilethemanagementoftheMTRprocessshouldbeinAMREF’shands,itwouldstillbeusefulfortheGuardiantohavesomeformofinvolvementintheMTRprocess.MyproposalwasthattheexternalevaluatorshouldprovideanindependentreviewoftheMTRprocess,bybeinginvolvedinboththeplanningandimplementationstagesoftheMTR.Thiskindof“meta–evaluation”functionisnowbeingseenasanessentialpartofthelongtermprocessofimprovingthequalityofevaluations4.InthelastyearorsobothDFIDandAusAIDhaveinstitutionalisedaprocessofpeerreviewoftheircontractedevaluations,andbothhavedevelopedasetofproceduresforthoseprocesses.Forthe

� ItwasreportedthattheydidnotmakeasignificantcontributiontothedesignoftheMTRTermsofReference� ThereisnoM&EofficerpositionattheUgandacountryoffice� TheUK’spolicyonindependentevaluationforinternationaldevelopment,DFID,March�009,page6� SeeMichaelScriven’seditorial“MetaevaluationRevisited”intheJanuary�009editionoftheJournalofMultidisciplinaryEvaluation

Page 50: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

KCPPMTRIproposedtheuseoftwosetsofDFIDchecklistsforreviewingevaluationplansandreports5.ThesewouldbeusedinanopenandconstructivemannerwiththeMTRconsultant,tobesharedwiththemastheMTRprocessandeditedinthelightoftheircomments.

Both the MTR consultant and AMREF London office were initially uneasy with the external evaluator be-inginsucha“schoolinspector”typeofrole.Concernswerealsoexpressedabouttheethicsofsuchanapproach,forreasonsthatwerelessclear.TheyproposedthattheexternalconsultantshouldbemoreengagedwiththeMTRprocess,bycommentingonandproposingmethodsofinquiry,andbytakingpartintheMTRinterviewsandmeetings.Thiswasagreedto,solongastheAMREFcontractedMTRconsultantremainedthepersonresponsiblefordeliveringtheMTRreport.Whilethisdecisionmayhavebeenatthecostoftheexternalevaluator’sindependenceitwasexpectedthatitwouldaddvaluetotheMTRprocess.Feedbackreceivedsofarsuggeststhattheexternalevaluator’sinvolvementdidaddvalue.

2.Theprocessreview—aquicksummary

The external evaluator was involved in a number of stages during the MTR process, as follows:CommentingonthedraftTermsofReference,byemailandfacetofacemeetingsintheUKCommentingtoGuardianandAMREFontheselectionoftheMTRconsultantDiscussionwiththeMTRconsultantretheproposedscheduleofactivitiestomakeuptheMTRprocess,includingdatacollectionactivitiespriortotheMTR,andstakeholdergroupsthatcouldbeengaged.ProvisionofinterimfeedbacktotheMTRconsultantontheplanfortheMTR,viatheuseofanadaptedDFID checklist, prior to the beginning of the fieldwork in UgandaParticipationwiththeMTRconsultantinmeetingswithdifferentstakeholdersinKampalaandSoroti6 Commenting on the draft MTR report, by email and meetings with the MTR consultant. (NB: Detailed commentswerealsoprovidedbyAMREFUK,andAMREFUganda)ProvidingfeedbackonthecompletedMTR,viatheuseofasecondDFIDchecklist(insection4ofthisannex)Summarising issues arising from the MTR, via sections 2 and 3 of this annex.

3.Issuesarising—abouttheMTRprocess

Apreface: The working relationship between the MTR consultant and external evaluator was positive and constructivethroughouttheMTRprocess.Whilebothhaddifferentapproachestoevaluationthesediffer-ences were a source of creative thinking, not conflict and confusion.

DesignoftheToRs:

AretheToRsanagreementaboutwhatneedstobedone,orasetofguidingsuggestionsthatcanbeusedasneeded?Myviewerredtowardstheformer,andtheMTRconsultanterredtowardsthelatter.WhileIacknowledgethatitisfrequentlythecasethatnotallexpectationsinaToRscanbemetinprac-tice,thereisanobligationtoaddressthosethatcanandexplainwhereandwhyotherscannotbe. Do the TORs belong to AMREF and reflect their concerns, or should they also reflect the concerns of otherkeystakeholders?WhiletheMTRconsultanterredtowardstheformer,myviewerredtowardsthelatter.ThemembersoftheSteeringCommitteeinSorotiandtheGuardianandBarclaysinLondonrepresentedtwootherstakeholdersgroupswhoseinterestsshouldideallybecapturedintheToRsforaMTR.ThiswasdonetosomeextentthroughameetingbetweenAMREF,Guardian,Barclays,theMTRconsultantandmyself,organisedshortlybeforethebeginningoftheMTR.WhilewedidseektheviewsoftheSteeringCommitteeatthebeginningoftheMTRitwouldhavebeenpreferabletodosobeforetheMTRstarted.

