The University of South Florida is requesting responses from the shortlisted Private Entities based on the additional
materials provided here. This is a continuation of ITN #15-01-GC to enter into a unique public private partnership
agreement with the University to develop new on-campus student residence facilities and other amenities at its Tampa,
Florida campus, as further specified herein.
THIS ADDITIONAL MATERIAL CONTAINS STATEMENTS, DESCRIPTIONS AND ANALYSIS OF USF, THE
TAMPA CAMPUS, THE CURRENT HOUSING MARKET AND OTHER PROJECT BACKGROUND
INFORMATION. SUCH STATEMENTS, DESCRIPTIONS AND ANALYSIS ARE FOR INFORMATIONAL
PURPOSES ONLY. USF DOES NOT GUARANTEE OR REPRESENT AND WARRANT THE COMPLETENESS
OR ACCURACY OF SUCH INFORMATION AND ANY RESPONDENT TO THIS ITN SHOULD COMPLETE ITS
OWN DUE DILIGENCE WITH RESPECT TO SUCH INFORMATION.
Terms and conditions in the original ITN document remain in effect. Unless otherwise stated, all terms defined in the
original ITN document have the same meaning when used in this ITN document.
Please note that responses to Phase II must be submitted no later than 3:00 p.m., December 19, 2014. Any questions
concerning this Invitation to Negotiate should be directed in writing to George Cotter, Associate Director, Purchasing
Services: [email protected].
Note: Please note receipt of this addendum and agreement to the conditions set forth by signing and returning
with your proposal response.
__________________________________________
Authorized Signature & Date
__________________________________________
Print Name & Title
__________________________________________
Company Name
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
2 of 48
Table of Contents
Topic Page
1. OVERVIEW OF DEVELOPMENT OPPORTUNITY 4
1.1. Project Objectives 4
1.2. Detailed Project Overview 6
1.2.1. Housing Component 6
1.2.2. Non-Housing Component 7
1.3. Design and Sustainability Objectives 8
1.3.1. Student Housing Design Requirements 9
1.3.2. Non-Housing Component Design Requirements 13
1.4. Housing Maintenance and Operations Objectives 18
1.5. Operating Costs of Non-Housing Project Components 19
1.6. Leasing, Marketing, and Programming Support for the Project 19
2. SITE CONDITIONS AND UTILITIES 20
2.1. Proposed Site and Existing Conditions Assumptions and Utilities 20
3. CODE AND PLANNING REQUIREMENTS 23
3.1. Additional Code and Planning Requirements 25
3.2. Project Infrastructure 25
3.3. Project Information Technology Requirements 27
4. MANAGEMENT AGREEMENT, GROUND LEASING AND PROGRAMMING 29
5. PHASE II ITN SCHEDULE 31
6. SUBMITTAL REQUIREMENTS 32
7. EVALUATION FACTORS / CRITERIA 35
8. ADDITIONAL PROCUREMENT REQUIREMENTS AND
NOTICES OF CONTRACT PROVISIONS 36
9. SPECIAL CONDITIONS 37
10. EXHIBITS 42
10.1. Key Project Assumptions Matrix 42
10.2. Key Project Assumptions Further Notes / Details 45
10.3. USF Demolition Approval Form 48
10.4. Directions & Map to Purchasing Services 49
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
3 of 48
INTRODUCTION
The University of South Florida (the “University”) is requesting proposals from the shortlisted
qualified proposers (“Qualified Proposers”) to enter into a contractual relationship for a Design-
Build-Finance-Operate-Maintain project for development of facilities on the Tampa campus. This
request for proposals (the “Phase II ITN” or “ITN”) continues the Invitation to Negotiate process
initiated through Invitation to Negotiate #15-01-GC (the “Phase I ITN”) dated September 5, 2014.
Terms and conditions in the Phase I ITN document remain in effect. Unless otherwise stated all
terms defined in the Phase I ITN document have the same meaning when used in this Phase II ITN
document.
The Phase II ITN is a formal document designed to satisfy the requirements of the procurement
laws and regulations of the University and the State of Florida (the “State”). The University may
amend or modify the terms and provisions hereof and may abandon the procurement as it determines
to be in the best interest of the University and the State.
THE UNIVERSITY HAS NO RESPONSIBILITY TO THE QUALIFIED PROPOSER,
OR FOR ANY OBLIGATIONS OF THE QUALIFIED PROPOSER, OTHER THAN
THOSE INDICATED IN THIS ITN. THE UNIVERSITY WILL NOT GUARANTEE OR
OTHERWISE SUPPORT OR BACKSTOP IN ANY WAY OBLIGATIONS INCURRED
BY THE QUALIFIED PROPOSER IN THE PERFORMANCE OF ANY CONTRACT
RESULTING FROM THIS ITN. THE UNIVERSITY WILL NOT SUBORDINATE ITS
FEE INTEREST IN ANY OF THE REAL ESTATE THAT WILL BE LEASED BY THE
QUALIFIED PROPOSER. THE UNIVERSITY WILL REQUIRE REGULAR
FINANCIAL MONITORING OF THE QUALIFIED PROPOSER AND WILL RETAIN
A RIGHT TO EXTINGUISH ANY OF THE GROUND LEASES AND AGREEMENTS
WITH THE QUALIFIED PROPOSER AND TO TAKE POSSESSION OF THE
FACILITIES CONSTRUCTED ON ITS PROPERTY TO PROTECT THE BEST
INTERESTS OF THE UNIVERSITY IN ACCORDANCE WITH THE PROVISIONS
DESCRIBED IN THIS ITN AND THE GROUND LEASE AGREEMENT. NONE OF
THE ITEMS DESCRIBED IN THIS PARAGRAPH ARE NEGOTIABLE WITH THE
UNIVERSITY AND EACH QUALIFIED PROPOSER MUST SIGN A DOCUMENT
INDICATING ITS AGREEMENT TO THESE PROVISIONS.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
4 of 48
This ITN contains statements, descriptions and analysis of the University, the Tampa campus, the
current housing market and other project background information. Such statements, descriptions and
analysis are for informational purposes only. The University does not guarantee the completeness or
accuracy of such information and any respondents to this Phase II ITN should not rely on such
information.
PHASE II INVITATION TO NEGOTIATE
1. OVERVIEW OF DEVELOPMENT OPPORTUNITY
The University of South Florida (“University” or “USF”) is issuing these additional materials to
solicit responses from the shortlisted Private Entities to enter into a public-private partnership with
the University to develop a new on-campus mixed-use residential community (“Project”) at its
Tampa, Florida campus. The University’s plans include the development of approximately 2,125
semi-suite and traditional style residential beds with associated residential support spaces in two
separate phases of the Project to be delivered in the summer of 2017 and 2019, respectively. A
majority of residents living within the Project are expected to be first-time-in-college (“FTIC”)
students, who are required to live on campus during their freshman year (with the exception of those
who meet one of the following criteria: 21 years or older, married, dependent family member, or
have a permanent residence in Hillsborough, Pasco, or Pinellas counties). The FTIC population has
historically comprised a majority of the Tampa campus on-campus residents at USF. In the fall of
2012, 2013 and 2014, the University provided housing to more than 3,000 FTIC students on the
Tampa campus, and that number is expected to remain stable during the next ten years.
1.1 Project Objectives
The University believes that this Project could physically transform a major portion of the Tampa
campus offering compelling academic and student life services. This Project also has the potential
to further the University’s strategic objectives and provide an important competitive advantage
relative to traditional and non-traditional competitors for the most qualified students. Particularly,
the University is interested in achieving the Project goals, restated in Section 2.3.1.2 from the Phase
I ITN:
Enhance USF On-Campus Student Housing Opportunities:
USF’s Tampa campus is interested in supporting the existing and future demand that exists
from its student population. The University expects the Project to be an attractive on-campus
housing destination through its living spaces and diverse programmatic opportunities.
Balance Self-Sufficiency with Financial Accessibility:
Existing and new housing offerings should provide a compelling value proposition to highly-
qualified students from a broad geographic area. While the University understands the need
for the Project to be financially successful, the University is also interested in providing a
financially-accessible academic opportunity to all students. Please note that rental rates for
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
5 of 48
the 2014-2015 academic year can be found at the following website:
http://www.housing.usf.edu/resources/rates/.
Deliver a Unified, Comprehensive On-Campus Housing Experience:
The Project must provide a uniform housing experience regardless of the residence hall in
which a student lives.
Creation of a Common Social Experience:
USF is interested in enhancing student engagement by creating diverse social spaces – in a
village concept – and co-locating student housing with a residential dining facility, indoor
health and wellness facility, outdoor pool and deck, as well as retail space. The University
believes that the creation of a quality of life activity hub will enhance the Project’s
desirability amongst students.
Provide a Safe, Secure Community Environment:
The Project must provide building access, lighting, circulation, and other safety and security
features consistent with USF’s standards. USF expects the Private Entity to actively partner
with USF leaders, campus planners and police to ensure that safety and security is prioritized
in design options.
Deliver a Progressive Housing Model:
USF desires to deliver a progressive housing model on campus, aligning appropriate unit-
type offerings with a student’s position along the student housing continuum. The University
intends to provide increasingly more independent living configurations to students as they
progress academically.
Ensure that Students Receive Appropriate Level of Support
A majority of the Project’s residents will be FTIC students. It is paramount that they receive
appropriate guidance while residing in the community. The University expects that the
student development model to be implemented within the Project is consistent with strategies
currently being delivered within on-campus residential facilities.
Support Relationship Between Academics and Housing
The University desires to provide a programmatic relationship between the Project and
academic resources due to the synergistic impact that this integration can have in enhancing
student success. Promotion of University academic resources such as advising, tutoring, and
academic-based student organizations should be visible throughout common areas and co-
curricular spaces. Through this effort, University leadership anticipates that the visibility of
academic resources is positively correlated with utilization of USF resources, and contributes
to the instillation of critical behaviors and attitudes toward the available support structures
early on in students’ academic careers.
Provide a Positive Impact During USF’s Campus Tour
The Project will need to have a positive impact on prospective students’ perceptions of USF
during the campus tour for both internal and external spaces - eliciting a favorable response
from prospective applicants and their families. Achieving a balance between quality and
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
6 of 48
maintaining financial responsibility to students is paramount. The Project must provide a
competitive, “value-added” amenity when compared to peer institutions in support of the
University’s goal of increasing its competitive profile for highly qualified, geographically
diverse incoming students, as well as when compared to the available off-campus residential
offerings.
