jenks east intermediate cafeteria · 1/17/2016  · 810 south cincinnati second floor tulsa, ok...

27
810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 www.cyntergy.com Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east intermediate\Drawings\Sheet\G-000.dwg JENKS EAST INTERMEDIATE CAFETERIA HVAC REMODEL 3933 EAST 91ST ST TULSA, OK 74137 PERMIT SET 11/1/2016 JENKS EAST INTERMEDIATE CAFETERIA HVAC REMODEL 3933 EAST 91ST ST TULSA, OK 74137 PERMIT SET 11/1/2016 OWNER JENKS PUBLIC SCHOOLS 205 EAST B STREET JENKS, OK 74037 CONTACT ROGER WRIGHT 918-299-4415, EXT. 6411 [email protected] ARCHITECT DAVID F. PHELPS, AIA CYNTERGY 810 S CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 [email protected] STRUCTURAL ENGINEER LARRY L. VORBA, PE CYNTERGY 810 S CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 [email protected] MECHANICAL ENGINEER MICHAEL D. OBERMARK, PE CYNTERGY 810 S CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 [email protected] ELECTRICAL ENGINEER MATTHEW RUTKOWSKI, PE CYNTERGY 810 S CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 [email protected] BID SET

Upload: others

Post on 06-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

Prin

te

d: 1

1/2

/2

01

6 1

:3

2:1

3 P

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\G

-0

00

.d

wg

JENKS EAST INTERMEDIATE CAFETERIA

HVAC REMODEL

3933 EAST 91ST ST

TULSA, OK 74137

PERMIT SET

11/1/2016

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

PE

RM

IT

S

ET

11/1/2016

OWNER

JENKS PUBLIC SCHOOLS

205 EAST B STREET

JENKS, OK 74037

CONTACT

ROGER WRIGHT

918-299-4415, EXT. 6411

[email protected]

ARCHITECT

DAVID F. PHELPS, AIA

CYNTERGY

810 S CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

[email protected]

STRUCTURAL ENGINEER

LARRY L. VORBA, PE

CYNTERGY

810 S CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

[email protected]

MECHANICAL ENGINEER

MICHAEL D. OBERMARK, PE

CYNTERGY

810 S CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

[email protected]

ELECTRICAL ENGINEER

MATTHEW RUTKOWSKI, PE

CYNTERGY

810 S CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

[email protected]

BID SET

Page 2: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

GYMNASIUM

CAFETERIA

CLASSROOMS

MUSIC

TENNIS COURTS

B

U

S

P

A

R

K

I

N

GO

V

A

L

B

U

S

P

A

R

K

I

N

G

MAINTENANCE

EAST 91ST STREET SOUTH

TREE/FENCE LINE

1

JENKS EAST INTERMEDIATE

CAMPUS

2

N1

STAGING AREAS AND WORKSITE LIMITS

NOT TO SCALE

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/1

/2

01

6 2

:4

3:4

7 P

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\G

-0

01

.d

wg

G-001

SHEET INDEX AND STAGING

AREAS

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

SHEET INDEX

SHEET TITLE

GENERAL

G-000

COVERSHEET

G-001

SHEET INDEX AND STAGING AREAS

STRUCTURAL

S-001

GENERAL STRUCTURAL INFORMATION

S-101

ROOF FRAMING PLAN

S-501

FRAMING DETAILS

ARCHITECTURAL

AD101

REFLECTED CEILING DEMOLITION PLAN

A-101

REFLECTED CEILING PLAN

A-102

ROOF PLAN

A-103

ROOF DETAILS

MECHANICAL

MP001

MECHANICAL AND PLUMBING SYMBOLS AND ABBREVIATIONS

MP002

MECHANICAL AND PLUMBING NOTES

MD101

MECHANICAL DEMOLITION PLAN

MD102

MECHANICAL DEMOLITION PLAN

MD103

MECHANICAL ROOF DEMOLITION PLAN

M-101

MECHANICAL PLAN

M-102

MECHANICAL PLAN

M-103

MECHANICAL ROOF PLAN

M-501

MECHANICAL DETAILS

M-601

MECHANICAL SCHEDULES

M-701

MECHANICAL CONTROLS

PLUMBING

P-101

PLUMBING PLANS

P-501

PLUMBING DETAILS

ELECTRICAL

E-001

ELECTRICAL SPECIFICATIONS

E-002ELECTRICAL NOTES, SYMBOLS, ABBREVIATIONS, AND SCHEDULES

E-101

ELECTRICAL FIRST FLOOR PLAN

E-102

ELECTRICAL ROOF PLAN

E-601

ELECTRICAL DIAGRAMS

INDICATES AVAILABLE STAGING AREAS

THAT CAN BE USED WHILE SCHOOL IS

IN SESSION

INDICATES WORKSITE LIMITS

KEYNOTES

IT IS ANTICIPATED THAT EQUIPMENT WILL NEED

TO BE ORDERED AND STAGED PRIOR TO

SCHOOL ENDING FOR THE SUMMER. THE

SHADED & HATCHED AREAS CAN BE USED FOR

STAGING WHILE SCHOOL IS IN SESSION. ALL

GRAY SHADED AREAS CAN BE USED FOR

STAGING WHILE SCHOOL IS OUT. PARKING

CANNOT BE BLOCKED WHILE SCHOOL IS IN

SESSION.

ACCESS TO MAINTENANCE BUILDING MUST BE

MAINTAINED THROUGHOUT THE DURATION OF

THE PROJECT.

1

2

BUILDING CODE INFORMATION

2015 INTERNATIONAL BUILDING CODE

2015 INTERNATIONAL EXISTING BUILDING CODE

2015 INTERNATIONAL MECHANICAL CODE

2015 INTERNATIONAL PLUMBING CODE

2014 NATIONAL ELECTRICAL CODE

INDICATES THE JENKS EAST

INTERMEDIATE CAFETERIA

INDICATES AVAILABLE STAGING

AREAS THAT CAN BE USED ONLY

WHILE SCHOOL IS OUT OF SESSION

1. REMOVE EXISTING CHILLERS, BOILERS, PUMPS, AND ASSOCIATED HYDRONIC PIPING,

COMPONENTS AND CONTROLS. REFER TO DEMOLITION NOTES FOR ANY EQUIPMENT TO

BE SALVAGED.

2. REMOVE EXISTING INTAKE AND RELIEF HOODS ON ROOF.

3. REMOVE EXISTING AIR HANDLERS AND ASSOCIATED PIPING, COMPONENTS, AND

CONTROLS FROM MEZZANINE LEVEL AND ABOVE CEILINGS.

4. INSTALL NEW ROOFTOP UNITS AND SPLIT DX CONDENSING UNITS, INCLUDING ALL

REFRIGERANT PIPING AND DUCTWORK CONNECTIONS, ON THE ROOF AND ABOVE KITCHEN

AND OFFICE CEILINGS.

5. INSTALL NEW STRUCTURE TO ACCOMMODATE NEW ROOFTOP EQUIPMENT. NEW

STRUCTURE TO BE CRANED IN AND ATTACHED FROM ABOVE. ROOF AREAS TO BE

REMOVED FOR NEW STRUCTURE WORK AND REPLACED WITH LIKE. RE: STRUCTURAL

PLANS.

6. CONNECT NEW UNITS TO EXISTING DUCTWORK WHERE APPLICABLE.

7. INSTALL NEW DIGITAL CONTROLS TO CONTROL ROOFTOP UNITS.

8. INSTALL NEW DOMESTIC COLD WATER LINE AND HOSE BIBB AT ROOF HATCH.

9. ROUTE NEW GAS LINE UP TO ROOF TO EQUIPMENT AND TO FURNACE ABOVE CEILING.

10. REPAIR/REPLACE ALL CEILING SYSTEMS, WALLS, PLENUM SYSTEMS, AND ALL OTHER ITEMS

DAMAGED DURING CONSTRUCTION.

11. CONSTRUCTION SCHEDULE:

· BEGIN AFTER - END OF SCHOOL YEAR IN JUNE OF 2017, EXPECTED 05/06/17.

· COMPLETED BY - 08/4/2017

12. TEST AND DOCUMENT EXISTING HVAC SYSTEMS PRIOR TO ANY WORK AS REQUIRED TO

ACCOMMODATE SYSTEM MODIFICATIONS AND ADDITIONS. MAINTAIN ACCEPTABLE

COMFORT LEVELS DURING TEST AS REQUIRED. ENSURE THE INTEGRITY OF THE EXISTING

SYSTEM BALANCE.

13. SALVAGED ITEMS TO BE TRANSPORTED TO THE JENKS FACILITIES MAINTENANCE

BUILDING.

SCOPE OF WORK

BID SET

Page 3: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

ENGINEER OF RECORD

LARRY L. VORBA, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

JLK

NW

LARRY LEEVORBA11654

L

I

C

E

NS

E

D

P

R

O

F

E

SS

IO

N

A

L

E

N

G

IN

E

E

R

O

K

L

AH

O

M

A

1 11/1/2016

Prin

te

d: 1

1/1

/2

01

6 1

0:2

7:3

0 A

M

V:\Je

nks P

ub

lic S

ch

oo

ls\Je

nks E

ast In

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\S

-0

01

.d

wg

S-001

GENERAL STRUCTURAL

INFORMATION

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

DESIGN CRITERIA

1. THE STRUCTURAL DESIGN IS BASED ON THE DESIGN REQUIREMENTS OF THE

INTERNATIONAL BUILDING CODE, 2012 EDITION.

2. ROOF DESIGN LOADS

LIVE LOAD 20 PSF

DEAD LOAD MAX MIN

METAL DECKING 5 PSF 5 PSF

SHINGLES 3 PSF -- PSF

GYP BOARD 3 PSF -- PSF

PLYWOOD 2 PSF -- PSF

INSULATION 5 PSF -- PSF

MECHANICAL, ELECTRICAL AND PLUMBING 4 PSF -- PSF

SUSPENDED CEILING 3 PSF -- PSF

TOTAL DEAD LOAD 25 PSF 5 PSF

SNOW LOADS AND COEFFICIENTS

GROUND SNOW 10 PSF

ROOF SNOW 10 PSF

SNOW EXPOSURE FACTOR 1.0

IMPORTANCE FACTOR 1.0

THERMAL FACTOR 1.0

3. LATERAL LOADS

WIND LOADS AND COEFFICIENTS

ULTIMATE DESIGN WIND VELOCITY 115 MPH

NOMINAL DESIGN WIND VELOCITY 90 MPH

EXPOSURE C

BUILDING CATEGORY II

INTERNAL PRESSURE COEFFICIENT ±0.18

ULTIMATE DESIGN WIND PRESSURES

MWFRS

PARAPET 68.6 PSF

ROOF UPLIFT RE: 1/S-001

COMPONENTS & CLADDING

PARAPET

AREA ≤ 10 SF 74.1 PSF

AREA > 500 SF 47.5 PSF

ROOF UPLIFT RE: 2/S-001

SEISMIC DESIGN

I

E

1.0

S

S

0.135

S

I

0.070

SITE CLASS D

S

DS

0.144

S

DI

0.111

SEISMIC DESIGN CATEGORY B

GENERAL

1. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE TEMPORARY SUPPORT AND STABILITY OF

EXISTING STRUCTURE DURING ALL PHASES OF CONSTRUCTION.

2. COORDINATE ALL DIMENSIONS WITH FLOOR PLAN; NOTIFY THE ARCHITECT/ENGINEER OF ANY

CONFLICTS PRIOR TO CONSTRUCTION.

3. COORDINATE THE EXACT SIZE AND LOCATION OF ALL SLEEVES AND OPENINGS THROUGH CONCRETE,

MASONRY, OR STUD WALLS AND CONCRETE FLOORS WITH ARCHITECTURAL, MECHANICAL, PLUMBING

AND ELECTRICAL DRAWINGS.

4. SHOP DRAWINGS MUST INDICATE CHANGES TO CONSTRUCTION DOCUMENTS, THE CHANGES MUST

BE CLEARLY IDENTIFIED. THE ARCHITECT/ENGINEER SHALL NOT BE RESPONSIBLE FOR CHANGES

SHOWN ON SHOP DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL CHANGES TO

THE DESIGN PROVIDED ON SHOP DRAWINGS. THE ARCHITECT/ENGINEER SHALL NOT BEAR THE

COSTS OF SUCH REVIEWS OR REDESIGN.

5. PROJECT SPECIFICATIONS ARE PART OF THE CONSTRUCTION DOCUMENTS AND ARE TO BE USED IN

CONJUNCTION WITH THE DRAWINGS.

6. VERIFY ALL CONDITIONS, EXISTING AND NEW, SHOWN ON THE CONSTRUCTION DOCUMENTS PRIOR

TO PROCEEDING WITH WORK. DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT OR ENGINEER IN WRITTEN FORM. THE ARCHITECT/ENGINEER SHALL NOT BE

RESPONSIBLE FOR WORK DONE IN THESE AREAS WITHOUT CLARIFICATION IN WRITING FROM THE

ARCHITECT/ENGINEER.

7. ALL PHASES OF CONSTRUCTION SHALL CONFORM TO THE MINIMUM STANDARDS OF THE BUILDING

CODE(S) NOTED IN "DESIGN CRITERIA".

8. DIMENSIONS SHOWN ON CONSTRUCTION DOCUMENTS TAKE PRIORITY OVER SCALED DIMENSIONS. IN

SOME CASES PLANS AND DETAILS MAY NOT BE DRAWN TO SCALE FOR CLARITY.

9. DETAILS LABELED "TYPICAL" ON THESE DRAWINGS APPLY TO SITUATIONS OCCURRING ON THE

PROJECT THAT ARE THE SAME OR SIMILAR TO THOSE SPECIFICALLY DETAILED. SUCH DETAILS APPLY

WHETHER OR NOT DETAILS ARE REFERENCED AT EACH LOCATION. NOTIFY ENGINEER OF ANY

CONDITIONS NOT APPLICABLE TO THESE "TYPICAL" DETAILS.

10. DO NOT LOAD THE CONCRETE SLAB ON GRADE WITH ERECTION EQUIPMENT. THE SLABS HAVE NOT

BEEN DESIGNED FOR ERECTION EQUIPMENT LOADS. SHOULD THE CONTRACTOR REQUIRE ERECTION

EQUIPMENT TO BE PLACED ON SLAB ON GRADE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

DESIGN OF THE SLAB IN THE AFFECTED AREAS.

11. DO NOT STACK CONSTRUCTION MATERIALS ON FLOORS OR ROOFS DURING CONSTRUCTION IN

EXCESS OF 80 PERCENT OF THE DESIGN LIVE LOAD NOTED ON THESE PLANS.

12. THESE STRUCTURAL CONSTRUCTION DOCUMENTS ARE TO BE USED IN CONJUNCTION WITH ANY

ARCHITECTURAL, MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION, LANDSCAPE, AND CIVIL

CONSTRUCTION DOCUMENTS FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR

IMPLEMENTING THE INFORMATION SHOWN ON ALL REFERENCED PLANS. THE ARCHITECT/ENGINEER

SHALL BE NOTIFIED IN WRITING SHOULD DISCREPANCIES IN THE CONSTRUCTION DOCUMENTS BE

FOUND PRIOR TO COMMENCING WITH WORK IN THE AREA WHERE THE DISCREPANCY OCCURS. THE

ARCHITECT/ENGINEER SHALL NOT BE RESPONSIBLE FOR WORK DONE IN THESE AREAS WITHOUT

CLARIFICATION IN WRITING FROM THE ARCHITECT/ENGINEER.

13. SUBSTITUTION REQUESTS: APPROVAL FROM THE ARCHITECT/ENGINEER IS REQUIRED PRIOR TO

SUBSTITUTING COMPARABLE MATERIALS OR MANUFACTURED OR PRE-ENGINEERED PRODUCTS THAT

ARE INDICATED IN THE CONSTRUCTION DOCUMENTS. ALL REQUESTS SHALL BE SUBMITTED TO THE

OWNER'S REPRESENTATIVE. ALL NECESSARY INFORMATION REQUIRED TO DETERMINE THE

EQUIVALENCY OF THE SUBSTITUTED PRODUCT SUCH AS ICC EVALUATION REPORTS AND TESTING

REPORTS SHALL BE PROVIDED. COMPARABLE PRODUCTS SUBMITTED MUST INCLUDE A DETAILED

LINE-BY-LINE COMPARISON OF HOW THE SUBMITTED PRODUCT MEETS OR EXCEEDS THE GENERAL

DESIGN, PERFORMANCE, AND QUALITY INDICATED IN THE CONSTRUCTION DOCUMENTS. THE

MANUFACTURER OR CATALOG NUMBERS SHOWN IN THE CONSTRUCTION DOCUMENTS ESTABLISH A

STANDARD FOR THE GENERAL DESIGN, PERFORMANCE, AND QUALITY OF THE PRODUCT REQUIRED.

WHERE "OR APPROVED EQUAL" IS INDICATED, OTHER PRODUCTS SIMILAR TO DESIGN AND OF EQUAL

QUALITY AND PERFORMANCE, AND COMPLYING WITH THE PLANS AND SPECIFICATIONS MAY BE

APPROVED IF FOUND ACCEPTABLE BY THE ARCHITECT/ENGINEER. ALL SUBSTITUTION REQUESTS,

INCLUDING "ENGINEER APPROVED EQUALS", FOR EQUIPMENT AND MATERIALS SHALL BE SUBMITTED

FOR REVIEW AFTER AWARD IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. UNLESS NOTED

OTHERWISE, SUBSTITUTION REQUESTS SHALL BE SUBMITTED WITHIN 14 DAYS AFTER AWARD. THE

ARCHITECT/ENGINEER SHALL NOT BEAR THE COSTS FOR REVIEW AND APPROVAL OF ALL

REQUESTED SUBSTITUTIONS.

14. CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION, AS WELL AS

SEQUENCE OF CONSTRUCTION THAT DOES NOT IMPACT THE FINAL DESIGN AS SHOWN ON

CONSTRUCTION DOCUMENTS.

15. MECHANICAL UNITS AND OTHER SYSTEMS, SUCH AS ELEVATORS, SHOWN ON THE STRUCTURAL

PLANS INDICATE A SPECIFIC WEIGHT AND LOCATION. SHOULD THE CONTRACTOR INSTALL UNITS ANDSYSTEMS WITH DIFFERENT WEIGHTS OR LOCATIONS THAN SHOWN, THE CONTRACTOR SHALL PROVIDE THISINFORMATION TO THE STRUCTURAL ENGINEER FOR APPROVAL, PRIOR TO PURCHASING, CLEARLY INDICATINGTHE DIFFERENCES IN SIZE, WEIGHT AND LOCATION. THE ARCHITECT/ENGINEER SHALL NOT BEAR THE COSTSOF SUCH REVIEWS OR REDESIGNS.

STRUCTURAL STEEL

1. STRUCTURAL STEEL SHALL BE DETAILED, DESIGNED, FABRICATED AND ERECTED IN ACCORDANCE

WITH THE REQUIREMENTS OF AISC SPECIFICATION FOR THE DESIGN, FABRICATION, AND ERECTION OF

STRUCTURAL STEEL BUILDINGS, AISC MANUAL OF STEEL CONSTRUCTION (ALLOWABLE STRESS

DESIGN), AISC CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES, AND THE AWS

STRUCTURAL WELDING CODE. ALL CODES AND MANUALS SHALL BE THE LATEST ADOPTED EDITIONS.

2. STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING ASTM DESIGNATIONS:

WIDE FLANGE SHAPES A992 (F

y

=50 KSI)

CHANNELS, ANGLES, PLATES, ETC. A36 (F

y

=36 KSI)

STRUCTURAL TUBE A500 GRADE B (F

y

=46 KSI)

STRUCTURAL PIPE A53 TYPE B GRADE B (F

y

=35 KSI)

BOLTS A325 OR A490

WELDING ELECTRODES E70XX

HARDENED STEEL WASHERS ASTM F436

3. CONNECTION MATERIALS FOR STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING

DESIGNATIONS:

BEAM OR COLUMN STIFFENER PLATES SHALL BE OF THE SAME GRADE OF STEEL AS THE

STRUCTURAL ELEMENT.

ALL BOLTED CONNECTIONS ARE TO BE ERECTED WITH HIGH STRENGTH BOLTS, ASTM A325 OR ASTM

A490, WITH BEARING TYPE "N" ALLOWABLE LOADS EXCEPT FOR BRACE CONNECTIONS WHICH ARE

SLIP CRITICAL CONNECTIONS.

4. ALL BEAM TO BEAM AND COLUMN TO BEAM CONNECTIONS SHALL BE BOLTED UNLESS NOTED

OTHERWISE.

5. ALL WELDING SHALL BE IN ACCORDANCE WITH THE AMERICAN WELDING SOCIETY (AWS) STANDARD

D1.1. ALL WELDING SHALL BE PERFORMED BY WELDERS CERTIFIED IN THE TYPE OF WELD REQUIRED

USING E70XX ELECTRODES OR IN A CERTIFIED SHOP TO DO SUCH WORK.

6. MINIMUM SIZE AND STRENGTH OF WELDS SHALL CONFORM TO THE FOLLOWING REQUIREMENTS.

PROVIDE MINIMUM SIZE OF FILLET WELDS AS SPECIFIED IN TABLE J2.4 OF THE

AISC MANUAL.

PROVIDE THE MINIMUM EFFECTIVE THROAT THICKNESS OF PARTIAL PENETRATION

GROOVE WELDS AS SPECIFIED IN TABLE J2.3 OF THE AISC MANUAL.

DEVELOP THE FULL TENSILE STRENGTH OF THE MEMBER ELEMENT JOINED, WITH

SHOP AND FIELD WELDS, UNLESS OTHERWISE NOTED ON THE CONSTRUCTION

DOCUMENTS.

WHERE CONNECTIONS ARE NOTED ON CONSTRUCTION DOCUMENTS AS FULL MOMENT

CONNECTIONS, PROVIDE WELDS TO DEVELOP THE FULL FLEXURAL CAPACITY OF

THE LEAST CAPACITY MEMBER OF THE CONNECTION.

7. ALL STRUCTURAL STEEL EXPOSED TO THE WEATHER IS TO BE HOT-DIP GALVANIZED. PROVIDE BOLTS,

NUTS AND WASHERS THAT ARE HOT-DIP GALVANIZED ACCORDING TO ASTM A153, CLASS C.

8. ALL NEW STRUCTURAL STEEL SHALL BE PAINTED IN ACCORDANCE WITH THE SPECIFICATIONS.

9. SPLICING OF STRUCTURAL STEEL MEMBERS IS NOT ALLOWED UNLESS SPECIFICALLY DETAILED ON

THESE PLANS.

10. DO NOT FIELD CUT ANY STRUCTURAL STEEL MEMBERS IN CONFLICT WITH THE WORK WITHOUT

APPROVAL BY THE ENGINEER OR UNLESS SPECIFICALLY SHOWN ON THE CONSTRUCTION DOCUMENTS.

11. PROVIDE HARDENED STEEL WASHERS CONFORMING TO ASTM F436 FOR CONNECTIONS WITH

STANDARD AND SHORT-SLOTTED HOLES. FOR LONG SLOTTED HOLES, PROVIDE STRUCTURAL-GRADE

STEEL

5

16

" PLATE WASHERS OR CONTINUOUS BARS. IN ALL CASES, WASHER OR PLATE MUST BE OF

SUFFICIENT SIZE TO COVER THE HOLE OR SLOT.

12. ALL HOLES IN STEEL MEMBERS SHALL BE DRILLED OR PUNCHED. TORCH CUT HOLES ARE NOT

ALLOWED.

13. PROVIDE L4x3x1/4 (LLV) FRAME SPANNING FROM JOIST TO JOIST AROUND ALL ROOF PENETRATIONS

LARGER THAN 12"x12", UNLESS NOTED OTHERWISE.

14. ERECT AND MAINTAIN TEMPORARY BRACING TO ENSURE THE ALIGNMENT AND STABILITY OF THE

STRUCTURE DURING CONSTRUCTION UNTIL PERMANENT CONDITIONS HAVE BEEN COMPLETED.

15. SHOP DRAWINGS ARE REQUIRED TO BE REVIEWED PRIOR TO FABRICATION.

16. THE FABRICATOR SHALL BE RESPONSIBLE FOR THE DESIGN OF ALL CONNECTIONS THAT ARE NOT

FULLY DETAILED ON THESE DRAWINGS. BEAM CONNECTIONS SHALL BE DESIGNED TO RESIST ONE

HALF THE TOTAL ALLOWABLE UNIFORM LOAD CAPACITY OF GIVEN SHAPE AND SPAN IN ADDITION TO

ANY AXIAL FORCE NOTED ON THE PLANS IN ACCORDANCE WITH THE AISC SPECIFICATION.

CALCULATIONS AND DETAILS SHALL BE PERFORMED, SIGNED AND SEALED BY AN ENGINEERING

LICENSED IN THE STATE OF OKLAHOMA AND SHALL BE PROVIDED TO THE ENGINEER OF RECORD FOR

APPROVAL. RE: DETAILS FOR TYPICAL CONNECTION REQUIREMENTS.

STEEL DECKING

1. FLOOR AND ROOF STEEL DECK SHALL CONFORM TO ASTM A1008 OR A653 WITH A MINIMUM YIELD

STRENGTH OF 33 KSI.

2. ROOF DECK SHALL BE PAINTED OR GALVANIZED ACCORDING TO THE SPECIFICATIONS.

3. FURNISH DECK PANELS OF SIZE AND GAUGE AS NOTED ON THE CONSTRUCTION DOCUMENTS.

4. FURNISH DECK PANELS IN LENGTHS ADEQUATE FOR A THREE SPAN CONDITION WHERE POSSIBLE FOR

TYPE OF PROFILE AND GAUGE SHOWN.

5. ATTACH DECK PANELS SECURELY TO SUPPORTS AND PROVIDE SIDE LAP CONNECTIONS AS SHOWN.

6. PROVIDE A CONTINUOUS CLOSURE SECTION TO FACILITATE DECK SUPPORT AND ATTACHMENT AS

REQUIRED OR WHERE CHANGES OF DECK DIRECTION OCCUR. THE CLOSURE STRIP IS TO BE THE SAME

GAUGE AS DECKING, MINIMUM.

TEST AND INSPECTIONS

1. SPECIAL TESTS AND INSPECTIONS: CONDUCTED BY A QUALIFIED TESTING AGENCY AND SPECIAL

INSPECTOR AS REQUIRED BY AUTHORITIES HAVING JURISDICTION AND AS FOLLOWS:

1.1. VERIFYING THAT MANUFACTURER MAINTAINS DETAILED FABRICATION AND QUALITY-CONTROL

PROCEDURES AND REVIEWING THE COMPLETENESS AND ADEQUACY OF THOSE PROCEDURES

TO PERFORM THE WORK.