DurationoftheMTR

WhenplanninganMTR,shouldthefocusbeonminimisingdemandsonAMREFstaffmember’stimeorensuringthatallrelevantstakeholdergroupswerecontacted?TheformerwasofconcerntotheMTR

� “QualityAssurance:TemplateforEntrylevel”and“QualityAssurance:TemplateforExitlevel”6 This ended unexpectedly on July 9th, because a family crisis that I needed to attend to in Australia

●●●

●●

Page 51: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

consultant,whereasthelatterwasofgreaterconcerntotheexternalevaluator.Inpracticethetotalde-mandonthetimeofeachcomponentstaffmemberwasprobablyaboutthreedaysincludinginitialbrief-ing, field work split between two, assigned tasks, and the debriefing. The greatest time demand was on the M&E officer who participated in meetings on most days. The reverse was the case with the Project Manager,whowasnotasengagedasmuchasmighthavebeenexpected,giventheimportanceoftheMTR.Overall,mostofthestakeholdersthatwereproposedforcontactweremet.However,withthewis-domofhindsight,itcouldhavebeenveryusefultobringtogetherthestakeholdersforeachcomponent,todiscussissuethatconnectedthem.WiththeMTRprocessthatwasusedtherewasnoopportunityforcommunicationsbetweenstakeholdergroups.ThismayormaynotbepossibleduringaprojectplanningmeetingproposedforSeptember2009.

AMREFstaffengagement

AtthebeginningoftheMTRreviewprocessKCPPprojectstaffwereopenlyscepticalaboutthevalueoftheMTRprocessasdescribed,questioningitsabilitytobeobjectiveandtobecredibleintheeyesofothers.ThiswaspartlyduetotheirfrustrationswiththelackofinformationtheyhadbeengivenabouttheMTRandpartlybecauseofconcernsthattheirownviewswouldnotbeseenascrediblebyothers,includinganysurveydatatheymightgatherfromhouseholds.Thelatterconcernseemstohavebeenin-fluenced by the degree of public scrutiny that the staff feel the project is under, via the Guardian website. WhiletheMTRteamdidmanagetoallaystaffconcernsandobtaintheircooperation,theyhavealsoimplicitlytakenonaresponsibilitytoproduceareportthatwillwithstandcriticalpublicscrutiny.

Participants’views

Whatismoreimportant,howstakeholdersseetheirroleintheKCPPorhowtheyseetherelevanceandvalueoftheassistanceprovidedbyAMREF?ThedraftMTRreportgivesadetailedaccountoftheviewsofthemanydifferentstakeholdergroupsofthevalueoftheassistanceprovidedbyAMREF.Itgiveslessattentiontoanalysesofthefunctionofthesedifferentgroupsandhowtheyrelatetoeachother(ide-allyandinpractice)7. Yet the project is called the Katine Community Partnership Project, and it is these groupswhoarenotonlythekeyrecipientsofAMREFassistancebutalsothevehiclesthroughwhichso-cialchangeisexpectedtohappen.Expectationsabouttheirrelationshipsfallintothecategoryofprojectdesignissues,whichwereraisedbeingofconcernintheLondonconsultationontheToRs.

Comparedtowhat?8

TheMTRreportcorrectlypointsout“AmajorconstraintinattemptingtoreviewandgiveanachievementratingtotheProjectisthelackofasuccinctLogFrame”.TheKCPPConceptualFrameworkdetailstheexpectedOutputs(thingstobedeliveredbyAMREFstaff)buttheexpectedOutcomes(mainlychangesinpeoples’lives)aredescribedonlybybroadinclusivestatementse.g.“Increasedcommunityaware-ness of, access to and utilisation of health services in community and health facilities”. The “Specific Objectives” referred to in the ToRs, and narrative progress reports, are less specific e.g. “Improved com-munityhealth”.TheConceptualFrameworkdoeslist“exampleindicatorsforeachoftheexpectOut-comes.ThesubsequentlyproducedMonitoringandEvaluationFrameworkthenliststheindicatorsthatthe project will monitor, but without any commitment to specific targets that the project (i.e. AMREF and itspartners)hopestoachieve.Bothlistsofindicatorsareamixofoutputs(whatAMREFstaffwillpro-vide),outcomes(changesinthefunctioningofcommunitystructuresandservices)andimpactmeasures(changesinpeople’slives)9.TheMTRreport’sAnnex10tabulationof“achievementratings”hasinheritedthisconfusion,mixingupdifferentkindsofchanges(inhouseholds,communitygroupsandinAMREFstaffactivities)inoneas-

