jithendra_l._vadlamuri._2015_10_02_19_16_09_940

4
JITHENDRA LAKSHMAN VADLAMURI 16-23D-3, Pallamrajunagar, Kakinada 533001, Andhra Pradesh, India. [email protected] , 09866490496 OBJECTIVE: Have a strong desire to become a part of high performance team in a challenging environment towards a successful career in industry by making the best out of my abilities and interpersonal skills for contributing in long term progress and profitability of my employer organization and thus to make my own identity. SUMMARY: Currently having 5+ years of Industrial work experience in Material Management and Execution - Fabrication (Steel Structures). Having good knowledge with transaction codes of SAP - Material Management Module. Have good knowledge on fabrication of structural steel. Planning, Monitoring, controlling, coordination with Vendors and coordinating of site construction activities and Sound knowledge in studying and interpreting construction drawings. Excellent in verbal, written and interpersonal communication skills. PROFESSIONAL EXPERIENCE: RELIANCE INDUSTRIES LIMITED Project :- J3 - Project, Third Expansion of Jamnagar Refinery & Petro-chemical Project, Jamnagar, Gujarat. Nature of Work : CSA - Material Co-ordination and Controller. Department : EPC - Project Controls (Materials) Designation : Manager (March'2014 to Present) Roles and Responsibilities: Planning, controlling and Monitoring of CSA - Materials. Involved in major civil construction materials few of them are Rebar, Grout, Water Stoppers, UPVC Pipes, Hume Pipes, HDPE Sheet, Polysulphide Sealant, Curing Compound, Mechanical couplers , Shear Connectors, Stud Bolts, Foundation bolts. Review and Monitoring of all these materials well in advance based on planning reports, Site Look ahead's, consumption patterns and its delivery periods from vendors. Purchase Planning well in advance for materials required for all areas. Coordinating with Engineering and Construction dept. and evaluate project quantity and place bulk material requisition (PR). Based on IFC drawings and site requirement (SR & SER) timely raising PR- Purchase requisitions for materials through SAP-MM and getting the approvals from area managers, department head and from project In-charge for the release of PR Levels. Preparing comparative Statements of materials specifications from various vendors technical bids.

Upload: jithendra308

Post on 07-Dec-2015

213 views

Category:

Documents


0 download

DESCRIPTION

cv

TRANSCRIPT

Page 1: Jithendra_L._Vadlamuri._2015_10_02_19_16_09_940

JITHENDRA LAKSHMAN VADLAMURI 16-23D-3, Pallamrajunagar, Kakinada 533001, Andhra Pradesh, India.

[email protected], 09866490496

OBJECTIVE:

Have a strong desire to become a part of high performance team in a challenging

environment towards a successful career in industry by making the best out of my abilities and

interpersonal skills for contributing in long term progress and profitability of my employer

organization and thus to make my own identity.

SUMMARY:

Currently having 5+ years of Industrial work experience in Material Management and

Execution - Fabrication (Steel Structures).

Having good knowledge with transaction codes of SAP - Material Management Module.

Have good knowledge on fabrication of structural steel.

Planning, Monitoring, controlling, coordination with Vendors and coordinating of site

construction activities and Sound knowledge in studying and interpreting construction drawings.

Excellent in verbal, written and interpersonal communication skills.

PROFESSIONAL EXPERIENCE:

RELIANCE INDUSTRIES LIMITED

Project :- J3 - Project, Third Expansion of Jamnagar Refinery & Petro-chemical Project,

Jamnagar, Gujarat.

Nature of Work : CSA - Material Co-ordination and Controller.

Department : EPC - Project Controls (Materials)

Designation : Manager (March'2014 to Present)

Roles and Responsibilities: Planning, controlling and Monitoring of CSA - Materials.

Involved in major civil construction materials few of them are Rebar, Grout, Water

Stoppers, UPVC Pipes, Hume Pipes, HDPE Sheet, Polysulphide Sealant, Curing

Compound, Mechanical couplers , Shear Connectors, Stud Bolts, Foundation bolts.

Review and Monitoring of all these materials well in advance based on planning reports,

Site Look ahead's, consumption patterns and its delivery periods from vendors.

Purchase Planning well in advance for materials required for all areas.

Coordinating with Engineering and Construction dept. and evaluate project quantity and

place bulk material requisition (PR).

Based on IFC drawings and site requirement (SR & SER) timely raising PR- Purchase

requisitions for materials through SAP-MM and getting the approvals from area managers,

department head and from project In-charge for the release of PR Levels.

Preparing comparative Statements of materials specifications from various vendors technical

bids.

Page 2: Jithendra_L._Vadlamuri._2015_10_02_19_16_09_940

Coordinating with Buyers for placing the Purchase Order for required materials and getting

them release at various levels till the order released to external party (Vendor).

Ensuring timely and periodically constraint resolution, Shortfall Estimation, Substitution

and sparability for non-priority jobs with surplus inventory to save cost and time by

avoiding fresh procurement.

Coordinating on weekly basis with all concerned department heads to review pending order

status, quality of material to ensure standards.

Keep track of outstanding purchase order and formalize a report for the same department

wise to ensure the delivery is completed within reasonable time.

Coordinating with Buyers and vendors to get materials at site within the time frame and

same has to be allocate based on SAP MTO for bulk items and site requirement.

Doing Allocation and de-allocation of required material, Uploading MTO, Preparing

MIN(Material Issue Notes), BTN(Booking Transfer Notes), DIN (Direct Issue Notes),

MRN(Material Issue Notes) through SAP-MM module.