1.2. NOTIFYING ENGINEER AND CONTRACTOR PROMPTLY OF IRREGULARITIES AND DEFICIENCIES

OBSERVED IN THE WORK DURING THE PERFORMANCE OF ITS SERVICE.

1.3. SUBMITTING A CERTIFIED WRITTEN REPORT OF EACH TEST, INSPECTION AND SIMILAR

QUALITY-CONTROL SERVICE TO ENGINEER WITH COPY TO CONTRACTOR AND TO AUTHORITIES

HAVING JURISDICTION.

1.4. SUBMITTING A FINAL REPORT OF SPECIAL TESTS AND INSPECTIONS AT SUBSTANTIAL

COMPLETION, WHICH INCLUDES A LIST OF UNRESOLVED DEFICIENCIES.

1.5. INTERPRETING TESTS AND INSPECTIONS AND STATING IN EACH REPORT WHETHER TESTED AND

INSPECTED WORK COMPLIES WITH OR DEVIATES FROM THE CONTRACT DOCUMENTS.

1.6. RE-TESTING AND RE-INSPECTING CORRECTED WORK.

2. REFER TO SPECIFICATIONS FOR INSPECTION AND TESTING REQUIREMENTS FOR EACH MATERIAL

(MASONRY, CONCRETE, STEEL, ETC.). ALL TESTS SHALL BE PER ASTM STANDARDS.

3. SPECIAL INSPECTIONS ARE REQUIRED FOR BUILDING CODE(S) NOTED IN "DESIGN CRITERIA". REFER

TO "SPECIAL INSPECTIONS REQUIRED" TABLE PROVIDED ON THIS SHEET.

4. THE CONTRACTOR SHALL NOTIFY THE SPECIAL INSPECTOR WHEN WORK IS READY FOR INSPECTION

AND SHALL PROVIDE ACCESS FOR INSPECTIONS AND TESTING

5'-3"

TYP

51'-10"

112'-10"

ZONE 1

ZONE 2

ZONE 2 ZONE 3ZONE 3

ZONE 3 ZONE 3

ZONE 2ZONE 2

20'-0"

20'-0"

MWFRS UPLIFT PRESSURES

ZONE

1

UPLIFT PRESSURE

GROSS NET

2 24.7 PSF 19.7 PSF

15.8 PSF 10.8 PSF

COMP. & CLADDING UPLIFT PRESSURES

ZONE

1

UPLIFT PRESSURE

GROSS NET

2 51.7 PSF 46.7 PSF

30.8 PSF 25.8 PSF

GROSSNET

33.4 PSF28.4 PSF

28.2 PSF23.2 PSF

AREA < 10 FT

2

AREA > 100 FT

2

3 51.7 PSF 46.7 PSF 33.4 PSF28.4 PSF

ZONE 1

ZONE 2

1

ROOF KEYPLAN MWFRS

NOT TO SCALE

2

ROOF KEYPLAN

COMPONENTS AND CLADDING

NOT TO SCALE

SPECIAL INSPECTIONS REQUIRED

STEEL

PERIODIC SPECIAL INSPECTIONS:

1. MATERIAL VERIFICATION OF HIGH STRENGTH BOLTS, NUTS, AND WASHERS

2. INSPECTIONS OF HIGH STRENGTH BOLTING (BEARING TYPE CONNECTIONS)

3. INSPECTION OF STRUCTURAL STEEL WELDING:

A. SINGLE PASS FILLET WELDS < 5/16"

B. FLOOR AND DECK WELDING

4. INSPECTION OF STEEL FRAME JOINT DETAILS FOR COMPLIANCE WITH APPROVED

CONSTRUCTION DOCUMENTS:

A. DETAILS SUCH AS BRACING AND STIFFENING

B. MEMBER LOCATIONS

C. APPLICATION OF JOINT DETAILS AT EACH CONNECTION

CONTINUOUS SPECIAL INSPECTIONS:

STEEL

1. INSPECTIONS OF HIGH STRENGTH BOLTING (SLIP-CRITICAL CONNECTIONS)

2. INSPECTION OF STRUCTURAL STEEL WELDING:

A. COMPLETE AND PARTIAL PENETRATION GROOVE WELDS

B. MULTIPASS FILLET WELDS

C. SINGLE PASS FILLET WELDS GREATER THAN 5/16"

BID SET

Page 4: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

EXISTING

PIPE COL

EXISTING

MASONRY

COL, UNO

W16x26 (E

)

W16x26 (E

)

W16x26 (E

)

W16x26 (E

)

W16x26 (E

)

W16x26 (E

)

*W16x26 (E), 17'-10" ± 2'-0"*W18x35 (E), 25'-9" ± 2'-0"

*W18x35 (E), 23'-10" ± 2'-0" *W18x35 (E), 22'-3

1

2

" ± 2'-0"

4

S-101

4

S-101

4

S-101

OH

6

S-101

6

S-101

3A

S-101

TYP

HSS4

1

2

x4

1

2

x

1

2

"

POST, TYP

14'-2 1/4" 9'-0" 8'-9 3/4" 9'-5 1/4" FV 11'-0" FV 9'-0" 8'-0" 5'-9 1/2" 13'-3" 5'-10"

1'-6 1/2"

112'-10" FV

19'-3" F

V32'-7" F

V

51'-10" F

V

23'-6" 7'-4 1/2"

5

S-101

7

S-101

28'-3 3/8"

18'-7"

15'-10 1/2"

16'-8 1/2"

2

S-101

9'-0"

9'-0"9'-0"

INFILL METAL DECK,

TYP 7 LOCATIONS.

RE: 4/S-501

8'-0"

RTU 7

RTU 5

RTU 6

RTU 4

RTU 3

RTU 2

RTU 1

NOTE:

1. (E) = EXISTING

2. PERIMETER SCREEN WALL BEAMS ARE NOT

SHOWN ON PLAN FOR CLARITY. RE: DETAILS

3. EXISTING BEAMS NOTED WITH AN

ASTERISK, *, SHALL BE FIELD VERIFIED TO

BE WITHIN THE ESTIMATED SPAN SHOWN.

ANY DISCREPANCIES SHALL BE SUBMITTED

TO THE SEOR PRIOR TO INSTALLATION

OF RTU SUPPORT BEAMS.

4. PROVIDE TEMPORARY WEATHERTIGHT

ENCLOSURE FOR BUILDING EXTERIOR

INCLUDING BUT NOT LIMITED TO THE ROOF.

RTU DESIGN WEIGHTS

2535 LBSRTU 1

2535 LBSRTU 2

2535 LBSRTU 3

2535 LBSRTU 4

2535 LBSRTU 5

2535 LBSRTU 6

2935 LBSRTU 7

3

S-501

2

S-501

TYP

TYP

1'-0"

2'-8"

SUSPENDED

FURNACE,

WT = 152 LB,

RE: 2/S-101

ROOF

HATCH

W8x18

W8x18

W8x18

W16x31

W14x26

W14x26

W14x26

W14x26

W8x18

W8x18

W8x18

W14x26

W16x31

W14x26

IF BEAM INTERFERES

WITH EXISTING EF,

SHIFT BEAMS AND

RTU AS REQUIRED

12'-4

1 2

9'-4"±

11'-3

1 2

18'-5

1 2

16'-10

1 4

8'-5

3 4

15'-0

3 4

6'-4

1 4

SIM

HSS7x5x

3

16

HSS7x5x

3

16

HSS7x5x

3

16

W10x19

W10x19

W10x19

W10x19

W10x19

W10x19

W10x19

W10x19

W10x19

W10x19

W10x19

W10x19

W10x19

W10x19

*W18x35 (E), 22'-3

1

2

" ± 2'-0"

W10x19

1'-0" MIN

6"

MIN

3"

7

1

2

"

BEAM, RE: PLAN

L2

1

2

x2

1

2

x

3

16

, EACH SIDE

LAP LIGHT GAUGE PLATE

WITH EXISTING DECK3/16"

TYP

3" 3"

BEAM, RE: PLAN

L2

1

2

x2

1

2

x

3

16

, EACH SIDE

ATTACH TO EXISTING DECK

WITH #10 TEK SCREWS AT

12"OC, EACH SIDE

ATTACH TO BEAM WITH (2)

HILTI X-U PAF AT 12" OC

1'-0" x 14 GA CONTINUOUS

BENT PLATE

3/16"

3 SIDES

A B

9"

TOP OF BEAM

26'-7 1/2"

TOP OF BEAM

20'-7 1/2"

4'-0"

TOP OF BEAM

19'-5 1/2" (19'-11 1/2" AT SIM)

7'-2" (6'-8" A

T S

IM

)

HSS4x4x

1

4

BEAM, TYP

HSS4

1

2

x4

1

2

x

1

2

COLUMN, RE:

PLAN FOR LOCATIONS

RE: ARCH FOR SCREEN

BEAM, RE: PLANL4x4x

1

4

x1'-0" LEDGER ANGLE

WITH (2)

1

2

" HILTI HIT-Z

ANCHORS, EMBED INTO

EXISTING MASONRY 4

1

2

"

WITH HIT-HY 70 ADH

6"

CAP PLATE, SEAL

WELD ALL AROUND

BEAM, RE: PLAN

CAP PLATE, SEAL

WELD ALL AROUND

3/16"

TYP

3/16"

3/16"

TYP

3/16"

TYP

3/16"

3/16"

TYP

3/16"

3/16"

TYP

3/16"

TYP

3/16"

TYP

3/16"

TYP

3/16"

3/16"

TYP

TOP OF BEAM

26'-7 1/2"

4'-0"

TOP OF BEAM

20'-0" FV

HSS4x4x

1

4

BEAM, TYP

RE: 4/S-101 FOR CONNECTIONS

HSS4

1

2

x4

1

2

x

1

2

COLUMN, RE:

PLAN FOR LOCATIONS

RE: ARCH FOR SCREEN

6"

CAP PLATE, SEAL

WELD ALL AROUND

6'-7 1/2"

EXISTING BEAM, RE: PLAN

3/16"

TYP

4'-0"

VA

RIE

S

HSS4x4x

1

4

BEAM, TYP

RE: 4/S-101 FOR

CONNECTIONS

HSS4

1

2

x4

1

2

x

1

2

COLUMN,

RE: PLAN

RE: ARCH FOR SCREEN

BEAM, RE: PLAN

EXISTING LEDGER ANGLE

CAP PLATE, SEAL

WELD ALL AROUND

6"

DBE

FIELD VERIFY

TOP OF BEAM

26'-7 1/2"

1'-0" MIN

L2

1

2

x2

1

2

x

3

16

EACH SIDE

3/16"

TYP

3/16"

TYP

3/16"

3 SIDES

EXISTING METAL DECK

L3x3x

3

16

"x4'-6" ANGLE, TYP

1

2

" DIA A36 THREADED ROD,

TYP; PROVIDE DOUBLE NUT

ABOVE ANGLE AND A SINGLE

NUT BELOW

P1000 UNISTRUT FOR

LENGTH OF UNIT, TYP;

EXTEND 1'-0" MAX BEYOND

UNIT EACH END

FURNACE; ATTACH TO

UNISTRUT PER

MANUFACTURER'S

RECOMMENDATIONS

RE: MECH FOR LOCATION

RE: 5/M-501 FOR

VIBRATION ISOLATOR

ATTACH ANGLE TO DECK

WITH (2) #10 SDS SCREWS

AT EACH RIB THROUGH

PRE-DRILLED HOLES

3/16"

3/16"

2@12

2@12

TYP

BEAM, RE: PLAN

4'-0"

VA

RIE

S

HSS4x4x

1

4

BEAM, TYP

RE: 4/S-101 FOR

CONNECTIONS

HSS4

1

2

x4

1

2

x

1

2

COLUMN, RE:

PLAN

RE: ARCH FOR SCREEN

EXISTING BEAM, RE: PLAN

CAP PLATE, SEAL

WELD ALL AROUND

6"

TOS

FIELD VERIFY

TOP OF BEAM

26'-7 1/2"

3/16"

TYP

ENGINEER OF RECORD

LARRY L. VORBA, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

JLK

NW

LARRY LEEVORBA11654

L

I

C

E

NS

E

D

P

R

O

F

E

SS

IO

N

A

L

E

N

G

IN

E

E

R

O

K

L

AH

O

M

A

1 11/1/2016

Prin

te

d: 1

1/1

/2

01

6 1

0:2

7:1

1 A

M

V:\Je

nks P

ub

lic S

ch

oo

ls\Je

nks E

ast In

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\S

-1

01

.d

wg

S-101

ROOF FRAMING PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

1

ROOF FRAMING PLAN

1/8"=1'-0"

3

FRAMING DETAIL

3/4"=1'-0"

4

FRAMING DETAIL

3/4"=1'-0"

5

FRAMING DETAIL

3/4"=1'-0"

6

FRAMING DETAIL

3/4"=1'-0"

N

2

SUSPENDED FURNACE DETAIL

3/4"=1'-0"

7

FRAMING DETAIL

3/4"=1'-0"

BID SET

Page 5: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

10"

FV

3"

L5x5x

1

4

, TYP

3

4

" DIA THRU BOLT

AT 12" OC

2"

3"

3"

3'-2"

3'-0" RE: PLAN 3'-4"

3"

1A

TOP OF OPENING

14'-0"

(1'-0" MIN)

EXISTING WALL

SEAL WELD, TYP

EXISTING METAL DECK

L5x3x1/4

EXISTING METAL

DECK

NEW RTU CURB

NEW RTU CURB

BEAM RE: PLAN

BEAM RE: PLAN

RE: CURB MANUFACTURER

FOR CONNECTION

RE: CURB MANUFACTURER

FOR CONNECTION

7

3

4

"

3/16"

3/16"

ANGLE TO

BEAM

ATTACH DECK EDGE TO

BEAM WITH HILTI X-U PAF AT

24" OC, LOCATE 1" FROM

EDGE OF BEAM

ATTACH DECK EDGE TO

ANGLE WITH HILTI X-U PAF

AT EACH RIB, LOCATE 1

1

2

"

FROM EDGE OF ANGLE

CL DECK

SUPPORT

CL DECK

SUPPORT

FIELD VERIFY

FIE

LD

V

ER

IF

Y

INFILL WITH 16 GA ASC

7.5D METAL DECK, OR

EQUIVALENT

REMOVE DECK AT

EXISTING OPENING

FULL LENGTH OF SPAN

LAP WITH EXISTING DECK AND ATTACH WITH

(2) #10 TEK SCREWS AT 12" OC, EACH SIDE

B

EXISTING OPENING

A

C

4C

S-501

REMOVE EXISTING DECK RIB AS REQUIRED

TO PROVIDE LAP AS SHOWN, TYP

FIELD VERIFY EXTENTS

OF NEW DECK

PROVIDE 1'-0" x 2'-0" x

14 GA BENT PLATE

D

EXISTING BEAM

PROVIDE HILTI X-U PAF

AT EACH RIB, LOCATE 1"

FROM BEAM EDGE

1'-0" x 2'-0" x 14 GA

BENT PLATE

EXISTING DECK

E

1'-0" x 2'-0" x 14 GA

BENT PLATE

PROVIDE (4) #10 TEK

SCREWS

3"

1

1

2

"

9"

3" 3"

EXISTING WALL

ATTACH DECK TO LEDGER

WITH HILTI X-U PAF AT EACH

DECK RIB, LOCATE 1

1

2

" FROM

ANGLE EDGE

EXISTING LEDGER ANGLE

F

3"

W8x35 (E

)

W12x22 (E

)

W8x35 (E

)

W12x22 (E

)

NOTE:

AFTER EXISTING AIR HANDLING UNITS ARE REMOVED,

PROVIDE HANDRAILS AT ALL LOCATIONS SHOWN ON

PLAN WHERE HANDRAILS ARE NOT PRESENT.

14'-2

1 2

" F

V

10'-6" F

V

8'-8

1 2

" F

V8'-8

1 2

" F

V

EXISTING GRATING

EXTENTS

AHU TO BE

REMOVED, TYP

6x6-6/6 WWF

1" x 3" STL TOP RAIL

HSS2x2x

3

16

AT BOTH

ENDS AND AT 24" OC

EXISTING BEAM, RE: PLAN

EXISTING GRATING,

CUT AS REQUIRED

TO PLACE POSTS

1

4

" CAP PLATE, SEAL

WELD ALL AROUND

3/16"

TYP

3'-6"

ENGINEER OF RECORD

LARRY L. VORBA, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

JLK

NW

LARRY LEEVORBA11654

L

I

C

E

NS

E

D

P

R

O

F

E

SS

IO

N

A

L

E

N

G

IN

E

E

R

O

K

L

AH

O

M

A

1 11/1/2016

Prin

te

d: 1

1/1

/2

01

6 1

0:2

7:4

8 A

M

V:\Je

nks P

ub

lic S

ch

oo

ls\Je

nks E

ast In

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\S

-5

01

.d

wg

S-501

FRAMING DETAILS

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

1

FRAMING DETAIL

1"=1'-0"

2

FRAMING DETAIL

1"=1'-0"

3

FRAMING DETAIL

1"=1'-0"

4

DECK INFILL DETAIL

NTS

5

ENLARGED MEZZANINE PLAN

3/16"=1'-0"

6

HANDRAIL DETAIL

1"=1'-0"

BID SET

Page 6: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

2

1

3

3

T

T

T

T

FS FS

FS

FS

FS

FS

FS

FS FS

4

5

1

REFLECTED CEILING DEMOLITION PLAN

3/32" = 1'-0"

ARCHITECT OF RECORD

DAVID F. PHELPS, AIA

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

DFP

CCW

DAVID F.PHELPS3504

S

T

E

O

F

OK

A

H

T

O

A

M

A

L

L

C

E

N

E

DC

H

E

C

I

S

AR

I

T

T

1 11/1/2016

Prin

te

d: 1

1/1

/2

01

6 1

0:2

2:0

0 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\A

D1

01

.d

wg

AD101

REFLECTED CEILING

DEMOLITION PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

N

1. MEZZANINE ABOVE CEILING @ APROX 12'-6" AFF.

2. ACCESS LADDER TO REMAIN.

3. KITCHEN EXHAUST HOODS TO REMAIN.

4. EXISTING GRILLS AT BULKHEAD TO BE REMOVED.

REPAIR AND REFINISH DAMAGED SURFACES.

5. PROVIDE 20 GAGE PRE-FINISHED METAL COVER

PLATES WHERE EXISTING PIES HAVE BEE REMOVED.

PROVIDE COVER THAT IS 2" LARGER THAT OPENING.

SET IN BED OF SEALANT AT ATTACH TO MASONRY. AT

FILL ONE SIDE OF BRICK MASONRY OPENING WITH

FULL WYTHE OF EXTRUDED POLYSTYRENE

INSULATION AND SEAL TO BRICK WITH SPRAY FOAM.

DEMO KEYNOTES

1. CONTRACTOR TO FIELD VERIFY ALL EXISTING

CONDITIONS, DIMENSIONS AND REPORT

DIFFERENCES BETWEEN THESE DRAWINGS AND

ACTUAL FIELD CONDITIONS TO THE ARCHITECT FOR

RESOLUTION.

2. WORK SHALL BE PERFORMED IN STRICT

ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL

CODES AND ORDINANCES.

3. EXISTING CONSTRUCTION SHOWN TO REMAIN

INCLUDING, BUT NOT LIMITED TO: WALLS, PARTITIONS,

DOORS, FRAMES, ETC. SHALL BE PROTECTED DURING

DEMOLITION. DAMAGE TO EXISTING CONSTRUCTION

SHOWN TO REMAIN SHALL BE RESTORED TO MATCH

PRE-DAMAGED CONDITION.

4. PROVIDE ALL NECESSARY SHORING, BRACING, AND

SUPPORT TO PREVENT MOVEMENT, SETTLEMENT, OR

COLLAPSE OF STRUCTURE OR ELEMENT TO BE

DEMOLISHED, AND ADJACENT STRUCTURE OR

ELEMENT SHOWN TO REMAIN.

5. WHERE ITEMS ARE SHOWN TO BE REMOVED FROM

EXISTING CONSTRUCTION, REPAIR AND PATCH

DAMAGED SUBSTRATE AND PREPARE FOR NEW

FINISH. REPAIR AND PATCH ALL REMAINING

SUBSTRATES THAT WERE ORIGINALLY CONCEALED

BY EXISTING FINISHES, BUT WILL NOW BE EXPOSED IN

THE NEW CONSTRUCTION.

6. ALL CEILING HEIGHTS ARE TO REMAIN THE SAME AS

EXISTING HEIGHTS.

7. ALL DEMOLISHED ITEMS BECOME THE PROPERTY OF

THE CONTRACTOR, UNO. COMPLETELY REMOVE ALL

ITEMS FROM THE SITE AND DISPOSE OR SALVAGE.

8. VERIFY WITH OWNER AND ARCHITECT OF ITEMS

SPECIFICALLY NOT INDICATED ON DRAWINGS TO BE

SALVAGED AND/OR DELIVERED BACK TO OWNER.

9. THE CONTRACTOR SHALL PROTECT OR REMOVE AND

REINSTALL KITCHEN EQUIPMENT. DAMAGE TO

EQUIPMENT WILL BE THE RESPONSIBILITY OF THE

CONTRACTOR. DAMAGED EQUIPMENT SHALL BE

RESTORED TO NEW CONDITION OR REPLACED.

10. THE PROPOSED CEILING DEMOLITION IS

DIAGRAMMATIC AND NOT INTENDED TO ILLUSTRATE

THE EXACT EXTENT OF ITEMS TO BE REMOVED. IT IS

THE RESPONSIBILITY OF THE CONTRACTOR TO

DETERMINE THE FINAL EXTENT OF ALL ITEMS TO BE

REMOVED.

DEMO PLAN NOTES

A. EXISTING CEILING GRID AND

TILES TO REMAIN.

B. REMOVE, PROTECT AND

STORE THE CEILING GRID,

TILES, LIGHT FIXTURES AND

DIFFUSERS FOR REUSE AND

INSTALLATION.

CONTRACTORS OPTION TO

SUSPEND LIGHTS AND

DIFFUSERS IN THEIR ORIGINAL

POSITION.

C. REMOVE CEILING GRID, TILES,

LIGHT FIXTURES AND

DIFFUSERS. PREP FOR NEW

CEILING GRID, TILES, NEW

LIGHT FIXTURES AND

DIFFUSERS.

DEMO LEGEND

BID SET

Page 7: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

103

ELEC

105

LAUNDRY

102

CAN WASH

101

CORRIDOR

106

MECH

107

STORAGE

109

LOCKERS

111

STORAGE

110

TLT

112

OFFICE

114

SERVING

113

KITCHEN

116

OFFICE

115

CHEM STOR

118

EATING

120

EATING

119

VEST

122

CORR

128

VEST

123

BOYS

124

WASH

127

GIRLS

130

OFFICE

129

CLINIC

125

JAN/MECH126

MECH

131

TLT

133

REST

132

EATING

121

SOUPS & SALADS

117

SCULLERY

104

PUMPS

2

1

3

3

REPLACE EXISTING

LIGHTS WITH NEW,

RE: 1/E-101

REPLACE EXISTING

LIGHTS WITH NEW,

RE: 1/E-101

REPLACE EXISTING

LIGHTS AND

CEILING TILES WITH

NEW, RE: 1/E-101

1

REFLECTED CEILING PLAN

3/32" = 1'-0"

ARCHITECT OF RECORD

DAVID F. PHELPS, AIA

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

DFP

CCW

DAVID F.PHELPS3504

S

T

E

O

F

OK

A

H

T

O

A

M

A

L

L

C

E

N

E

DC

H

E

C

I

S

AR

I

T

T

1 11/1/2016

Prin

te

d: 1

1/1

/2

01

6 1

0:2

2:0

3 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\A

-1

01

.d

wg

A-101

REFLECTED CEILING PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

N

1. MEZZANINE ABOVE CEILING @ APROX 12'-6" AFF.

2. ACCESS LADDER TO REMAIN.

3. KITCHEN EXHAUST HOODS TO REMAIN.

RCP KEYNOTES

1. CONTRACTOR TO VERIFY AND DOCUMENT TYPE AND

COLOR OF GRIDS AND TYPE AND FINISH OF LAY-IN

TILE.

2. ALL GRIDS AND LAY-IN TILE THAT ARE REPLACE ARE

TO MATCH ORIGINAL TYPE AND FINISH.

RCP NOTES

A. EXISTING CEILING GRID AND

TILES TO REMAIN.

B. REINSTALL EXISTING CEILING

GRID, TILES, LIGHTS, AND

DIFFUSERS TO THEIR ORIGINAL

CONDITION, UNLESS NOTED

OTHERWISE.

RCP LEGEND

BID SET

Page 8: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

14'-2 1/4" 9'-0" 8'-9 3/4" 9'-5 1/4" FV 11'-0" FV 9'-0" 8'-0" 5'-9 1/2" 13'-3" 5'-10"

1'-6 1/2"

112'-10" FV

19

'-3

" F

V3

2'-7

" F

V

51

'-1

0" F

V

23'-6" 7'-4 1/2"

18

'-7

"1

5'-1

0 1

/2

"1

6'-8

1

/2

"

9'-0"

9'-0"9'-0"

8'-0"

1'-0"

2'-8"

12

'-4

1 2

9'-4"±

11

'-3

1 2

18

'-5

1 2

16

'-1

0

1 4

8'-5

3 4

15

'-0

3 4

6'-4

1 4

EXISTING ROOFING TO BE

REMOVED AND REPLACED AS

REQUIRED FOR INSTALLATION

OF NEW FRAMING AND HVAC

NEW VTR LOCATION

NEW VTR LOCATION

PROVIDE TAPERED

INSULATION CRICKETS

SLOPED 1/4"/FT AT ALL

NEW RTU'S

RE: 3/A-102RE: 6/A-102RE: 6/A-102

EXISTING ROOFING TO BE

REMOVED AND REPLACED AS

REQUIRED FOR INSTALLATION

OF NEW FRAMING AND HVAC

EXISTING FLUES

EXISTING ROOF HATCH

36" WIDE,

TYP

PROVIDE

WALKWAYCAP-SHEET

STRIPS TO AND

AROUND RTUS

REFER TO 2/A-102 FOR

ALL ROOF CURBS

TYPICAL

COUNTER FLASHING FASTENERS

APPROX. 24" O.C. BEYOND

FLASHING AND COUNTERFLASHING

FASTENERS MAXIMUM 8" O.C.

CANT STRIP NAILED TO NAILER

AND CURB

BASE FLASHING

ROOF MEMBRANE

BASE/PLY SHEET(S)

EXISTING ROOF STRUCTURAL

EXISTING ROOF INSULATION

8" M

IN

.

8

"

M

I

N

.

PREFABRICATED METAL RTU

CURB. RE: MECH.

STEEL FRAMING. RE: STRUCT.