7 Included here are the Parent Teachers Associations, the School Management Committees, the School Health Committees, the Village Health Teams, the Water Source Committees, the Farmers Groups, the VSLAs and the government and quasi government bodies they are linkedtoincludingthe��schools,the�healthcentres,theHealthUnitManagementCommittees,theParishDevelopmentCommittees,theSub–County Health Committee (and sub–committees), and others possibly not included here

� ThequestionaskedbyGrouchoMarx,whenhisfriendcomplainedtohimthat“Lifeisdifficult”9 TheM&EOfficerreportedthatdataisbeingsystematicallycollatedontheseindictaors.Butforreasonsnotyetidentified,thisdataisnot

being systematically reported in the six monthly narrative reports to the Guardian and Barclays Bank

Page 52: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �9

sessment.InMid–TermReviewsthatIamfamiliarwith10itisimportanttoassessthesetypesofchangesseparately,andtotrytoidentifytheextenttowhichchangesatonelevelhavecontributedtochangesintheother11.Forexample,howhaveAMREFstaffactivities(outputs)contributedtochangesinthecapacitiesoftheSchoolManagementCommitteesandParentTeachersAssociations(outcomes),andthenhowhavechangesinthosegroups’functioningaffectedchildren’sattendanceandperformanceatschool. It is quite possible for project activities to be successfully implemented, but have no significant effectsonsuchcommunitygroups,andviceversa,forimprovementtotakeplaceinthecapacitiesofsuchgroups,despiteprojectactivitiesnotbeingimplementedsuccessfully.

Multiplesectors,multipleactivities

Howdoyoumakeoveralljudgementsabouttheprogressofamulti–sectoralintervention,involvingarange of activities in each sector? Some form of judgement like this is required by the first of the three purposesoutlinedintheToRs(Thepurposeofthemid–termreviewistoassessprogressagainstob-jectivesinall5componentstoassesstowhatextenttheprojectisontracktoimprovethequalityoflifeforthepeopleofKatine).OnesectionoftheMTRreportdoesexamineeachcomponent,intermsofstaffmember’ssuccessinimplementingactivitiesaspertheirworkplans,duringthesecondyearoftheproject.However,thedecisiontostructuremostofthereportarounddifferent“levels”oforganisations(e.g.district,sub–county,parish,households)hasmeantthatinthemaintextofthereporttherehasbeennocorrespondinganalysisofthesuccessofeachcomponentattheoutcomelevel(changesinthefunctioningofdifferentcommunitygroups).Therearetwoannexesthatdisaggregateperformancebycomponents (Annex 6: KCPP Achievements since Jan 2008) and Annex 10: Achievement Rating Scale). The first of these lists various “Results” for each component along side the inputs provided (infrastruc-tureandhardware,training).Thesecondgoesfurtherandgeneratesan“Achievementrating”foreachcomponent. Unfortunately the changes listed as the basis for each component rating conflate changes in outputs(whatstaffhavedone),outcomes(changesinthefunctioningofcommunitygroups)andimpacts(changesinpeople’slives)12. Additional difficulties have been created by the absence of targets, of what wasexpectedtobeachieved.Ideallyanevaluationwillmakeuseofmultipleinformationsources,includingpre–existingdatacollectedbyothers.ThecurrentMTRreportprovidesinformationfromgroupandone–to–oneinterviews,ahouse-holdsurvey,astaffself–assessmentandadatabaseofvillagesxprojectactivities.Howeverthesearereportedinseparatesections.Ananalysisofcomponentbycomponentwouldallowthesesourcestobeintegratedintoonecompositepicture.Informationwasalsoavailablefrompastnarrativeprogressreportsandbaselinesurveys,butthishasnotbeenusedasmuchasmightbeexpected.

Futureplans

The draft report listed a set of 13 activities that project staff thought were of the highest priority during the final year of the project. These were identified through a staff workshop facilitated by the MTR consult-ant,attheendoftheMTRprocess.Whileseenasavaluableexercise,thelistneedstobesupplement-edwithsomeexplanationsforthereasonsbehindthesechoices,sothattheunderlyingstrategyismoreevident,alongwithanyassociatedassumptionsandrisks.ThatiswhatAMREFKampala,theGuardianandBarclaysshouldthenbeattendingtowhenconsideringthesepriorities.ThiskindofinformationshouldalsobeofinteresttootherparticipantsintheproposedSeptemberworkshop.Becauseitwasnotyetcompletedthedraftreportdidnotmakeanyrecommendationsaboutthepro-posedSeptemberworkshop,orpossiblepost–2010activitiestobefundedbytheGuardianandoroth-ers(otherthanthattheprojectshouldbeextendedforatleasanextrayear).Isubsequentlyprovidedsomesuggestionsonhowproposalsforthethirdyear,andaoneyearextension,couldbedevelopedviaastakeholderconsultationprocessduringtheproposedSeptemberworkshop(andpossiblyextendedthereafter).Thesearegiveninpara18below.