Achieve Sustainability Through Facility Design Consistent with USF Standards
The Project must at least meet minimum requirements set forth by USF’s design guidelines,
which includes LEED Silver Certification by the US Green Building Council.
1.2 Detailed Project Overview
1.2.1 Housing Component
Phase 1
Phase 1 of the Project will include the demolition of four existing Andros student residential
buildings, adjacent support buildings, and the outdoor pool. This site preparation will be followed
by the construction of a new residential village with approximately 1,550 combined semi-suite and
traditional style residential beds, a health and wellness facility (approximately 18,250 NASF), an
outdoor pool and deck (approximately 10,000 NASF), a dining facility (approximately 10,000
NASF), a number of small retail spaces (approximately 7,000 NASF) and the relocation and
installation of all appropriate infrastructure in sufficient capacity to support the Project. The Project
needs to include attractive landscape architecture and outdoor gathering spaces.
Phase 2
Phase 2 will complete the development of the site (Exhibit 5.1 in the Phase 1 ITN) with the
demolition of five remaining Andros residential buildings and adjacent support buildings and
construction of approximately 575 combined semi-suite and traditional-style residential beds.
The demolition and site preparation for Phase 1 is expected to start in May of 2016, with the Phase
I development to begin construction in the summer of 2016 and be delivered no later than June 1,
2017. Demolition and site preparation for the Phase 2 effort is expected to start in May of 2018, with
Phase 2 development to begin construction in the summer of 2018 and be delivered no later than
June 1, 2019. There may be an opportunity to accelerate the schedule to May 2017 with delivery
June 1, 2018 based upon demonstrated demand and if it is found to be in the best interest of the
University.
The location of housing facilities within the scope of this Project is to be determined through the
design efforts of the Private Entity. The location, however, must be within the boundaries defined in
the site map shown on pages 8 and 21. The housing facilities are expected to be consistent with the
University’s strategic objectives related to providing a comprehensive experience to residents,
providing a positive impact on the campus tour, and delivering a common social experience for all
residents within the community.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
7 of 48
1.2.2 Non-Housing Components
To enhance the “student experience” within the community, as well as the broader area of this
portion of USF’s Tampa campus, the University is seeking to provide additional quality-of-life
services, such as health and wellness, dining, and retail. These additional components are to be
delivered as part of Phase 1 of the Project.
Health and Wellness: The health and wellness component of the Project will include both indoor
and outdoor activities. For indoor spaces, the facility is expected to be approximately 18,250 NASF
and include weight and fitness equipment, group fitness space, locker rooms, staff offices, bike
program space, and a service desk in the entryway. The outdoor pool and deck area are expected to
be approximately 10,000 NASF.
The location of the health and wellness component of this Project is to be determined through the
design efforts of the Private Entity. The location, however, is expected to be consistent with the
University’s strategic objectives related to providing a comprehensive experience to residents,
providing a positive impact on the campus tour, and delivering a signature element for a common
social experience for all residents within the community.
Dining: For the residential dining facility, the Private Entity is expected to build according to
University specifications and will require direct coordination between the Private Entity and USF.
USF will coordinate input from its current food service provider. The anticipated square footage for
this facility is 10,000 NASF. Dining facilities are expected to be operated and maintained by the
University’s current food service provider.
The location of the dining component of the Project is to be determined through the design efforts
of the Private Entity. The location, however, is preferred to not be co-located within the same facility
as residential units to enhance pedestrian activity on the site and for sanitary purposes. The facility
may be co-located with other Project components to be proposed by the Private Entity.
Retail: The Project is expected to support up to three retail spaces, anticipated to total 7,000 NASF
and be allocated for small-scale food focused retail spaces in up to three (3) distinct concepts. The
University’s food service provider will be responsible for lease-up, operations and maintenance of
any retail spaces.
The location of retail services within the Project is to be determined through the design efforts of the
Private Entity. The location, however, is expected to be consistent with the University’s strategic
objectives related to safety, providing a comprehensive experience to residents, providing a positive
impact on the campus tour, and delivering a common social experience for all residents within the
community.
Parking: The Private Entity will be asked to make a cash contribution to the University for an
appropriate amount of parking, as specified by the University, at the commencement of the Project.
This parking contribution should include the replacement of displaced parking on the Project site in
Lot 13 and Lot 13T, equal to 101 spaces, due to the development of the Project at a 1:1 ratio. The
Project parking contribution should also include an additional 500 parking spaces based upon the
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
8 of 48
expectation of the Project increasing the density on the site by an anticipated 1,000 residents (1
parking space: 2 resident ratio). The cost for replacement parking and additional demand parking
will be negotiated with the Private Entity. The University has used a $17,000 per space figure to cost
displaced parking and new structured parking projects on campus. The Private Entity should assume
$17,000 per space for developing the requested financial pro forma (see Section 6 – Submittal
Requirements). Additional parking and replacement parking will be provided off the Project site by
the University in a location to be determined by the University, adjacent or in close proximity to
site.
A map of current surface parking locations and number of spaces in the Project site, Lots 13 and
13T, is provided below.
1.3 Design and Sustainability Objectives
The University expects that the Project’s buildings and site improvements to be of Class A
institutional quality and commensurate with top-tier American universities. The Project is expected
to comply with University building codes, standards and regulations. The Project must at least meet
minimum requirements set forth by USF’s design guidelines, which includes LEED Silver
Certification by the US Green Building Council.
The University expects that the Project’s buildings will reflect a modern welcoming design that
connects each Project element and outdoor space to create a vibrant community conducive for
student success, interaction, and involvement. The Project will reflect best practices in design for
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
9 of 48
each element while demonstrating innovative approaches to enhance the community member and
guest experience.
The expectation is that this Project will demonstrate the design tenets adopted by the Association of
College and University Housing Officers–International (ACUHO-I) 21st Century Project focused
on sustainability, flexibility, community, and technology.
In keeping with optimal community design and institutional criteria, the buildings will likely be a
mid-rise development with ample green space and pedestrian connections. The community should
be configured in a “village-style” concept incorporating unified architectural themes and materials
throughout each building and in outdoor common areas. The communities will be supported by a
new residential dining facility constructed on the Project site, managed by the University’s food
service provider, that delivers affordable, nutritious, appealing dining options to the residential
community and beyond. The expectation is that convenient niche food venues with late night hours,
indoor/outdoor connections, and attractive gathering spaces will be integrated into the new dining
options offered to the community as part of this Project. The village concept will be realized with
the addition of a vibrant, centrally located community center space that will serve as a hub of
residential and campus community life.
It is expected that the direct costs of USF employees residing in the Project and providing Project
administrative, facility, and academic services will be reimbursed by the Private Entity. Qualified
Proposers are provided with cost assumptions in Exhibit 10.1, which are expected to be included as
part of the total Project cost submitted in response to this Phase II ITN.
Further details regarding the design requirements for each Project component is provided below.
1.3.1 Student Housing Design Requirements
Please note that the items listed below for each of the Project components will either indicate that a
specific number is requested to be provided by the Private Entity or the ultimate number of requested
design items will be determined by the Private Entity for consideration by the University.
Each housing building (exclusive of the individual unit) must include the following key components:
A secure lobby with inviting lounge areas that create a sense of arrival and building identity
within each building comprising the Project. ADA unisex bathrooms should be included in
first floor design.
Each building in Project must include AED machines.
One (1) 24 hour desk location will be contained within the Project. Desk will serve as both
a welcome desk and service desk for keys and information. Service desk must accommodate
two staff members at front counter space.
Card access readers on all exterior doors that are compatible with the existing University
card system including ADA door openers.
o Access will also be restricted within the common areas of the building (not all
students will be able to access all floors within the building)
Design of restricted access within the building will be determined by
University.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
10 of 48
o Access card system will be hard wired with battery backup and appropriate
connection to generators to ensure access and tracking during power outages.
A single, central office area for operations and programming staff
o It is expected that at least 30 Housing & Residential Education staff members will
have an office located within the Project
o Space will be designated as RA resource room with sufficient size for meetings and
supplies.
Laundry facilities
o Each building will have a community laundry room on the first floor with transparent
access to study lounge/community space. Machines will be part of campus laundry
contract and utilize latest smart technology. Number of machines to be determined
in consultation with University. Design allows for chase to facilitate easy access
behind machines for repairs and maintenance. Appropriate venting and air handling
to ensure comfort of users.
Mailboxes
o Each student must have a combination mailbox located within the Project
o A mail and package room of sufficient size to accommodate residents within the
project will be provided and designed in consultation with USF.
o Must provide adequate secure package storage to handle peak delivery cycle in a
campus residential population and deliver exceptional service.
o Large interior service counter/window and option for exterior service delivery
window as well
o Must provide easy access for package delivery vehicles without jeopardizing safety
of pedestrians or impede traffic.
o Space must be ADA accessible.
All common areas within the Project will be fully furnished, which will be designed in
collaboration with the University.
Hard flooring in entrance lobbies and commercial grade carpet tiles in corridors. No flooring
will require strip and wax for regular maintenance.
Walls designed to attenuate sound between living areas and non-residential areas
Common area kitchens shall contain sufficient counter space, four-burner stove/oven, code
compliant exhaust hood, sink/garbage disposal, microwave and refrigerator sized to be
appropriate for the number of occupants. Kitchen facility will also provide for appropriate
dry storage for resident use.
o Total number of common area kitchens to be provided within each building will be
proposed by the Private Entity for the University’s consideration. Expectation is that
kitchen space may be combined with floor lounges to provide open, great room
concept for floor gathering spaces with the ability to sub-divide and close off space
as needed.
Multi-purpose space is expected throughout the community. These co-curricular spaces are
expected to be used for classes in the community by our Living Learning partners, Faculty
in Residence, or Faculty Fellows. All spaces should be equipped like a smart classroom with
appropriate technology equipment and connections, wireless access, white boards, and
furnishing that can be easily configured and stored. Appropriate adjacent storage for excess
furniture is required.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
11 of 48
Project will include one (1) large gathering space of up to 10,000 NASF that can be easily
sub-divided for multiple uses.
All floor communities shall have a gathering space that fosters collaboration and interaction.
Connected lounges shared by multiple floors would be considered.
Use of transparent walls to visually connect the activity in the various community spaces
would be welcome (laundry, kitchen, study space, gaming). Access to television
programming is expected.
