Project: Client Doc No :
Date :
Consultant
Logo
Main Contractor
Logo
Sub-Contractor
Logo
Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITS
Activi
ty No:
Activity Description Frequency of
inspection
Acceptance criteria Verifying
Documents
Inspection Verication
Sub Con ain
Con
Co
n
1.0 DOCUMENT
REVIEW
• Method of
Stateent
• Sho! Dra"in#$
• Materia%
Subitta%$
• &CS Sec. '1(
)art * C%au$e
*.1.+ ,
• )roect S!ec.
• !!ro/ed
Materia%
Subitta%
•
!!ro/edMethod
Stateent
• !!ro/ed Sho!
Dra"in#$
efore Wor
Coenceent
• $ !er C%ient Statu$ Code
• Re/ie" of Subitta%$ if it i$ in
!!ro/ed code or
• Re$ubit for the $ubitta%
that ha$ a code ( 2 C
incor!orate a%% con$u%tant
coent.
• !!ro/ed
Docuent$
b3 the
con$u%tant
4 4 4
45 4o%d )oint5 Written notification re6uired. Contractor a3 not
!roceed be3ond thi$ !oint "ithout "ritten confiration of theen#ineer.
W5 Witne$$ In$!ection S 7 Sur/ei%%ance 7 Notification
Re6uired.
R - Re/ie" Record 8 Docuent$
Re/ie"9
8/17/2019 ITP for Pvc Conduits
http://slidepdf.com/reader/full/itp-for-pvc-conduits 2/6
Project: Client Doc No :
Date :
Consultant
Logo
Main Contractor
Logo
Sub-Contractor
Logo
Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITS
Activi
ty No:
Activity Description Frequency of
inspection
Acceptance criteria Verifying
Documents
Inspection Verication
Sub Con ain
Con
Co
n
'.0 De% i/er3( Stora#e
and 4and%in# of
Materia%$5
• &CS
Sec. '1( )art
* C%au$e$
*.1. 2 *.'
• )roect S!ec.
• !!ro/ed
Materia%Subitta%
• !!ro/ed
Method
Stateent
• !!ro/ed
Each De%i/er3
•En$ure that the )VC conduit$
and it$ acce$$orie$ are
carefu%%3 off%oaded at $ite
u$in# !ro!er e6ui!ent to
a/oid daa#e$.
•En$ure that the ateria%$ ha/e
been in$!ected at off%oadin#
!oint for an3 !h3$ica%daa#e and co!%etene$$.
• %$o en$ure that the ateria%$
are $tored a$ !er
anufacturer:$ in$truction$
• De%i/er
3 note
• !!ro/ed
Materia%
Subitta%
8;ront Sheet9
• Materia%In$!ection
re!ort 8$
!er ttached
Sa!%e9
4 W<R S<R
45 4o%d )oint5 Written notification re6uired. Contractor a3 not
!roceed be3ond thi$ !oint "ithout "ritten confiration of theen#ineer.
W5 Witne$$ In$!ection S 7 Sur/ei%%ance 7 Notification
Re6uired.
R - Re/ie" Record 8 Docuent$
Re/ie"9
8/17/2019 ITP for Pvc Conduits
http://slidepdf.com/reader/full/itp-for-pvc-conduits 3/6
Project: Client Doc No :
Date :
Consultant
Logo
Main Contractor
Logo
Sub-Contractor
Logo
Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITS
Activi
ty No:
Activity Description Frequency of
inspection
Acceptance criteria Verifying
Documents
Inspection Verication
Sub Con ain
Con
Co
n
Sho!
Dra"in#$
45 4o%d )oint5 Written notification re6uired. Contractor a3 not
!roceed be3ond thi$ !oint "ithout "ritten confiration of theen#ineer.
W5 Witne$$ In$!ection S 7 Sur/ei%%ance 7 Notification
Re6uired.
R - Re/ie" Record 8 Docuent$
Re/ie"9
8/17/2019 ITP for Pvc Conduits
http://slidepdf.com/reader/full/itp-for-pvc-conduits 4/6
Project: Client Doc No :
Date :
Consultant
Logo
Main Contractor
Logo
Sub-Contractor
Logo
Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITS
Activi
ty No:
Activity Description Frequency of
inspection
Acceptance criteria Verifying
Documents
Inspection Verication
Sub Con ain
Con
Co
n
=.0 In$ta%%ation of )VC
< U)VC Conduit(
bo>e$ and
acce$$orie$.
• &CS
Sec. '1(
)art *
C%au$e$
*.1. 2 *.'
• )roect S!ec.
• !!ro/ed
Materia%
Subitta%
• !!ro/ed
Method
Stateent
!!ro/ed
Sho!
Dra"in#$
• fter
In$ta%%ation of
)VC Conduit$
2 cce$$orie$
• In$ta%%ation of )VC
Conduit$ and acce$$orie$$hou%d be a$ !er a!!ro/ed
$ho! dra"in#.
• To $e#re#ate different
$er/ice$ %ie %o" current(
MS( %i#htin#( !o"er etc. 2
!o"er "irin# in at %ea$t ',
conduit.
• Durin# %a3in# a%% conduit$
care $ha%% be taen to!re/ent an3 forei#n atter
enterin# in the !i!e. %% o!en
end$ $ha%% be ca!!ed "ith
a!!ro!riate ca!!in#
• ?ee! conduit at %ea$t 100
a"a3 fro the !i!e$ or
other non e%ectrica% $er/ice$.
• Tae a!!ro/a% !rior to
• !!ro/ed Sho!
Dra"in#
• !!ro/ed
Materia%
Subitta%
8;ront Sheet9
• R;IT Re6ue$t
for In$!ection <
Te$tin# 8$ !erattached
$a!%e9
4 W W
45 4o%d )oint5 Written notification re6uired. Contractor a3 not
!roceed be3ond thi$ !oint "ithout "ritten confiration of theen#ineer.
W5 Witne$$ In$!ection S 7 Sur/ei%%ance 7 Notification
Re6uired.
R - Re/ie" Record 8 Docuent$
Re/ie"9
8/17/2019 ITP for Pvc Conduits
http://slidepdf.com/reader/full/itp-for-pvc-conduits 5/6
Project: Client Doc No :
Date :
Consultant
Logo
Main Contractor
Logo
Sub-Contractor
Logo
Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITS
Activi
ty No:
Activity Description Frequency of
inspection
Acceptance criteria Verifying
Documents
Inspection Verication
Sub Con ain
Con
Co
n
concrete for the conduit
in$ta%%ation.
45 4o%d )oint5 Written notification re6uired. Contractor a3 not
!roceed be3ond thi$ !oint "ithout "ritten confiration of theen#ineer.
W5 Witne$$ In$!ection S 7 Sur/ei%%ance 7 Notification
Re6uired.
R - Re/ie" Record 8 Docuent$
Re/ie"9
8/17/2019 ITP for Pvc Conduits
http://slidepdf.com/reader/full/itp-for-pvc-conduits 6/6
Project: Client Doc No :
Date :
Consultant
Logo
Main Contractor
Logo
Sub-Contractor
Logo
Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITS
Activi
ty No:
Activity Description Frequency of
inspection
Acceptance criteria Verifying
Documents
Inspection Verication
Sub Con ain
Con
Co
n
45 4o%d )oint5 Written notification re6uired. Contractor a3 not
!roceed be3ond thi$ !oint "ithout "ritten confiration of theen#ineer.
W5 Witne$$ In$!ection S 7 Sur/ei%%ance 7 Notification
Re6uired.
R - Re/ie" Record 8 Docuent$
Re/ie"9