10 Oftencalled“OutputtoPurposeReviews”11 SeetheDFIDAnnualReviewformat,foradetailedexampleofthekindofanalysisexpected,athttp://www.dfid.gov.uk/Documents/funding/

wahrf–annual–review.xls 12 The same is the case with Annex 6, which includes as results activities carried out by AMREF e.g. provision of books and desks

Page 53: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �0

Risksandassumptions

Mostevaluationswillseektoidentifyimportantrisksandassumptionsbeingmadebytheprojectmanag-ersand/orintheprojectdesign.SimilarexpectationswerebuiltintotheToRsforthisMTR,inthe“scope”section.InthedraftversionoftheMTRtheseissueswerenotyetaddressed.Oneimportantareawhereassumptionscouldbeusefullydiscussedisthatofdrugsupply.Theoriginalneedsassessmentstudiesidentified problems in this area, but the subsequent project design did not make it clear AMREF’s expec-tationsabouthowtheseproblemscouldbestberespondedto.OtherrisksseemtobepresentwiththearrangementformoneymanagementbytheWaterSourceCommittees.Ourtwovisitssuggestedthatneither government nor project staff were fully informed about the financial status of the groups visited. Yet proposals have been made by some to extend the roles of these groups to take on savings and creditservices.

4.Issuesarising—abouttheKCPPproject

Apreface: The response of the AMREF UK and Uganda offices to the MTR report has been very positive. Theissuesraisedbelowareonesthatstrucktheexternalevaluatorasespeciallyimportant.

Projectcosts

InthemeetingwiththeSteeringCommitteetherewasanintensediscussionofprojectcosts,includ-ing questions about the contribution of the AMREF Kampala and other offices. In response, the Project Managerofferedtoprovidemoreinformationonhowprojectcostswerebrokendown.TheGuardianandBarclaysBankcouldtakeafurtherstep,andrequestthateachsixmonthlynarrativereportontheKCPPincludes a section on the activities of the AMEF London and Kampala offices and the costs they have incurredincarryingouttheseactivities.Ifthisstepistaken,thesenarrativereportsshouldthenberou-tinelysharedwiththeSteeringCommitteeandManagementCommittee,aswellasbeingmadepubliclyavailableviatheGuardianwebsiteasatpresent.Thereisanimportantlargerlessonhere.AidprojectsliketheKCPPinvolvelongandcomplexsupplychains,bringingfundsandtechnicalexpertisetocommunitiesofconcern,fromdistantlocations.Intheprivatesectorintenseeffortisinvestedintomakingeverypartofsupplychangesworkasquicklyandef-ficiently as possible. But in the world of development aid often the focus is almost wholly on the final link inthechain,theorganisationsdeliveringassistanceatthegrassrootslevel.Verylittleattentionisgiventothemoreexpensive13partsofthesupplychainlinedupbehindthem.GiventhattheGuardianhasre-portedlyfoundthecostsofdeliveringaidmuchmoreexpensivethantheyexpectedperhapstheyshouldturntheirjournalisticattentiontowardstheissueofsupplychaincostsininternationalaiddelivery.Seediagrambelowforasummaryviewofthesupplychain.(Therearelikelytobesomeerrorsinthisdiagramwhichwillneedcorrection)

Governmentcontributions

In2009AMREFswitcheditsapproachtothebuildingofschoolclassroomsinKatine,fromcentrallycon-tractedconstructiontolocallycontractedconstruction,plussomematerialandlabour[check]inputfromthesurroundingcommunities.Requiringthesetypesofco–contributionsisacommonplaceaspectofruraldevelopmentwork.Inotherpartsoftheprojecttherearegovernmentcontributions,mostnotablyintheformoftrainingofcommunitygroupsbylocalgovernmentstaff.Butthesetraininginputsarepaidforbytheproject(intheformofmealsandtravellingallowancesand[check]).WhatappearstobemissingisanyformofcontractualagreementaboutthenatureofgovernmentcontributionsthatshouldmatchAMREFinputs. For example, in the form of additional staffing to the health centre facilities or to the schools. Thisexperiencecouldinformthedesignoftheremainingperiodoftheprojecttotheendof2010,andanyextensionofactivitiesthereafter.AgreementsaboutnewinputstobeprovidedbyAMREF,espe-ciallythosemostdesiredbylocalgovernment(e.g.physicalinfrastructure),shouldincludedetailsofthecontributions that government will also make. In the case of staffing commitments, the beginning of new infrastructure works should be dependent upon fulfilment of staffing commitments to previously com-pletedinfrastructurework