Wireless Internet will be available throughout the Project with adequate load for multiple
devices, including outdoor space. Data drops are expected to be provided in all shared/public
spaces.
Interior and exterior recycling
Trash disposal in a convenient location for student and staff use designed in a way that does
not detract from landscape architecture. Selected location for trash disposal should consider
pick-up logistics and minimizing noise disturbance for living units, and avoiding pedestrian
vehicular conflict.
An area for maintenance and equipment storage
o Total number and location of storage areas to serve the Project will be determined by
the Private Entity in consultation with the University.
Cameras at building entrance points, elevators, mailroom, service desks, and within public
areas part of USF system. The card access secured doors should have an alarm and camera
feed to UPD if the door is propped open for a period of time.
Secure exterior bicycle storage (Covered and at least 100 feet from building entrance, located
on way to campus core.)
Exterior benches, trash cans, and recycling containers consistent with University standards
Interior and exterior lighting throughout the Project that is consistent with University
standards
Design of emergency vehicle access / security access must meet University standards
Design of vehicular access points to ease flow of residential move-in and move-out
processes.
Private entity to provide clear signage both on building exteriors, as well as way finding
throughout Project.
Individual housing units must include the following key components:
Individually controlled heating/cooling system per residential unit with advanced
environmental control systems.
All residential units within the Project will be fully furnished (beds, desks, chairs, closets,
etc.)
Bathrooms to be exhausted to the exterior per local building code requirements at a volume
respective to static pressure of ductwork.
Consistent with a semi-suite unit-type configuration, every two (2) units will be sharing one
(1) bathroom.
At a minimum, each bathroom serving two semi-suite units will include the following
facilities:
o One (1) toilet, lockable door
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
12 of 48
o One (1) shower, lockable door
o One (1) sink
o Fixtures to be low flow for water reduction. High profile toilets preferred.
Each semi-suite unit will have access to a sink vanity with mirror, lighting, and electrical
outlets.
Community bathrooms for halls with traditional double and single rooms shall be shared by
8-12 residents while designed to maximize privacy and comfort (lockable shower and
dressing areas, floor length toilet divides, upgraded finishes, adequate lighting well-placed
electrical outlets/vanity, etc.)
Each non-Residential Assistant semi-suite and traditional unit will have:
o Two (2) single person beds (extra-long twin or full)) in double occupancy and one
(1) bed in single occupancy rooms.
o One (1) desk per bed
o One (1) chair per desk
o Two (2) wire drops per bed
o One (1) set of four drawers per bed
o One (1) closet per bed (compliant with fire sprinkler requirements)
o Windows and lighting will be consistent with University standards
o Each window will include vertical window blinds
o Location and number of electrical outlets will be consistent with University standards
and sufficient to handle typical residential student load
o Exterior signage for resident names/notes
One (1) single-occupancy unit will be provided to support one (1) Resident Assistant per 32
students. Location of RA space within building design to be proposed by Private entity with
University approval.
Resident Assistant single unit will include the following:
o One (1) single person bed
o One (1) desk per bed
o One (1) chair per desk
o Two (2) wire drops per bed
o One (1) set of drawers per bed
o One (1) closet per bed
o Soft seating area that supports meeting space for RAs to meet with residents
o Windows and lighting will be consistent with University standards
o Each window will include vertical window blinds
o Location and number of electrical outlets will be consistent with University standards
and sufficient to handle typical residential student load
o Signage on exterior of room door indicating staff space
Bedroom and bathroom doors for all unit types must be lockable and solid core
Peepholes to be provided at entry doors for each residential unit
One (1) first floor tour room for each room type representative of the Project room
configuration(s) will be included in the Project. Tour room will not be part of residential
floor in order to minimize disruption to community during heavy tour days.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
13 of 48
Two (2) two-bedroom apartments will be provided in each building to accommodate
professional staff members and their families. First floor location with separate hallway from
general residential population. Must have direct exterior access.
Two (2) three-bedroom apartments will be provided in the Project for Faculty in Residence.
First floor location with separate hallway from general residential population. Must have
direct exterior access.
Apartment units to support professional staff will contain the following and be ADA
accessible:
o At least two (2) bedrooms with queen size beds
o One (1) full kitchen (stove, dishwasher, sink, garbage disposal, refrigerator, storage,
microwave, range hood exhausted to the exterior)
o Two (2) full bathrooms with low flow toilets, shower, mirrored vanity with electrical
plugs, storage. One bathroom in each unit must have bathtub.
o In-unit laundry with energy efficient washer and dryer, vented to outside.
o Living room / common room will be wired with two drops for streaming/IP phone
o Two (2) sets of four drawers per bed
o One (1) closet per bedroom
o Windows and lighting will be consistent with University standards
o Each window will include vertical window blinds
o Two (2) wire drops per bedroom, and two wire drops in living room/common area.
o Location and number of electrical outlets will be consistent with University standards
o Flooring to be carpet tiles throughout with ceramic tile in wet areas and entrance.
Wireless, high speed computer connections with sufficient broad band width for heavy
download are required for the building
Each residential unit, office space, and multi-purpose space will be accessible through USF
residential standard electronic key card security access
Residential units and bathrooms will be fully furnished by Private Entity with approval by
USF
Walls designed to attenuate sound between living areas and non-residential areas
Ample ADA rooms and accommodations will be included throughout project.
Floor lounges in each building will be designed to accommodate temporary conversion to
residential space (code compliant and connectivity.)
All elevators in the Project must be sized to at least fit medical stretcher and personnel to
respond in an emergency. Elevators will be sized and configured to support heavy residential
use not be a hindrance during move-in move-out peaks and provide for ease of maintenance.
Additional details related to design and constructions standards can be found Section 3 links.
1.3.2 Non-Housing Component Design Requirements
Health and Wellness
Indoor health and wellness facility must include the following key components:
A secure lobby with a service / security desk and common bathrooms
Additional storage areas for administrative support and equipment (minimum 800 SF)
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
14 of 48
Cameras to University specifications at building entrance points and within public areas
Wireless Internet throughout building
Sufficient data drops at all desk locations and common areas
Weight and fitness space (expected to be approximately 11,500 NASF)
Group fitness space (expected to be approximately 2,900 NASF total) is expected to be
delivered in three (3) individual spaces:
o 1,250 NASF
o 1,000 NASF
o 650 NASF
Locker rooms (serves as a connection between indoor and outdoor recreation facilities) to
equal approximately 1,850 NASF
o Locker rooms must include bathrooms, showers, private changing areas, and a
sufficient number of lockers. Locker rooms must have vanity areas with sufficient
lighting and electrical outlets.
o Locker room space must be welcoming for guests with disabilities and accommodate
their needs.
o Single use options must be available for transgender or transitioning guests.
750 NASF for offices, front desk, conference room, and break room
o It is expected that at least two (2) Campus Recreation staff members will have an
office located within the Project
500 NASF for storage and laundry
Weight and fitness equipment (and racks), selectorized equipment, and group fitness
equipment will be provided by Private Entity
o High end (technology) cardio machines with dedicated electrical circuits and data and
cable lines to each
o Accessible equipment
Secure exterior bicycle storage (Covered, no closer than 100 feet to entrance, 20% of building
capacity, well-lit).
Borrow-our-Bike program space offered in the Project 750 NASF (to accommodate 50
bikes); desk/counter with data, phone, etc.; repair station, tools, power, air, covered UFIXIT
stand outside, exterior wall access with separate double doors (no station); card swipe for
staff entry; covered outdoors space with bike racks.
Exterior benches, trash cans, and recycling containers consistent with University standards
Outdoor recreation facility must include the following key components:
o 10,000 NASF leisure pool and sundeck (zero depth entry option). Private Entity to
propose number of gallons
o A portion of the deck will be shaded by design
o Point of entry for outdoor pool will be serviced through the locker room facility
o Security card access
o Gate to enclose the pool
o Equipment storage
o Wireless Internet
o Sound system (camouflaged)
o Lighting
o Poolside furniture to include chairs, tables with umbrellas, lounge chairs, and
includes ADA accessible furniture and placement.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
15 of 48
o All pool operating equipment
o ADA compliant self-operating lift
o Unisex ADA accessible restroom facility with exterior access.
o Use of solar panels for electricity and solar heating element, desirable
o Landscaping, adjacent space, fire pit
o Grill, barbecue area for programming
Dining
Dining facility must include the following key components:
A secure lobby with a service / security desk and common bathrooms
Additional storage areas for administrative support and equipment
o Number and size of storage areas will be determined by the Private Entity in
consultation with the University.
Cameras to University specifications at building entrance points and within public areas
Wireless Internet throughout building
Sufficient data drops at all desk locations
Secure exterior bicycle storage (covered, no closer than 100 feet from building entrance)
Interior skateboard/umbrella storage
Exterior benches and trash cans consistent with University standards
Interior and exterior lighting throughout the Project that is consistent with University
standards
Dining General Shell Requirements
Complete environmental envelope. Construction assembly for exterior envelope to be
complete inclusive of required weatherproofing and thermal barriers. No interior finish.
Accessible grade level access for patrons; accessible entrances at all required means of
egress.
Grade level service drive(s) and grade level access for deliveries and waste removal. See
platform worksheets for additional requirements. (location and interaction with pedestrian
traffic)
The loading dock is a critical area and should not be visible to pedestrian traffic and must be
designed to minimize odors and provide pest control, safety design to prevent hazards to
pedestrians in area and minimize noise disturbances to residential area
16’ minimum floor to floor height in dining areas; 14’ minimum floor to floor height in back
of house locations
Maximize visibility between indoors and out for dining areas
Include shading devices for glazed exterior surfaces to maximize access to natural light with
limited direct sun March –September
Complete fire-rated assembly between dining operations (assembly occupancy) and adjacent
occupancies as required by code. Include fire dampers and fire caulking of all penetrations
through rated assemblies.
Minimum 4” concrete slab. Slab flatness and finish to meet industry standards for polished
concrete floor finishes. Use of post-tensioned slabs not acceptable.
Underfloor utility infrastructure to designated service locations. See platform worksheets for
specific requirements. Service platform layouts to be provided at later date for coordination
purposes.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
16 of 48
Metered water service to spaces designated for dining operations sized to meet demand. See
platform worksheets for specific requirements.
Metered Gas service to spaces designated for dining operations sized to meet demand
inclusive of gas regulator. See platform worksheets for specific requirements.
AHU unit(s) sized to meet demand. AHU capacity to account for environmental load,
anticipated occupancy, make-up air requirements and equipment heat loads. See platform
worksheets for specific requirements.