INSULATION

2X4 WOOD NAILER

EXISTING JOIST

INSULATE INSIDE OF METAL WORK

SHEET METAL ENCLOSURE -

CROSSBREAK OR SLOPE FOR

DRAINAGE

SHEET METAL OR FLEX-TUBE COLLAR

FLASHING RECEIVER

SLOPE PIPES DOWN FROM HOOD

MINIMUM 4" CLEARANCE FROM PIPE TO

TOP OF CURB-MINIMUM 2" BETWEEN

PIPES

FILL OPENING WITH FOAM

INSULATION AIR TIGHT AFTER

LINES ARE INSTALLED

CAP FLASHING

FASTENERS AT 24" O.C.

REMOVABLE COUNTERFLASHING

FASTENERS MAXIMUM 8" O.C.

CANT NAILED TO NAILER AND CURB

BASE FLASHING

SET BOLTS IN ELASTOMERIC SEALANT

CONTINUOUS NEOPRENE PAD

EXISTING ROOF INSULATION

EXISTING ROOF STRUCTURE

ROOF MEMBRANE

EXISTING BASE/PLY SHEET(S)

8" M

IN

.

MECHANICAL EQUIPMENT SKID CHANNEL

ENGINEERED STEEL EQUIPMENT

RAIL

COUNTER FLASHING FASTENERS

APPROX. 24" O.C. BEYOND

FLASHING AND COUNTERFLASHING

FASTENERS MAXIMUM 8" O.C.

CANT STRIP NAILED TO NAILER

AND CURB

BASE FLASHING

ROOF MEMBRANE

BASE/PLY SHEET(S)

EXISTING ROOF STRUCTURAL

EXISTING ROOF INSULATION

8" M

IN

.

8

"

M

I

N

.

PREFABRICATED METAL RTU

CURB. RE: MECH.

STEEL FRAMING. RE: STRUCT.

INSULATION

2X4 WOOD NAILER

EXISTING JOIST

STEEL TUBE FRAMING,

REFER STRUCTURAL

LIQUID APPLIED

FLASHING SYSTEM

MODIFIED BITUMEN,

INSTALL PER

MANUFACTURER'S

ROOFING SYSTEM

REQUIREMENTS

CANT STRIP

NEW RIGID INSULATION,

MATCH EXISTING

METAL ROOF DECK,

REFER STRUCTURAL

EXISTING

MASONRY WALL

TURN LIQUID FLASHING

UP PARAPET 4"

5/8" FIRE RATED FIBER

REINFORCED COVER

BOARD

MANUFACTURER'S

STANDARD

TIE IN EXISTING MODIFIED ROOF

MEMBRANE

PER MANUFACTURER REQ.

NEW STEEL INSULATED

CURB

INSULATED DUCT

24 GA. COUNTER

FLASHING

8"

WATER PROOF DUCT

WRAP OVER FLASHING

BY MECHANICAL

FASTEN COUNTER

FLASHING TO DUCT

LONG SPAN DUCT

2'-6"

CORNER BEAD

3 5/8" METAL STUDS

5/8" GYP. BOARD

SUSPENDED CEILING

+10'-0"

+11'-5 1/2"

REFER MECHANICAL; PAINTTO MATCH WALL FINISH

COUNTER FLASHING FASTENERSAPPROX. 24" O.C. BEYOND

FLASHING AND COUNTERFLASHING

FASTENERS MAXIMUM 8" O.C.

CANT STRIP NAILED TO NAILERAND CURB

BASE FLASHING

ROOF MEMBRANE

BASE/PLY SHEET(S)

EXISTING ROOF STRUCTURAL

EXISTING ROOF INSULATION

8" MIN.

8"MIN.

PREFABRICATED METAL RTUCURB. RE: MECH.

STEEL FRAMING. RE: STRUCT.INSULATION

2X4 WOOD NAILER

EXISTING JOIST

INSULATE INSIDE OF METAL WORK

SHEET METAL ENCLOSURE -

CROSSBREAK OR SLOPE FORDRAINAGE

SHEET METAL OR FLEX-TUBE COLLAR

FLASHING RECEIVER

SLOPE PIPES DOWN FROM HOOD

MINIMUM 4" CLEARANCE FROM PIPE TOTOP OF CURB-MINIMUM 2" BETWEEN

PIPES

FILL OPENING WITH FOAMINSULATION AIR TIGHT AFTER

LINES ARE INSTALLED

CAP FLASHING

FASTENERS AT 24" O.C.

REMOVABLE COUNTERFLASHING

FASTENERS MAXIMUM 8" O.C.

CANT NAILED TO NAILER AND CURB

BASE FLASHING

SET BOLTS IN ELASTOMERIC SEALANT

CONTINUOUS NEOPRENE PAD

EXISTING ROOF INSULATION

EXISTING ROOF STRUCTURE

ROOF MEMBRANE

EXISTING BASE/PLY SHEET(S)

8" MIN.

MECHANICAL EQUIPMENT SKID CHANNEL

ENGINEERED STEEL EQUIPMENT

RAIL

COUNTER FLASHING FASTENERSAPPROX. 24" O.C. BEYOND

FLASHING AND COUNTERFLASHING

FASTENERS MAXIMUM 8" O.C.

CANT STRIP NAILED TO NAILERAND CURB

BASE FLASHING

ROOF MEMBRANE

BASE/PLY SHEET(S)

EXISTING ROOF STRUCTURAL

EXISTING ROOF INSULATION

8" MIN.

8"MIN.

PREFABRICATED METAL RTUCURB. RE: MECH.

STEEL FRAMING. RE: STRUCT.INSULATION

2X4 WOOD NAILER

EXISTING JOIST

TIE IN EXISTING MODIFIED ROOFMEMBRANE

PER MANUFACTURER REQ.

NEW STEEL INSULATED

CURB

INSULATED DUCT

24 GA. COUNTERFLASHING

8"

WATER PROOF DUCTWRAP OVER FLASHING

BY MECHANICAL

FASTEN COUNTER

FLASHING TO DUCT

LONG SPAN DUCT

1

ROOF PLAN

3/32" = 1'-0"

ARCHITECT OF RECORD

DAVID F. PHELPS, AIA

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

DFP

CCW

DAVID F.PHELPS3504

S

T

E

O

F

OK

A

H

T

O

A

M

A

L

L

C

E

N

E

DC

H

E

C

I

S

AR

I

T

T

1 11/1/2016

Prin

te

d: 1

1/1

/2

01

6 1

0:2

2:0

7 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\A

-1

02

.d

wg

A-102

ROOF PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

N

1. IF POSSIBLE REUSE EXISTING ROOF OPENINGS FOR

NEW RTU DUCT ROUTING. MAINTAIN

MANUFACTURER'S RECOMMENDED CLEARANCES

AROUND EACH UNIT.

2. COORDINATE NEW RTU LOCATION WITH EXISTING

EXHAUST AND VENT LOCATIONS. MAINTAIN MIN 10'

CLEARANCE FROM ANY EXHAUST OR VENT

OPENINGS.

3. ROOF AREA TO BE REMOVED IS DIAGRAMMATIC. THE

CONTRACTOR IS RESPONSIBLE FOR DETERMINE THE

AMOUNT AND LOCATIONS OF ROOF MEMBRANE AND

INSULATION TO REMOVE FOR INSTALLATION OF NEW

STEEL SUPPORTS.

4. MATCH EXISTING ROOF MEMBRANE AND INSULATION.

PROVIDE

1

2

" FIRE RATED DENS DECK COVER BOARD.

5. CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL

EXISTING CONSTRUCTION AND EQUIPMENT BELOW

WHILE THE ROOF IS OPEN. REMOVE ONLY ENOUGH

ROOF AREA THAT CAN BE MADE WATERTIGHT PRIOR

TO THE NEXT RAIN EVENT.

6. EXISTING DRAWINGS INDICATE THAT THE EXISTING

ROOF IS CREATING A 1 HOUR FIRE SEPARATION.

CONTRACTOR IS TO VERIFY THE ROOF/INSULATION

CROSS SECTION AND PROVIDE COMPLETE SYSTEM

TO MATCH.

7. REFER TO SHEET S-001 FOR ROOF MEMBRANE WIND

LOADING REQUIREMENTS.

8. ALL VERTICAL PENETRATIONS INCLUDING BUT NOT

LIMITED TO VTRS AND SCREEN SUPPORTS TO BE

FLASHED WITH FLUID APPLIED FLASHING SYSTEM.

9. ALL TRADES ARE RESPONSIBLE TO REMOVE ALL

DEBRIS EACH DAY INCLUDING BUT NOT LIMITED TO

SCREWS, NAILS, AND FASTENERS.

PLAN NOTES

1

2

RTU ROOF CURB DETAIL

1 1/2" = 1'-0"

3

PENETRATION FLASHING DETAIL

1 1/2" = 1'-0"

4

PIPING THROUGH ROOF DETAIL

1 1/2" = 1'-0"

5

ROOF CURB DETAIL

1 1/2" = 1'-0"

6

TYPICAL DUCT

PENETRATION

1 1/2" = 1'-0"

BID SET

Page 9: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

6"

VA

RIE

S

4'-0

"2

"

8"

8"

3"

J-TRIM W/ WEEPS

STANDARD R-PANEL

CONTINUOUS CLEAT

TOP TRIM TO HIDE

FASTENER

NOTE:

ALL TRIM PIECES

TO BE

MANUFACTURERS

STANDARD TRIM

GAGE. COLOR TO

MATCH PANEL

NEW PARAPET CAP TO

MATCH EXISTING

1/2" FIRE RATED DENSE DECK

CONTRACTOR TO VERIVY WITH

EXISTING

INSULATION TO MATCH EXISTING TYPE

AND THICKNESS

ROOF STRUCTURE

SIPLAST PARAPRO 123 LIQUID FLASHING.

INSTALL PER MANUFACTURERS

REQUIREMENTS

SCREEN SUPPORT

SIPLAST ROOF MEMBRANE

CONTRACTOR TO VERIFY WITH

SIPLAST REQUIRED SYSTEM

EXISTING LOAD

BEARING BRICK WALL

8"

8"

1

SCREENWALL DETAIL

1 1/2" = 1'-0"

PARAPRO 123

FLASHING

SYSTEM

ARCHITECT OF RECORD

DAVID F. PHELPS, AIA

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

DFP

CCW

DAVID F.PHELPS3504

S

T

E

O

F

OK

A

H

T

O

A

M

A

L

L

C

E

N

E

DC

H

E

C

I

S

AR

I

T

T

1 11/1/2016

Prin

te

d: 1

1/1

/2

01

6 1

0:2

2:0

9 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\A

-1

03

R

OO

F D

ET

AIL

S.d

wg

A-103

ROOF DETAILS

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

PS-304

SEALANT

TYPICAL VENT

PENETRATION

2

PENETRATION DETAIL

1 1/2" = 1'-0"

BID SET

Page 10: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:1

5 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\M

P0

01

.d

wg

MP001

MECHANICAL AND PLUMBING

SYMBOLS AND ABBREVIATIONS

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

DUCT SECTION, EXHAUST

DUCTWORK TOE-HEEL TAP

(RECTANGULAR TO

RECTANGULAR)

RETURN GRILLE

EXHAUST GRILLE

DUCTWORK CONICAL TAP

(RECTANGULAR TO ROUND)

5'-0" MAX LENGTH FOR

FLEX DUCT

RIGID ELBOW, FLEXIBLE

ELBOWS NOT ALLOWED

RIGID SUPPLY DUCTWORK

90° RECTANGULAR ELBOW

WITH SINGLE THICKNESS

TURNING VANES

90° ROUND ELBOW,

RADIUS/DIAMETER=1.5

45° RECTANGULAR BEND,

RADIUS/DIAMETER=1.5

45° ROUND BEND,

RADIUS/DIAMETER=1.5

DUCTWORK CONICAL TAP

(ROUND-TO-ROUND)

F=FALL IN DUCT ELEV R=RISE

IN DUCT ELEV

NOTE: AIR DISTRIBUTION DEVICES ARE

ARE DENOTED AS ILLUSTRATED BELOW:

90° RECTANGULAR ELBOW

DOWN WITH SINGLE

THICKNESS TURNING VANES

90° RECTANGULAR ELBOW

UP WITH SINGLE THICKNESS

TURNING VANES

LINEAR DIFFUSER, NO ARROWS

INDICATE 2-WAY AIR PATTERN

SIDEWALL REGISTER OR GRILLE

CEILING DIFFUSER SQUARE

PATTERN. NO ARROWS INDICATE

4-WAY AIR PATTERN

DUCT SECTION, RETURN

MVD

SUPPLY DIFFUSER

MAIN DUCTWORK

DIFFUSER

NOTE: SINGLE LINE DUCT TAP SYMBOLS ARE DENOTED

AS ILLUSTRATED BELOW:

RECTANGULAR TO RECTANGULAR

ROUND TO ROUND

RECTANGULAR TO ROUND

DUCT SIZE TRANSITION

CEILING DIFFUSER ROUND

PATTERN. NO ARROWS

INDICATE 4-WAY AIR PATTERN

DUCT SECTION, SUPPLY

90° ROUND ELBOW DOWN

90° ROUND ELBOW UP

S/A DIFFUSER WITH FACTORY

INSTALLED QUADRANT BLANKS.

PROVIDE BLANKS AS SHOWN ON

DRAWINGS.

FIRE/SMOKE DAMPER

DEFINITION OF LINEWEIGHTS AND LINETYPES:

OUTLINE OF NEW EQUIPMENT

INSTALLED ABOVE THE FLOOR

SHOWN (I.E., ROOF)

XXX-X

EQUIPMENT TAG

EQUIPMENT NUMBER

BFW

CHWS

CHWR

BA

CA

CD

CP

LPC

MPC

HPC

CWS

CWR

HWS

HWR

S

MPS

HPS

RG

RL

RS REFRIGERANT SUCTION

REFRIGERANT LIQUID

REFRIGERANT GAS

STEAM, HIGH PRESS 125 PSI & ABOVE

STEAM, MED PRESS 16-124 PSI

STEAM, LOW PRESS 0-15 PSI

HEATING WATER RETURN

HEATING WATER SUPPLY

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

CONDENSATE, HIGH PRESS

125 PSI & ABOVE

CONDENSATE, MED PRESS 16-124 PSI

CONDENSATE, LOW PRESS 0-15 PSI

CONDENSATE, PUMPED

CONDENSATE, DRAIN

COMPRESSED AIR

COMPRESSED AIR, BREATHING AIR

CHILLED WATER RETURN

CHILLED WATER SUPPLY

BOILER FEED WATER

PIPE LABEL DESCRIPTION

SYMBOL DESCRIPTIONSYMBOL DESCRIPTION

AUTOMATIC AIR VENT

BACKFLOW PREVENTER

BALL VALVE

BASKET STEAM TRAP

BLIND FLANGE

BUTTERFLY VALVE

CAP

CHECK VALVE

CHECK VALVE, SILENT

CIRCUIT SETTER

COMPRESSED AIR CONNECTION

CONTROL VALVE, 2-WAY

CONTROL VALVE, 3-WAY

FLEXIBLE CONNECTOR

GATE VALVE

GATE VALVE, ANGLE

GENERAL VALVE, SEE SPECS

GLOBE VALVE

GLOBE VALVE, ANGLE

PLUG VALVE

PRESSURE AND TEMPERATURE RELIEF

PRESSURE REDUCING STATION, STEAM

PRESSURE REDUCING VALVE

RELIEF VALVE, ASME

SOLENOID VALVE

STRAINER

SUCTION DIFFUSER

THERMOSTAT, HUMIDISTAT

TRIPLE DUTY VALVE

UNION

VENTURI

RISER DOWN (ELBOW)

RISER UP (ELBOW)

RISE OR DROP

TEE DOWN

TEE UP

TOP CONNECTION

BOTTOM CONNECTION

SIDE CONNECTION

FLOW IN DIRECTION OF ARROW

PIPE SLOPE IN DIRECTION OF ARROW

TIE-IN TO EXISTING AT THIS POINT

REMOVE EXISTING TO THIS POINT

PUMP

DEVICE TYPE, REFER TO SCHEDULE

AIRFLOW IN CFM

NECK SIZE IN INCHES

XXxXX

XXX

NEW CONSTRUCTION

EXISTING TO REMAIN

DEMOLITION

PRS

PSD

T H

45° RECTANGULAR BEND

END CAP

F

AAV

TYPICAL RUNOUT:

S

HT CO2TEMPERATURE, HUMIDITY & CO2 SENSOR

X

FS

FIRE DAMPERF

SMOKE DAMPERS

DAMPER SYMBOLS:

MOTORIZED DAMPERM

HVAC SYMBOLS LEGEND

DUCTWORK SPIN-IN TAP

(RECTANGULAR TO ROUND)

R REFRIGERANT

DUCTWORK 45° LATERAL TAP

(ROUND-TO-ROUND)

DUCTWORK 90° TAP

(ROUND-TO-ROUND)

SMOKE DETECTORSD

X"Ø

(e.g., 6"Ø)

ROUND DUCT SIZE IN INCHES

XxX

(e.g., 10x10)

RECTANGULAR DUCT SIZE IN INCHES

SIDEWALL GRILLE

RECTANGULAR TO ROUND

TRANSITION

A

AC AIR COMPRESSOR

ACC AIR COOLED CHILLER

ACFM ACTUAL CUBIC FEET PER MINUTE

ADD ADDENDUM

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AFUE ANNUAL FUEL UTILIZATION EFFICIENCY

APD AIR PRESSURE DROP

AR AIR RECEIVER

AV ACID VENT

AVTR ACID VENT THRU THE ROOF

AW ACID WASTE

B

BA BREATHING AIR, COMPRESSED

BAC BREATHING AIR COMPRESSOR

BCU BLOWER COIL UNIT

BFF BELOW FINISHED FLOOR

BFPD BACK FLOW PREVENTION DEVICE

BFW BOILER FEED WATER

BTUH BRITISH THERMAL UNIT PER HOUR

C

CA COMPRESSED AIR

CC COOLING COIL

CD CONDENSATE DRAIN

CF CEILING FAN

CFM CUBIC FEET PER MINUTE

CH CHILLER (WATER COOLED)

CHWP CHILLED WATER PUMP

CHWS CHILLED WATER SUPPLY

CHWR CHILLED WATER RETURN

CL CENTER LINE

CO CLEANOUT

CONT CONTINUATION

CP PUMPED CONDENSATE

CT COOLING TOWER

CU CONDENSING UNIT

CWP CONDENSER WATER PUMP

CWS CONDENSER WATER SUPPLY

CWR CONDENSER WATER RETURN

D

DCW DOMESTIC COLD WATER

DF DRINKING FOUNTAIN

DHW DOMESTIC HOT WATER

DI DEIONIZED WATER

DN DOWN

DOAU DEDICATED OUTDOOR AIR UNIT

DP DEWPOINT

DS DISTILLED WATER

DWG DRAWING

DWV DRAIN WASTE AND VENT

E

(E) EXISTING TO REMAIN

E/A EXHAUST AIR

EAG EXHAUST AIR GRILLE

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB

EEW EMERGENCY EYE WASH

EF EXHAUST FAN

ENGR ENGINEER

EPO EMERGENCY POWER OFF

ESP EXTERNAL STATIC PRESSURE

EQUIP EQUIPMENT

EWB ENTERING WET BULB

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER TEMPERATURE

EXT EXPANSION TANK

F

F FAHRENHEIT

FCO FLOOR CLEANOUT

FCU FAN COIL UNIT

FD FLOOR DRAIN

FH FUME HOOD

FLR FLOOR

FP FIRE PROTECTION

FPM FEET PER MINUTE

FPWH FREEZE PROOF WALL HYDRANT

FS FLOOR SINK

FT FOOT, FEET

G

G NATURAL GAS, LOW PRESSURE

GAL GALLON, GALLONS

GPF GALLONS PER FLUSH

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GCO GRADE CLEAN OUT

GW GREASE WASTE

GWH GAS WATER HEATER

H

HB HOSE BIBB

HD HEAD

HP HORSEPOWER

HPC HIGH PRESSURE CONDENSATE

HPG NATURAL GAS, HIGH PRESSURE

HPS HIGH PRESSURE STEAM

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

HEX HEAT EXCHANGER

I

IDU INDOOR UNIT

IH INTAKE HOOD

IN INCH, INCHES

INV INVERT

INWC INCHES OF WATER COLUMN

IW IRRIGATION WATER

K

KW KILOWATT

K THOUSAND

L

L LOUVER

LAT LEAVING AIR TEMPERATURE

LB POUND, POUNDS

LDB LEAVING DRY BULB

LPC LOW PRESSURE CONDENSATE

LPS LOW PRESSURE STEAM

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

M

M THOUSAND

MBH THOUSAND BTUH

MFG MANUFACTURER

MPG NATURAL GAS, MEDIUM PRESSURE

MIN MINIMUM

MISC MISCELLANEOUS

MPC MEDIUM PRESSURE CONDENSATE

MPS MEDIUM PRESSURE STEAM

MSB MOP SINK BASIN

MVD MANUAL VOLUME DAMPER

N

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN or NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

O/A OUTSIDE AIR

ODU OUTDOOR UNIT

P

PH PHASE

PRD PRIMARY ROOF DRAIN

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAGE

R

(R) EXISTING TO REMAIN, RELOCATE

R REFRIGERANT

R/A RETURN AIR

RAD REFRIGERATED AIR DRYER

RAG RETURN AIR GRILLE

RD ROOF DRAIN

RE REFER TO

RG REFRIGERANT GAS

RH RELATIVE HUMIDITY

RL REFRIGERANT LIQUID

RL/A RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

RPS REVOLUTIONS PER SECOND

RS REFRIGERANT SUCTION

RTU ROOFTOP UNIT

RV RELIEF VALVE

Ø ROUND, DIAMETER

S

S/A SUPPLY AIR

SAG SUPPLY AIR GRILLE

SCFM STANDARD CUBIC FEET PER MINUTE

SD STORM DRAIN

SF SUPPLY FAN

SP STATIC PRESSURE

SRD SECONDARY ROOF DRAIN

SS SANITARY SEWER or STAINLESS STEEL

STM STEAM

SQIN SQUARE INCH/INCHES

SQFT SQUARE FOOT/FEET

T

T/A TRANSFER AIR

TAG TRANSFER AIR GRILLE

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

THRU THROUGH

TMV THERMOSTATIC MIXING VALVE

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TYP TYPICAL

U

UH UNIT HEATER

UL UNDERWRITER'S LABORATORIES

UNO UNLESS NOTED OTHERWISE

UR URINAL

V

V VENT or VOLT

VAC VACUUM

VFD VARIABLE FREQUENCY DRIVE

VRF VARIABLE REFRIGERANT FLOW

VTR VENT THRU THE ROOF

VTW VENT THRU THE WALL

W

W WATT

WAG WATER AND GAS

WB WET BULB or WASHER BOX

WC WATER CLOSET

WHA WATER HAMMER ARRESTOR

Y

YH YARD HYDRANT

MECHANICAL ABBREVIATIONS

GAS REGULATOR

S

DEFINITION OF LINEWEIGHTS AND LINETYPES:

OUTLINE OF NEW EQUIPMENT INSTALLED

ABOVE THE FLOOR SHOWN (I.E., ROOF)

DISTILLED WATER

DEMINERALIZED OR DEIONIZED WATER

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

DOMESTIC HOT WATER (110°F)

DOMESTIC HOT WATER (140°F)

NATURAL GAS, LOW PRESS

NATURAL GAS, MED PRESS

NATURAL GAS, HIGH PRESS

ROOF DRAIN

STORM DRAIN

VENT, SANITARY SEWER

VENT, ACID WASTE

VACUUM

WASTE, ACID

WASTE, GREASE

WASTE, SANITARY SEWER

VENT, GREASE

DS

DI

DCW

DHW

DHWR

110°F

140°F

G

MG

HG

RD

SD

V

AV

GV

VAC

AW

GW

SS

XXX-X

EQUIPMENT TAG

EQUIPMENT NUMBER

BACKFLOW PREVENTER, SEE SPECS

BLIND FLANGE

CAP

CHECK VALVE

CHECK VALVE, SILENT

CIRCUIT SETTER

FLEXIBLE CONNECTOR

GENERAL VALVE, SEE SPECS

PRESSURE AND TEMPERATURE RELIEF

PRESSURE REDUCING VALVE

RELIEF VALVE, ASME

SOLENOID VALVE

STRAINER

TRIPLE DUTY VALVE

UNION

RISER DOWN (ELBOW)

RISER UP (ELBOW)

RISE OR DROP

TEE DOWN

TEE UP

TOP CONNECTION

BOTTOM CONNECTION

SIDE CONNECTION

FLOW IN DIRECTION OF ARROW

TIE-IN TO EXISTING AT THIS POINT

REMOVE EXISTING TO THIS POINT

PIPE SLOPE IN DIRECTION OF ARROW

PUMP

CLEANOUT PLUG

CLEANOUT, FLOOR

CLEANOUT, WALL

HOSE BIBB

FLOOR DRAIN

SHOWER DRAIN

FLOOR SINK

PRIMARY ROOF DRAIN

SECONDARY ROOF DRAINSRD

PRD

FS

SD

FD

HB

WCO

FCO

DESCRIPTIONSYMBOLDESCRIPTIONSYMBOL

DEMOLITION

EXISTING TO REMAIN

NEW CONSTRUCTION

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

CO

PLUMBING SYMBOLS LEGEND

FREEZE PROOF WALL HYDRANTFPWH

SECONDARY ROOF DRAINSRD

PRIMARY ROOF DRAINPRD

IRRIGATION WATERIW

BALL VALVE

BID SET

Page 11: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:1

7 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\M

P0

02

.d

wg

MP002

MECHANICAL AND PLUMBING

NOTES

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

1. DEMOLISH EXISTING AS REQUIRED FOR NEW CONSTRUCTION AS DIRECTED BY ENGINEER AND/OR

AS NOTED ON DRAWINGS. AVOID DISRUPTION OF SERVICES DURING NORMAL BUSINESS HOURS. ALL

SYSTEM SHUT-DOWNS AND DISRUPTION OF BUILDING SERVICES SHALL BE COORDINATED WITH

OWNER AND SCHEDULED AFTER NORMAL BUILDING HOURS OR AS OTHERWISE APPROVED BY

OWNER.

2. PRIOR TO DEMOLITION FIELD VERIFY AND IDENTIFY ANY EXISTING EQUIPMENT TO REMAIN IN

SERVICE THAT IS SERVED BY SYSTEMS TO BE DEMOLISHED. NOTIFY ENGINEER OF ANY SUCH

CONDITIONS AND REMOVE AND/OR RELOCATE THE SERVICES AS DIRECTED.