13 In terms of the costs of staff time and transport costs involved

Page 54: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

Thick blue lines = financial transfers. Broken blue lines = information transfers (not including most of those between yellownodes(intermediariesbetweendonorsandrecipients))

Provisionoftraining

More than 50% of all the activities in the three year workplan for the KCPP are training activities. AMREF considerstheseasanessentialpartoftheproject,enablingthemanycommunitygroupsandgovern-mentservicesthatitisworkingwithtofunctionbetterthaninthepast.Withouttheseimprovementsthebenefits obtained from new physical infrastructure will be reduced. ManyofthetrainingactivitiesinvolvebothAMREFstaffandgovernmentstaffworkingtogether.Ide-allyAMREFstaffwouldbehelpingbuildthetrainingcapacitiesofthesegovernmentstaff.However,ifAMREFissimply“sub–contracting”governmentstafftoprovidetrainingthenthisrelationshipismorequestionable.InthatcaseitmightbearguedthattheGuardianshouldsimplyprovidepartofitsfundingdirecttolocalgovernment,and“cutoutthemiddleman”andtheirassociatedcosts.However,ifAMREFisinfacttryingtobuildstafftrainingcapacitiesthenweneedtoseesomereportingonthisaspectoftheirworkinfuturenarrativeprogressreports.Thatis,notjustdataonwhowastrained,butwhodidthetrainingandhowtheirtrainingcapacitieshavebeenimproved. In interviews with government official at the district and sub–county levels it was clear that budgets availablefortraining(andsupervision)wereverylimited.Thismeanstheprospectsforacontinuationoftraining activities on the scale introduced by AMREF are very small. Yet ongoing training will be needed, becauseofstaffturnoverinschoolsandhealthcentresandmembershipturnoverinthecommunitygroups. These considerations do not seem to have visibly influenced the design of the KCPP develop-ment strategy. There are however two ways in which it could:

Cutbackonthebreadthoftrainingactivitiesundereachcomponent,tofocusonthosewiththemospotentialtobecontinuedbygovernmentbodies,afterthecessationofAMREFinputsBuildincommitmentstomodestincreasesingovernmentfundedtrainingactivitiesduringthelifetimeoftheproject,aspartoftheagreementsproposedaboveongovernmentco–contributions.

Planning for the future: ThefollowingsuggestionsweremadetotheMTRconsultantregardingtherecom-mendationsthathadbeenmade(onpage7ofthedraftMTRreport)fortheone–yearextensionoftheproject.

TheSeptemberworkshopneedstoclearlyidentifywhatisexpectedtobeachievedbytheendof2011.Itisunlikelythatanydonorwouldagreetoafundingextensionwithoutclarityinthisarea.

Page 55: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes �2

NotintermsofwhatinputsAMREFwilldeliver,butintermsofexpectedimprovementsinthefunctioningofdifferentgroupsandservices(e.g.VHTs,HCs,SMCs,PRAs,Schools,HealthCentres,WSCs,etc).Theseareoutcomesthatshouldleadtosomelongertermimpactsonpeople’slives Those changes will need to be clearly prioritised, otherwise it will be difficult to make an appropriate allocationofresources(orresourceswillbeallocatedaccordingtotheprioritiesofthoseholdingtheresources) The 2011 targets could be defined in relation to existing national targets or national averages Associated with this clarification of expectations, agreements need to be developed that will spell out not onlywhatAMREFwillprovide,butalsowhatcommunitieswillprovide,ANDwhatthegovernmentwillprovide.Multipleagreementsmaybeneeded,perhapscomponentbycomponent.Onegenericagree-mentwillprobablynotwork,becauseresponsibilitieswillbecometoogeneralisedandfuzzy.TheresultingplanshouldbepublicisedasaKatineCommunityPartnersplan,notanAMREFplan.Oneinwhichbothgovernmentpartnersandcommunitygroupsarecommittedtoandclaimastheirown.Therecommendations(page28)forthethirdyearactivitiesshouldconnecttothislongertermplan.Performance during this third year should be sufficient to give a donor confidence that a fourth year of fundingwillbeworthwhile.OnecriteriacouldbethattheSeptemberworkshopisabletodeliverthekindofresultsoutlinedabove,and That progress in 2010 meets a series of benchmarks identified during the September workshopThereisariskthatthecurrentdonorswillnotsupportafourthyearextension,ormaychangetheirmindbytheendof2010.Withthisinmind,theSeptemberworkshopshouldbedesignedsuchthatthepart-nersinvolvedcouldtakeallorpartoftheirdevelopedplanstootherdonors,toseekreplacementfundingfromthem(withtheinterestingchallenge—canyoubeabetterdonorthanG&B?)Thisisanadditionalreasonwhythe2011planmightbetsbemadeupofmultiplepartsIntheargumentabovemyassumptionhasbeenthatAMREFthinksthatafourthyearisnecessary,andthereforeifG&Bwillnotfunditthenfundingwillneedtobesoughtelsewhere.AnyplanstoclosedownAMREF’sinvolvementinprojectattheendof2010wouldundermineanyargumentfortheneedforex-tendedfundingfromG&B.TheycouldalsoundermineAMREF’sreputationamongstotherdevelopmentagenciesThedraftreportproposesthreecriteriaforselectingactivitiestobecontinued,whichcouldbeappliedin the September workshop: impact, sustainability, and what the community wants. Impact and sustain-abilitycriteriawillleadindifferentdirections(e.g.materialsupportversustraining).Thealternativeistofocusonthoseactivitiesthatgovernmentandcommunitiesaremostwillingtoco–investin,alongwithAMREFresources.