Primary supply and return air ducts from dining spaces to AHU location(s).
Complete EMS control system(s) for AHU’s to meet University standards.
Thermostatic controls for AHU’s accessible from applicable dining spaces (computer
controlled).
Chases for hood exhaust and make-up air from hood location to roof. See platform
worksheets for specific requirements. Hood locations to be designated at later date for
coordination purposes. Where chases are required to pass through intermediate
floors/occupancies, provide fire rated chase assemblies in accordance with applicable code
requirements.
Roof parapet or equipment screen to shield view of roof mounted equipment.
Sprinkler service entry, riser, distribution piping and heads to cover all spaces designated for
dining operations. Hold piping tight to roof or floor structure; provide swing arms for all
piping to individual heads to accommodate adjustments necessary to adapt to finish ceilings
to be installed by others.
Fire alarm panel and system with annunciating devices and pull stations as required by code.
Provide contactors in alarm panel for all hoods, shunt trip breakers and automatic shut-off
valves for food service equipment. See platform worksheets for specific requirements.
Emergency generator sized to operate walk-in coolers and freezers and code required
emergency lighting. See platform worksheets for specific requirements.
Independent electrical panel sized for all emergency circuits with appropriate transfer switch
and conductors to emergency generator.
Electrical transformer and MDP sized with capacity to meet general power and lighting
requirements, space conditioning needs and food service equipment loads. See platform
worksheets for specific food service requirements. Provide primary conduits and conductors
sized by code as required to energize MDP.
Individual electrical panels at each service platform location sized to meet local power and
lighting requirements and food service equipment loads. See platform worksheets for specific
food service requirements. Provide secondary conduits and conductors sized by code as
required to energize individual panels.
Telecommunications closet with backboard and active fiber backbone connected to
University telecommunications network
Grease interceptor(s) sized to meet local code. Interceptor(s) to be located for ease of access
without disruption to building/dining operations. See individual platform worksheets for
fixture requirements.
Dining Area Shell Requirements
Maximize visibility between indoor and outdoor spaces to support connectivity between
Project spaces and the general campus
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
17 of 48
Provide complete operational public restrooms to match available seating capacity. Calculate
rest room capacity based upon occupant load as required by local code. ADA accessible and
unisex, single occupant option.
Service Platform Shell Requirements
Platforms to operate as stand-alone kitchens: include required infrastructure to support
equipment and storage components to operate independently for daily menu expectations.
See platform worksheets for specific requirements.
Back of House Shell Requirements
Space for a remote refrigeration rack to hold condensers for respective walk-in coolers and
freezers. The unit can be located on the roof, but its weight and size may make it easier to
locate adjacent the building. If there is a mechanical space in the building, it could be located
there and be connected to the chilled water system.
Provide natural light to back of house areas where possible.
The loading dock is a critical area. Cameras to be installed with coverage of any loading
dock areas. Space must include truck docks with dock levelers; area allocations for used oil
container, with enough room for a waste service truck to remove used oil from its receptacle
and storm water regulations can impact the location of the used oil storage and storm drains,
electric cart parking and charging, truck bay for trash compactor; and ramp for hand truck
deliveries where required by grade.
Depressed floors for the walk in freezer and coolers. See individual platform worksheets for
specific requirements.
Provide complete operational employee restroom(s). Calculate rest room capacity based
upon occupant load as required by local code.
Retail
Retail spaces must adhere to requirements listed above appropriate to support a retail dining
operation including, but not limited to: delivery, storage, waste removal, refrigeration, exhaust, fire
safety and security systems, and utility infrastructure. The spaces must also include the following
key components:
Warm shell of retail space and adherence to construction guidelines and standards
o Delineation of retail square footage is to be determined through negotiation with the
University
Warm shell includes:
o HVAC system
o Drop Ceilings
o Plumbing
o Restrooms – ADA compliant, unisex, family friendly
o Interior lighting
o All other utility and IT connectivity
Exterior space will include:
o Secure exterior bicycle storage
o Exterior benches, trash cans, and recycle containers consistent with University
standards
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
18 of 48
o Interior and exterior lighting throughout the Project that is consistent with University
standards
o Security cameras to University specifications
o Design of emergency vehicle access / security access must meet University standards
o Gas-operated fire pit
o Exterior seating options with appropriate lighting.
o Ability to utilize seating area as gathering /study space upon closing for business.
1.4 Housing Maintenance and Operations Objectives
Certain sections below were included in Section 2.3.1.4 of the Phase I ITN.
In alignment with the stated objectives, the standards for delivery of maintenance and operations for
the Project must be consistent with services currently provided on campus.
There are five (5) options that the University will consider from Private Entities for the delivery of
maintenance and operations for housing Project components:
1. Private Entity will maintain and operate the Project in alignment with USF standards.
2. University will maintain and operate the Project and will be reimbursed for all costs by the
Private Entity.
3. Private Entity will maintain and operate the Project and the Private Entity will maintain and
operate all of the existing USF housing facilities in alignment with USF standards and the
University will reimburse the Private Entity for its costs.
4. Private Entity will outsource its responsibilities to a third-party operator, subject to the
approval of the University. The third-party operator will provide a level of service consistent
with USF standards.
5. A combination of the above options.
The University will work with the Private Entity to develop an agreement that delineates the
standards for the management and maintenance responsibilities within and around the Project.
If maintenance and operations are to be delivered by USF, cost assumptions should be included in
the Private Entity’s Phase II ITN proposed pro forma submission, see Section 6.2 and described in
Exhibit 10.1. If maintenance and operations are to be provided to USF housing, cost assumptions
should be included in the Private Entity’s Phase II ITN proposed pro forma submission, see Section
6.2 and described in Exhibit 10.1.
The University will require that certain maintenance be performed to the housing facilities during
the term of the Ground Lease to ensure that the housing facilities are maintained properly and at a
level of maintenance that makes the housing facilities an asset to the University community.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
19 of 48
1.5 Operating Costs of Non-Housing Project Components
For non-housing Project components, the University will be responsible for management,
operations, operating costs and routine and life cycle maintenance and repairs and renovations
(utilities, supplies, general and administration, turnover, property insurance, service contracts, and
all maintenance, repairs and renovations to the built-out spaces and to the facilities). The Private
Entity's sole responsibility for non-housing Project components will be to design and build the
facilities. Once constructed, the facilities will be delivered to the University to own, operate and
maintain.
o Health and Wellness
o The University will be responsible for management, maintenance and operating
costs. o Dining
o The USF dining services provider will be responsible for management, maintenance
and operating costs.
o Retail
o The USF dining services provider will be responsible for management, maintenance
and operating costs.
1.6 Leasing, Marketing, and Programming Support for the Project
For housing components of the Project, it is important to the University that students residing in all
housing on campus have a common student life experience. The University is willing to entertain
proposals from the Private Entities to have the University provide marketing, leasing, billings,
collections, and room assignments services to the Project through the Department of Housing &
Residential Education. These services will not include any guarantees of occupancy or outcomes
and will not include the pricing of the Private Entity’s leases with residents for the Private Entity or
the Project. The Private Entity is responsible for conducting its own due diligence in considering
these services. Should the Private Entity wish to consider these services, this service approach should
be included in the proposal approach described in Section 6.1. Costs associated with the University’s
provision of student housing services will be reimbursed by the Private Entity from the Project. The
University anticipates entering into a Management Agreement with the Private Entity or such entity's
third party operator to describe services and responsibilities. Expense assumptions for student
housing services for the Project are provided in Exhibit 10.1 herein.
For the non-housing Project components, the University will retain all operating and life cycle
maintenance expenses for the facilities. The leasing, marketing, and programming responsibilities
will be assumed as follows:
o Health and Wellness
o The University will retain the responsibility of marketing and staffing the facility.
The costs associated with this effort will be assumed by the University.
o Dining
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
20 of 48
o The University’s third-party dining services operator will retain the responsibility of
marketing and executing of dining operation within the Project. The operating costs
associated with this effort will be assumed by the University’s third-party dining
operator. o Retail
o The University’s third-party dining services operator will retain the responsibility of
marketing and executing of retail leases within the Project. The operating costs
associated with this effort will be assumed by the University’s third-party dining
operator.
SITE CONDITIONS AND UTILITIES
2.1 Proposed Site and Existing Conditions Assumptions and Utilities and Infrastructure
Site and Existing Conditions
The identified Project site is a highly-visible location that is proximate to 2,800 beds (that will not
be demolished as part of the development) and the Marshall Student Center, which serves as the hub
of student activities on USF’s campus. The identified Project site is on the north side of campus
immediately north of USF Holly Drive and east of USF Palm Drive on the USF Tampa campus
where the Andros Residential Community currently exists. Currently, the Andros Residential
Community consists of 1,039 student beds within nine individual buildings, and is home to several
Housing and Residential Education administrative buildings, a pool, and former dining hall. As part
of the Project, the Private Entity will be required to demolish all buildings within the development
site (including several additional non-residential structures), and will be responsible for the
relocation of specific services that are currently occupying facilities on site such as existing IT
infrastructure hub.
The diagram below indicates the Phase 1 and Phase 2 sites for the Project.
Utilities and Infrastructure
Each of the facilities developed as part of the Project must be designed and constructed such that the
required capacity for all utilities (cooling, heating, potable water, electrical service, storm and
sanitary, IT, etc.) necessary to service the Project must be brought in from a third party provider or
the University and that the total cost of providing this capacity to the site and its distribution
throughout the site will be part of the project costs, borne by the Private Entity as part of the Project,
and a cash contribution made to the University for this cost at the commencement of the Project.