3. MEET WITH OWNER PRIOR TO DEMOLITION TO IDENTIFY WHETHER EXISTING MATERIALS SYSTEMS,

EQUIPMENT, ETC. ARE CONSIDERED SALVAGE OR DEBRIS. REMOVE DEBRIS FROM SITE AND

DISPOSE OF IN AN APPROVED MANNER. RETURN SALVAGE TO OWNER IN A LOCATION AND MANNER

AS DIRECTED BY OWNER.

3.1. EQUIPMENT TO BE SALVAGED INCLUDE BUT NOT LIMITED TO CHILLERS, PUMPS, CHEMICAL POT

FEEDERS, AND ELECTRIC MOTORS.

4. TERMINATE DEMOLISHED SYSTEM SERVICES IN A CONCEALED LOCATION IN AN APPROVED MANNER.

COORDINATE WITH NEW AND EXISTING CONSTRUCTION.

5. FIELD VERIFY EXISTING PIPING LOCATIONS PRIOR TO WORK.

6. VERIFY EXTENT OF DEMOLITION OF HVAC, PLUMBING, AND FIRE PROTECTION PIPING, EQUIPMENT,

AND SYSTEMS PRIOR TO WORK. ALL DEMOLITION WORK SHALL BE IN COMPLIANCE WITH

APPLICABLE CODES, STANDARDS AND THE AUTHORITY HAVING JURISDICTION.

7. WHERE REQUIRED, COORDINATE EQUIPMENT ELECTRICAL TERMINATION REQUIREMENTS WITH

ELECTRICAL CONTRACTOR.

DEMOLITION NOTES

RENOVATION NOTES

1. THE CONTRACTOR IS RESPONSIBLE TO COMPLY WITH CURRENT APPLICABLE LOCAL, STATE, FEDERAL, FIRE, AND HEALTH CODES

AND ORDINANCES AND IS RESPONSIBLE TO COMPLY WITH ALL REGULATIONS OF REGULATORY AGENCIES HAVING JURISDICTION.

THE CONTRACTOR SHALL ALSO CONFORM TO THE REQUIREMENTS OF THE OWNER'S INSURANCE CARRIER. NOTIFY THE

ARCHITECT AND ENGINEER OF ANY CONFLICTS PRIOR TO INSTALLATION. CODES, ORDINANCES AND REGULATIONS SHALL HAVE

PRECEDENCE OVER SPECIFICATIONS AND DRAWINGS WHERE THERE IS A CONFLICT. OBTAIN CURRENT COPIES OF ALL ADOPTED

CODES AND ORDINANCES PRIOR TO BID AND INCLUDE ALL COSTS TO COMPLY WITH CODES AND ORDINANCES IN BID.

2. PAY ALL LAWFUL FEES, PERMITS OR LICENSES REQUIRED TO ACCOMPLISH WORK. OBTAIN AND PAY FOR ALL NECESSARY

CERTIFICATES OF APPROVAL.

3. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICE AND ANYTHING REASONABLY

INCIDENTAL TO COMPLETE ALL WORK INDICATED ON THE DRAWINGS AND AS SPECIFIED IN ACCORDANCE WITH THE INTENT OF

THE CONSTRUCTION DOCUMENTS.

4. THE CONTRACTOR IS RESPONSIBLE TO VISIT AND EXAMINE THE JOB SITE AND BECOME FAMILIAR WITH ALL EXISTING CONDITIONS

PERTINENT TO THE WORK TO BE PERFORMED.

5. INCORPORATE ALL CODE AND ORDINANCE REQUIREMENTS INTO THE BID AND INSTALLATION OF WORK. NO ADDITIONAL FUNDS

WILL BE ALLOCATED FOR WORK REQUIRED TO CONFORM TO REGULATIONS AND REQUIREMENT AND/OR TO OBTAIN APPROVAL OF

WORK.

6. THE DRAWINGS ARE DIAGRAMMATIC AND ARE ONLY INTENDED TO DEFINE THE BASIC FUNCTIONS REQUIRED. THE DRAWINGS

SHALL BE FOLLOWED AS CLOSELY AS ACTUAL CONSTRUCTION CONDITIONS AND COORDINATION WITH OTHER TRADES WILL

ALLOW. MINOR DEVIATIONS FROM THE DESIGN LAYOUT ARE ANTICIPATED AND ARE A PART OF THE WORK INCLUDED; HOWEVER,

CHANGES THAT ALTER THE CHARACTER OF THE WORK ARE NOT PERMITTED. APPROVAL OF ARCHITECT AND ENGINEER SHALL BE

OBTAINED BEFORE DEVIATIONS FROM THESE PLANS ARE MADE.

7. PLUMBING AND MECHANICAL SYSTEMS ARE NOT DIMENSIONED. DO NOT SCALE FROM DRAWING(S). THE CONTRACTOR SHALL

COORDINATE WITH OTHER TRADES AND ENSURE THERE IS AVAILABLE SPACE FOR INSTALLATION BEFORE ORDERING EQUIPMENT

AND FABRICATING PIPING AND/OR DUCTWORK.

8. THE CONTRACTOR SHALL STUDY THE ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL PLANS TO ENSURE ALL

MECHANICAL SYSTEMS WILL FIT WITH SUFFICIENT CLEARANCES FOR INSTALLATION, SERVICING AND MAINTENANCE. NOTIFY THE

ARCHITECT AND ENGINEER OF ANY CONFLICTS PRIOR TO INSTALLATION.

9. THE CONTRACTOR SHALL COMPLY WITH SPECIFICATIONS AND INDUSTRY STANDARDS FOR ALL INSTALLATIONS.

10. PROVIDE ALL DOMESTIC POTABLE WATER EQUIPMENT AND PIPING AS "LEAD FREE" PER THE "REDUCTION OF LEAD IN DRINKING

WATER ACT". NOTIFY ENGINEER OF ANY CONFLICTS PRIOR TO SUBMITTAL.

11. REFER TO MECHANICAL DRAWINGS FOR ALL MECHANICAL EQUIPMENT LOCATIONS. REFER TO PLUMBING DRAWINGS FOR ALL

PLUMBING EQUIPMENT.

12. SEAL ALL PENETRATIONS WATER TIGHT. SEAL AROUND ALL WALL PENETRATIONS. PROVIDE ESCUTCHEONS ON ALL PIPING ON

EXTERIOR AND EXPOSED LOCATIONS. CAULK WITH REQUIRED THICKNESS 3M BRAND FIRE BARRIER CAULK CP-25 (OR OTHER

APPROVED METHOD) TO MAINTAIN FIRE RESISTANCE RATING OF FIRE RATED ASSEMBLIES.

13. ALL CUTTING AND PATCHING OF STRUCTURE SHALL BE APPROVED BY THE STRUCTURAL ENGINEER PRIOR TO PERFORMING

WORK.

14. THE CONTRACTOR SHALL COORDINATE ALL ROUTING AND MOUNTING OF EQUIPMENT, DUCTWORK, PIPING, ETC (ALL WORK) WITH

ALL OTHER TRADES.

15. PROVIDE ACCESS PANELS WHERE INDICATED ON DRAWINGS AND AS REQUIRED TO PROPERLY OPERATE, ADJUST AND MAINTAIN

ALL EQUIPMENT, VALVES, DAMPERS AND OTHER ACCESSORIES. VERIFY EXACT LOCATION WITH ARCHITECT PRIOR TO

INSTALLATION. COORDINATE INSTALLATION WITH ALL OTHER TRADES. ACCESS PANEL TO BE MILCOR, MATHBROOK, OR

APPROVED EQUAL, HINGED WITH SCREWDRIVER LOCK.

16. ROUTE DUCTWORK AND PIPING AS HIGH AS POSSIBLE ABOVE FINISHED CEILING TO AVOID CONFLICT WITH LIGHTS.

17. INSTALL ALL PIPING PARALLEL AND PERPENDICULAR TO BUILDING WALLS AND PARTITIONS UNLESS DISTINCTLY SHOWN OR

NOTED OTHERWISE. ROUTE PIPING LOCATED NEAR EACH OTHER PARALLEL IN ALL PLANES AND WITH SUFFICIENT CLEARANCE.

18. ALL PIPING SHALL BE INSTALLED SO THAT IT MAY EXPAND AND CONTRACT FREELY WITHOUT DAMAGES TO EQUIPMENT, OTHER

WORK, OR INJURY TO PIPING SYSTEM, ALL NECESSARY SWING JOINTS, EXPANSION JOINTS, OR OFFSETS TO PROTECT PIPING,

ETC. SHALL BE INSTALLED WHETHER INDICATED OR NOT.

19. PROPERLY SUPPORT ALL PIPING. PROVIDE ALL REQUIRED ANCHORS, GUIDES AND EXPANSION DEVICES.

20. PAINT ALL EXTERIOR AND EXPOSED PIPING. COORDINATE COLOR TO MATCH SURROUNDING ARCHITECTURAL ELEMENTS. GAS

PIPE TO BE PAINTED YELLOW.

21. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT ALL MATERIAL, EQUIPMENT, APPARATUS AND WORK

FROM DAMAGE. FAILURE TO DO SO TO THE SATISFACTION OF THE OWNER OR OWNER'S REPRESENTATIVE WILL BE SUFFICIENT

CAUSE FOR THE REJECTION OF THE MATERIAL, EQUIPMENT, APPARATUS AND WORK IN QUESTION.

22. THE CONTRACTOR SHALL GUARANTEE ALL EQUIPMENT, MATERIALS AND WORKMANSHIP FOR A PERIOD OF 1 YEAR FOLLOWING

THE DATE OF ACCEPTANCE. THE CONTRACTOR'S GUARANTEE INCLUDES EQUIPMENT CAPACITY, PERFORMANCE RATINGS AND

NOISE RATINGS. ANY DEFICIENCIES SHALL BE PROMPTLY CORRECTED. ROUTINE MAINTENANCE SHALL NOT BE INCLUDED.

23. THE CONTRACTOR SHALL CLEAN ALL FIXTURES, PIPES, EQUIPMENT AND EXPOSED WORK AFTER COMPLETION OF FINAL TESTING

AND BEFORE ACCEPTANCE.

24. ALL PLATED AND OTHER FINISHED PRODUCTS SHALL BE THOROUGHLY CLEANED AND POLISHED.

25. THE MANUFACTURER MODEL OR CATALOG NUMBERS INDICATED IN THE CONSTRUCTION DOCUMENTS ESTABLISH A STANDARD

FOR THE GENERAL DESIGN, PERFORMANCE, AND QUALITY OF THE PRODUCT REQUIRED.

26. ALTERNATE MANUFACTURERS LISTED IN THE SCHEDULE OR SPECIFICATIONS ARE APPROVED TO BID; HOWEVER, THE SUBMITTED

PRODUCT MUST MEET THE GENERAL DESIGN, PERFORMANCE, DIMENSIONS, WEIGHT, AND QUALITY OF THE SCHEDULED

PRODUCT. EACH MANUFACTURER WILL HAVE DIFFERENCES IN INSTALLATION REQUIREMENTS. IF THE CONTRACTOR ELECTS TO

GO WITH A NON-BASIS OF DESIGN MANUFACTURER, THE CONTRACTOR SHALL BE RESPONSIBLE TO INCLUDE THE COST FOR

ENGINEERING TIME, AS REQUIRED, TO ADJUST THE DESIGN TO THOSE DIFFERENCES IN THEIR BID, IF THE BASIS OF DESIGN IS

NOT BID. THE CONTRACTOR IS RESPONSIBLE TO IDENTIFY THE DIFFERENCES IN THE INSTALLATION REQUIREMENTS BETWEEN

THE BASIS OF DESIGN AND THE SUBMITTED MANUFACTURER DURING THE SUBMITTAL PHASE.

27. WHERE “OR APPROVED EQUAL” IS INDICATED, OTHER PRODUCTS SIMILAR IN DESIGN AND OF EQUAL QUALITY AND PERFORMANCE,

AND COMPLYING WITH THE PLANS AND SPECIFICATIONS MAY BE APPROVED IF FOUND ACCEPTABLE BY THE

ARCHITECT/ENGINEER. THE CONTRACTOR MUST SUBMIT TO THE ARCHITECT/ENGINEER A LINE-BY-LINE COMPARISON BETWEEN

SCHEDULED MANUFACTURER AND "OR APPROVED EQUAL" MANUFACTURER 10 DAYS PRIOR TO BID.

28. ALL MATERIALS, EQUIPMENT, ETC., INSTALLED UNDER THIS CONTRACT SHALL CONFORM TO ALL RULES, CODES, ETC., AS

RECOMMENDED OR ADAPTED BY THE NATIONAL ASSOCIATION GOVERNING THE MANUFACTURER, RATING AND TESTING OF SUCH

MATERIALS, EQUIPMENT, ETC., ALL ELECTRICALLY OPERATED EQUIPMENT SHALL BE U.L. APPROVED FOR THE USE INTENDED.

29. ALL FIRED AND UNFIRED PRESSURE VESSELS SHALL CONFORM TO THE RULES OF THE A.S.M.E. AND NATIONAL BOARD CODES

AND SHALL BE SO LABELED. FURNISH A.S.M.E. AND NATIONAL BOARD CERTIFICATES.

30. MOTORS SHALL CONFORM TO THE RULES OF THE N.E.M.A. FOR THE SERVICE INTENDED AND TO THEIR STANDARDIZED FORM

SIZES.

31. SHOP DRAWINGS, CATALOG CUTSHEETS AND PERFORMANCE DATA PERTAINING TO ALL MATERIALS AND EQUIPMENT PROPOSED

FOR USE SHALL BE SUBMITTED.

32. JOINTS BETWEEN DISSIMILAR METALS SHALL BE MADE WITH DIELECTRIC NIPPLES DOWNSTREAM OF A VALVE.

33. ALL MATERIALS EXPOSED IN A RETURN AIR PLENUM SHALL COMPLY WITH NFPA 90A FLAME SPREAD UNDER 25 AND SMOKE

DEVELOPED AND FUEL CONTRIBUTED UNDER 50.

34. THE DISCHARGE OF SAFETY VALVES, BLOWOFF PIPES AND OTHER OUTLETS SHALL BE LOCATED AND SUPPORTED SO AS TO

PREVENT INJURY TO PERSONNEL.

35. MECHANICAL EQUIPMENT SHOWN ON THE PLANS HAVE A SPECIFIC WEIGHT AND LOCATION. SHOULD THE CONTRACTOR INSTALL

EQUIPMENT WITH DIFFERENT WEIGHTS OR LOCATIONS AS SHOWN, CONTRACTOR SHALL PROVIDE THIS INFORMATION TO THE

STRUCTURAL ENGINEER FOR APPROVAL, PRIOR TO PURCHASING, CLEARLY INDICATING THE DIFFERENCES IN SIZE, WEIGHT AND

LOCATION. THE ARCHITECT/ENGINEER SHALL NOT BEAR THE COSTS OF SUCH REVIEWS OR REDESIGNS.

36. DO NOT ROUTE PIPING OVER ELECTRICAL OR COMMUNICATIONS EQUIPMENT. THIS INCLUDES HYDRONICS, STEAM, DOMESTIC

WATER, SANITARY SEWER AND VENTS, CONDENSATE, ROOF DRAINS, ETC.

GENERAL NOTES

1. THE CONTRACTOR SHALL VISIT THE SITE BEFORE BIDDING AND SHALL BECOME FULLY

INFORMED AS TO THE EXTENT AND CHARACTER OF THE WORK REQUIRED AND ITS RELATION

TO OTHER WORK. FAILURE TO VISIT SITE SHALL NOT CONSTITUTE A BASIS FOR FUTURE

CLAIMS.

2. EXISTING CONDITIONS WERE TAKEN FROM OBSERVABLE SITE CONDITIONS AND ORIGINAL

DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD

VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL

CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND

EXISTING CONDITIONS.

3. FIELD VERIFY EXISTING SYSTEM PRESSURES AND TEMPERATURES PRIOR TO ANY SYSTEM

TIE-INS. ALL NEW MATERIALS SHALL MEET OR EXCEED PERFORMANCE OF MATERIALS USED ON

EXISTING SYSTEMS.

4. AVOID DISRUPTION OF BUILDING SERVICES DURING NORMAL BUSINESS HOURS. COORDINATE

ALL SYSTEM SHUT DOWNS WITH OWNER. REQUIRED SYSTEM SHUT DOWNS AND DISRUPTION

OF BUILDING SERVICES WILL BE SCHEDULED AFTER NORMAL BUSINESS HOURS AND/OR AS

DIRECTED BY OWNER. CONTRACTOR SHOULD ANTICIPATE THAT SHUTDOWNS MAY OCCUR AT

PREMIUM TIME. CONTRACTOR SHALL INDICATE ON THEIR BID PROPOSAL QUANTITY AND

DURATION OF EACH BUILDING SYSTEM SHUTDOWN REQUIRED TO COMPLETE WORK AS

DESCRIBED ON CONTRACT DOCUMENTS.

5. THE CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND EXACT LOCATION OF ALL

EQUIPMENT, DUCTWORK, AND PIPING, INCLUDING SYSTEM TIE-INS. NOTIFY ENGINEER OF ANY

MODIFICATIONS REQUIRED FROM THE PLANS TO FACILITATE INSTALLATION PRIOR TO

INSTALLATION.

6. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL CONSTRUCTION WITH BUILDING

OCCUPANTS LOCATED IN THE WORK AREA.

7. THE CONTRACTOR SHALL COORDINATE ALL PATCH AND REPAIR OF WALLS, FLOORS, AND

CEILINGS WHEN DISTURBED BY NEW CONSTRUCTION.

8. WHERE SYSTEM TIE-INS ARE MADE AND AT ALL LOCATIONS WHERE DAMAGE OCCURRED FROM

NEW CONSTRUCTION, PATCH AND REPAIR DAMAGED INSULATION WITH INSULATION TYPE AND

THICKNESS TO MATCH EXISTING.

9. TEST AND DOCUMENT EXISTING HVAC SYSTEMS PRIOR TO ANY WORK AS REQUIRED TO

ACCOMMODATE SYSTEM MODIFICATIONS AND ADDITIONS. MAINTAIN ACCEPTABLE COMFORT

LEVELS DURING TEST AS REQUIRED. ENSURE THE INTEGRITY OF THE EXISTING SYSTEM

BALANCE.

10. THE EXISTING MCQUAY CHILLER SHALL BE DISCONNECTED AND LEFT ON SITE TO BE PICKED

UP BY THE SALVAGER AT A LATER DATE. ALL OTHER SALVAGED ITEMS TO BE TRANSPORTED

TO THE JENKS FACILITIES MAINTENANCE BUILDING

DUCTWORK SEALANT SCHEDULE

DUCT

LOCATION

DUCT TYPE

SUPPLY

EXHAUST RETURN

≤ 2 INWC > 2 INWC

OUTDOOR A A C C

UNCONDITIONED SPACES B A C B

CONDITIONED SPACES C B B C

SEALING REQUIREMENTS:

SEAL LEVEL A - ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL

PENETRATIONS. PRESSURE-SENSITIVE TAPE SHALL NOT BE USED AS THE PRIMARY

SEALANT, UNLESS IT HAS BEEN CERTIFIED TO COMPLY WITH UL-181A OR UL-181B

BY AN INDEPENDENT TESTING LABORATORY AND THE TAPE IS USED IN ACCORDANCE WITH THAT

CERTIFICATION.

SEAL LEVEL B - ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS PRESSURE-SENSITIVE TAPE SHALL NOT BE

USED AS THE PRIMARY SEALANT, UNLESS IT HAS BEEN CERTIFIED

TO COMPLY WITH UL-181A OR UL-181B BY AN INDEPENDENT TESTING LABORATORY

AND THE TAPE IS USED IN ACCORDANCE WITH THAT CERTIFICATION.

SEAL LEVEL C - TRANSVERSE JOINTS ONLY.

BID SET

Page 12: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

FC1

FC2

FC3

FC4

FC5

FC6

FC7

FC8

AH-1

AH-2

AH-3

AH-4

F-2 (E)

F-1 (E)

B-2

B-1

CH-1

CH-2

CH-3

FCU

FCU

103

ELEC

WH (E)

HWP-2

HWP-1

48x36 COMBUSTION

AIR LOUVERS AT

FLOOR AND CEILING

(E)

CHWP-1,2,3

EF-4 (E)

105

LAUNDRY

102

CAN WASH

101

CORRIDOR

106

MECH

107

STORAGE109

LOCKERS

111

STORAGE

110

TLT

112

OFFICE

114

SERVING

113

KITCHEN

116

OFFICE

115

CHEM STOR

118

EATING

120

EATING

119

VEST

122

CORR

128

VEST

123

BOYS

124

WASH

127

GIRLS

130

OFFICE

129

CLINIC

125

JAN/MECH126

MECH

131

TLT

133

REST

132

EATING

121

SOUPS & SALADS

117

SCULLERY

104

PUMPS

AIR ELIMINATOR

AIR ELIMINATOR

6

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

REMOVE PIPING

PENETRATION,

REFER TO ARCH

FOR WALL REPAIR

2

REMOVE HYDRONIC

PIPING

REMOVE HYDRONIC

AND CONDENSATE

PIPING

3

5

5

3

CHEMICAL

FEEDER

DEPICTS MEZZANINE

AREA ABOVE CEILING

EXISTING CONDENSATE DRAIN

LINE FOR FCU IN THIS AREA TO

REMAIN TO CONNECT TO NEW

FURNACE

8

4

4

4

4

WALK-IN

COOLER

WALK-IN

FREEZER

7

COORDINATE DEMOLITION

OF PIPING WITH EXISTING

WALK-IN COOLER. DO NOT

DAMAGE COOLER.

REMOVE EXISTING FENCE

9

1

MECHANICAL PIPING DEMOLITION PLAN

3/32" = 1'-0"

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:2

0 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\M

D1

01

.d

wg

MD101

MECHANICAL DEMOLITION

PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

N

1. REMOVE EXISTING EQUIPMENT AND ASSOCIATED PIPING,

CONNECTIONS, HOUSEKEEPING PADS, AND

COMPONENTS.

2. EXISTING LOUVERS TO REMAIN.

3. EXISTING MCQUAY CHILLER TO BE DISCONNECTED AND

LEFT ON SITE TO BE PICKED UP BY SALVAGER AT A LATER

DATE.

4. UNITS TO BE REMOVED THRU EXISTING ROOF OPENINGS.

5. SALVAGE PUMP MOTOR.

6. EXISTING WATER HEATER TO REMAIN.

7. EXISTING ABANDONED IN PLACE WATER HEATER TO

REMAIN.

8. EXISTING EXHAUST FAN TO REMAIN.

9. CONTRACTOR SHALL GRADE ALL DISTURBED AREAS TO

PROVIDE POSITIVE DRAINAGE AWAY FROM THE BUILDING.

ALL DISTURBED AREAS SHALL BE SODDED.

KEYNOTES

1. REMOVE ALL HYDRONIC PIPING INCLUDING

CHWS/CHWR/HWS/HWR LINES AND ASSOCIATED

VALVES AND ACCOMPANIMENTS.

2. REMOVE CEILING AS NEEDED TO DEMO HYDRONIC

PIPING AND EQUIPMENT. REPAIR AND REPLACE

CEILING AS NEEDED DURING CONSTRUCTION.

PLAN NOTES

BID SET

Page 13: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

FC2

FC3

FC4

FC5

FC6

FC7

FC8

AH-1

AH-2

AH-3

AH-4

F-2

F-1

FCU-B

FCU-A

EF-4

(E)

SF-1 SF-2 SF-3

EF-1

(E)

EF-2

(E)

EF-5

(E)

EF-6

(E)

EF-7

(E)

EF-3

(E)

103

ELEC

105

LAUNDRY

102

CAN WASH

101

CORRIDOR

106

MECH

107

STORAGE

109

LOCKERS

111

STORAGE

110

TLT

112

OFFICE

114

SERVING

113

KITCHEN

116

OFFICE

115

CHEM STOR

118

EATING

120

EATING

119

VEST

122

CORR

128

VEST

123

BOYS

124

WASH

127

GIRLS

130

OFFICE

129

CLINIC

125

JAN/MECH126

MECH

131

TLT

133

REST

132

EATING

121

SOUPS & SALADS

117

SCULLERY

104

PUMPS

1

1

1

DUCTWORK FROM NEW

RTU TO RECONNECT TO

EXISTING DUCT BRANCH

HERE, RE: M-101

4

2

2

2

2

2

2

1

1

1

1

1

1

1

1

4

4

5 5

6

7

7

NO WORK THIS AREA

MEZZANINE ABOVE

CEILING TO REMAIN

T

T

T

T

8

FS FS

9

9

FS

FS

FS

FS

FS

2

2

10

1111

12

12

10

10

1

FS

9

2

FS

2

2

9

9

9

1

3

3

WALK-IN

COOLER

WALK-IN

FREEZER

2

13

N1

MECHANICAL DUCT DEMOLITION PLAN

3/32" = 1'-0"

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:2

2 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\M

D1

02

.d

wg

MD102

MECHANICAL DEMOLITION

PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

1. REMOVE EXISTING EQUIPMENT AND ASSOCIATED

DUCTWORK, CONNECTIONS, AND COMPONENTS.

2. EXISTING TO REMAIN.

3. REMOVE EXISTING DIFFUSERS AND ASSOCIATED

DUCTWORK.

4. REMOVE EXISTING DUCTWORK.

5. REMOVE OUTSIDE AIR DUCT TO HERE. EXISTING

LOUVER TO REMAIN CAP AND SEAL DUCT.

6. REMOVE EXISTING O/A AND RL/A DUCTS TO ROOF.

7. REMOVE RL/A DUCTWORK FROM ROOF TO HERE, CAP

AND SEAL OPEN END. EXISTING GRILLES TO REMAIN.

8. REMOVE EXISTING THERMOSTAT. PROVIDE

STAINLESS STEEL COVER PLATE OVER REMAINING

JUNCTION BOX.

9. EXISTING FIRE/SMOKE DAMPER TO REMAIN.

10. REMOVE EXISTING R/A DUCT TO HERE, CAP AND SEAL

OPEN END.

11. REMOVE EXISTING S/A DUCTWORK TO HERE.

12. CAP AND SEAL EXISTING DUCTWORK HERE.

13. REMOVE EXISTING THERMOSTAT. NEW THERMOSTAT

FOR NEW UNITS TO BE INSTALLED IN THIS LOCATION.

KEYNOTES

1. AIR HANDLERS ARE LOCATED ON MEZZANINE LEVEL

ABOVE KITCHEN CEILING.

2. EXISTING KITCHEN HOOD EXHAUST AND MAKE-UP AIR

SYSTEMS TO REMAIN.