Assessingimpactonpeople’slives

InDecember2008CAREcontractedanindependentUgandanconsultanttocarryoutabaselinesurveyofhouseholds’socio–economicstatusinKatinesub–countyandacontrolgroupinKamudasub–county(232 households in all). Because of the simplicity of the method used to collect that data (known as the BasicNecessitiesSurvey)itwillberelativelyeasyandinexpensiveforCAREorAMREFtofundarepeatofthissurveyinlate2010(orlater).Thedatathatwascollectedinlate2008hasnotyetbeenfullyanalysed.NorhasitspotentialbeenrealisedforpubliclycommunicatinghowpeoplearelivinginKatine.Forexample,usingthesurveydataitispossibletoprovideagraphicdescriptionof(a)whatpeopleinKatinethoughtwerethebasisneces-sitiesthateveryoneshouldbeabletohaveandnothavetogowithout,and(b)whatinfacttheaveragehouseholdinthesampledgroupactuallypossessedinDecember2008.Ihaveofferedtocompletetheanalysis,probono.IhavealsoencouragedCAREtoensurethatmultiplecopiesofthesurveydataaremade(andstoredseparately)toensurethatthesurveyresultsarestillavailablein2010andbeyond14.

�.DFID“QualityatExit”checklist:AnassessmentoftheMTRReport(and the field work process lead-ingtothatreport)

14 At present the only digital and hard copies of the survey data are being held by the baseline survey consultant.

●●

●●

●●

Page 56: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

1 Isthereaclearrationaleforwhythestudyisbe-ingdone,whynowandwhoitisfor?

Partlyso.TherecouldbeamoreexplicitreferencebacktothethreepurposesoftheMTR,asstatedinthe1.2PurposeofthemidtermreviewsectionoftheTermsofReference. And to section 3. Expected outputs.

2 Doesthereportde-scribethescopeandcoverageoftheevalu-ation?Istherationaleoftheinterventionorpolicyclear?

Partlyso.ThebulletpointedlistinthescopesectionoftheToRsshouldbeincludedintheIntroductionsectionoftheMTR.However,theseareavailableinthefulltextoftheToRsinAnnex1.

Whiletheactivitiesandobjectivesoftheprojectarewelldocumentedtherationaleoftheprojectisnotclear.AMREF’sviewsonworkingwithpartners,providingmod-els,undertakingoperationalresearchandadvocacyallhaveaplacehere

3

Isthepolicy,develop-mentandinstitutionalcontextoftheinterven-tionclearlyassessed,includingpoliticalecon-omy,poverty,gender,environmentandrightsissues?

To some extent. There is a reference to the fit between the project activities and the PovertyEradicationActionPlan(PEAP)onpage14.Attentionhasbeengiventodatacollectedonnationaltargetsandaverages,relevanttoonecomponent(Educa-tion),butnotothers.In2008AMREFcommentedontheExternalEvaluators’AugustVisit report: Analysis of KCPP did not fully take into account the wider development contextofKatine,SorotidistrictandUganda.HoweverintheircommentonthedraftMTRtheyhavenothighlightedthisasanissue.