However, it is assumed that required utilities, regardless of capacity logistics, may be integrated into
existing USF infrastructure. In the case of the Project utilizing existing USF utilities capacity, the
costs of these utilities will be reimbursed by the Project. University review and approval of the
Project design will be required.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
21 of 48
Residential Buildings – Project Site
PFX
Numbe
r
Yea
r Building Name
Floor
s GSF Use Phase
Demolitio
n
RDE 029 1964 Delta Hall 3 43,404 Residential Phase I May-2016
REP 030 1964 Epsilon Hall 3 43,416 Residential Phase I May-2016
RET 033 1964 Eta Hall 2 14,600 Residential Phase I May-2016
RQA 031 1964 RQA 1 1,572 Residential Staff Phase I May-2016
AL
W 034 1964 ALW 1 1,572 Laundry Facility - Gas Phase I May-2016
RQC 035 1964 RQC 1 2,393 Residential Staff Phase I May-2016
RZE 032 1964 Zeta Hall 2 14,600 Residential Phase I May-2016
RIO 057 1966 Iota Hall 2 22,229 Residential Phase II May-2016
RKA 058 1966 Kappa Hall 3 14,722 Residential Phase II May-2018
RLA 059 1966 Lambda Hall 2 14,722 Residential Phase II May-2018
RM
U 060 1966 Mu Hall 3 43,939 Residential Phase II May-2018
RQD 061 1966 RQD 1 1,772 Residential Staff Phase II May-2018
ALE 062 1966 ALE 1 1,572 Laundry Facility - Gas Phase II May-2018
RQF 063 1966 RQF 1 1,572 Residential Staff Phase II May-2018
RTH 056 1966 Theta Hall 2 14,951 Residential Phase II May-2018
Subtotal (Residential) 237,03
6
Non-Residential Buildings – Project Site
PFX Number Year Building Name Floors GSF Use Phase Demolition
AOC 067 1967
Andros
Classroom
Building
2 14,722
Purchasing, Procurement, P-
Card, Technology Hub,
Standard Software
Development, Accounts
Payable, Travel
Phase I May-2016
RAN 064 1966 Andros Center 1 46,574
Community Space, Retail,
Office space, Storage, Public
Restrooms
Phase I May-2016
ANG 6205 1999 Andros Gazebo 1 480 Recreation Phase I May-2016
ANP 096 1972
Andros Pool
Equipment
Bldg.
1 361 Pool Service Phase I May-2016
PLN NA 1972
Andros Pool
Deck 1 12,982 Recreation
Phase I May-2016
Andros Pool 5,297 253,000 gallons
Subtotal (Non-Residential) 65,694
No comprehensive surveys for asbestos, lead or other environmental hazards are available. The age
of the buildings suggests the presence of asbestos and lead paint which must be mitigated prior to
demolition. Asbestos containing material (ACM) and lead paint surveys will be required.
Existing reports will be provided to Private entities for informational purposes only but are not
intended to replace more comprehensive assessment.
Non-Residential buildings indicated for May 2016 demolition could be reviewed for earlier
demolition potential subject to execution of ground lease if in the best interest of the University.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
22 of 48
Please note that the AOC IT Hub demolition is subject to the relocation of existing equipment and
distribution, which cost will be reimbursed by the Project.
All demolition work must be permitted through the University office of Facilities Planning and
Construction Building Code Administrator and comply with all applicable environmental
regulations. USF Demolition Approval Form (see Exhibit 10.3).
Utility Infrastructure on Project site (see below):
Existing utilities infrastructure on Project site is deemed unreliable and beyond its useful life
expectancy. The Project is expected to include providing all new utilities infrastructure on site and
to include the cost of providing such infrastructure to the site in the capacity necessary for the
Project.
Current USF infrastructure capacity is not sufficient for an additional 1,075 beds for electrical,
HVAC, storm water, potable water and sanitary sewer. Project must ensure stability and continuity
of infrastructure to serve Andros II beds through proposed demolition in May 2018.
There are no available surveys or assessments for the Project site.
Site topographic survey, site assessments, archeological survey, geotechnical report and all other
environmental reports are required of the selected Private Entity.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
23 of 48
3. CODE AND PLANNING REQUIREMENTS Qualified Proposers must submit proposals that comply with the University’s code requirements,
design guidelines, and Master Plans described in this section. It will be the continuing responsibility
of the Private Entity to fully comply with all of these Code and Design requirements throughout the
design, construction, maintenance, operation and future renovation of all facilities.
The sections below were included in Section 5.2 of the Phase I ITN.
Campus Master Plan
The project scope as defined in this document is within the allowable quantities in the existing
Campus Development Agreement and current Campus Master Plan adopted by the USF Board of
Trustees in December 2011. The Student Housing development needs to be consistent with the
Campus Master Plan Goals, Objectives, and policies including pedestrian and bicyclist connectivity
to the core academic areas of campus.
Codes, Permits, and Standards Generally Required for USF Construction and Maintenance
Operations
The Architect and Engineer shall ensure that the contract documents comply with all
applicable codes, regulations, and orders in effect at the time of permitting. The Architect and
Engineer shall submit a list of codes to which the Project is subject, to the University with the
Schematic Design submittal. All reference to codes herein shall mean the latest editions
adopted through legislation or state rule-making for use in state-owner/leased buildings
(including, but not limited to Florida Statues sections 471, 481 and 553).
The Architect and Engineer shall confer with the University Project Manager to determine those
permits to which the Project is subject. Required permits include those necessary for the
design as well as those needed by the Private Entity for actual construction work.
The Architect and Engineer shall determine the requirements of each permit, confer with the
appropriate officials, and submit all required information necessary to obtain approvals by the
agencies having jurisdiction over the Project. The Architect and Engineer shall ensure that the
design and contract documents and additional information provided are capable of obtaining
all required approvals and permits in a timely manner.
The Architect and Engineer shall use the following codes (where code requirements conflict, the
USF Office of Facilities Planning shall resolve any disputes of code application).
Building Codes: The Florida Building Code in effect at time of building permitting.
Demolition of existing buildings and utilities will require asbestos survey, EPC permits, and
Building Permits through the USF Building Code Administrator and any hazardous materials are
required to be removed and disposed of in accordance with all applicable code and law.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
24 of 48
Fire Prevention and Life Safety:
• The Florida Fire Prevention Code, including the Life Safety Code, Fire Protection Rules and
Regulations of the State Fire Marshal, in effect at time of building permitting. State Fire
Marshall plans review and inspections required. Current Building Code and Permitting
process information may be obtained at the USF Facilities Planning & Construction,
Building Codes Administration website:
http://usfweb2.usf.edu/facilitiesplan/Process/bca.html
Federal (EPA):
• National Pollution Discharge Elimination System (NPDES), Phase II MS4 Permit for
Storm Water Pollutant Abatement/Discharge - Notice and coverage under the State’s
General Permit submitted to the FDEP.
• Air Emissions Permit for Central Plant Boilers - Applications submitted to the
Hillsborough County Environmental Protection Commission (HCEPC).
FDEP:
• Permit for Water System Improvements/Alterations – Applications submitted to the
Hillsborough Co. Health Dept. (HCDOH). • Permit for Sanitary System Improvements/Alterations – Applications submitted to the
Hillsborough Co. Environmental Protection Commission (HCEPC). • Permit for Fuel Containment Vessels greater than 500 gals. – Application submitted
to the Hillsborough Co. Environmental Protection Commission • Permit for Industrial Waste Discharge (IWP) – Permit for any Chiller Plant cooling
tower discharges going into the storm water system. • Notice of Demolition or Asbestos Renovation – if required, administered by the local
Agency HCEPC.
SWFWMD:
• Permit for Storm Water Management and Pollutant Abatement – Applications
submitted to the Southwest Florida Water Management District, Tampa Office. • WUP – Water Use Permit, a 10 year duration permit issued is by the Southwest
Florida Water Management District that limits the amount of water the University
can pump from its wells. Water usage by the project will have to be metered for
water audit purposes of operational efficiency and bench marking against future
University needs.
City of Tampa:
• Commitments of Service for City of Tampa Water – Application submitted to the City Water
Dept. only when water will be served by them to a USF project. • Commitments of Service for City of Tampa Sewer – Application submitted to the City Sewer
Dept. for all new building services on the Tampa Campus
Hillsborough County:
• Right-of-Way Use Permit – Application submitted to the Right-of-Way Dept. for any
work required to be done in the Right-of-Way of Bruce B. Downs, Fletcher Ave., and
50th Street.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
25 of 48
Note: Permits listed above are not the specific names of the permits but are identified
by the issue they address.
University
• USF Policies:
http://regulationspolicies.usf.edu/regulations-and-policies/regulations-policies-
procedures.asp
• USF Design and Construction Guidelines and Standards:
http://www.usf.edu/administrative-services/facilities-planning/process/guidelines-
standards.aspx
• Student Housing Appendix to USF Design and Construction Guidelines and Standards
http://www.usf.edu/administrative-services/facilities-planning/documents/designguide-
appendix-c.pdf
• USF Division of Information Technology Standards:
http://www.usf.edu/it/about-us/policies-and-standards.aspx
• USF Parking & Transportation Services:
http://www.usf.edu/administrative-services/parking/
Other:
• Applicable Federal Regulations
• Florida Statutes
• Archeological permit and Survey
• Board of Governors Regulations
• LEED Silver Certification
• Federal Fair Housing Accessibility Guidelines
• Others as applicable 3.1 Additional Code and Planning Requirements
USF requires that the Private Entity be familiar with USF’s Master Plan documents to ensure
consistency in implementing the Project. USF Design and Construction Guidelines will apply.
Access / construction hours must be coordinated with USF Academic Calendar for exam weeks and
USF Student Housing expectations to maintain a residential environment conducive to student
success. 3.2 Project Infrastructure
Sections 3.2 and 3.3 were included in Sections 5.3 and 5.4 of the Phase I ITN.
The net proposed housing growth for Phases 1 & 2 is within the University’s Water Use Permit.
For water capacity for future phases that go beyond Phases 1 & 2, USF must absorb this additional
capacity and still meet the needs of the future campus population. SWFWMD has emphasized that
it will not increase the USF water consumptive use permit. Project use of infrastructure capacity
exceeding what is currently being used by the housing facilities will need to be reimbursed to the
University. The capacity refers to that of generation and delivery of systems of electrical, chilled
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
26 of 48
water, hot water, potable water, storm and sanitary sewers. University approval will be required for
design of systems and selection of materials. The USF standard is for LEED Silver minimum
certification in meeting the requirements of the Florida Statutes.
There are a number of infrastructure systems which the institution operates across the environment,
including those enumerated below. Private Entities should plan, design, and build for the continued
operation of these infrastructure systems by USF in the Project site. Systems which have not been
specifically mentioned include (but are not limited to) the building access control system, energy
management systems, security camera systems, and security alarm systems. Buildings must be
provided with infrastructure systems which are technologically advanced but compatible with the
type of systems that already exist in order for the institution to continue consistent
operations. Private Entities are responsible for ensuring consistent and compatible infrastructure
management systems are in place and reviewed and coordinated with the USF organizations which
have responsibility for each system.