PLAN NOTES

BID SET

Page 14: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

2

WALK-IN FREEZER

CONDENSING

UNITS (E)

VTR (E)

EXHAUST FAN

HOOD (E)

VTR (E)

VTR (R)

ROOF HATCH

1

1

1

1

1

1

1

KITCHEN HOOD

SUPPLY FANS (E)

2 2

2

22

KITCHEN HOOD

EXHAUST FANS (E)

EXHAUST FANS (E)

KITCHEN HOOD

SUPPLY FANS (E)

KITCHEN HOOD

EXHAUST FANS (E)

EXHAUST FANS (E)

VTR (R)

VTR

(R)

VTR (E)

FLUE (E)

VTR (E)

VTR (E)

3

WALK-IN COOLER

CONDENSING

UNIT (E)

4

4

22

2

2

2

4

1

MECHANICAL ROOF DEMOLITION PLAN

3/32" = 1'-0"

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:2

4 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\M

D1

03

.d

wg

MD103

MECHANICAL ROOF

DEMOLITION PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

N

1. REMOVE EXISTING RELIEF/INTAKE AIR HOOD.

2. EXISTING TO REMAIN.

3. REMOVE FLUE, CAP ROOF CURB.

4. RELOCATE EXISTING VENT, RE: P-101. NEW LOCATION

TO BE 10' MIN AWAY FROM ANY NEW OUTSIDE AIR

INTAKE.

KEYNOTES

1. EXISTING KITCHEN HOOD EXHAUST AND MAKE-UP AIR

EQUIPMENT AND SYSTEMS TO REMAIN.

2. ALL RELIEF AIR HOODS TO BE REMOVED.

PLAN NOTES

BID SET

Page 15: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

103

ELEC

105

LAUNDRY

102

CAN WASH

101

CORRIDOR

106

MECH

107

STORAGE

109

LOCKERS

111

STORAGE

110

TLT

112

OFFICE

114

SERVING

113

KITCHEN

115

CHEM STOR

118

EATING

120

EATING

119

VEST

104

PUMPS

117

SKULLERY

121

SOUPS & SALADS

LADDER UP TO

ROOF

LADDER UP TO

MEZZANINE

FROM 1ST

FLOOR

RE: M-102 FOR CONT

RE: M-102

FOR CONT

FSFS

FS

FS

FS

FS

FS

FS

UP TO RTU-3

116

OFFICE

2

2

48x28 (E)

60x24

(E)

60x24

(E)

42x36 (E)

UP TO

RTU-1

UP TO RTU-2

UP TO RTU-4

UP TO

RTU-6

UP TO

RTU-5

44x26 R/A UP

TO ROOF

38x30

2

36x24 (E)

36x24 (E)

2

2

28

x3

4

42x36

2

2

2

C

24x24

RAG

48

x2

8

40x24

2

32x30

60

x2

4

48x28 (E)

925 CFM

350 CFM

925 CFM

350 CFM

925 CFM

925 CFM

925 CFM

350 CFM

925 CFM

350 CFM

925 CFM

925 CFM

500 CFM

910 CFM

350 CFM

910 CFM 910 CFM 910 CFM 910 CFM

910 CFM

350 CFM

350 CFM

990 CFM990 CFM 990 CFM 990 CFM 990 CFM

990 CFM

350 CFM350 CFM 350 CFM

32

x3

4

28

x3

4

32

x3

4

36x24

36

x3

2

F-3

A

12"Ø

400

D

24x24

RAG

12Ø

12

x1

0

1

A

10"Ø

150

C

24x12

RAG

10Ø

10x12

4

2

MVD,

TYP

DEPICTS

MEZZANINE

AREA

36x24 (E)

5

3

DEPICTS ROOF

CURB OPENING,

TYP

FS

T

RTU-2

T

RTU-3

T

RTU-6

48x24

36x24

T

RTU-1

28x24

T

F-3

T

RTU-7

36x24 S/A UP

TO ROOF

WALK-IN

COOLER

WALK-IN

FREEZER

RTU-7

ABOVE

6

6

6

PROVIDE WITH

A GRAVITY OR

MOTORIZED

O/A DAMPER

RE: STRUCT FOR

WALL PENETRATION

RE: STRUCT FOR

WALL PENETRATION

MATCHLINE

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:2

7 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\M

-1

01

.d

wg

M-101

MECHANICAL PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

N1

NORTHEAST MECHANICAL HVAC PLAN

1/8" = 1'-0"

N

1. PROVIDE 24x24 R/A PLENUM FOR FURNACE.

2. CONNECT NEW TO EXISTING DUCTWORK HERE.

3. 8"Ø O/A DUCT UP TO ROOF, PROVIDE WITH VENT CAP.

CONNECT TO RETURN AIR PLENUM AT FURNACE, RE:

5/M-501 FOR FURNACE DETAIL.

4. COORDINATE DUCT LOCATION WITH EXISTING

ELECTRICAL PANELS. DO NOT ROUTE DUCTWORK

ABOVE ELECTRICAL PANELS.

5. PROVIDE 6"Ø FLUE UP TO ROOF, PROVIDE WITH VENT

CAP.

6. PROVIDE WITH LOCKABLE COVER FOR THERMOSTAT.

KEYNOTES

1. PROVIDE FULL SIZE DUCTS DN FROM RTU.

2. REBALANCE EXISTING AIRFLOWS AS NOTED.

3. BALANCE AIR FLOWS TO PRE-CONSTRUCTION VALUES

FOR DIFFUSERS NOT NOTED.

4. ALL EXISTING FIRE/SMOKE DAMPERS TO REMAIN.

CONNECT ANY NEW DUCTWORK UPSTREAM OF

DAMPERS.

PLAN NOTES

BID SET

Page 16: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

122

CORR

128

VEST

123

BOYS

124

WASH

127

GIRLS

130

OFFICE

129

CLINIC

125

JAN/MECH

126

MECH

131

TLT

133

REST

132

EATING

28x3428x34

24x22

24x28

28x28

28x28

28x20

20x20

T T

RTU-5 RTU-4

32x34

B

20x8

650

B

20x8

650

B

20x8

650

B

20x8

650

A

12"Ø

600

A

12"Ø

600

B

48x12

2000

B

48x12

2000

B

48x12

2250

B

48x12

2250

B

48x12

2250

B

48x12

2250

32x34

C

36x30

RAG

C

36x30

RAG

1

1

1

1

1

1

1

1

1

1

RE: M-101 FOR CONT

RE: M-101

FOR CONT

2

2

3

FS FS FS FS

A

12"Ø

600

A

12"Ø

600

4

RE: M-101

FOR AIR

SUPPLY

QUANTITY

MVD, TYP

F-1 (E)

F-2 (E)

RE: STRUCT FOR

WALL PENETRATION

RE: STRUCT FOR

WALL PENETRATION

MATCHLINE

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

1

SOUTHWEST MECHANICAL HVAC PLAN

1/8" = 1'-0"

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:2

9 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\M

-1

02

.d

wg

M-102

MECHANICAL PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

N

1. NEW AIR DEVICES TO BE INSTALLED IN EXISTING

OPENING IN WALL FROM DEMOLISHED DUCTWORK

AND GRILLES.

2. INSULATE THE TOP OF THESE DIFFUSERS WITH

ARMAFLEX INSULATION TO ELIMINATE

CONDENSATION BUILDUP ON THE DIFFUSERS.

3. PROVIDE WITH LOCKABLE COVER.

4. COORDINATE DUCT LOCATION WITH EXISTING

ELECTRICAL PANELS. DO NOT ROUTE DUCTWORK

ABOVE ELECTRICAL PANELS.

KEYNOTES

BID SET

Page 17: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

RTU-1

RTU-2

RTU-3

RTU-4

RTU-6

RTU-5

RTU-7

WALK-IN FREEZER

CONDENSING

UNITS (E)

EXHAUST FAN

HOOD (E)

VTR (E)

VTR (R)

ROOF HATCH

KITCHEN HOOD

SUPPLY FANS (E)

KITCHEN HOOD

EXHAUST FANS (E)

EXHAUST FANS (E)

KITCHEN HOOD

SUPPLY FANS (E)

KITCHEN HOOD

EXHAUST FANS (E)

EXHAUST FANS (E)

VTR (E)

VTR (E)

2

CU-3

3

4

1

36x24

32x36

5

6

7

8

9

10

VTR'S (E)

VTR(R)

VTR (R)

WATER HEATER

FLUES (E)

VTR (E)

CAPPED BOILER

FLUES

WALK-IN COOLER

CONDENSER UNIT

(E)

PROVIDE METAL

EQUIPMENT RAIL

PROVIDE DUCTWORK

WITH DURABLOCK

ROOF SUPPORT

VTR (E)

4

4

11

TYP 7

1

MECHANICAL ROOF PLAN

3/32" = 1'-0"

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:3

2 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\M

-1

03

.d

wg

M-103

MECHANICAL ROOF PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

N

1. EQUIPMENT CLEARANCES, TYP.

2. ROUTE DUCTWORK ON ROOF.

3. REFER TO 9/M-501 FOR REFRIGERANT LINESET DETAIL.

4. RELOCATE EXISTING VTR, RE: P-101. NEW LOCATION TO

BE 10' MIN AWAY FROM ANY NEW OUTSIDE AIR INTAKE.

5. STACK DUCTWORK AS NEEDED. COORDINATE

LOCATION WITH ROOF SCREEN AND GAS PIPING, RE:

STRUCTURAL AND PLUMBING DRAWINGS.

6. ROUTE REFRIGERANT LINES TO FURNACE BELOW

ROOF, RE: 10/M-501 FOR PENETRATION HOOD DETAIL.

7. SIZE REFRIGERANT LINES PER MANUFACTURER'S

RECOMMENDATIONS.

8. FLUE AND O/A INTAKE, MAINTAIN MIN 10' CLEARANCE

BETWEEN ALL EXHAUSTS AND INTAKES. PROVIDE WITH

VENT CAP, RE: M-601 FOR SCHEDULE.

9. 44x26 R/A DUCT DOWN TO KITCHEN AREA, COORDINATE

LOCATION WITH STRUCTURAL ELEMENTS.

10. COORDINATE LOCATION WITH STRUCTURAL ELEMENTS.

11. RTU LOCATIONS ARE BASED ON THE APPROXIMATE

LOCATIONS OF NEW STRUCTURAL ELEMENTS. NEW

STRUCTURAL ELEMENT LOCATIONS MAY BE ADJUSTED

DEPENDING ON EXISTING FIELD CONDITIONS. SHIFT RTU

LOCATIONS ACCORDINGLY. COORDINATE WITH

STRUCTURAL ENGINEER.

1. MAINTAIN MANUFACTURER'S RECOMMENDED

CLEARANCES AROUND EACH UNIT.

2. COORDINATE NEW RTU LOCATION WITH EXISTING

EXHAUST AND VENT LOCATIONS. MAINTAIN MIN 10'

CLEARANCE FROM ANY EXHAUST OR VENT

OPENINGS.

3. RTU-1 TO SERVE EATING 118.

RTU-2 & -3 TO SERVE EATING 120.

RTU-4 & -5 TO SERVE EATING 132

RTU-6 & -7 TO SERVE KITCHEN.

PLAN NOTES

KEYNOTES

BID SET

Page 18: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:3

3 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\M

-5

01

.d

wg

M-501

MECHANICAL DETAILS

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

8

TURNING VANES DETAIL

NOT TO SCALE

4

AIR DEVICE

TAKEOFF DETAIL

NOT TO SCALE

3

CEILING DIFFUSER

BRANCH DUCT DETAIL

NOT TO SCALE

1

LOW PRESSURE DUCT CONSTRUCTION DETAIL

NOT TO SCALE

2

DUCT STRAP DETAIL

NOT TO SCALE

7

RETURN/EXHAUST GRILLE DETAIL

NOT TO SCALE

AIR FLOW

H

W

R

9

0

°

DETAIL NOTE:

1. USE 24 GAUGE GALVANIZED VANE RUNNERS (TOP & BOTTOM)

2. CONSTRUCT SMOOTH RADIUS ELBOW WITH SPLITTER VANE ACCORDING TO SMACNA

HVAC SYSTEMS DUCT DESIGN 4TH EDITION SECTION 5.15.

3. FOR RECTANGULAR DUCTWORK, PROVIDE LONG RADIUS ELBOWS WITHOUT TURNING

VANES OR SPLITTERS. IF SPACE DOES NOT ALLOW FOR LONG RADIUS ELBOWS, SHORT

RADIUS ELBOWS WITH SPLITTER(S) MAY BE SUBSTITUTED. IN EXTREMELY TIGHT SPACES,

SQUARE ELBOWS WITH SINGLE WIDTH TURNING VANES MAY BE SUBSTITUTED.

3/4"

RADIUS = 2"

1 1/2"

CEILING

DETAIL NOTE:

1. INSULATED (MINIMUM R-6), FLEXIBLE DUCTWORK SHALL BE SUPPORTED PER SMACNA AND

INDUSTRY STANDARDS. MAXIMUM 5'-0" PER HVAC DUCT CONSTRUCTION STANDARDS, FIGURE

3-9, FLEXIBLE DUCT SUPPORTS. AVOID TIGHT RADIUS TURNS THAT RESTRICT AIRFLOW.

WHERE TIGHT RADIUS TURNS ARE NECESSARY PROVIDE RIGID SHEET METAL ELBOWS.

DUCT STRAP TYPICAL IN

TWO PLACES MINIMUM 1"

WIDE, CONSTRUCT PER

SMACNA

INSULATED GALVANIZED

SHEET METAL ELBOW

CEILING DIFFUSER

SS SCREW CLAMP

CONICAL TAP W/ MANUAL

VOLUME DAMPER

PRE-MANUFACTURED 45°

LATERAL FITTING OR TAP

SECURE FLEXIBLE DUCT TO

PLENUM AND FITTING WITH

SS SCREW CLAMP

INSULATED FLEXIBLE DUCT -

INSIDE DIAMETER AS NOTED

ON DRAWINGS. MAXIMUM

LENGTH 5'-0"

SUPPLY

DUCT

AIRFLOW

DETAIL NOTE:

1. ALL DUCTWORK SHALL BE SEALED IN

ACCORDANCE WITH SMACNA FOR SEAL

CLASS 'A'. SEE SPEC FOR INSULATION

REQUIREMENTS.

RECTANGULAR

BRANCH DUCT

15° MAXIMUM PER SIDE

RECTANGULAR

TRUNK DUCT

90° MITERED ELBOW

WITH SINGLE-WIDTH

TURNING VANES

MANUAL VOLUME DAMPER WITH

EXTERNAL ADJUSTMENT AND

POSITION LOCK (TYP)

RECTANGULAR

BRANCH DUCT

SPIN-IN TAP

FLEXIBLE RUN-OUT DUCT

DETAIL NOTE:

1. NO POP RIVETS ALLOWED

BOTTOM CHORD OF

TRUSSED RAFTER

OR JOIST

INSULATION

TWIST STRAP

1" X 18 GAGE STRAP

HANGERS AT 8'-0"

SPACING

DUCT WRAP

#10 X 3/4" SELF TAPPING

GALVANIZED SHEET METAL

SCREWS TO ANCHOR

STRAPS TO DUCT. ALL

STRAPS TO BE TIGHT

AGAINST DUCT AND

SUPPORT MEMBERS (TYP.)

(2) #10 TEE SCREENS

CONFIGURATION FOR

METAL FRAMING

DETAIL NOTE:

1. THE LENGTH AND WIDTH OF THE PLENUM

SHALL MATCH THE DUCT CONNECTION SIZE

OF THE GRILLE. THE HEIGHT OF THE PLENUM

SHALL BE AS REQUIRED TO MAKE THE DUCT

CONNECTION PER SMACNA STANDARDS.

SHEETMETAL

PLENUM

1" DUCT LINER,

BLACK

SECURE DUCT TO

REGISTER WITH

SHEETMETAL

SCREWS 6" ON

CENTER (MIN. 2

PER SIDE)

SPIN-IN FITTING

RETURN/EXHAUST DUCT, SEE

PLANS FOR CONNECTION SIZE

INSULATED FLEXIBLE DUCT

PERMITTED. MAXIMUM LENGTH

5'-0".

RIGID DUCTWORK

(INSULATED)

3" MINIMUM

WALL

6

2

3 5

1

7

7

3

2

6

4

65

CAULKING MATERIAL

DUCT OUTLET

SMOKE BARRIER

#8 MIN FASTENER

DUCT (SLEEVE)

DAMPER

6.

7.

4.

5.

ITEM.

3.

2.

1.

DESCRIPTION

1

MULTIPLE BLADE LEAKAGE RATED

DAMPER INSTALLED WITHIN A DUCT OR

SLEEVE PER MANUFACTURERS

RECOMMENDATIONS. PROVIDE ACCESS

PANEL WHERE REQUIRED,

COORDINATE WITH ARCHITECTS.

SINGLE BLADE LEAKAGE RATED

DAMPER INSTALLED WITHIN A DUCT

OR SLEEVE PER MANUFACTURERS

RECOMMENDATIONS. PROVIDE

ACCESS PANEL WHERE REQUIRED,

COORDINATE WITH ARCHITECTS.

OPERATOR/ACTUATOR DAMPER MAY BE

SUPPLIED WITHOUT OPERATOR/ACTUATOR

INSTALLED. RUSKIN'S UL LISTED FIRE

DAMPER OPERATORS SPECIFIED ON

DAMPER MARKING MAY BE FIELD INSTALLED.

SEE OPERATOR/ACTUATOR INSTALLATION

INSTRUCTIONS FOR FIELD MOUNTING OF

DAMPER OPERATORS.

4

6

FIRE/SMOKE DAMPER AT WALL DETAIL

NOT TO SCALE

45° HEEL-TOE TAP

DIFFUSER, FACE MOUNTED

TO DUCT; INTERNALLY

SECURED TO DUCT WITH

SHEET METAL SCREWS TO

HIDE FASTENERS

MVD

SIZE RUNOUTS TO MATCH

DIFFUSER FACE SIZE (2"

LARGER THAN DIFFUSER

NECK SIZE) SO THAT

DIFFUSER DOES NOT

OVERHANG DUCT

MIN. 6"

DUCT MAIN

PROVIDE MINIMUM

1" "LIP" TO ATTACH

DIFFUSER WITH

SHEET METAL

SCREWS ON ALL (4)

SIDES

ACCESS PANEL

W/HINGE & LATCH.

SIZE, 2" LESS

THAN DUCT

DIMENSION. MIN.

6"x 6", MAX. 18"x 18"

DAMPER FRAME,

WELD TO SLEEVE

AT 5" O.C. W/1"

FILLETS

ALTERNATE

ACCESS

PANEL

LOCATION

FIRE DAMPER WITH

BLADE OUT OF AIR

STREAM

10 GA. STEEL

WALL SLEEVE

& SHROUD

CLEARANCE FOR

EXPANSION 1/8" TO

1/4" MAXIMUM

"S" TYPE SLIP

CONNECTION

(TYP)

1-1/2"x 1-1/2"x 1/8"

(4 SIDES) MITERED

CORNERS WELDED

TO SLEEVE WITH 1"

FILLETS.

9

ROOF PIPING PENETRATION DETAIL

NOT TO SCALE

10

TYPICAL PENETRATION DETAIL

NOT TO SCALE

2'-0"

MIN.

DETAIL NOTE:

1. HEIGHT OF LIQUID AND SUCTION LINES TO

MATCH SPECIFIC CONDENSING UNIT.

8"

12"

3'-6"

20 GAGE GALVANIZED SHEET METAL HOOD.

1/2" MESH GALVANIZED BIRD SCREEN OVER

OPENING.

UNISTRUT ANCHORED TO CURB. CLAMP

SUCTION AND LIQUID LINES WITH

HYDRO-ZORB OR CUSHA CLAMP.

CONDENSING UNIT

SUCTION LINE

LIQUID LINE

TOP OF ROOF DECK

PRE-FABRICATED CURB.

FILL OPENING WITH FOAM

INSULATION AIR TIGHT

AFTER LINES ARE

INSTALLED

DETAIL NOTE:

1. FOR INSULATED PIPING SIZE SLEEVE ACCORDINGLY.

2. PROVIDE ESCUTCHEONS OR ANGLED STRIPS WHERE PENETRATIONS ARE

EXPOSED TO VIEW.

DUCT, PIPE OR

CONDUIT

PACK WITH FIBROUS

MATERIAL AND

CAULK ALL AROUND

STUD WALL

PIPE SLEEVE FOR ALL

MASONRY WALLS AND

RATED WALLS (SEE

ARCHITECTURAL

DRAWINGS FOR

LOCATIONS)

FIRE-RATED SEALANT FOR RATED

WALLS (SEE ARCHITECTURAL

DRAWINGS FOR LOCATIONS)

CONCRETE OR

MASONRY WALL

CC COIL

FURNACE

G

O/A DUCT

(TYPICAL)

MVD

R/A DUCT

S/A DUCT

FLEX DUCT (TYP)

GAS PIPING

GAS FLUE VENT. TERMINATE AT

ROOF IN AN APPROVED MANNER.

PLUG VALVE

UNION

DIRT LEG

2" THICK FARR 30/30

FILTER WITH FIELD

FABRICATED RACK,

PROVIDE ACCESS

FULL SIZE OF FURNACE R/A

FLEXIBLE CONNECTION

CONDENSATE DRAIN CONNECTION

ROUTE TO NEAREST FLOOR DRAIN OR

STANDPIPE, DISCHARGE INDIRECTLY

REFRIGERANT CONNECTIONS

TYPE 48 SPRING CUSHION

VIBRATION ISOLATOR (TYP)

1/2"Ø THREADED

ROD (TYP)

CONNECTION TO STRUCTURAL

SUPPORTING MEMBER; RE: 2/S-101

5

HORIZONTAL FURNACE DETAIL

NOT TO SCALE

RE: 2/S-101

11

VTR PENETRATION AND

SUPPORT DETAIL

NOT TO SCALE

SCREENWALL

SCREENWALL

SUPPORT

VTR SUPPORTED BY

HORIZONTAL STRUCTURAL

MEMBERS OF SCREENWALL

OFFSET DUE TO

STRUCTURAL MEMBER

ROUTE VENT UNDER

ROOF UNTIL VERTICAL

PENETRATION

REFER TO ARCHITECTURAL

DRAWINGS FOR

PENETRATION DETAIL

PIPE CLAMP

PARAPET

WALL

ROOF

BID SET

Page 19: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:3

6 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\M

-6

01

.d

wg

M-601

MECHANICAL SCHEDULES

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

AIR DEVICE SCHEDULE

MARK

MANUFACTURER/

MODEL

SERVICE TYPE MOUNTING

FACE

SIZE

REMARKS

A

TITUS

TMS

S/A LOUVERED

LAY-IN (UNO)

24x241,2,3

B

TITUS

300RL

S/A SIDEWALL SURFACE SEE PLANS2,3

C

TITUS

25RL

R/A LOUVERED

SURFACE (UNO)

24x24 UNO2,3

D

TITUS

350FLF

R/A

LOUVERED

FILTER

LAY-IN 24x242,3,4

REMARKS:

1. PROVIDE 4-WAY PATTERN EXCEPT AS OTHERWISE SHOWN ON DRAWINGS.

2. PROVIDE STANDARD WHITE FINISH, UNO.

3. REFER TO PLANS FOR NECK SIZES.

4. PROVIDE 20x20 NECK WITH 20x20 WITH MERV 7 FILTER.

PACKAGED ROOFTOP HVAC EQUIPMENT

MARK

MANUFACTURER

MODEL

TYPE

AREA

SERVED

CAPACITY EVAP FAN ELECTRICAL WEIGHT

REMARKS

COOLING HEATING S/A HP

MCA/

MOCP

V/PH/HZ

UNIT

(LBS)NOMINAL

TONS

QT (MBH) QS (MBH) IN (MBH) OUT (MBH)

O/A ESP

RTU-1

LENNOX

KGA300S4B

CONSTANT

AIR VOLUME

EATING 118 25 270 190 260 208

8750 7.5

116/125 208/3/60 25351-11,13

2100 1.0

RTU-2

LENNOX

KGA240S4B

CONSTANT

AIR VOLUME

EATING 120

EAST

20 238 153 260 208

6990 5

100/110 208/3/60 25351-3,5-11,13

1500 1.0

RTU-3

LENNOX

KGA240S4B

CONSTANT

AIR VOLUME

EATING 120

SOUTH

20 238 153 260 208

7010 5

100/110 208/3/60 25351-11,13

1500 1.0

RTU-4

LENNOX

KGA300S4B

CONSTANT

AIR VOLUME

EATING 132

EAST

25 270 190 260 208

8750 7.5

116/125 208/3/60 25351-3,5-11,13

2100 1.0

RTU-5

LENNOX

KGA300S4B

CONSTANT

AIR VOLUME

EATING 132

WEST

25 270 190 260 208

8750 7.5

116/125 208/3/60 25351-3,5-11,13

2100 1.0

RTU-6

LENNOX

KGA300S4B

CONSTANT

AIR VOLUME

KITCHEN 111 &

SERVING 114

25 270 190 260 208

8750 7.5

116/125 208/3/60 25351-3,5-11,13

2100 1.0

RTU-7

LENNOX

KGA300S4B

CONSTANT

AIR VOLUME

KITCHEN 111

WEST

25 270 190 260 208

8750 7.5

116/125 208/3/60 29351-10,12,13

2100 1.0

REMARKS:

1. INSTALL EQUIPMENT PER MANUFACTURER'S INSTALLATION REQUIREMENTS.

2. COORDINATE ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR.

3. PROVIDE WITH FACTORY MOUNTED UNIT DISCONNECT.

4. PROVIDE WITH CONVENIENCE OUTLET.

5. PROVIDE WITH MANUFACTURER'S STRUCTURAL ROOF CURB. HEIGHT OF ROOF CURB SHALL BE A MINIMUM OF 14 INCHES. CONTRACTOR SHALL PROVIDE A TALLER CURB AS REQUIRED TO PROVIDE SUFFICIENT CLEARANCE

ABOVE ROOF INSULATION FOR PROPER RTU INSTALLATION.

6. PROVIDE WITH HINGED ACCESS DOORS AND 2" MERV 8 FILTERS.

7. PROVIDE WITH BAROMETRIC RELIEF HOOD.

8. PROVIDE WITH MANUFACTURER'S SINGLE ENTHALPY ECONOMIZER.

9. PROVIDE WITH MANUFACTURER'S SMOKE DETECTOR IN THE RETURN AIRSTREAM AND WIRE FOR UNIT SHUT-DOWN UPON DETECTION. INTEGRATE DETECTION INTO EXISTING FIRE ALARM CONTROLS. WIRING SHALL BE IN

CONDUIT. PROVIDE LABEL ON OUTSIDE OF ROOFTOP UNIT WITH DUCT DETECTOR TAG NUMBER

10. MECHANICAL EQUIPMENT CONTROLS SHALL BE ELECTRO MECHANICAL INCLUDING 24 VOLT TRANSFORMER. MANUFACTURER'S EQUIPMENT STARTUP SHALL INCLUDE ALL COORDINATION WITH CONTROLS CONTRACTOR. THE

CAMPUS CONTROL SYSTEM IS ANDOVER WITH CONTACT AS BRANDON ACKLEY (816) 607-6140. CONTRACTOR SHALL CONFIRM THAT ALL MECHANICAL EQUIPMENT, CONTROLS, AND ANY OTHER REQUIREMENTS FOR INTERFACE

HAVE BEEN COORDINATED WITH BOTH THE CONTROLS CONTRACTOR AND THE MANUFACTURERS' AUTHORIZED REPRESENTATIVE TO ENSURE A COMPLETE AND OPERATING MECHANICAL SYSTEM FOR ALL MODES OF

OPERATION.