4 Istheevaluationframe-workestablishedandwasitappropriate,ensuringthatdiverseviewswereheard?

Anevaluationframeworkwasestablishedandused.TheIntroductiontotheMTRgivesaquickoverviewofthemethodsusedandtheevaluationissuesattendedto.Theresultsofthedifferentmethodsusedareclearlydocumentedinthereport.

Adiversityofviewshasbeendocumented,Differentcommunitygroupsandgovern-mentbodies,atdistrict,sub–county,parishandvillagelevelwereinterviewedandreportedon.

5

Wasthedatacollectedsufficiently disaggre-gatedtoenablediverseviews to be reflected; wasitcollectedinanappropriatemannerandwasinformationsufficiently triangu-lated?

Thereportseparatelydocumentstheviewofmanydifferentgovernmentbodiesandcommunitygroups.Viewswereobtainedthroughstructuredmeetings,householdsurveysandrandomwalks

Therewasnodis–aggregationofthehouseholdsurveydata

Therewassometriangulationofdatae.g.byrelatinghouseholdsurveyresponsestostaffdataoncoverageofeachvillagebyeachprojectactivity.Moreusemightbeexpectedofdataavailableinthenarrativereportsandbaselinesurveys

6

Doesthereportindicatethestakeholderscon-sulted,thecriteriafortheirselection,andthemethodsandreasonsforselectionofparticu-larstakeholders?

Annex2listsallgroupsthatweremet.Thedecisiontomeetcontrastingpairsofcommunitygroupshasbeenmadeclearonpage27,butnotthecriteriabehindthechoiceof“well”and“less–well”performinggroups.Theseareimportantbecausethe “success” criteria used may or may not fit well with the official objectives of the project.

7 HaveParisDeclara-tionPrinciplesbeenaddressedintheevalu-ation?

AlignmentwithgovernmentpolicywasmentionedviareferencestothePEAPandgovernmenttargetsforeachsector

HarmonisationeffortswithotherNGOshavenotbeendescribed/analysed.Infor-mationwascollectedandcouldbeused(e.g.onthedistrictlevelforumsforwaterandeducationactivities)

8 AresomeoftheDACevaluationcriteria1reflected in an appropri-ateway?

Tosomeextent.TheDAC+criteriawereusedtoinformthequestionsaskedduringinterviews, but the findings on each of these criteria are not easily accessible in the reportascurrentlystructured.RelevanceandeffectivenessofAMREFactivities,asseenbydifferentstakeholders,havebeenemphasisedthemost.Discussionofis-suesofimpact,sustainabilityandtransparencyarelessevident.Genderandequityissues have been analysed in the final version of the report.

Page 57: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

9 Istheanalysis suffi-cientlyrobust?

Alltherecommendationsaresupportedbysomepriordiscussion.Thereisasig-nificant section of the report (pages 20–27) that are descriptive with little analysis of issuesarising(andanyrecommendationsthatcouldrelatetothoseissues).Thereneedstobesomeformofsummarizingorsynthesizinghere.Asnotedbelow,allre-spondents’ view of project benefits seem to be accepted at face value, and of equal value.Inpracticesomeviewswillbemoreimportantthanothers,bothtotheindi-vidualrespondentsandgiventhestrategyoftheproject

10 Arethefindingsvalid,balancedandad-equatelysupportedbyevidence?

The findings appear balanced, and have been accepted by AMREF, even though somearequitecriticalofAMREFpractices.TheachievementratingsinAnnex10havebeenmadeonthebasisofamixedsetofdataonoutputs,outcomesandim-pact, and in the absence of defined targets or comparators. They must therefore be regardedasimpressions.Theselimitationsneedtobeclearlystated

11 Aretherecommenda-tions sufficiently clear, targetedandpractical?

Yes. But some seem to assume some background knowledge about the issues involved.Anon–AMREFaudiencemightneedsomemorecontext/explanation.Some will need clarification even to the parties referred to, such as those regarding theneedforMoUsandRulesofEngagement

12 Arethelessons2clearlypresentedandappli-cableforwideruse?

Lessonslearnedhavenotbeenexplicitlydocumentsassuch.IntheircommentsonthedraftMTRreportAMREFLondonhavesincerequested“keylearningthatwillimpactwhatwecandodifferently”Tosomeextentthisrequestiscoveredbythelistofrecommendations,butthesearenoteasilyreadasgeneralisationsthatmightberelevanttootherAMREFproject

13 Aretheevaluationresults sufficiently inde-pendentandimpartial,(fromtheevidenceavailable)? 3

Thereportappearsindependentandimpartial.However,perhapssomeofthedatathathasbeencollectedneedstobeviewedmorecritically.Allrespondents’viewof project benefits seem to be accepted at face value. VSLA have been judged as highlysuccessful(accordingtomemberviews),butsomeharddatae.g.onmem-bershipturnoveringroups,wouldbemorepersuasivestill.Trainingisreportedasappreciatedbymany,butthereisnoreferencetoanytechnicalassessmentsoftrainingprogramsthathavebeenprovided.

