Jump into Release 1. Pepper. Goals for End of Class. Project delivery Diagrams (new class & firm state, use, context, sequence) Agile cycles with SCRUM management - live it Project management terms and tasks - PowerPoint PPT PresentationTRANSCRIPT
Jump into Release 1
Pepper
Goals for End of Class• Project delivery• Diagrams (new class & firm state, use, context, sequence)• Agile cycles with SCRUM management - live it• Project management terms and tasks
– assigning man hours and tracking completion; critical path; gantt chart and burndown chart
• Testing Levels + How to write a test case• Change control - live it• Mysql and Junit and GIT - just enough• Design classes - touch on design patterns (need stronger
Class UML first)
Test Plans
• Test Driven Development– Unit test plan first
• Code coverage• Automated Regression built as you go• Debug is easier• Serves as system doc
– Still need system test on top– Legacy code might not have the plans
Test Plan levels
•User Acceptance•System (integration)•Unit test (TDD concerned with these)
•Regression
Type• Try to break it• Validate flows (from state to state)• Validate Specifications (including use cases
and sequence diagrams) • Stress test• Code inspection• Black box vs white box
– Black - From spec - no design knowledge– White - look at code to find decisions
A Good Test Case
• Setup situation - environment to input into• Action to test - actual input• Assertion of result - what the environment
looks like when you are done
Chose cases
• Input / output partitions (similar characteristics)– One from each paritition; boundaries and null
• Cause all failure types (every failure error msg)• Sequences: have only 1 in a sequence; have
none in a sequence; also act on first, middle and last
• Input / output buffer overflow• Try to force invalid outputs
Environments
• Good test environments encourage good tests– Refresh periodically– One per user + One shared
• Bypass Database with stubs to return from a DB call– Quick– Not complete
Testing Wrap UP
• Levels - unit / system / user• Structure - situation / input / expected output• TDD - code test before coding program• Choose cases - partitions (border, null,
sample) / sequences / buffer limits / force errors
• You will be able to : – Write a user acceptance test plan– Write good test cases on paper
Scrum - Plan a Sprint• Great Video (but added release /sprint layer)http://www.youtube.com/watch?v=XU0llRltyFM - pictures in this presentation from that video
• Plan a release: • Prod Owner: Pick user stories from product
backlog
Acceptance Plan
• Write a quick plan that the user agrees will validate the sprint is good– Starting situation / Actions / Resulting situation– Estimate: 4 plans per story included in the release
Sprint Tasks• Choose tasks for your sprint • Assign man hours to tasks• Scrum Master Assign tasks to people• Commit to release date based on man hours
Project Control• 15 minute daily stand up meetings
– Development Team: What is done, what obstacles, what is next for you
– Discuss group solutions
• Burn Down Chart
SCRUM Summary• Roles
– Product owner, Scrum Master, Development team• Ceremonies
– Sprint planning done (stories chosen)– Sprint designed (tasks chosen with high level design)– Daily Scrum Meeting
• Artefacts– Product backlog– Sprint backlog– Burndown charts
Credit to http://alaverdyan.com/readme/2011/12/back-to-basics-scrum-origin-and-lean-thinking/
Class Diagram UML Annotations
• Example: http://www.math-cs.gordon.edu/courses/cps211/ATMExample/ClassDiagram.html
• Diamond
• Big Open Triangle
• Small Arrow
• Dotted line
• http://www.uml-diagrams.org/class-reference.html
ATM – check Bjork’s design
Class diagram AnnotationsDiamond
Diamond attached to the class that contains another class.
Often read as “has a “ from the diamond side to the non-diamond, and “is part of” from the non-diamond to the diamond.
Filled diamond means the part cannot exist without the container. If the container is deleted, delete the parts.
Chapter 7 Design and implementation 16
ATM – check Bjork’s design – more annotations
Class diagram AnnotationsTriangle
Triangle attached to the whole in an “is a “ relationship.
The class not touching the triangle “is a “ the class touching the triangle.
The class touching the triangle “can be a “ the class not touching the triangle (“but it will not always be one”)
Chapter 7 Design and implementation 17
ATM – check Bjork’s design – more annotations
Class diagram AnnotationsSmall arrow
Two classes are related, but only one knows the relationship exists
The class without the arrow knows the one with the arrow exists
Solid line – the arrow side is contained inside the other side
Dotted line – just has a weak relationship with (maybe creates it during a method)
Chapter 7 Design and implementation 18
ATM – check Bjork’s design – more annotations
Class diagram AnnotationsDotted line - association
To small arrow – depends on the small arrow side Non-arrow side “somehow depends upon” arrow side(small arrow side may be an interface)Maybe “uses’ , calls, creates, sends, instead of “depends
upon”
To large arrow - realizes (implements or executes)Non arrow side implements or executes arrow side
Chapter 7 Design and implementation 19
Inventory UML
Simple Product is a product managerA product manager can be a Simple Product manager
ProductManager knows Product exists, but Product does not know. PM changes product
Try one (observer)
Concrete Observer is a Observer
Concerted subject is the information being observed
Concrete observer holds one copy of the subject's state
Concrete subject is a subject
Subject has an observer (diamond)Observer is part of a subject (diamond)Observer is owned by Subject (filled circle)
One More - File Inventory
All these files are types of Inventory Items
Directory and path are inventory containers
Items and containers are inventory elements
Elements are part of inventory container, and inventory model and should be deleted when container gone
An element has a inventory relationship, which deletes when the element is gone
GIT
• See Moodle presentation
MySQL
• See moodle presentation by Jan
Ready to Run a Sprint
• Just enough– UML - Enough Class diagram– Testing Knowledge - Junit– Change Control - Git– Database - MySQL– Scrum - plan your release and monitor