Project Site:
Project will require construction of roadways in or around the Project. Project will require
relocating and adding parking. Any alteration to the wetland will require additional permit
authorization and mitigating provisions. Asbestos assessment of the existing buildings and utilities
is required and will require permits for the demolition.
ELECTRICAL: Project will require TECO Primary Meter service via Fletcher for the Private
Entity primary feeder that will be needed to serve the Project. There may be additional costs
associated with project phasing due to keeping portions of the existing feeder system energized to
serve existing facilities while constructing the new feeder loop.
HVAC/HOT/CHILLED WATER: There is currently insufficient capacity for this Project. Project
demands will require a new plant with hot/chilled water capacity to support the project including
capacity and distribution piping to meet the demand on the Project site.
STORMWATER: The northern Mu (RMU) Residence Hall, Lambda Residence Hall (RLA), and
Lot 16 area is prone to flooding. Buildings will need to be elevated. Project will require new storm
water piping to convey water from the area and onsite retention pond(s) are required to manage the
flow and provide flood protection.
POTABLE WATER: Existing lines will have to be relocated, and extended and sized
appropriately. Combined potable demand and fire flow requirements will be required for the
Project, service obtained through the City.
SANITARY: Project will require new sanitary lines and a new Lift Station will be required on the
Project site.
TELECOMMUNICATIONS/DATA: The site has in place extensive in-ground infrastructure
including manholes, conduit, copper cable and fiber optic cable. Once a site plan is determined, an
assessment of the current infrastructure will need to occur to determine what modifications and
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
27 of 48
additions will be needed to support the Project. Rerouted and new cable will be required to provide
services to the area buildings.
A USF IT Communications Node is located in the Andros residential complex. It provides both
data and voice connectivity to 76 surrounding buildings within the northeast quadrant of the
campus. The Communications Node also provides an operations center for the termination for
telecommunications providers including: Verizon, Time Warner, Level 3, and Sprint. Services
provided also include commodity Internet, Metro Ethernet (to provide data services to USF's
remote campuses) and voice circuits (PRI, analog, BRI, and others) for both voice and alarm
services. The relocation of the Node would require 1200 square feet of space, located within a USF
owned facility in the northeast quadrant of the Campus. This facility will require a generator with
adequate capacity for power in the event of an outage and redundant auxiliary cooling units, and
the probability of substantial in-ground infrastructure construction and new cabling installation.
Migration to a new facility must occur over a period of time in which both facilities would be
active, requiring an investment in additional electronics in order to support this activity. The
overlap of facilities will provide for continuous operation of critical communications services. USF
IT Communications will work cooperatively with the Private Entity to achieve a flexible design.
3.3 Project Information Technology Requirements
This section is intended to outline the services expected for the residents and administration of the
Project.
Information Technology Support
USF Information Technology Department (“USF IT”) will provide the systems noted and outlined
in this section. This is in order to provide the delivery of a unified, seamless, comprehensive on-
campus Housing information technology experience.
The following services will be provided by USF:
Internet Connectivity: Internet connectivity will be provided by USF to ensure the most seamless
service to the end users (residents). A proportionate amount of service for the Project will be funded
by the Private Entity.
Wired Local Area Network: Wired data network connections must be provided to support
classrooms, digital information displays, residence rooms (2 per bed), and common areas. While
many students use the wireless network for their activities, the wired network is necessary for
applications that require higher, consistent network bandwidth. Many current students connect
their game consoles, TV’s, and other entertainment devices to the wired network as well as those
with desktop computers.
In the construction of the Project, there must be accommodation for “wiring closets.” These closets
are the termination points for the data network connections out to the room and the location for
network equipment. Wiring closets need to be located so that no wiring run (from the jack to the
termination in the closet) is longer than 100 meters. The cabling must be installed in compliance
with USF wiring specifications. It is required that the cabling and associated jacks and cross-
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
28 of 48
connect panels be installed by one of USF’s pre-qualified contractors under the oversight of USF
IT. This insures a quality installation and one that will be supported by USF IT.
The network equipment for each building will be funded and installed during the initial
construction. Equipment specifications and estimates for the cost of this equipment will be
provided by USF when building plans are developed to the completion stage where data jack and
wireless access points are identified. Installation of the equipment will be conducted by USF in
order for it to be supported by USF’s network operations.
This equipment will need to be upgraded / replaced periodically. The University will expect an
appropriate replacement/upgrade schedule (no less than every 5 years.) USF will consult with the
Private Entity at the time of replacement to develop a cost estimate and for equipment
specifications. Installation of replacement equipment will be conducted by USF in order for it to
support USF’s network operations.
Wireless Networks: Wireless access will be provided by USF to provide seamless coverage to the
end users. In the building design process, USF will provide specifications to the Private Entity for
the design of the wireless network in order to provide the proper coverage and capacity. The
wireless infrastructure will consist of wireless access points, cabling, and network switch
connections. Infrastructure funding and replacement of wireless access points at least every five
years will be funded by the Private Entity.
Additionally, USF will continue to manage the wireless controllers that support the Project’s
wireless installation, which are tightly integrated into the USF wireless network infrastructure.
USF’s cost for running this infrastructure will be funded by the Private Entity.
Voice Telephone Services: Locations for telephones or similar devices (fax machines, for example)
will be identified during the design process as part of construction standards. Each location will
need cabling installed for connection back to the wiring closet as well as the appropriate jacks.
USF IT cabling specifications must be followed in order for the system to be supported. USF IT
will use pre-qualified cable installers who, as with the wired and wireless networks, will install the
cabling with USF oversight. The Private Entity will be responsible for costs associated with
telephone service and equipment.
Distributed Antenna System (DAS): The Project buildings must be surveyed for potential issues
with strength of cellular signal as design is completed for optimum placement of repeaters and
antennas to provide the building with full cellular coverage. As with the wired and wireless
networking, USF IT cabling specifications must be followed in order for the system to be supported.
Television: The Project will deliver television programming in a manner consistent with the other
residential units on campus.
Audio/Visual Services: USF will consult on educational and other AV needs in the Project to ensure
alignment with University standards, which aims to offer faculty and students a seamless teaching
and learning classroom experience.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
29 of 48
Helpdesk: The University will provide IT Helpdesk Services to ensure faculty, staff, and students
with a common support structure.
Summary
Provision of technology services for Tampa Housing & Residential Education Department is best
served through utilization of USF Information Technology systems and services. Following the
precedent of the current model, any Project arrangement needs to follow the same model for
provision of equipment, payment of services provided by USF, as well as provision of upgrades
and replacement of equipment.
4. MANAGEMENT AGREEMENT, GROUND LEASING AND
PROGRAMMING
Ground Lease Requirements. A Ground Lease will be entered into for each housing facility in
each Phase of the Project. Each Ground Lease will require the Private Entity to commence and
complete the housing facilities or element covered by such Ground Lease on a schedule to be
agreed upon with the University, but meeting at a minimum the “Completion Not Later Than”
requirements set forth in Section 1.2.1 of this ITN – Additional Materials. It is critical that the
entire scope of the Project be accomplished. Therefore, failure to comply with these requirements
will result in remedies including termination of the term of all Ground Leases entirely or the
individual Ground Lease involved at the sole discretion of the University.
The University expects to enter into the Ground Lease for each Phase for one or more parcels
identified as part of the Site with a term of not more than 50 years, preferably a shorter term. During
the term of each Ground Lease, the Private Entity will have control of the improvements relating to
use, operating maintenance, life cycle maintenance, replacement, repairs and renovation subject to
the terms of the Management Agreement. The University and its agents may enter the premises and
improvements for inspection and to ascertain compliance with all contract provisions.
Replacement, Repairs and Renovation. The Private Entity will be responsible at its expense for
all maintenance, routine replacement of fixtures and equipment and any life cycle maintenance and
repairs required for the housing facilities. To provide assurance for the costs of these items, the
Private Entity will be required to fund a replacement and repair reserve to be placed in escrow at an
amount and in accordance with a budget that is approved annually by the University. The Private
Entity will be responsible for marketability of the improvements and a portion of the reserve
requirement will be to provide funds for renovations and refitting to keep the Project attractive to
tenants, both for housing and office space. Each Ground Lease will contain provisions for review
and approval by the University of the level of reserves, the maintenance requirements and to address
the need for renovations.
Insurance. The Private Entity will be responsible for providing insurance meeting the standards
described below and, in the event of any damage or destruction, the proceeds of such insurance must
be used for maintenance and repair of the damaged facility.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
30 of 48
Assignment and Transfer. There will be no right to assign or transfer a Ground Lease without the
approval of the University.
Liens. Each Ground Lease will contain terms requiring the Private Entity to obtain consent from the
University to any pledge or mortgage of its leasehold interest under any Ground Lease as security,
or otherwise allowing liens to be placed upon the leasehold estate, for financing or any other purpose
relating to this Project or any other project.
Right of Approval to Certain Changes. Each Ground Lease will contain provisions regarding the
requirement of University review and approval for any changes that occur to the exterior landscaping
and façade of any of the facilities during the term of the lease.
Buy-Out by University. Each Ground Lease will contain provisions providing the University with
a right, at its sole option, to buy out the remainder of the lease term. This buy out provision will be
based upon either the unamortized cost of the specific facility or facilities involved (based upon a
40 year amortization period) or the current appraised value of the leasehold interest, whichever is
less.
Delivery of Premises at End of Term. At the conclusion of the term of any Ground Lease, any
improvements located on the sites will remain and shall be delivered to the University fully
operational and in good condition as determined jointly by the University and the Private Entity.
Other Covenants. Each Ground Lease will contain additional covenants requiring periodic financial
reports to be submitted by the Private Entity to ensure that the Private Entity maintains financial
strength throughout the term of the lease. Additional covenants may contain limitations on use,
signage, and other items designed to ensure conformity with the campus environment.
Termination. The University will have as a remedy for default under any Ground Lease, the right
to terminate and take possession and occupancy of any improvements. If there are separate Ground
Leases, there will be cross-default provisions. The University will consider providing for step-in
rights for lenders.
Student Housing Facilities. The University will entertain proposals that include entering into a
Management Agreement with the Private Entity or such entity's third party operator, which will
describe responsibilities for the administration of leases with residents and for billings, collections
and room assignments.
The Management Agreement will provide for the establishment of an advisory committee including
University representatives that will prepare annual budgets, including rental rates. The Private Entity
will be responsible for financial reporting.