14 Hastheevaluationprocessandreportadequatelyaddressedtheinformationneedsofthecommissioningbodyandotherusers;anddoesitaddressthequestionsintheTOR?

FeedbackonthedraftreportfromAMREFLondonwaspositive,withrequestsforfurther information on:

keylearningthatwillimpactwhatwecandodifferentlywhyreportsectionswereorganisedaccordingtoparishandgovernancelevelmorepointersona4thyearandwhatweneedtoconsiderfortheprojecttobesustainablePerformancemeasurementagainsteachcomponent(usingDACcriteria)Integrationofprojectactivities,acrosscomponents

(RD)LookingattheToRs,thereareanumberofaspectsoftheScopeofworknotyetaddressed(4of8).Moreinformationcouldbeprovidedand/orreasonsgivenfornot covering these issues (e.g. in the Introduction):

Changestocommunityandgovernmentstructuresintermsoftheircapacitiesandtheimpactthishasonthedeliveryoftheprojectandpeople’slivesi.e.areweseeingamoreactivecommunityorpolicychange?(consideringsustainabilityandeffectiveness)[Notaddressed] The contribution of: Partners activities e.g. UWESO, FARM–Africa, CARE (con-sidering relevance, effectiveness and efficiency3) Role of other NGOs operating inKatine,consideringtowhatextentthepartnershipsandcollaborationshavehinderedorhelpedtowardsachievingtheendgoal[Partlyaddressed]Reviewandidentifysustainabilitymechanisms,whatneedstohappenfrommidwayuntiltheendoftheprojectandaftertheprojectlifetimetoensuresustain-abilityi.e.replicationofthemodel/scaleupandanexplorationofopportunitiestosupportthat.[Notaddressed] Risks and assumptions: consider assumptions in initial design of project, what hasbeenlearnttoinformfutureimplementation.[Notaddressed]

●●●

●●

Page 58: Katine mid-term review annexes

Mid–Term Review Katine Community Partnerships Project, July 2009 — Annexes ��

15 Havestakeholdersincountriesandotherusers been sufficiently engagedintheevalua-tionprocess4;andhascommunicationbeensufficiently transparent?

Largelyso.ConsultationsontheToRstookplacewithinAMREF,andwiththeGuardian,CARE,FarmAfricaandBarclays.TheSteeringCommitteedidnotappeartobeinvolvedinthedevelopmentoftheToRs.

AMREF Katine staff participated in all field visits, meetings and interviews. A plan-ning workshop was held with AMREF Katine staff on the final day of the fieldwork

A debriefing of the results of the MTR took place in Kampala, and will also take place inLondon.Astakeholdersmeetingisscheduledformid–September,anditisexpect-ed the MTR results will be discussed there. The finalised MTR will be available on the Guardianwebsite,andshouldbeprovidedtotheSteeringCommitteeinSoroti.

16 IstheExecutiveSum-maryclear,balancedandofappropriatelength5;anddoesitsufficiently reflect the findings and tone of the mainreport?AretheappropriateAnnexesavailable and of suffi-cientquality?

AnExecutiveSummaryhasbeenprovided,ofappropriatelength.Thesequenceoffindings could be improved, with method descriptions in one place (e.g. paras 1, 3, 5)andoverallassessmentsinanotherplace(e.g.paras4,8).Thedescriptionoftheachievementratingsneedtobeassociatedwithacaveat,relatingtounclearobjec-tivesandpoordata,documentedinthereport.Somestatementsareabitskeletal,and may leave the reader puzzled e.g. paras 8, 13

A list of Recommendations is also provided. These would benefit by references to specific sections of the main text where they are discussed in detail e.g. See page…TheAnnexesprovidesubstantialsupplementaryinformation

(Footnotes)� Relevance,effectiveness,efficiency,impact,sustainabilityplustheadditional�criteriaofcoverage,coherenceandcoordination.2 Note: Recommendations are actionable proposals and lessons learned are generalisations of conclusions applicable for wider use. 3 It is recognised that the QA Assessor may not be able to make a valid judgment, because of lack of evidence; in which case, there should

be an/a response.� Theevaluationapproachshouldincludelearningandparticipationopportunities(e.g.workshops,learninggroups,debriefing,participa-

tioninfieldvisits)toensurekeystakeholdersarefullyintegratedintotheevaluationlearningprocess.� Uptofourpages.