11. COORDINATE STRUCTURAL CURB TYPE TO PROVIDE FOR DOWNFLOW OPERATION.

12. COORDINATE STRUCTURAL CURB TYPE TO ALLOW HORIZONTAL DUCT DISCHARGES.

13. PROVIDE WITH FLEX DUCT CONNECTORS.

SPLIT-SYSTEM SCHEDULE

MARK TYPE

MANUFACTURER

MODEL

NOMINAL

SIZE

(TONS)

COOLING

CAPACITY

(MBH)

HEATING

CAPACITY

IN/OUT

(MBH)

EVAP FAN ELECTRICAL

WEIGHT

(LBS)

REMARKS

S/A O/A HP

MCA/MOCP

CU/ MOCP-F

(AMPS)

V/PH/HZ

F-3

NATURAL GAS

FURNACE

LENNOX

EL180UH045

--- --- 44/36 400 50 1 6.8/15 120/1/60 152

1-11CC-3

COOLING

COIL

LENNOX

CX35-30B-F

1.5 18.1 --- --- --- --- --- --- 42

CU-3

CONDENSING

UNIT

LENNOX

14ACX-018-230

1.5

1.5-TON

(NOMINAL)

--- --- --- --- 12.4/20 208/1/60 250

REMARKS:

1. COORDINATE ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR

2. PROVIDE AFUE-80.0%

3. PROVIDE BOTTOM FILTER RACK AND FILTERED RETURN AIR GRILLE.

4. COORDINATE THERMOSTAT WITH CONTROLS CONTRACTOR.

5. PROVIDE CONDENSATE TRAP

6. PROVIDE 20 YEAR HEAT EXCHANGER WARRANTY

7. PROVIDE COMPRESSOR START ASSIST - CAPACITOR AND RELAY

8. PROVIDE ANTI-SHORT CYCLE PROTECTOR

9. PROVIDE TXV

10. PROVIDE SUSPENSION KIT FOR HORIZONTAL FLOW INSTALLATION.

11. MECHANICAL EQUIPMENT CONTROLS SHALL BE ELECTRO MECHANICAL INCLUDING 24 VOLT TRANSFORMER. MANUFACTURER'S EQUIPMENT STARTUP SHALL INCLUDE ALL COORDINATION WITH CONTROLS CONTRACTOR. THE

CAMPUS CONTROL SYSTEM IS ANDOVER WITH CONTACT AS BRANDON ACKLEY (816) 607-6140. CONTRACTOR SHALL CONFIRM THAT ALL MECHANICAL EQUIPMENT, CONTROLS, AND ANY OTHER REQUIREMENTS FOR INTERFACE

HAVE BEEN COORDINATED WITH BOTH THE CONTROLS CONTRACTOR AND THE MANUFACTURERS' AUTHORIZED REPRESENTATIVE TO ENSURE A COMPLETE AND OPERATING MECHANICAL SYSTEM FOR ALL MODES OF

OPERATION.

VENT CAP SCHEDULE

UNIT

SERVED

MANUFACTURER/

MODEL

DUCT

CONNECTION

REMARKS

CU-3

BROAN NUTONE

611

8"Ø1,2,3

REMARKS:

1. PROVIDE WITH NATURAL ALUMINUM FINISH.

2. PROVIDE WITH BIRD SCREEN.

3. FOR FLAT ROOF INSTALLATION.

BID SET

Page 20: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:3

8 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\M

-7

01

.d

wg

M-701

MECHANICAL CONTROLS

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

T

SA

AI - Zone Temp

AI - Zone Setpoint Adjust

BI - Zone Override

M

CT

Starter

BO - Supply Fan Start/Stop

BI - Supply Fan Status

T

BI - Freezestat

T

AI - Return Air Temp

DX

BO - Cooling Stage 1

BO - Cooling Stage 2

Gas

BO - Heating Stage 1

BO - Heating Stage 2

BI - Return Air Smoke Detector

OA

EA RA

AI - Supply Air Temp

SF

T

N.C.

*Gravity Relief

RTU-1 through RTU-7

1. ROOF TOP UNITS RTU-1 THROUGH RTU-7 (TYPICAL OF 7)

RUN CONDITIONS - SCHEDULED:

THE UNIT SHALL RUN ACCORDING TO A USER DEFINABLE TIME SCHEDULE IN

THE FOLLOWING MODES:

• OCCUPIED MODE: THE UNIT SHALL MAINTAIN

• A 74°F (ADJ.) COOLING SETPOINT 

• A 70°F (ADJ.) HEATING SETPOINT.

• UNOCCUPIED MODE (NIGHT SETBACK): THE UNIT SHALL MAINTAIN

• A 85°F (ADJ.) COOLING SETPOINT.

• A 55°F (ADJ.) HEATING SETPOINT.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

• HIGH ZONE TEMP: IF THE ZONE TEMPERATURE IS GREATER THAN THE

COOLING SETPOINT BY A USER DEFINABLE AMOUNT (ADJ.).

• LOW ZONE TEMP: IF THE ZONE TEMPERATURE IS LESS THAN THE

HEATING SETPOINT BY A USER DEFINABLE AMOUNT (ADJ.).

DEMAND LIMITING - ZONE SETPOINT OPTIMIZATION:

TO LOWER POWER CONSUMPTION, THE ZONE SETPOINTS SHALL

AUTOMATICALLY RELAX WHEN THE FACILITY POWER CONSUMPTION EXCEEDS

DEFINABLE THRESHOLDS. THE AMOUNT OF RELAXATION SHALL BE

INDIVIDUALLY CONFIGURABLE FOR EACH ZONE. THE ZONE SETPOINTS SHALL

AUTOMATICALLY RETURN TO THEIR PREVIOUS SETTINGS WHEN THE FACILITY

POWER CONSUMPTION DROPS BELOW THE THRESHOLDS.

ZONE SETPOINT ADJUST:

THE OCCUPANT SHALL BE ABLE TO ADJUST THE ZONE TEMPERATURE HEATING

AND COOLING SETPOINTS AT THE ZONE SENSOR.

ZONE OPTIMAL START:

THE UNIT SHALL USE AN OPTIMAL START ALGORITHM FOR MORNING START-UP.

THIS ALGORITHM SHALL MINIMIZE THE UNOCCUPIED WARM-UP OR COOL-DOWN

PERIOD WHILE STILL ACHIEVING COMFORT CONDITIONS BY THE START OF

SCHEDULED OCCUPIED PERIOD.

ZONE UNOCCUPIED OVERRIDE:

A TIMED LOCAL OVERRIDE CONTROL SHALL ALLOW AN OCCUPANT TO

OVERRIDE THE SCHEDULE AND PLACE THE UNIT INTO AN OCCUPIED MODE FOR

AN ADJUSTABLE PERIOD OF TIME. AT THE EXPIRATION OF THIS TIME, CONTROL

OF THE UNIT SHALL AUTOMATICALLY RETURN TO THE SCHEDULE.

FREEZE PROTECTION:

THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A

FREEZESTAT STATUS.

RETURN AIR SMOKE DETECTION:

THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A

RETURN AIR SMOKE DETECTOR STATUS.

SUPPLY FAN:

THE SUPPLY FAN SHALL RUN ANYTIME THE UNIT IS COMMANDED TO RUN,

UNLESS SHUTDOWN ON SAFETIES. TO PREVENT SHORT CYCLING, THE SUPPLY

FAN SHALL HAVE A USER DEFINABLE (ADJ.) MINIMUM RUNTIME.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

• SUPPLY FAN FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.

• SUPPLY FAN IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.

• SUPPLY FAN RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER

DEFINABLE LIMIT (ADJ.).

COOLING STAGES:

THE CONTROLLER SHALL MEASURE THE ZONE TEMPERATURE AND STAGE THE

COOLING TO MAINTAIN ITS COOLING SETPOINT. TO PREVENT SHORT CYCLING,

THERE SHALL BE A USER DEFINABLE (ADJ.) DELAY BETWEEN STAGES, AND

EACH STAGE SHALL HAVE A USER DEFINABLE (ADJ.) MINIMUM RUNTIME.

THE COOLING SHALL BE ENABLED WHENEVER:

• OUTSIDE AIR TEMPERATURE IS GREATER THAN 60°F (ADJ.).

• AND THE ECONOMIZER (IF PRESENT) IS DISABLED OR FULLY OPEN.

• AND THE ZONE TEMPERATURE IS ABOVE COOLING SETPOINT.

• AND THE SUPPLY FAN STATUS IS ON.

• AND THE HEATING IS NOT ACTIVE.

GAS HEATING STAGES:

THE CONTROLLER SHALL MEASURE THE ZONE TEMPERATURE AND STAGE THE

HEATING TO MAINTAIN ITS HEATING SETPOINT. TO PREVENT SHORT CYCLING,

THERE SHALL BE A USER DEFINABLE (ADJ.) DELAY BETWEEN STAGES, AND

EACH STAGE SHALL HAVE A USER DEFINABLE (ADJ.) MINIMUM RUNTIME.

THE HEATING SHALL BE ENABLED WHENEVER:

• OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJ.).

• AND THE ZONE TEMPERATURE IS BELOW HEATING SETPOINT.

• AND THE SUPPLY FAN STATUS IS ON.

• AND THE COOLING IS NOT ACTIVE.

PREFILTER HOURS:

THE CONTROLLER SHALL MONITOR THE FAN RUNTIME.

ALARMS SHALL BE PROVIDED AS FOLLOWS:

• PREFILTER CHANGE REQUIRED: PREFILTER HAS BEEN IN USE FOR MORE

THAN 2200 HRS (ADJ.).

RETURN AIR TEMPERATURE:

THE CONTROLLER SHALL MONITOR THE RETURN AIR TEMPERATURE AND USE

AS REQUIRED FOR ECONOMIZER CONTROL (IF PRESENT).

ALARMS SHALL BE PROVIDED AS FOLLOWS:

• HIGH RETURN AIR TEMP: IF THE RETURN AIR TEMPERATURE IS GREATER

THAN 90°F (ADJ.).

• LOW RETURN AIR TEMP: IF THE RETURN AIR TEMPERATURE IS LESS

THAN 45°F (ADJ.).

SUPPLY AIR TEMPERATURE:

THE CONTROLLER SHALL MONITOR THE SUPPLY AIR TEMPERATURE. 

ALARMS SHALL BE PROVIDED AS FOLLOWS:

• HIGH SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS GREATER

THAN 120°F  (ADJ.).

• LOW SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS LESS

THAN 45°F  (ADJ.).

OCCUPANCY SCHEDULE

OCCUPIED UNOCCUPIED WARM UP

MON THRU FRI

7:00 - 17:00

OTHERWISE

MON THRU FRI

6:00 - 7:00

SEQUENCE OF OPERATIONS

MATERIAL LIST

DESCRIPTIONTAG

CONTROL PANEL WIRING DETAIL

7

6

4

5

24VAC

TYPICAL SPLIT SYSTEM

UNIT CONTROL PANEL

SUPPLY FAN

COOLING STAGE-1 ENABLE

GAS HEAT STAGE-1 ENABLE

G

R

Y1

W1

10

N.O.

LOAD

SPLIT SYSTEM SUPPLY FAN

SUPPLY FAN

CURRENT STATUS

SWITCH

Por

CS1

DISCHARGE

AIR TEMP

SENSOR

Dat

TS2

GAS HT.

CURRENT STATUS SWITCH WIRING DETAIL

9

Fan

Cool1

Heat1

ROOM TEMP

SENSOR W/ OVRD.

TS1

SETPT RET

SETPT

SENSOR/BUTTON

SENSOR RET

SPACE TEMPERATURE

SENSOR WIRING DETAIL

17

18 Rmt

SEQUENCE OF OPERATION

OCCUPIED MODE: THE SUPPLY FAN WILL CYCLE ON WHEN THERE IS A CALL FOR

HEATING, COOLING OR IF THE FAN IS NOT IN THE "AUTO MODE". WHEN THE AVERAGE

ROOM TEMPERATURE IS ABOVE THE COOLING ENABLE TEMPERATURE SETPOINT 72

°F (ADJ), MECHANICAL COOLING WILL BE ENABLED TO MAINTAIN THE ROOM COOLING

TEMPERATURE SETPOINT. WHEN THE AVERAGE ROOM TEMPERATURE IS BELOW THE

HEATING ENABLE TEMPERATURE SETPOINT 70 °F (ADJ), THE GAS HEATER WILL BE

ENABLED TO MAINTAIN THE ROOM HEATING TEMPERATURE SETPOINT.

UNOCCUPIED MODE: THE SUPPLY FAN, COOLING AND HEATING WILL BE OFF. IF THE

AVERAGE ROOM TEMPERATURE FALLS BELOW THE NIGHT SETBACK TEMPERATURE

SETPOINT 60 °F (ADJ), THE SUPPLY FAN WILL START AND THE GAS HEATER WILL BE

ENABLED UNTIL THE ROOM TEMPERATURE RISES TO 5°F ABOVE THE NIGHT SETBACK

TEMPERATURE SETPOINT. IF THE AVERAGE ROOM TEMPERATURE RISES ABOVE THE

NIGHT SETUP TEMPERATURE SETPOINT 80 °F (ADJ), THE SUPPLY FAN WILL START AND

MECHANICAL COOLING WILL BE ENABLED UNTIL THE ROOM TEMPERATURE FALLS TO

5°F BELOW THE NIGHT SETUP TEMPERATURE SETPOINT.

OVERRIDE MODE: THE THERMOSTAT OVERRIDE BUTTON WILL BE AVAILABLE TO

OCCUPANTS TO CHANGE MODE TO OCCUPIED DURING UNOCCUPIED HOURS. THE

THERMOSTAT SET POINT SLIDER WILL BE AVAILABLE TO OCCUPANTS TO MOVE THE

SETPOINT +/- 3 °F.

TS2 4" DUCT TEMPERATURE SENSOR

CS1 SOLID CORE CURRENT SWITCH

TS1 ROOM TEMPERATURE SENSOR PLUS

RA

OA

SA

1211

SPLIT SYSTEM

1

SPLIT SYSTEM FURNACE UNIT

NOT TO SCALE

THERMAL COMPONENTS INC.

BRANDON ACKLEY

(816) 607-6140

CAMPUS CONTROL SYSTEM

CONTACT INFORMATION

BID SET

Page 21: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

103

ELEC

105

LAUNDRY

102

CAN WASH

101

CORRIDOR

106

MECH

107

STORAGE

109

LOCKERS

111

STORAGE

110

TLT

112

OFFICE

114

SERVING

113

KITCHEN

115

CHEM STOR

104

PUMPS

117

SKULLERY

M

121

SOUPS & SALADS

PIPING LOCATED ABOVE

CEILING AND BELOW

MEZZANINE FLOOR

180° HWR (E)

180° HWS (E)

DCW (E)

140° HWS (E)

140° HWR (E)

LADDER UP TO

ROOF

LADDER UP TO

MEZZANINE

FROM 1ST FLOOR

CONNECT NEW 3/4"

DCW TO EXISTING

3" LINE

ROUTE UP TO JUST BELOW

ROOF STRUCTURE

HB-1

INSTALL HOSE BIBB SUCH THAT

FAUCET OPENING FACES ROOF

HATCH

DCW (E)

2

1

3

4

4"

CONNECT CONDENSATE

DRAIN TO EXISTING CD

LINE, FIELD VERIFY

LOCATION

116

OFFICE

DEPICTS MEZZANINE

AREA

9

DOMESTIC WATER

ENTRY. ISOLATION

VALVE IN VERTICAL.

NATURAL GAS ENTRY

SUPPLIES 2,624 MBH

EXISTING ABANDONED

IN PLACE DOMESTIC

WATER HEATER TO

REMAIN.

EXISTING DOMESTIC

WATER HEATER

10

ROOF HATCH

ISOLATION VALVE

PEX-A, UPONOR RUNOUT

WITH ISOLATION VALVE AND

COPPER TERMINATION

RTU-1

RTU-2

RTU-3

RTU-4

RTU-6

RTU-5

RTU-7

CU-3

CU-4

3"

G

G

GG

3"

1-1/2"

2"

1-1/2"

1-1/2"

2-1/2"

1-1/2"

2"

1-1/2"

1-1/2"

5

4"

ROOF HATCH

6 7TYP

8

G

3/4"

EXHAUST FAN

HOOD (E)

WALK-IN COOLER

CONDENSING

UNIT (E)

VTR (R)

VTR (R)

ROUTE

BELOW ROOF

ROUTE BELOW

ROOF

ROUTE BELOW

ROOF

12

1212

VTR (R)

13

13

13

TYP

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:4

2 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\P

-1

01

.d

wg

P-101

PLUMBING PLANS

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

1

PLUMBING PLAN

1/8" = 1'-0"

2

ROOF PLUMBING PLAN

1/8" = 1'-0"

1. EXISTING TO REMAIN.

2. REMOVE EXISTING GAS PIPING SERVING DEMO'D

BOILERS TO HERE, CAP AND SEAL.

3. CONNECT NEW 4" GAS LINE TO EXISTING 4" LINE HERE.

4. ROUTE 4" GAS LINE UP TO ROOF.

5. RE: 1/P-501 FOR PIPE SUPPORT DETAIL (TYP)

6. RE: 6/P-501 FOR CONDENSATE DRAIN DETAIL.

7. RE: 1/P-501 FOR GAS CONNECTION DETAIL.

8. ROUTE GAS LINE DOWN TO FURNACE. USE

PENETRATION HOOD WITH REFRIGERATION LINES, RE:

10/M-501 FOR DETAIL.

9. 3/4" GAS DOWN FROM ROOF, RE: 2/P-501 FOR GAS

CONNECTION DETAIL.

10. CAP EXISTING GAS CONNECTION AND ABANDON LINE IN

PLACE.

11. RTU LOCATIONS ARE BASED ON THE APPROXIMATE

LOCATIONS OF NEW STRUCTURAL ELEMENTS. NEW

STRUCTURAL ELEMENT LOCATIONS MAY BE ADJUSTED

DEPENDING ON EXISTING FIELD CONDITIONS. SHIFT RTU

LOCATIONS ACCORDINGLY. COORDINATE WITH

STRUCTURAL ENGINEER.

12. NEW VTR LOCATION, ATTACH VTR TO SCREEN WALL

STRUCTURAL SUPPORT. RE: 11/M-501 FOR VTR

SUPPORT DETAIL.

13. SEAL EXISTING ROOF PENETRATION PER

ARCHITECTURAL.

KEYNOTES

N

N

BID SET

Page 22: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

ENGINEER OF RECORD

MICHAEL D. OBERMARK, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MDO

GDT

1 11/1/2016

Prin

te

d: 1

1/3

/2

01

6 9

:3

5:4

4 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\P

-5

01

.d

wg

P-501

PLUMBING DETAILS

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

1

ROOF MOUNTED GAS EQUIPMENT

CONNECTION DETAIL

NOT TO SCALE

DETAIL NOTE:

1. CONNECTION SIMILAR AT GAS LINES PENETRATING ROOF EQUIPMENT OR PIPE

PENETRATION.

2. CONTRACTOR TO VERIFY GAS PRESSURE AND TO ADD REGULATOR IF NEEDED.

UNION

SHUT-OFF VALVE

TEE WITH CAPPED 1/8"

PRESSURE GAUGE

CONNECTION, TYP

INSTALL GAS PIPING TO ALLOW

FULL OPENING OF ALL

EQUIPMENT/ACCESS PANELS

COOPER B-LINE

DURA-BLOK PIPE

SUPPORT

ROOF

DIRT LEG (FULL LINE SIZE)

2

FURNACE GAS

CONNECTION DETAIL

NOT TO SCALE

G

DETAIL NOTE:

1. THE CONTRACTOR SHALL INSTALL THE GAS TRAIN PER THE SPECIFIC

APPLIANCE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND PER ALL

LOCAL CODES AND ORDINANCES. THE MANUFACTURER'S INSTALLATION

INSTRUCTIONS AND CODES AND ORDINANCES SHALL TAKE PRECEDENCE

OVER SPECIFICATIONS AND DRAWINGS WHERE THERE IS A CONFLICT.

2. CONTRACTOR TO VERIFY GAS PRESSURE AND TO ADD REGULATOR IF

NEEDED.

SHUT-OFF VALVE

TEE WITH CAPPED 1/8" PRESSURE

GAUGE CONNECTION, TYP

6" (MINIMUM) DIRT LEG

INSTALL GAS PIPING TO ALLOW

FULL OPENING OF ALL

EQUIPMENT/ ACCESS PANELS

REFER TO PLANS FOR SIZE

AND CONTINUATION

UNION

3

TYPICAL PENETRATION DETAIL

NOT TO SCALE

4

PIPE PENETRATION DETAIL

NOT TO SCALE

DETAIL NOTES:

1. FOR INSULATED PIPING SIZE SLEEVE ACCORDINGLY.

2. PROVIDE ESCUTCHEONS OR ANGLED STRIPS WHERE

PENETRATIONS ARE EXPOSED TO VIEW.

CONCRETE OR

MASONRY WALL

FIRE-RATED SEALANT FOR RATED

WALLS (SEE ARCHITECTURAL

DRAWINGS FOR LOCATIONS)

PIPE SLEEVE FOR ALL MASONRY WALLS

AND RATED WALLS (SEE ARCHITECTURAL

DRAWINGS FOR LOCATIONS)

STUD WALL

PACK WITH FIBROUS

MATERIAL AND CAULK

ALL AROUND

DUCT, PIPE OR

CONDUIT

TEE WITH CAPPED 1/8" PRESSURE

GAGE CONNECTION

1" DRAW

BAND

NEOPRENE

RUBBER

FLASHING 8" HIGH WITH

4" FLANGE

ROOF FASTENERS 6"

O.C.

SET IN

NON-HARDENING

SEALANT

ROOF

GAS VALVE

MIN 3" DIRT LEG

(FULL SIZE)

UNION

PLUMBING FIXTURE SCHEDULE

MARK FIXTURE

MANUFACTURER

MODEL

TRIM

CONNECTIONS

WASTE VENT DCW DHW

HB-1 HOSE BIBB

ZURN

Z1341

ANTI-SIPHON VACUUM BREAKER; CHROME FINISH;

3/4" HOSE THREAD; WITH OPTIONAL METAL WHEEL

HANDLE

-- -- 3/4 --

5

FURNACE CONDENSATE DETAIL

NOT TO SCALE

6

RTU CONDENSATE DETAIL

NOT TO SCALE

B

A

B = GREATER OF 2" OR 1" PLUS (DRAWTHRU) UNIT

TOTAL PRESSURE IN INCHES-WC

A = GREATER OF 4" OR 1" PLUS (BLOWTHRU) UNIT TOTAL

PRESSURE IN INCHES-WC

SLOPE LINE AT

MINIMUM 1/8"

PER FOOT

CONNECT TO CD

PIPING, REFER

TO PLANS

FURNACE

THREADED TEE, WITH EXTENDED

NECK AND CAP FOR CLEANING

TRAP

SEE DRAWING

FOR SIZE

ROOF

2"

MIN

.

2"

MIN

.

5"

MIN

.

EQUIPMENT DRAIN PAN

2" NIPPLE

PIPE PLUG CLEAN OUT

VENT TOP BELOW DRAIN

PAN

5" NIPPLE5" MIN. NIPPLE

PIPE PLUG CLEAN OUT

SPLASH BLOCK

PIPE SUPPORT

2" NIPPLE

BID SET

Page 23: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

ENGINEER OF RECORD

MATTHEW RUTKOWSKI, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MJR

JWE

1 11/1/2016

MATTHEWRUTKOWSKI

28077

L

I

C

E

NS

E

D

P

R

O

F

E

SS

IO

N

A

L

E

N

G

IN

E

E

R

O

K

L

AH

O

M

A

Prin

te

d: 1

1/3

/2

01

6 1

1:3

3:4

3 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\E

-0

01

.d

wg

E-001

ELECTRICAL SPECIFICATIONS

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

PART 1 GENERAL

1.1 GENERAL PROVISIONS:

A. FURNISH ALL LABOR, MATERIAL, EQUIPMENT, TOOLS AND

TEMPORARY POWER REQUIRED TO COMPLETE THE INSTALLATION OF

THE ELECTRICAL SYSTEMS.

B. OBTAIN ALL PERMITS, INSPECTIONS AND APPROVALS AS REQUIRED

BY THE LOCAL AUTHORITIES HAVING JURISDICTION (AHJ). ALL

ASSOCIATED FEES SHALL BE PAID BY THE CONTRACTOR AND/OR

CONSTRUCTION MANAGER. COORDINATE WITH THE CONSTRUCTION

MANAGER.

C. ALL MATERIALS, EQUIPMENT AND SYSTEM APPURTENANCES OF THE

ELECTRICAL SYSTEMS NECESSARY FOR ITS PROPER OPERATION

AND INSTALLATION, BUT NOT NECESSARILY STATED OR SHOWN ON

THE DRAWINGS SHALL BE PROVIDED BY THE ELECTRICAL

CONTRACTOR AND BE INCLUDED IN THEIR SCOPE OF WORK AND BID.

D. THE ELECTRICAL CONTRACTOR SHALL FULFILL ALL REQUIREMENTS

OF THE CONTRACT DOCUMENTS AND SHALL COMPLETE THE

IMPROVEMENTS SHOWN IN THE CONTRACT DOCUMENTS. ALL

SYSTEMS SHALL BE PROVIDED AND PROVEN TO BE FULLY

OPERATIONAL AND FUNCTIONAL.

E. WORK SHALL BE IN ACCORDANCE WITH ALL OF THE FOLLOWING

MINIMUM APPLICABLE REQUIREMENTS OF THE LATEST GOVERNING

CODES. FINAL APPROVAL OF ALL WORK SHALL BE IN COMPLIANCE

WITH THE AUTHORITIES HAVING JURISDICTION. WHERE THERE ARE

CONFLICTS WITH CODES AND OR AUTHORITIES HAVING

JURISDICTION, THE MOST STRINGENT SHALL APPLY AND BE

IMPLEMENTED.