Transferring Material stock from Plant to Plant, Sloc. to Sloc. (Storage location) and

checking material invoice in SAP-MM.

TRINITY MECHANICAL CONTRACTORS PVT. LTD.

Project :- Reliance DMD (Dahej Manufacturing Division) Project, Gujarat.

Nature of Work: Material Coordination and Fabrication of Pipe Rack Structures.

Designation: Senior Structural Fabrication Engineer (Sept'2013 to Feb'2014)

Roles and Responsibilities: Prepared BOM(Bill of materials) from IFC drawings and coordinated for steel with Client

for fabrication.

Assuring the availability of materials for fabrication as per given plan.

Fabrication of Pipe rack Structures( Columns, beams, bracings, brackets).

Preparing inspection reports according to fabrication.

Coordinating with TPI for conducting the NDT as per required FQP/ITP.

Preparing the RA bill for the work done.

SHAPOORJI PALLONJI - ENGINEERING & CONSTRUCTION

Project :-Mercedes Benz India Pvt. Ltd., Chakan, Pune.

Nature of Work:- Material Coordination and Control, Fabrication of Steel Structures

like Columns, Girders, Bracings, Rafters, Mezzanine Floor structure and Pipe rack

structure.

Designation:- Structural Engineer (Execution) - Fabrication. (Feb'2013 to Aug'2013)

Roles and Responsibilities:

Prepared Scope of material for Material Procurement.

Coordinating with client for Steel quantity finalizing for IFC drawings as per standards.

Involved in Establishing Site infrastructure.

Prepared BOM from Design and Detail Drawings.

Page 3: Jithendra_L._Vadlamuri._2015_10_02_19_16_09_940

Involved in preparing QAP/FQP.

Maintaining the co-ordination between Planning, fabrication team and erection team.

Plan the daily activities and execute as per schedule and preparing Daily progress report.

In time fabricating steel structures with Approved FQP as per the erection sequences.

preparing sub - contractors RA-Bills every month as per fabrication activity.

Project :- RattanIndia Power Ltd. (Formerly Indiabulls Power Ltd.), 5x270 MW, Amravati,

Maharashtra.

Nature of Work: Material Coordination and Control, Fabrication of Steel Structures like

Heavy Columns, Crane Girders, Roof Girders, Bracings, Pipe Racks Structures and Floor

Beams (Built-up Sections) for TG-Building and Mill & Bunker.

Designation: Structural Engineer (Execution)- Fabrication (Aug’2011 to Feb'2013)

Roles and Responsibilities:

Managing day to day works at site. Delegation of work on priority basis Planning and

Material Coordination and control, Preparation of Fabrication Methodology.

Involved in Preparation of Cutting Plans for Structural steel to control the wastage of Steel.

Fabrication according to erection sequence by following approved FQP.

Study the drawing and fabricate the heavy steel structures with respect to drawings.

Preparation of Detail drawing from design drawing.

Preparation of BOM (Bill of Materials) and protocol according to inspection.

Maintaining Daily progress report and Documentation record like inspection protocols,

WPS, PQR, Material reconciliation.

Preparation of reconciliation statement of materials is monthly basis and after completion of

work.

Monitoring in NDT activities like (DPT, MPT and UT) during Fabrication of structural steel.

Interaction with clients and third party agencies.

Preparation of client & sub-contractor RA - BILLS.

CONSTRUCTO - (ENGINEERS & CONTRACTORS) (I) PVT. LTD.

Project:- IOCL, Paradip Refinery, Orissa.

Client: Heurtey Petrochem (I) Pvt. Ltd.,

Nature of Work: Fabrication of fired heaters and structure work at constructo work shop,

Kakinada, AP.

Designation: Graduate Engineer Trainee (September, 2010 to July, 2011)

Roles and Responsibilities:

Got trained by Engineers at fabrication work shop.

Prepared Bill of Materials from Shop Drawings.

Preparation of internal inspection report and dimensional reports at the time of fabrication.

Page 4: Jithendra_L._Vadlamuri._2015_10_02_19_16_09_940

Academics:

Chaitanya Institute Of Science and Technology Percentage : 64.60 %

(Affiliated to J. N. T. U, Kakinada) B-Tech (Mechanical Engineering), May 2010.

Pragati Vidyalaya Junior College Grading: Distinction (81.1%)

(State Board of Intermediate), MPC, 2006,

Pragati Little Public School Grading: Distinction (72.33%)

(State Board of Secondary Education), 2004,

Co-Curricular Activities:

Participated in National level paper presentation on Non-Conventional Energy Sources at

ERUDITE-09.

Got trained in AutoCad at National institute of technology, Kakinada.

Got trained in Pro. E and Ansys at Trinity computer centre, Vishakhapatnam.

Got trained in Catia v5 at Cadd Centre, Hyderabad.

Volunteer of National Level Technical Symposium TURBULENCE-09.

Personal Details:

Name : Jithendra L. Vadlamuri

Date Of Birth : 15th

Feb'1989

Languages Known : Telugu, English, Hindi

Passport No. : H2945422

Nationality : Indian

E-Mail Id : [email protected]

[email protected]

Permanent Address : Door no. 16-23D-3, Pallamrajunagar Road

no.3, Bank Colony, KAKINADA -533001,

East Godavari District, ANDHRA PRADESH,

INDIA.

Contact no. : 09866490496