The housing facilities must be maintained at a level commensurate with Class A student housing
space. The University will retain the right to demand that the Private Entity pay for certain
operational and life cycle maintenance to be performed to the housing facilities during the term of
the Ground Lease to ensure that the facilities are maintained properly and at a level of maintenance
that makes them an asset to the University community. The Operating Agreement, if applicable, will
contain provisions that will provide enforcement rights to the University.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
31 of 48
The University is committed to the academic success and personal development of all students at
the University. It is the University’s intent that the University's Resident Life Program, administered
by the Tampa Housing & Residential Education Department, will be required in the Project’s
housing facilities, to promote and enhance academic support services, living and learning
communities, and faculty involvement. The inclusion of Resident Life Programming spaces, such as
study spaces, community spaces, etc., will be required in the Project’s housing facilities.
Health and Wellness. The Private Entity's sole responsibility will be to design and build the health
and wellness facility. Once constructed pursuant to the Development Agreement, the facility will
be delivered to the University to own, operate, and maintain.
Dining. The Private Entity's sole responsibility will be to design and build the dining facility. Once
constructed pursuant to the Development Agreement, the dining facility will be delivered to the
University to own, operate and maintain.
Retail. The Private Entity's sole responsibility is to design and build three retail facilities or spaces
within the Project. Once constructed and finished out to the appropriate specification as provided in
the Development Agreement, such space shall be turned over to the University to lease-up, operate,
and maintain. Should the retail spaces be incorporated into the Project housing facilities, the
University will retain the right to demand from the Private Entity that the Private Entity pay for
certain structural maintenance be performed to the retail spaces during the term of the Ground Lease
to ensure that the facilities are maintained properly and at a level of maintenance that makes them
an asset to the University community.
5. PHASE II ITN SCHEDULE
Dates are subject to change
PHASE II PROJECTED SCHEDULE DATE
ITN - Document issued to Qualified Proposers November 14, 2014
Qualified Proposers meeting December 1, 2014
Due date for Qualified Proposer questions December 6, 2014
Addendum responses to questions due December 12, 2014
Phase II - ITN Proposals due December 19, 2014
Campus Presentations January 12 –
January 16, 2015
References / Site Visits January 20 –
January 30, 2015
Finalists Selected / Begin Negotiations February 13, 2015
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
32 of 48
6. SUBMITTAL REQUIREMENTS
The following constitute the submittal requirements and evaluation criteria for the University to
evaluate the Phase II ITN responses. The Phase II ITN response must follow the order provided
below in order to facilitate evaluation of the responses. In addition, the Phase II ITN response should
provide tabs correlating to each of the following criteria numbers below. It is critical that responses
to the Phase II ITN are consistent in order to ensure accuracy in the University’s review process.
Failure to submit proposals in the requested order poses risk that all Submittal Requirements are
included, and accurately compared.
Your proposal must respond to each criterion in the following order:
- Cover Page
- Tab 1: Cover Letter
- Table of Contents
- Tab 2: Description of Project Approach / Schedule
- Tab 3: Proposal Requirements
- Tab 4: Graphic Documents / Renderings
- Tab 5: Proposed Agreement Terms
A description of Tabs 2, 3, 4 and 5 is included below in further detail.
6.1 Description of Project Approach and Schedule
Please provide a narrative that describes the proposed Project approach and schedule. The narrative
should include any anticipated risks in meeting the targeted phasing schedule as it relates to any
stage of the development process.
The University of South Florida encourages and values the use of local Tampa Bay region vendors
and Florida vendors as sub-contractors to complete this Project. Please describe how you will
engage local and Florida resources to include them in this project.
6.2 Proposal Requirements
o Predevelopment Budget
The Private Entity shall submit a budget for all predevelopment costs associated
with the project which will be the Predevelopment Budget. It is expected that at
a minimum the Predevelopment Budget will include costs for the following and
be allocated among the project.
Design drawings
Permit-set completion
Construction drawings
Bid-set completion
o Development Budget
The Private Entity shall submit a budget for all development costs associated with
the project which will be the Development Budget. It is expected that, at a
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
33 of 48
minimum, the Development Budget will include costs for the following and be
allocated among the project:
Demolition
Site preparation
Construction
o Total Project Cost
The Private Entity shall submit a budget for all predevelopment, development
and all other costs associated with the Project which will be the Total Project
Cost.
o Schedules: Development and Delivery
Discuss how you will advance the Project’s requirements, add distinctive value
to the University, and the steps you would take to ensure timely completion of
the project.
Include a schedule for the design and construction of the facilities.
The schedule should demonstrate the private party’s ability to ensure that the
project is move-in ready not later than the delivery dates described in Section
1.2.1 (Completion Dates).
In the event of a force majeure event or other delay of the completion of the
project beyond the Completion Dates, please describe how you would mitigate
impacts to the University, including a detailed alternative housing plan for
students.
o Pro Forma for full term of ground lease:
All revenue and expenses, including operating and maintenance expenses and net
operating income
Annual cash flow after debt and / or equity obligations
Disclosure of growth assumptions
Ground lease term and lease payments
Design and construction costs, financing and scheduling assumptions and all
other identifiable project costs
Property taxes
Replacement reserves
Proposed room-type mix and anticipated rental rates (based on an academic year
term as determined by the University – 8.5 months) (Additional compensation for
any use beyond 8.5 months /annum)
All developer compensation
Disclose cost of capital assumption for Project funding – full term of ground lease
o Compensation to Private Entity
Developer fee
Contingencies
Revenue sharing
Others
o Compensation to University
Ground Lease Base Rent
Percent of Gross Revenues
Payment to University for student life services (provided by USF)
Facilities Management Fee
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
34 of 48
Payments to University for marketing and administrative services
Payments to University for utilities and other services
o Transfer payments to University
Parking contribution
Utilities capacity allowances
Connectivity allowances
o Management Fee payment to University for out-of-pocket costs for developing the
project
6.3 Graphic Documents / Renderings
Private Entities shall illustrate their design proposal for all aspects of the Project and the sites in a
graphic manner as part of the ITN response. The minimum drawings required by the ITN shall be:
o A schematic site plan for the Project, including Phase I and II, indicating proposed street
level functions and the relationship between program components and parking
o Typical residential floor plan Phase I and II
o Typical unit plans
o Primary elevations illustrating the major components of the Project
o 3-Drenderings illustrating the primary facades for the Project (including all program
components)
Materials shall be either noted or clearly rendered
o An animated fly-through will be expected for the campus presentations
o Drawings shall be 11” x 17”
Private Entities shall clarify their design proposal with narratives as part of the ITN response.
Narratives may also identify specifications offered by the Private Entities which are beyond the
design guidelines described herein. The minimum narratives required by the ITN shall be:
o A narrative describing broad architectural concepts which govern the proposal for the
site layout and building design for all Project components. The narrative should also
describe details of the design that may not be readily apparent from drawings and may
include comments on material and finish quality.
o A narrative describing the structural methodology which the Private Entity would employ
for the Project.
o A narrative describing the mechanical systems (HVAC, plumbing), and the electrical
system which the Private Entity would employ for the Project.
6.4 Proposed Key Contract Terms for Ground Leases, Operating Agreement, Management
Agreement and Development Agreement
Include within your submission non-binding contract terms. The non-binding contract terms will be
reviewed as part of the submission and evaluation process.
o Provide key contract terms that will clearly and concisely reflect the Private Entity’s
contractual approach to the Project.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
35 of 48
o Key contractual terms and conditions of the Private Entity will allow the University to
understand the Private Entity’s agreement structures and previous or existing contracts
with other Universities or Colleges.
o Indicate agreement with Section 4 Operations, Leasing and Programming requirements.
o The University will not compensate the preferred candidate during the negotiation period
as they negotiate contractual terms.
7. EVALUATION FACTORS / CRITERIA
Evaluation process
The purpose of this ITN is to provide the University with a detailed, consistent proposal in order to
facilitate a fair evaluation of each proposal by the University. The University’s evaluation of each
proposal will be based upon the information provided in your response to this ITN, additional
information requested by the University, information obtained from independent sources, and formal
presentations if requested. The University will select the Qualified Proposer that best meets the
University’s programmatic and financial objectives.
Following selection of a finalist, the University reserves the right to modify project requirements set
forth in the ITN as deemed in the best interest of the University. The University makes no
representations of any kind that an award will be made as a result of this ITN. The University
reserves the right to accept or reject any or all proposals, waive any formalities or minor technical
inconsistencies, to request clarification of proposal data and/or delete any item/requirements from
this ITN when deemed to be in University’s best interest.
Selection of a finalist
The University will evaluate proposals submitted by each qualified party to determine which
proposal creates the greatest overall value for the University. The University reserves the right to
call for Best and Final Offers.
Based upon its evaluation of the Phase II responses, the University will select a finalist(s) to enter
into negotiations.
The University will not enter into negotiations on a Ground Lease, Development Agreement and/or
other legal documents with a Private Entity until a full investigation has been completed on behalf
of the University. The finalist shall fully and timely cooperate with the University’s representatives
and/or advisors during the investigation.
For the initial qualifications stage, submit one (1) original, five (5) hard-copies and one (1) electronic
copy (via CD/DVD/flash drive) of your proposal that can be readily disseminated among the
University’s evaluation committee members.
The hard copy should be single-sided and submitted on 8.5” x 11” sized paper to make reproduction
feasible as needed by the University. Graphic documents and renderings provided in response to
Section 6.3 may be provided on 11”x17” paper. Pro forma should be appended to your response.
No supplemental information will be allowed.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
36 of 48
Copies of your proposal should be delivered to the representative at the address shown below no
later than 3:00PM EST, on December 19, 2014.
The Qualified Private Entities parties should not contact any other parties of the University, its
Housing & Residential Education program, or advisors of these entities with regard to this
opportunity. The Qualified Private Entities are advised that unauthorized contacts with officials or
related parties of the University may result in elimination from this ITN process.
Receipt of each submission will be acknowledged via e-mail.
Questions All questions or requests for information regarding this ITN should be directed only to George Cotter
via e-mail ([email protected]) no later than 3:00PM EST, December 6, 2014.
Addenda Any addenda or instructions issued by the University prior to the time for receiving proposals shall
become a part of this proposal. Such addenda shall be acknowledged in the proposal. No instructions
or changes shall be binding unless documented by a proper and duly issued addendum. The
University is under no obligation to contact proposers for clarification but reserves the right to do
so.