1. NATIONAL ELECTRICAL CODE (NEC)

2. INTERNATIONAL BUILDING CODE (IBC)

3. INTERNATIONAL MECHANICAL CODE (IMC)

4. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

5. AMERICANS WITH DISABILITIES ACT (ADA)

6. LOCAL CODES AND AMENDMENTS

7. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)

8. OWNER'S CONSTRUCTION STANDARDS

9. BUILDING STANDARDS

F. MATERIALS AND EQUIPMENT SHALL BE NEW AND SHALL CONFORM TO

THE FOLLOWING CURRENT APPLICABLE INDUSTRY STANDARDS:

1. NEMA (NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION)

2. ANSI (AMERICAN NATIONAL STANDARDS INSTITUTE)

3. UL (UNDERWRITERS LABORATORIES)

4. IEEE (INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS)

5. IPCEA (INSULATED POWER CABLE ENGINEERS ASSOCIATION)

G. PRIOR APPROVAL REQUESTS: ALL PRIOR APPROVAL REQUESTS FOR

EQUIPMENT AND MATERIALS SHALL BE SUBMITTED FOR ENGINEER

REVIEW PRIOR TO BID IN ACCORDANCE WITH THE CONTRACT

DOCUMENTS. UNLESS NOTED OTHERWISE, PRIOR APPROVAL

REQUESTS SHALL BE SUBMITTED TEN DAYS PRIOR TO BID.

H. CONTRACTOR SHALL REVIEW ALL DOCUMENTS, PRIOR TO

SUBMITTING BID PROPOSAL, INCLUDING, BUT NOT LIMITED TO,

REFLECTED CEILING PLANS, ARCHITECTURAL DETAILS, MECHANICAL

DRAWINGS, AND MECHANICAL SCHEDULES. REQUIREMENTS AND

INFORMATION NECESSARY FOR THE ELECTRICAL MAY BE FOUND IN

OTHER DISCIPLINE'S DOCUMENTS.

I. COORDINATE AND VERIFY ALL WORK SHOWN ON THESE DOCUMENTS

WITH ALL OTHER DISCIPLINE'S CONTRACT DOCUMENTS DRAWINGS

AND EXISTING CONDITIONS. IT IS THE RESPONSIBILITY OF THIS

CONTRACTOR TO NOTIFY THE ENGINEER IN WRITING OF

DISCREPANCIES FOUND.

J. COORDINATE WITH THE WORK OF ALL OTHER TRADES INVOLVED IN

THIS PROJECT. IT IS THE RESPONSIBILITY OF THE ELECTRICAL

CONTRACTOR TO VERIFY THE ACTUAL LOCATION OF THE EQUIPMENT,

DUCTWORK, PIPING, STRUCTURE, ETC., AND COORDINATE THE

INSTALLATION ACCORDINGLY.

K. CONTRACTOR SHALL SURVEY SITE DURING BIDDING PROCESS AND

FULLY FAMILIARIZE THEMSELVES WITH ALL CONDITIONS THAT

AFFECT THE WORK OR COST THEREOF. PROVIDE REQUESTS FOR

INFORMATION, AS REQUIRED AND IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

L. THE ELECTRICAL SYSTEMS SHOWN ON THE DRAWINGS ARE

DIAGRAMMATIC. EXACT LOCATION OF EQUIPMENT SHALL BE

COORDINATED WITH ENGINEER, OTHER TRADES AND FIELD

CONDITIONS.

M. CONDUIT RUNS SHOWN ARE DIAGRAMMATIC IN NATURE.

CONTRACTOR IS RESPONSIBLE FOR SIZING AND LOCATING PULL

BOXES PER NEC AND FOR COORDINATION WITH OTHER TRADES.

N. EQUIPMENT SHOWN ON DRAWINGS REPRESENTS ONE

MANUFACTURER. CONTRACTOR SHALL CONFIRM SUBMITTED

EQUIPMENT WILL FIT THE SPACE AS SHOWN ON THE CONTRACT

DOCUMENTS AND MAINTAIN ALL WORKING CLEARANCE

REQUIREMENTS PER NATIONAL ELECTRICAL CODE OR AS REQUIRED

BY THE AUTHORITIES HAVING JURISDICTION.

O. DO NOT SCALE OR DIMENSION LOCATIONS FROM THESE DRAWINGS.

P. SUBMITTALS: THE ELECTRICAL CONTRACTOR SHALL SUBMIT

INFORMATION FOR ENGINEER REVIEW, INCLUDING BUT NOT LIMITED

TO, ALL OF THE FOLLOWING EQUIPMENT: LIGHT FIXTURES, CONDUIT,

BOXES, DISCONNECT SWITCHES, CONDUCTORS, ETC. SUBMITTALS

SHALL BE NEATLY BOUND WITH EXACT MODEL NUMBER PROVIDED

AND CLEARLY MARKED. SUBMITTALS SHALL INCLUDE, BUT NOT BE

LIMITED TO: FINISHES, PHYSICAL SIZE, LISTINGS, PERFORMANCE

INFORMATION, AND FABRICATION MATERIALS. SUBMITTALS SHALL BE

DIVIDED INTO TABBED SECTIONS WITH SPECIFICATIONS SECTION

NUMBERS REFERENCED ON EACH TAB. IF A SUBMITTED LIGHT

FIXTURE IS DIFFERENT THAN THE EXACT SPECIFIED LIGHT FIXTURE,

LIGHTING PHOTOMETRICS SHALL BE PROVIDED BY THE CONTRACTOR

TO THE ENGINEER WITH THE SUBMITTALS.

PART 2 PRODUCTS

2.1. MATERIALS, EQUIPMENT, AND DEVICES SHALL BE LISTED AND

LABELED BY A NATIONALLY RECOGNIZED AND APPROVED TESTING

AGENCY AS OUTLINED IN THE NATIONAL ELECTRICAL CODE.

2.2. FIRESTOPPING MATERIAL SHALL BE MANUFACTURED BY 3M OR

ENGINEER APPROVED EQUAL.

2.3. CONDUIT RACEWAYS:

A. CONDUIT SIZES SHOWN ON DRAWINGS ARE BASED ON THHN/THWN

INSULATION AND EMT. CONTRACTOR SHALL ADJUST CONDUIT SIZE

FOR CONDUCTORS OF DIFFERENT INSULATION AND CONDUIT OTHER

THAN EMT.

B. CONDUIT TYPES PERMITTED:

1. RIGID METAL CONDUIT (RMC)-EXTERIOR ABOVE GRADE.

2. ELECTRICAL METALLIC TUBING (EMT)-INTERIOR.

3. LIQUID TIGHT FLEXIBLE METAL CONDUIT: SEAL-TIGHT, WITH PVC

JACKET. FINAL CONNECTIONS TO MECHANICAL EQUIPMENT. NOT

TO EXCEED 6'-0".

4. METAL CLAD CABLE (MC)-MAY BE USED FOR FIXTURE WHIPS.

WHIPS SHALL NOT EXCEED 6'-0" IN LENGTH AND MAY BE USED FOR

INTERIOR CONCEALED LOCATIONS.

5. FLEXIBLE METAL CONDUIT (FMC) - FINAL CONNECTIONS TO LIGHT

FIXTURES, EQUIPMENT SUBJECT TO VIBRATION, NOISE

TRANSMISSION, OR MOVEMENT; AND FOR MOTORS. NOT TO

EXCEED 6'-0".

6. INTERMEDIATE METAL CONDUIT (IMC)-USES PERMITTED BY NEC.

ALL CONDUITS NOT SPECIFICALLY LISTED ABOVE SHALL NOT BE

ALLOWED.

C. STEEL CONDUIT:

1. "HEAVY WALL" GALVANIZED RIGID METAL CONDUIT (RMC) SHALL BE

USED IN WET LOCATIONS OR WHERE THE RACEWAY MAY BE

EXPOSED TO WEATHER OR SUBJECT TO MECHANICAL DAMAGE.

WHERE EXTERIOR CONDUITS TERMINATE AT AN INTERIOR PANEL,

PROVIDE CABLE TERMINATORS TO SEAL CONDUITS FROM WATER

ENTRY.

2. "THIN WALL" GALVANIZED ELECTRICAL METALLIC TUBING (EMT)

SHALL BE USED IN WALLS, CEILINGS, AND FOR EXPOSED SURFACE

MOUNTED OUTLET LOCATIONS.

3. FLEXIBLE STEEL CONDUIT, USE 1/2" MINIMUM. FLEXIBLE CONDUIT

SHALL BE USED FOR THE FOLLOWING APPLICATION ONLY.

a. FOR FINAL CONNECTION TO MOTOR. 6'-0” MAX.

b. FROM BOX TO RECESSED LIGHTING FIXTURE 4' MIN., 6' MAX.

D. MINIMUM INTERIOR CONDUIT SIZE SHALL BE 1/2”, MINIMUM EXTERIOR

CONDUIT SIZE SHALL BE 3/4".

E. UNLESS NOTED OTHERWISE NON-METALLIC RACEWAYS ARE

PROHIBITED.

2.4 OUTLET BOXES AND CONDUIT FITTINGS:

A. FURNISH OUTLETS AND BOXES WHERE REQUIRED BY DOCUMENTS,

EQUIPMENT REQUIREMENTS, OR CODE. ALL OUTLET AND SWITCH

BOXES SHALL BE SIZED TO PROVIDE SPACE FOR WIRING DEVICES,

CONDUCTORS, AND GROUNDING CONDUCTORS. NON-METALLIC

OUTLET BOXES ARE NOT ACCEPTABLE.

B. INTERIOR BOXES SHALL BE HOT-DIPPED GALVANIZED, 4 INCH

MINIMUM SQUARE 1-1/2 INCH DEEP, UNLESS OTHERWISE NOTED. BOX

OPENING FOR OUTLETS INSTALLED FLUSH IN DRYWALL MAY BE

SINGLE OR MULTIPLE GANG (MUD-RING) AS REQUIRED. BOXES SHALL

BE SET BACK TO ALLOW THE INSTALLATION OF A SQUARE CUT AND

RAISED ADAPTER RING; DEPTH OF RAISED PORTION SHALL MATCH

THE WALL CONSTRUCTION.

C. PULL AND JUNCTION BOXES ARE NOT COMPLETELY SHOWN ON

DRAWINGS. THEY SHALL BE INSTALLED WHERE REQUIRED, IN

ACCORDANCE WITH THE NEC. ALL BOXES SHALL BE CONSTRUCTED

OF #14 GAUGE MINIMUM HOT DIPPED GALVANIZED STEEL, CAST OR

SHEET ALUMINUM WITH SCREWED OR HINGED COVER. FASTENERS

SHALL BE BRASS OR ZINC COATED SCREWS. WHERE EXPOSED TO

WEATHER, MOISTURE-TIGHT GASKET SHALL BE PROVIDED.

ELECTRICAL BOXES WITH UNUSED KNOCKOUTS SHALL BE PLUGGED.

ALL BOXES SHALL BE OF ADEQUATE SIZE WITHOUT THE USE OF

EXTENSION RINGS.

D. PROVIDE A BLANK COVER FOR EACH BOX WHERE A DEVICE IS NOT

INSTALLED.

E. UNLESS OTHERWISE NOTED NON-METALLIC BOXES ARE PROHIBITED.

F. CONDUIT CONNECTORS:

1. ALL FITTINGS FOR RIGID METAL CONDUITS SHALL BE THREADED

TYPE UNLESS NOTED OTHERWISE.

2. INDOOR EXPOSED EMT FITTINGS SHALL BE STEEL COMPRESSION

TYPE FOR ALL SURFACE MOUNT OR EXPOSED RACEWAY BELOW

10'-0". SCREW TYPE COUPLINGS AND FITTINGS MAY BE USED

WHERE CONDUIT IS ROUTED CONCEALED IN WALLS OR IN CEILING

ABOVE 10'-0".

3. INDOOR CONCEALED EMT FITTINGS MAY BE SET SCREW TYPE.

4. OUTDOOR RMC OR IMC CONNECTIONS INTO SHEET METAL BOXES

SHALL BE MADE WITH MEYERS SEAL-TIGHT HUBS WHERE

ENTERING FROM THE SIDE OR TOP OF BOX.

5. THREADLESS RMC OR IMC FITTINGS SHALL NOT BE USED. INDOOR

RMC OR IMC CONNECTIONS SHALL BE MADE WITH DOUBLE LOCK

NUTS AND BUSHINGS.

6. INDOOR MC FITTINGS SHALL BE SET SCREW TYPE. PROVIDE ANTI

SHORT BUSHINGS.

G. COMPLY WITH NECA FOR INSTALLATION OF HANGERS, AND

RACEWAYS FOR ELECTRICAL EQUIPMENT AND SYSTEMS EXCEPT IF

REQUIREMENTS IN THIS SECTION ARE MORE STRINGENT.

2.5 SUPPORTING DEVICES:

A. ANCHORS AND FASTENERS

1. STEEL STRUCTURAL ELEMENTS: USE BEAM CLAMPS. WELDED

FASTENERS MAY BE USED WITH APPROVAL FROM STRUCTURAL

ENGINEER.

2. CONCRETE SURFACES: USE SELF-DRILLING ANCHORS AND

EXPANSION ANCHORS.

3. MASONRY, PLASTER, AND GYPSUM BOARD: USE TOGGLE BOLTS

AND HOLLOW WALL FASTENERS.

4. SOLID MASONRY WALLS: USE EXPANSION ANCHORS.

5. SHEET METAL: USE SHEET METAL SCREWS.

6. WOOD ELEMENTS: USE WOOD SCREWS.

B. INSTALLATION

1. INSTALL PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S

INSTRUCTIONS.

2. DO NOT FASTEN SUPPORTS TO PIPES, DUCTS, MECHANICAL

EQUIPMENT, AND CONDUIT.

3. DO NOT USE SPRING STEEL CLIPS AND CLAMPS.

4. DO NOT USE POWDER-ACTUATED ANCHORS.

5. DO NOT DRILL OR CUT STRUCTURAL MEMBERS.

6. PROVIDE SUPPORTS LOCATED PER NEC CODE.

7. NO RACEWAYS SHALL BE SUPPORTED FROM CEILING, CEILING GRID

SUPPORTS OR OTHER TYPE OF SUPPORT WIRE.

C. COMPLY WITH NECA FOR INSTALLATION OF SUPPORTS FOR

ELECTRICAL EQUIPMENT AND SYSTEMS EXCEPT IF REQUIREMENTS IN

THIS SECTION ARE STRICTER.

2.6 CONDUCTORS:

A. CONDUCTORS AS INDICATED AND REQUIRED BY THE DRAWINGS

SHALL BEAR THE UL LABEL AND STAMPING INDICATING CONDUCTOR

SIZE, TYPE, VOLTAGE, AND GRADE, AND SHALL MEET THE STANDARD

SPECIFICATIONS AND TEST ESTABLISHED FOR SUCH MATERIALS AND

CONSTRUCTION BY ASTM, NEMA, ANSI, AND IPCEA WHERE

APPLICABLE.

B. CONDUCTOR SHALL BE CODE GAUGE, SOFT COPPER, NOT LESS THAN

98% CONDUCTIVITY AND OF THE 600 VOLT INSULATION UNLESS

OTHERWISE NOTED.

C. COLOR CODE CONDUCTORS IN ACCORDANCE WITH NEC, LOCAL

CODES, AND THE FOLLOWING:

1. 120/208 VOLT

PHASE A BLACK

PHASE B RED

PHASE C BLUE

NEUTRAL WHITE

GROUND GREEN

SWITCH LEG PURPLE

3 WAY TRAVELER PINK

D. #10 AWG AND SMALLER CONDUCTORS SHALL BE COLOR CODED BY A

CONTINUOUS OUTER COVERING. CONDUCTORS LARGER THAN #10

AWG MAY BE COLOR CODED BY TAPE OR CONTINUOUS OUTER

COVERING.

E. BRANCH CIRCUITS, INCLUDING IN CRAWLSPACES: TYPE THHN-THWN,

SINGLE CONDUCTORS IN RACEWAY.

F. BRANCH CIRCUIT AND FEEDER CONDUCTORS SIZE #10 AWG AND

SMALLER SHALL BE SOLID. BRANCH CIRCUIT AND FEEDER

CONDUCTORS SIZE #8 AWG AND LARGER SHALL BE STRANDED.

2.7 CONDUCTOR CONNECTIONS AND DEVICES:

A. MAKE SPLICES IN #8 AWG AND SMALLER WITH INSULATED TWIST-ON

WIRE CONNECTORS. MAKE SPLICES IN #6 AWG AND LARGER WITH

CU/AL LISTED COMPRESSION CONNECTORS.

B. DO NOT INSTALL MORE THAN THREE PHASE, ONE NEUTRAL, ONE

INSULATED EQUIPMENT GROUNDING CONDUCTOR AND/OR ISOLATED

GROUND CONDUCTORS IN ANY ONE CONDUIT, UNLESS NOTED

OTHERWISE. ALL CONDUITS SHALL CONTAIN A SEPARATE INSULATED

EQUIPMENT GROUNDING CONDUCTOR.

C. RECEPTACLE DEVICES SHALL BE GROUNDING TYPE COMMERCIAL

GRADE AS FOLLOWS:

1. DUPLEX RECEPTACLE 20A 125V, NEMA 5-20R

2. BACK AND SIDE WIRED

3. EXTERIOR DUPLEX 20A 125V, NEMA 5-20R GFCI PROTECTED

4. GROUND FAULT CIRCUIT INTERRUPTER 20A 125V, NEMA 5-20R

D. SWITCHES SHALL BE COMMERCIAL GRADE, BACK AND SIDE WIRED,

120/277V AND 20A RATED.

E. FINISH OF DEVICES AND COVER PLATES SHALL MATCH EXISTING.

F. COVER PLATES:

1. MATERIAL OF INTERIOR DEVICE COVER PLATES SHALL MATCH

EXISTING.

2. WEATHERPROOF WHILE IN USE COVER PLATES SHALL BE CAST

METAL. PLASTIC WEATHERPROOF COVER PLATES WILL NOT BE

ALLOWED.

G. ACCEPTABLE MANUFACTURERS:

1. WIRING DEVICES AND PLATES AS MANUFACTURED BY ARROW

HART, P&S, BRYANT, HUBBELL, LEVITON, GE OR APPROVED

EQUALS.

2. DEVICES OR PLATES FOUND NOT TO BE AS SPECIFIED SHALL BE

REMOVED AND REPLACED WITH SPECIFIED DEVICE AT

CONTRACTOR'S EXPENSE.

2.8 LIGHTING:

A. LIGHTING FIXTURES SHALL BE BASED ON LIGHT FIXTURES SPECIFIED

IN LIGHT FIXTURE SCHEDULE.

2.9 SAFETY SWITCHES:

A. MANUFACTURERS: SUBJECT TO COMPLIANCE WITH REQUIREMENTS,

PROVIDE SWITCHES BY ONE OF THE FOLLOWING:

1. EATON ELECTRICAL INC.; CUTLER-HAMMER PRODUCTS

2. GENERAL ELECTRIC

3. SQUARE D

4. SIEMENS

B. FURNISH FUSIBLE OR NON-FUSIBLE SWITCHES AS SHOWN ON THE

DRAWINGS. SWITCHES SHALL BE HORSEPOWER-RATED. INDOOR

SWITCHES SHALL BE NEMA 1; OUTDOOR SWITCHES SHALL BE NEMA

3R, UNLESS NOTED OTHERWISE. SWITCHES SHALL BE RATED FOR

THE CONNECTED SYSTEM VOLTAGE. SWITCHES SHALL BE HEAVY

DUTY QUICK MAKE, QUICK BREAK. FURNISH REJECTION TYPE FUSE

HOLDERS AND TYPE R FUSES UNLESS OTHERWISE NOTED.

2.10 IDENTIFICATION:

A. PROVIDE ELECTRICAL IDENTIFICATION FOR EACH PANELBOARD,

SWITCHBOARD, AND DISCONNECT. UTILIZE ENGRAVED ACRYLIC OR

MELAMINE NAMEPLATE IN CONTRASTING COLORS AND OF SIZE

APPROVED BY ENGINEER. MECHANICALLY CONNECT NAMEPLATE

WITH STAINLESS-STEEL SCREWS OR STAINLESS-STEEL MACHINE

SCREWS WITH NUTS, FLAT WASHERS, AND LOCK WASHERS.

B. NAMEPLATES

1. NAMEPLATES SHALL BE 4"X1"X1/8" MINIMUM WITH WHITE CORE,

BLACK FACE, ACRYLIC OR MELAMINE WITH ENGRAVED 3/8”

MINIMUM LETTERS.

C. PROVIDE PANEL DESIGNATION AND CIRCUIT NUMBER FOR ALL

ELECTRICAL JUNCTION BOX COVERS. PROVIDE SELF-ADHESIVE

VINYL LABELS: PREPRINTED, FLEXIBLE LABEL LAMINATED WITH A

CLEAR, WEATHER-AND CHEMICAL-RESISTANT COATING. PERMANENT

MARKER IS ACCEPTABLE FOR ALL JUNCTION BOXES LOCATED ABOVE

CEILINGS.

PART 3 - EXECUTION

3.1 PREPARATION:

A. COORDINATE:

1. COORDINATE THE INSTALLATION OF ELECTRICAL WITH THE

SCHEDULE AND WORK OF OTHER TRADES TO PREVENT

UNNECESSARY DELAYS AND OR COSTS IN THE TOTAL WORK.

2. COORDINATE WITH MECHANICAL AND OR CONTROLS CONTACTOR

FOR TEMPERATURE CONTROL AND INTERLOCK WIRING

REQUIREMENTS PRIOR TO SUBMITTING BID PROPOSAL.

3.2 INSTALLATION OF RACEWAYS AND FITTINGS:

A. SECURELY AND RIGIDLY SUPPORT CONDUITS TO SUPER STRUCTURE

THROUGHOUT THE WORK.

B. INSTALL RACEWAYS PARALLEL AND PERPENDICULAR TO SURFACES

OF STRUCTURAL MEMBERS. FOLLOW SURFACE CONTOURS, WHERE

POSSIBLE, IN EXPOSED AREAS.

C. COMPLY WITH ALL APPLICABLE NECA STANDARDS FOR INSTALLATION

OF HANGERS, SUPPORTS AND RACEWAYS FOR ELECTRICAL

EQUIPMENT AND SYSTEMS.

D. USE FLEXIBLE METALLIC CONDUIT ONLY FOR SHORT MOTOR

CONNECTIONS, OR WHERE SUBJECT TO VIBRATION.

E. CONDUITS THROUGH PERIMETER BUILDING WALLS SHALL HAVE

INTERNAL AND EXTERNAL SEALS.

3.3 INSTALLATION OF CONDUCTORS:

A. NO CONDUCTOR SHALL BE SMALLER THAN #12 AWG, EXCEPT THAT

WIRING FOR SIGNAL AND PILOT CONTROL CIRCUITS MAY BE #14 AWG,

UNLESS NOTED OTHERWISE.

3.4 CONDUCTOR CONNECTIONS AND DEVICES:

A. ALL ELECTRICAL CONNECTIONS SHALL BE MADE IN ACCORDANCE

WITH ARTICLE 110 OF THE NEC.

B. ALL 120 VOLT 20A RECEPTACLES IN THE FOLLOWING LOCATIONS

SHALL BE GFCI OR BE PROVIDED WITH GFCI PROTECTION:

MECHANICAL ROOM, ELECTRICAL ROOM, JANITOR'S CLOSET, WITHIN

6 FEET OF A PLUMBING FIXTURE, AND WHERE REQUIRED BY THE

NATIONAL ELECTRICAL CODE. ALL OUTDOOR RECEPTACLES SHALL

HAVE IN-USE WEATHER-PROOF COVERS.

3.5 IDENTIFICATION AT PANELS:

A. PANEL DIRECTORIES SHALL BE TYPED AND FILLED OUT BY

ELECTRICAL CONTRACTOR AFTER TESTING AND CHECKOUT AND BE

MOUNTED IN DIRECTORY FRAME INSIDE OF PANEL DOOR. PROVIDE

ACCURATE TYPED PANELBOARD SCHEDULES IN ALL NEW AND

EXISTING PANELS. MOUNT DIRECTORY BEHIND PLASTIC ON THE

INSIDE OF EACH PANEL DOOR. PROVIDE CIRCUIT NUMBER AND

COMPLETE DESCRIPTION OF ALL LOADS ON EACH CIRCUIT.

3.6 MATERIAL AND EQUIPMENT:

A. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE SAME TYPE

AND MANUFACTURER, AND SHALL BE FREE FROM DEFECTS.

DEFECTIVE AND OR DAMAGED EQUIPMENT SHALL BE REMOVED FROM

THE SITE AND REPLACED WITH NEW AT CONTRACTOR'S EXPENSE.

B. MAKE FINAL ELECTRICAL CONNECTIONS TO NEW AND ANY

RELOCATED EQUIPMENT.

3.7 GROUNDING:

A. A SEPARATE GREEN INSULATED EQUIPMENT GROUNDING

CONDUCTOR SHALL BE INSTALLED WITH THE CIRCUIT CONDUCTORS,

WHETHER INDICATED ON THE DRAWINGS OR NOT. METAL RACEWAY,

CABLE ARMOR OR SHEATH SHALL NOT BE USED AS THE PREFERRED

EQUIPMENT GROUNDING CONDUCTOR. RACEWAY SYSTEMS SHALL BE

MECHANICALLY AND ELECTRICALLY CONTINUOUS AND SHALL BE

BONDED AT ALL POINTS TO THE INSULATED EQUIPMENT GROUNDING

CONDUCTOR IN ACCORDANCE WITH THE APPLICABLE PROVISIONS OF

NEC ARTICLE 250.

B. IN THE LIGHTING SYSTEM, THE EQUIPMENT GROUNDING CONDUCTOR

OF EACH CIRCUIT SHALL BE CONNECTED TO THE EQUIPMENT

GROUNDING SCREW OF THE LIGHTING FIXTURE.

3.8 LIGHTING:

A. LIGHTING CONTROL DEVICES SHOWN IN ROOMS/AREAS SHALL

CONTROL THE FIXTURES IN THAT ROOM/AREA, UNLESS NOTED

OTHERWISE.

B. SUPPORT LIGHT FIXTURE FROM THE STRUCTURE. FIXTURES SHALL

NOT SOLELY BE SUPPORTED FROM THE CEILING.

3.9 SAFETY SWITCHES:

A. CONTRACTOR SHALL PROVIDE A HEAVY DUTY DISCONNECT FOR ALL

MOTORS WHICH ARE NOT PROVIDED BY THE MANUFACTURER WITH A

UL LISTED DISCONNECT. WHERE NO INTERNAL OVERLOAD

PROTECTION IS PROVIDED, PROVIDE A STARTER (IF REMOTELY

CONTROLLED) OR MOTOR STARTING SWITCH AS REQUIRED. PROVIDE

MELTING ALLOY OR ELECTRONIC TRIP MOTOR OVERLOAD

PROTECTION SIZED PER MANUFACTURER'S RECOMMENDATIONS.

3.10 CUTTING AND PATCHING:

A. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR

CUTTING AND PENETRATING ALL FLOORS, WALLS, PARTITIONS,

CEILINGS OR OTHER CONSTRUCTION REQUIRED FOR PROPER

INSTALLATION OF THEIR WORK. CUTTING AND PENETRATING SHALL

COMPLY WITH BUILDING CODE REQUIREMENTS. NO CUTTING OR

PENETRATIONS SHALL BE DONE WITHOUT PRIOR APPROVAL OF THE

ARCHITECT AND OR STRUCTURAL ENGINEER. ALL CUTTING AND

PENETRATIONS SHALL BE PERFORMED AS DIRECTED BY THE

ARCHITECT AND OR STRUCTURAL ENGINEER.

B. PROVIDE FIRESTOPPING FOR ALL FIRE RATED WALL, FLOOR AND

CEILING PENETRATIONS. FIRESTOPPING SHALL BE PRODUCED AND

INSTALLED TO RESIST SPREAD OF FIRE ACCORDING TO ASTME OR UL

REQUIREMENTS, RESIST PASSAGE OF SMOKE AND OTHER GASES,

AND MAINTAIN ORIGINAL FIRE-RESISTANCE RATING OF

CONSTRUCTION PENETRATED.

C. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING,

PAINTING AND REPAIRING ALL WALLS, FLOORS AND CEILINGS

DAMAGED DURING CONSTRUCTION TO MATCH EXISTING CONDITIONS.

3.11 MISCELLANEOUS ITEMS:

A. THE CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS ITEMS

REQUIRED FOR PROPER INSTALLATION OF ALL ELECTRICAL

SYSTEMS.

B. PROVIDE ALL DISCONNECTS AND SAFETY SWITCHES FOR

MECHANICAL AND PLUMBING EQUIPMENT. OVERCURRENT DEVICES

FOR HEATING, REFRIGERATION OR AIR CONDITIONING EQUIPMENT

SHALL BE FUSES OR “HACR” RATED CIRCUIT BREAKERS.

C. COMPLY WITH NECA INSTALLATION RECOMMENDATIONS FOR ALL

ELECTRICAL EQUIPMENT INSTALLATIONS.

3.12 TESTS:

A. TEST MOTORS FOR CORRECT ROTATION.

B. ANY FAILURE OR UNSATISFACTORY RESULT OF TESTS SHALL BE

CORRECTED AND RETESTED, AT CONTRACTOR'S EXPENSE. REPAIR

AND RETEST UNTIL A SATISFACTORY RESULT IS ACHIEVED.

3.13 PROJECT COMPLETION:

A. UPON COMPLETION OF THE WORK OF THIS SECTION, THOROUGHLY

CLEAN ALL EXPOSED PORTIONS OF THE ELECTRICAL INSTALLATION,

REMOVING ALL TRACES OF SOIL, LABELS, FINGERPRINTS, GREASE,

PAINT, DRYWALL COMPOUND, OIL, AND OTHER FOREIGN MATERIAL,

AND USING ONLY THE TYPE CLEANER RECOMMENDED BY THE

MANUFACTURER OF THE ITEM BEING CLEANED. CLEAN INTERIORS OF

ALL PANELBOARDS, DISCONNECTS AND OTHER ENCLOSURES. CLEAN

ALL LIGHT FIXTURE APERTURES, REFLECTORS, LENSES, AND ANY

OTHER SOILED PORTIONS OF THE LIGHT FIXTURES.

B. THOROUGHLY INDOCTRINATE THE OWNER'S OPERATION AND

MAINTENANCE PERSONNEL IN THE CONTENTS OF THE OPERATIONS

AND MAINTENANCE MANUAL REQUIRED TO BE SUBMITTED BY THESE

DOCUMENTS.

C. PROVIDE A COMPLETE, NEATLY BOUND SET OF AS-BUILT DRAWINGS

AND OPERATIONS AND MAINTENANCE MANUALS TO THE OWNER.

SUBMIT DOCUMENTS IN ACCORDANCE WITH THE GENERAL

CONDITIONS AND THE FOLLOWING. AS-BUILT DRAWINGS SHALL

INDICATE INSTALLED EQUIPMENT LOCATIONS (DISTRIBUTION

EQUIPMENT, LIGHT FIXTURES, OUTLETS, SWITCHES, ETC.), INSTALLED

WIRING CONNECTIONS (BRANCH CIRCUITS, REVISED CIRCUIT

NUMBERS, ETC.), UPDATED PANEL SCHEDULES, REVISED LIGHT

FIXTURE INFORMATION INDICATING MODEL NUMBERS OF INSTALLED

FIXTURES, ETC.. AS-BUILTS SHALL BE CREATED BY QUALIFIED

DRAFTING PERSONNEL.

END OF SPECIFICATIONS

BID SET

Page 24: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

ENGINEER OF RECORD

MATTHEW RUTKOWSKI, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MJR

JWE

1 11/1/2016

MATTHEWRUTKOWSKI

28077

L

I

C

E

NS

E

D

P

R

O

F

E

SS

IO

N

A

L

E

N

G

IN

E

E

R

O

K

L

AH

O

M

A

Prin

te

d: 1

1/3

/2

01

6 1

1:3

3:4

6 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\E

-0

02

.d

wg

E-002

ELECTRICAL NOTES, SYMBOLS,

ABBREVIATIONS, AND

SCHEDULES

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

DEMOLITION GENERAL NOTES

A. CONTRACTOR SHALL VISIT THE SITE, PRIOR TO BID, TO EVALUATE

SCOPE OF DEMOLITION AND EXISTING CONDITIONS.

B. CONTRACTOR SHALL MAINTAIN EXISTING ELECTRICAL SERVICE FOR

ALL AREAS OUTSIDE OF THE SCOPE OF WORK AREA THROUGHOUT

THE PROJECT, UNLESS SCHEDULED AND AGREED TO IN WRITING

WITH THE JENKS PUBLIC SCHOOLS. CONTRACTOR SHALL PROVIDE

A MINIMUM OF TWO WEEKS NOTICE TO JENKS PUBLIC SCHOOLS

FOR ALL SHUTDOWNS.

C. REFER TO MECHANICAL DOCUMENTS FOR INFORMATION ABOUT

ITEMS TO BE DEMOLISHED. THE ELECTRICAL DRAWINGS DO NO

SHOW DEMOLITION OF EXISTING ELECTRICAL SYSTEMS, HOWEVER,

THE CONTRACTOR SHALL PERFORM THE ELECTRICAL DEMOLITION

AS REQUIRED. PROTECT SYSTEMS TO REMAIN DURING DEMOLITION

AND CONSTRUCTION, PROVIDE NEW IF DAMAGED.

D. CONDUCTORS AND RACEWAYS ASSOCIATED WITH EQUIPMENT TO

BE REMOVED SHALL BE REMOVED BACK TO THE SERVING

PANELBOARD. RACEWAYS IN INACCESSIBLE CONCEALED AREA MAY

REMAIN.

E. CONTRACTOR SHALL CONFIRM IF THERE ARE ANY DEVICES TO

REMAIN ON THE CIRCUITS THAT ARE SCHEDULED TO HAVE

EQUIPMENT/DEVICES DEMOLISHED. CONTRACTOR SHALL UPDATE

PANEL SCHEDULES ACCORDINGLY. IF ALL EQUIPMENT/DEVICES

HAVE BEEN REMOVED FROM A CIRCUIT THEN THE OVERCURRENT

DEVICE SHALL BE TURNED OFF AND LABELED AS “SPARE”.

F. CONTRACTOR SHALL DISPOSE OF ALL EQUIPMENT/DEVICES IN

ACCORDANCE WITH APPLICABLE GOVERNMENT STANDARDS.

G. EXISTING FLUORESCENT BALLASTS AND LAMPS SHALL BE HANDLED

AND DISPOSED OF IN ACCORDANCE WITH THE ENVIRONMENTAL

PROTECTION AGENCIES (EPA) REQUIREMENTS.

CIRCUIT NUMBER

HOMERUN, XX DESIGNATES PANEL, # DESIGNATES

SINGLE POLE SWITCH 46" AFF TO CENTER, UON

XX-#

RACEWAY SYMBOLS

LIGHTING SYMBOLS

RECEPTACLE SYMBOLS

PANEL, SURFACE MOUNTED

NON-FUSED DISCONNECT

FUSED DISCONNECT

JUNCTION BOX

SURGE PROTECTION DEVICE

SWITCH SYMBOLS

DISTRIBUTION SYMBOLS

MOTOR RATED SWITCH WITH THERMAL OVERLOADS,

ELECTRICAL SYMBOLS

DUPLEX RECEPTACLE 18" AFF TO CENTER, UON.

NUMBER DENOTES CIRCUIT (TYPICAL)

LED FIXTURE, UPPERCASE LETTER

DENOTES FIXTURE TYPE, LOWER CASE LETTER

DENOTES SWITCH DESIGNATION, NUMBER

DENOTES CIRCUIT. (TYPICAL)

A

AF AMP FRAME

AFF ABOVE FINISHED FLOOR

AIC AMPERE INTERRUPTING CAPACITY

AMP AMPERE

AT AMP TRIP

C

C CONDUIT

F

F FAHRENHEIT

G

G/GD/GND GROUND

K

k KILO

kcmil 1000 CIRCULAR MILS

kVA KILOVOLT AMPS

M

MANUF MANUFACTURER

MAX MAXIMUM

MB MAIN BREAKER

MBJ MAIN BONDING JUMPER

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANELBOARD

MIN MINIMUM

MLO MAIN LUGS ONLY

MTG HGT MOUNTING HEIGHT

MTR MOTOR

LOWER CASE LETTER DENOTES SWITCH DESIGNATION

A

42

a

41

a

M

J

SPD

DUPLEX GROUND-FAULT CIRCUIT-INTERRUPTER

RECEPTACLE 18" AFF TO CENTER, UON

EXCLUDE OVERLOADS IF PROVIDED WITH MOTOR

ELECTRICAL ABBREVIATIONS

N

N NEUTRAL

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

O

OSHA OCCUPATIONAL SAFETY AND HEALTH ACT

S

SPD SURGE PROTECTION DEVICE

T

TYP TYPICAL

U

UG UNDERGROUND

UL UNDERWRITERS LABORATORIES

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

V

V VOLT

VA VOLT AMPS

VAC VOLTS ALTERNATING CURRENT

W

W WIRE

WP WEATHERPROOF WHILE IN USE

GENERAL NOTES

1. ALL MATERIAL SHALL FIT THE SPACE AVAILABLE. VERIFY DIMENSIONS AND CLEARANCES AT BUILDING PRIOR TO ORDERING. ALL WORKING

CLEARANCES AT ELECTRICAL EQUIPMENT SHALL BE MAINTAINED IN ACCORDANCE WITH THE NEC. COORDINATE WITH OTHER TRADES AS

REQUIRED.

2. REFER TO MECHANICAL DRAWINGS FOR MECHANICAL EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS. NOTIFY ENGINEER, IN WRITING,

TEN DAYS PRIOR TO BID IF MECHANICAL DOCUMENTS REQUIRE ELECTRICAL CONNECTIONS THAT ARE NOT INDICATED ON ELECTRICAL

DOCUMENTS.

3. ELECTRICAL DISCONNECTS, DEVICES, OR RACEWAYS MOUNTED ON OR ADJACENT TO EQUIPMENT SHALL NOT IMPEDE ACCESS TO THAT

EQUIPMENT. DISCONNECTS SHALL BE INSTALLED IN A LOCATION TO MEET THE NEC WORKING SPACE REQUIREMENTS.

4. LABEL ALL DISCONNECTS WITH EQUIPMENT DESIGNATION, SERVING PANELBOARD DESIGNATION AND CIRCUIT NUMBER. INTERIOR

EQUIPMENT MAY BE LABELED WITH SELF-ADHESIVE VINYL LABELS THAT ARE PREPRINTED, FLEXIBLE, LAMINATED WITH A CLEAR,

WEATHER-AND CHEMICAL-RESISTANT COATING. EXTERIOR EQUIPMENT SHALL BE LABELED WITH SCREW RETAINED, UV STABILIZED

PHENOLIC LABELS.

5. COORDINATE WITH MECHANICAL FOR ELECTRICAL CONTROLS WORK NOT PART OF CONTROLS CONTRACTOR SCOPE OF WORK.

6. ALL BRANCH CIRCUITS LARGER THAN 20A SHALL BE INSTALLED IN DEDICATED CONDUITS.

7. SLEEVE ALL WALL, FLOOR AND CEILING PENETRATIONS FOR CABLE INSTALLATIONS. SUPPORT SLEEVES ACCORDINGLY. FIRESTOP AROUND

AND IN SLEEVES AS REQUIRED. FIRESTOP MATERIAL IN SLEEVE SHALL BE REMOVABLE FOR FUTURE INSTALLATION OF CABLES.

8. CONTRACTOR SHALL REVIEW CONTRACT DOCUMENTS INCLUDING, BUT NOT LIMITED TO, ARCHITECTURAL DRAWINGS, MECHANICAL

DRAWINGS, CEILING PLANS, ELEVATIONS AND DETAILS FOR LOCATION OF ALL CEILING ELEMENTS (LIGHTS, SPRINKLERS, DIFFUSERS, ETC.).

ALL CEILING MOUNTED ITEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE ARCHITECTURAL REFLECTED CEILING PLANS. IF LOCATION

FOR AN ITEM IS NOT SHOWN ON THE ARCHITECTURAL PLANS, ELEVATIONS, OR DETAILS, VERIFY THE EXACT LOCATION OF THE ITEM WITH

THE ARCHITECT PRIOR TO INSTALLATION. THESE REQUIREMENTS APPLY TO ALL CEILING TYPES IN ALL AREAS. DO NOT SCALE OR DIMENSION

LOCATIONS FROM THESE DRAWINGS.

9. ALL 15A AND 20A, 120V CIRCUITS WITH CIRCUIT LENGTH GREATER THAN 100' SHALL BE #10 AWG MINIMUM.

10. THE WORD "PROVIDE" AS USED IN THE CONTRACT DOCUMENTS SHALL MEAN TO FURNISH AND INSTALL, UNLESS OTHERWISE NOTED.

11. PROVIDE PULL STRING IN ALL EMPTY CONDUITS.

12. CONTRACTOR SHALL UPDATE ALL PANELBOARD DIRECTORIES WITH ALL NEW AND REMOVED CIRCUITS. DIRECTORIES SHALL BE TYPED. ALL

SPARE CIRCUIT BREAKERS SHALL BE LABELED AS “SPARE” AND TURNED OFF.

13. ALL EQUIPMENT/DEVICES (INCLUDING LIGHTING ASSEMBLIES) SHALL BE UNDERWRITER LABORATORY (OR OTHER APPROVED NATIONALLY

RECOGNIZED TESTING LABORATORY) LISTED AND LABELED FOR INSTALLATION AND INTENDED USE.

14. SURFACE MOUNTED RACEWAYS AND DEVICES WILL BE ALLOWED IN MECHANICAL AREAS AND ELECTRICAL ROOMS ONLY, UNLESS NOTED

OTHERWISE.

15. PROVIDE DEDICATED NEUTRALS FOR GFCI CIRCUITS. GFCI OUTLETS ARE SHOWN FOR ALL OUTLETS REQUIRED TO BE PROTECTED,

HOWEVER, ONLY ONE GFCI MAY BE INSTALLED TO PROTECT THE GFCI OUTLETS SHOWN. LOCATE GFCI DEVICE IN CIRCUIT TO PROTECT ALL

GFCI OUTLETS SHOWN.

16. NEW CIRCUIT BREAKERS SHALL MATCH EXISTING PANEL MANUFACTURER AND AIC RATING.

EMERGENCY FIXTURE

BID SET

Page 25: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

EXISTING MDP/A

EXISTING MDP/B

EXISTING MDP/C

EXISTING MDP/D

EXISTING MDP/E

EXISTING PANEL A

(SECTION 1)

EXISTING PANEL A

(SECTION 2)

AA

AA

A

A

A

A

A

A

A

A

A

A

A

AA

2#12, 1#12G, 1/2"C

A(SECTION 1)-9

M

2

1

1

1

3

EM

EM

EM

EM

1

1

B B

B B

BB

A1

A1

A1

A1

A1

4

EM

EM

F-3

1

A

5

6

103

ELEC

105

LAUNDRY

102

CAN WASH

101

CORRIDOR

106

MECH

107

STORAGE

109

LOCKERS

111

STORAGE

110

TLT

112

OFFICE

114

SERVING

113

KITCHEN

115

CHEM STOR

118

EATING

120

EATING

119

VEST

104

PUMPS

117

SKULLERY

121

SOUPS & SALADS

116

OFFICE

122

CORR

128

VEST

123

BOYS

124

WASH

127

GIRLS

130

OFFICE

129

CLINIC

125

JAN/MECH126

MECH

131

TLT

133

REST

132

EATING

CCCCCC

ENGINEER OF RECORD

MATTHEW RUTKOWSKI, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MJR

JWE

1 11/1/2016

MATTHEWRUTKOWSKI

28077

L

I

C

E

NS

E

D

P

R

O

F

E

SS

IO

N

A

L

E

N

G

IN

E

E

R

O

K

L

AH

O

M

A

Prin

te

d: 1

1/3

/2

01

6 1

1:3

3:5

0 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\E

-1

01

.d

wg

E-101

ELECTRICAL FIRST FLOOR

PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

KEYNOTES

1. DISCONNECT AND REMOVE EXISTING LIGHT FIXTURES IN THIS AREA.

RETAIN CIRCUITS FOR RECONNECTION TO NEW FIXTURES. EXTEND

AND RECONNECT EXISTING CIRCUITS TO NEW FIXTURES. EXISTING

SWITCHING SCHEME AND SWITCHES SHALL REMAIN, UON.

EMERGENCY AND EXIT SIGNS SHALL BE CONNECTED TO THE SAME

ROOM LIGHTING AHEAD OF SWITCH.

2. MAKE FINAL CONNECTION TO CONTRACTOR PROVIDED

MOTOR-RATED SWITCH. CONFIRM EXACT LOCATION OF ELECTRICAL

CONNECTION WITH MANUFACTURER. PROVIDE PANEL INDICATED

WITH 15A, 1-POLE CIRCUIT BREAKER.

3. PROVIDE 20A, 1-POLE CIRCUIT BREAKER AT PANEL INDICATED FOR

ROOFTOP RECEPTACLES. REFER TO ROOF ELECTRICAL PLAN FOR

ADDITIONAL INFORMATION.

4. PROVIDE NEW CONNECTION TO NEW EGRESS FIXTURES AND

CONNECT TO THE SAME ROOM LIGHTING AHEAD OF SWITCH.

5. PROVIDE 120V POWER TO NEW FIRE SMOKE DAMPERS. EXTEND

EXISTING 120V CIRCUIT SERVING EXISTING FIRE SMOKE DAMPERS

TO NEW DAMPER LOCATIONS. REFER TO MECHANICAL FOR

ADDITIONAL INFORMATION. COORDINATE EXACT LOCATION AND

QUANTITY WITH MECHANICAL CONTRACTOR.

6. DISCONNECT EXISTING MECHANICAL CONTROL 120V POWER AND

RECONNECT TO NEW MECHANICAL CONTROL PANEL. COORDINATE

NEW LOCATION WITH CONTROLS CONTRACTOR. EXTEND CIRCUIT

TO NEW PANEL LOCATION. REFER TO MECHANICAL FOR ADDITIONAL

INFORMATION.

PLAN NOTES

A. RELOCATE EXISTING CONDUITS AND TEMPORARILY REMOVE LIGHTS

AS REQUIRED FOR DEMOLITION AND INSTALLATION OF NEW

DUCTWORK. REFER TO MECHANICAL PLANS FOR THE EXTENT OF

WORK. PROTECT AND CLEAN LENSES AND REFLECTORS. AS

APPLICABLE, TEMPORARILY REMOVE EXIT SIGNS AND REINSTALL. IF

EXIT SIGNS ARE DAMAGED, REPLACE WITH JENKS PUBLIC SCHOOLS

FURNISHED EXIT SIGNS.

1

ELECTRICAL FIRST FLOOR PLAN

3/32" = 1'-0"

N

BID SET

Page 26: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

RTU-1

RTU-2

RTU-3

RTU-4

RTU-5

RTU-7

CU-3

RTU-6

3#1, 1#6G, 1-1/4"C

3#2, 1#6G, 1-1/4"C

3#2, 1#6G, 1-1/4"C

3#1, 1#6G, 1-1/4"C

3#1, 1#6G, 1-1/4"C

3#1, 1#6G, 1-1/4"C

3#1, 1#6G, 1-1/4"C

1

1

1

1

1

1

1

MDP/C-7

MDP/C-5

MDP/C-2

MDP/C-1

MDP/C-4

MDP/C-6

MDP/C-3

2

2

A(SECTION 1)-40

WP

WP

2#12, 1#12G, 1/2"C

A(SECTION 2)-40,42

2#10, 1#10G, 1/2"C

A(SECTION 1)-40

2#10, 1#10G, 1/2"C

3

A(SECTION 1)-40

WP

2#10, 1#10G, 1/2"C

4

2

A(SECTION 1)-40

WP

2#10, 1#10G, 1/2"C

5

ENGINEER OF RECORD

MATTHEW RUTKOWSKI, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MJR

JWE

1 11/1/2016

MATTHEWRUTKOWSKI

28077

L

I

C

E

NS

E

D

P

R

O

F

E

SS

IO

N

A

L

E

N

G

IN

E

E

R

O

K

L

AH

O

M

A

Prin

te

d: 1

1/3

/2

01

6 1

1:3

3:5

2 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\E

-1

02

.d

wg

E-102

ELECTRICAL ROOF PLAN

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

1

ELECTRICAL ROOF PLAN

3/32" = 1'-0"

N

KEYNOTES

1. MAKE FINAL CONNECTION TO UNIT FACTORY PROVIDED

DISCONNECT. CONFIRM EXACT LOCATION OF ELECTRICAL

CONNECTION WITH MANUFACTURER.

2. PROVIDE CONNECTION TO FACTORY FURNISHED RECEPTACLE.

3. MAKE FINAL CONNECTION TO EQUIPMENT. PROVIDE FUSES IN

ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

PROVIDE PANEL INDICATED WITH 20A, 2-POLE CIRCUIT BREAKER.

4. PROVIDE STRUT STAND TO MOUNT CONTRACTOR-PROVIDED

DEVICE.

5. CONTRACTOR PROVIDED.

PLAN NOTES

A. REFER TO REMODELED MAIN SWITCHBOARD ELEVATION FOR

CIRCUIT BREAKER DESIGNATIONS.

BID SET

Page 27: JENKS EAST INTERMEDIATE CAFETERIA · 1/17/2016  · 810 SOUTH CINCINNATI SECOND FLOOR TULSA, OK 74119 918.877.6000 Printed: 11/2/2016 1:32:13 PM v:\jenks public schools\jenks east

MDP/AMDP/BMDP/CMDP/DMDP/E

3000A

MAIN

SERVICE

DISCONNECT

SPARE

RTU-2

110AT

RTU-3

110AT

RTU-1

125AT

RTU-4

125AT

RTU-5

125AT

RTU-6

125AT

RTU-7

125AT

SPARE

1 2

3 4

5 6

7

PANEL KC

PANEL KB

PANEL D

PANEL A

UNKNOWN

UNKNOWN

DISHWASHER

CONV. STEAMER

CONV. STEAMER

KITCHEN SF 1

KITCHEN SF 3

KITCHEN SF 2

KITCHEN EF 1

KITCHEN EF 3

KITCHEN EF 2

SPARE

UNKNOWNUNKNOWN

SPARE

SPARESPARE

SPARE

125AT

8

2

2

2

2

2

2

2

2

3

3

33

3 3

MDP/AMDP/BMDP/CMDP/DMDP/E

3000A

MAIN

SERVICE

DISCONNECT

PANEL KC

CHILLER #3

CHILLER #2

CHILLER #1

PANEL KB

PANEL D

PANEL A

DISHWASHER

KITCHEN SF 1

KITCHEN SF 3

KITCHEN SF 2

AH-1

AH-2

KITCHEN EF 1

AH-4

AH-3

UNKNOWNUNKNOWN

UNKNOWN

CONV. STEAMER

CONV. STEAMER

KITCHEN EF 3

KITCHEN EF 2

UNKNOWN

1

ENGINEER OF RECORD

MATTHEW RUTKOWSKI, PE

CYNTERGY ENGINEERING, PLLC

CA # 3537

EXPIRES 6/30/2018

810 SOUTH CINCINNATI

SECOND FLOOR

TULSA, OK 74119

918.877.6000

www.cyntergy.com

SHEET NUMBER

SHEET NAME

PROJECT NO:

CHECKED BY:

DRAWN BY:

ISSUES / REVISIONS

ISSUE DATE:

MJR

JWE

1 11/1/2016

MATTHEWRUTKOWSKI

28077

L

I

C

E

NS

E

D

P

R

O

F

E

SS

IO

N

A

L

E

N

G

IN

E

E

R

O

K

L

AH

O

M

A

Prin

te

d: 1

1/3

/2

01

6 1

1:3

3:5

4 A

M

v:\je

nks p

ub

lic sch

oo

ls\je

nks e

ast in

te

rm

ed

ia

te

\D

ra

win

gs\S

he

et\E

-6

01

.d

wg

E-601

ELECTRICAL DIAGRAMS

JPS 160001001

JENKS EAST INTERMEDIATE

CAFETERIA

HVAC REMODEL

JE

NK

S E

AS

T IN

TE

RM

ED

IA

TE

C

AF

ET

ER

IA

HV

AC

R

EM

OD

EL

3933 E

AS

T 91S

T S

T

TU

LS

A, O

K 74137

11/1/2016

1

EXISTING MAIN SWITCHBOARD ELEVATION

NOT TO SCALE

2

REMODELED MAIN SWITCHBOARD ELEVATION

NOT TO SCALE

KEYNOTES

1. REMOVE EXISTING FUSED DISCONNECT BUCKET. RETURN AND

DELIVER TO JENKS FACILITIES MAINTENANCE BUILDING.

2. REPLACE REMOVED BUCKET WITH NEW SIEMENS CIRCUIT BREAKER

UNIT. PROVIDE ORIGINAL MANUFACTURER MOUNTING AND

INSTALLATION HARDWARE, CLOSURE PLATES, AND TRIM PIECES

REQUIRED TO COMPLETE THE INSTALLATION. FIELD FABRICATED

HARDWARE OR REFURBISHED EQUIPMENT IS NOT ACCEPTABLE.

3. ABANDON EXISTING FUSED DISCONNECT BUCKET AND RELABEL.

PROVIDE NEW ENGRAVED NAMEPLATES FOR ALL NEW EQUIPMENT OR SPARES. ANY DEVICES SHOWN AS

UNKNOWN SHALL BE IDENTIFIED AND PROVIDED WITH LABELS.

BID SET