8. ADDITIONAL PROCUREMENT REQUIREMENTS AND
NOTICES OF CONTRACT PROVISIONS Submission Instructions
Copies of the qualifications stage of your submission should be delivered to the University
procurement representative at the address shown below no later than 3:00 pm EST, on December
19, 2014.
George Cotter
Associate Director, Purchasing Services
University of South Florida
4202 E. Fowler Avenue AOC 200
Tampa, Florida 33620-9000
Any questions concerning this ITN should be directed in writing to George Cotter, Associate
Director, Purchasing Services ([email protected]). Questions must be received by December 6, 2014.
Selection Protests.
Any respondent to this ITN who claims to have been adversely affected or aggrieved by the selection of
a competing respondent shall have three business days after notification of that selection to submit a
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
37 of 48
written protest of the selection to George Cotter at the address or email listed in this document pursuant
to Board of Governors regulation 18.002.
Disclaimer.
The University reserves the right to request additional information, or clarifications of material
submitted by your firm during the ITN selection process.
Any representations or statements made within this ITN shall not be considered a contractual
obligation by the University and your team entities shall not be entitled to rely upon them. The
University reserves the right to reject any and all submittals and to identify and select the firm which
the University, in its sole and absolute discretion, deems most qualified.
The respondents shall be solely and totally responsible for all costs associated with responding to
this ITN, and the University accepts no responsibility with regard thereto. Submissions will become
the property of the University.
9. SPECIAL CONDITIONS
1. OPENING NOTE TO PRIVATE ENTITIES
Qualified Private Entity’s response to this Phase II Invitation to Negotiate shall be delivered
to the Purchasing Services, University of South Florida, 4202 East Fowler Avenue AOC
200, Tampa, Florida 33620-9000, no later than 3:00 P.M. on December 19, 2014 according
to the official time stamp clock located in the University’s Purchasing Services Department.
No other time-keeping source will be considered for this purpose. The University shall not
extend or waive this time requirement for any reason whatsoever. Responses to the ITN that
arrive after 3:00 P.M. on December 19, 2014 will be rejected in the University’s sole
discretion. These proposals will be returned unopened to the Private Entity. Proposals and/or
amendments will not be accepted at any time via facsimile or electronic mail. At 3:00 P.M.
on December 19, 2014, all timely ITN Proposals received will be opened and receipt of
documents recorded.
If the Private Entity elects to mail/ship its ITN Proposal package, the Private Entity must
allow sufficient time to ensure the University’s proper receipt of the proposal package by the
time specified above. Regardless of the form of delivery, it is solely the responsibility of
the Private Entity to ensure that the ITN Proposal package arrives at the University’s
Purchasing Department no later than 3:00 P.M. on December 19, 2014.
ITN Proposals will be accepted up to, and no proposals may be withdrawn after, the deadline
for proposals submission time and date shown above.
ITN Proposals must be delivered in sealed envelopes/packages clearly marked: ITN
Proposal No.15-01-GC Phase II.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
38 of 48
2. GRANTING A SECURITY INTEREST IN AND RIGHT TO USE THE PRIVATE
ENTITY PLANS
The University acquires the rights to use any design ideas or other intellectual property
submitted in any proposal and the University acquires the right to reuse any designs and
plans without paying the Private Entity or its architect.
3. INQUIRIES
The University will not give verbal answers to inquiries regarding negotiation considerations
or verbal instructions prior to or after the selection process of this ITN. A verbal statement
regarding same by any person shall be non-binding. The University is not liable for any cost
incurred by the Private Entity in connection with the preparation, production, or submission
of their ITN Proposal including any increased costs resulting from the Private Entity
accepting verbal direction. All University changes to the ITN terms or specifications, if
necessary, shall be made by the University by written addendum to the Invitation to
Negotiate and distributed electronically by e-mail and posted on the Purchasing web site
only.
Note: Private Entities are responsible to insure that the University has their point of contact
as well as their name, title, company name, address, telephone, and e-mail address in order
to receive any addenda via e-mail.
4. QUESTIONS ABOUT ITN - POINTS OF CONTACT
ALL QUESTIONS MUST BE SUBMITTED IN WRITING VIA EMAIL BY 3:00 P.M.
December 6, 2014.
Any questions concerning this Invitation to Negotiate should be directed to George
Cotter, Associate Director, Purchasing Services ([email protected]) should be copied for
any submitted questions.
5. ADDENDA
Purchasing Services may issue written addenda prior to the proposal opening date,
supplementing, modifying or interpreting any portion of this Invitation to Negotiate. No
verbal or written information from any source other than the Purchasing Services addenda is
authorized as representing the University.
Private Entity’s failure to return any and all addenda may result in disqualification of
that Private Entity’s Invitation to Negotiate.
PLEASE NOTE: It is solely the Private Entity’s responsibility to check the USF
Purchasing Web site at usfweb.usf.edu/purchasing/purch2.htm, forty-eight (48) hours
before the closing time of this proposal to verify that the Private Entities have received
any addenda that may have been issued.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
39 of 48
6. MEETINGS
Notice of public meetings regarding the Invitation to Negotiate will be posted on the bulletin
board located outside the Purchasing Services Department located at 4202 E Fowler Avenue
AOC 200, Tampa, FL 33620 and posted electronically on the USF Purchasing Bid website
five (5) business days prior to the meeting, (USFWEB2.USF.EDU/PURCHASING/PURCH2.HTM).
For the purpose of this ITN, meeting notices will be Noticed (posted) by e-mail to the ITN
Private Entity list.
7. PARKING
Annual, semester, monthly, weekly, or daily parking permits must be obtained from Parking
and Transportation Services (813-974-3990 for further information) for any company
vehicles and/or individual vehicles that will be parked on campus. This applies to all vehicles
used for an extended period of time (over 3 days or on a recurring basis). Parking rules and
regulations must be observed by all drivers. Website for parking services is:
HTTP://USFWEB2.USF.EDU/PARKING_SERVICES/
8. AWARD
Proposals will be evaluated based on the requirements set forth in this Invitation to Negotiate.
The University reserves the right to reject any or all proposals.
Private Entities may be required to answer questions and may be required to make a
presentation to the evaluation committee regarding their qualifications, experience, service,
and capability to furnish the required service(s).
The award(s) shall be made by the University to the most responsive and responsible Private
Entity whose final proposal is determined to be the most advantageous to the University
taking into consideration price and other criteria as set forth in the Invitation to Negotiate.
9. PROPOSAL TABULATION
Proposal tabulation will be available after award and will be posted on the Purchasing
website. The proposal tabulation is an accounting of initial proposal information received
relative to requested information and may not include price information. Proposal results
will not be given out over the telephone.
10. THE INVITATION TO NEGOTIATE PROCESS
The ITN process is a flexible procurement process that is used when highly specialized and
or variable services or products are required. Negotiations offer an opportunity for selected
Private Entity(ies) to discuss their responses with an evaluation committee. The goal of this
comprehensive process is for identification of the optimal outcome or the solution that best
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
40 of 48
meets the needs of the University. Only representatives of the participating Private Entity
who are authorized to negotiate and make agreements shall be involved in negotiations.
11. EVALUATION CRITERIA
Evaluation to qualify potential Private Entities will be based on qualification requirements
identified in the SECTION 7. Any information a Private Entity deems essential to the
evaluation of the services offered, for which no provision is made in the ITN, should be
clearly stated in the proposal. While the University reserves the right to request additional
information or clarification from Private Entities at any time in the process, Private Entities
should not assume that they will be allowed to amplify or modify their initial written
proposal. The initial response must be a clear and easy to understand explanation of the
products, services, benefits and prices offered and should include information as to how all
specifications will be met.
12. NEGOTIATION WITH PRIVATE ENTITIES
To identify Private Entities for negotiations, submitted proposals will be evaluated,
presentations may be requested, and references may be verified and reviewed. The
University will compare the proposals according to the evaluation criteria described in
SECTION 7 for the purpose of identifying Qualified Proposers and negotiation.
Private Entities may be invited to continue in the negotiation process. Negotiations offer an
opportunity for the selected Private Entities to discuss their offers and proposals in further
detail with the University. Selected Private Entities may be given the opportunity to refresh
their initial offers. Refreshed proposals allow Private Entities to match or exceed the offers
made by competitors, both as to services and cost. This allows the University to secure
services which best meet its needs, at a highly competitive and favorable cost. At the
conclusion of this negotiation process, the University may ask selected Private Entities to
submit a written best and final offer, to memorialize all agreements reached during
negotiations and to extend additional benefits to the University, if desired. Invitation to
submit a best and final offer is not automatic. After this negotiation a final Private Entity(ies)
may be selected.
13. RIGHT TO NEGOTIATE
Upon evaluation of the responses, the University has the right to enter into negotiations with
one or multiple Private Entities that appear to have submitted proposal(s) that best meet the
needs and requirements of the University. Negotiations could include but are not limited to
price, scope of services, and the terms and conditions of this ITN.
If for any reason a Private Entity(ies) and the University cannot arrive at a mutual agreement
that would result in the issuance of a contract, the University reserves the right to terminate
negotiations, to reject the proposal(s), and to continue negotiations with other responsive
Private Entities that may lead to the issuance and award of a contract.
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
41 of 48
14. PRIVATE ENTITY’S RESPONSIBILITY
It is understood and the Private Entity hereby agrees that it shall be solely responsible for all
services that it proposes, notwithstanding the detail presented in the Invitation to Negotiate.
15. PRIVATE ENTITY’S EXPENSE
All proposals submitted in response to the ITN must be submitted at the sole expense of the
Private Entity, whether or not any agreement is signed as a result of this Invitation to
Negotiate. Private Entities will pay all costs associated with the preparation of proposals and
necessary visits to campus and other required site visits.
16. NUMBER OF PROPOSALS SUBMITTED
Private Entity shall submit 6 proposals – one clearly marked as “Original.” Private
Entities must also submit one (1) Electronic copy preferably on a thumb/flash drive. Proposals that do not include all of the requested copies, including electronic copy, may be
disqualified at the sole discretion of the University of South Florida.
17. PROPOSAL REJECTION
The University shall have the right to reject any or all ITN proposals and in particular to
reject an ITN proposal not accompanied by data required by the Invitation to Negotiate or an
ITN proposal in any way incomplete or irregular including the omission of pricing
information. Conditional ITN proposals may be considered non-responsive.
18. OPEN COMPETITION
The University encourages free and open competition among Private Entities. Whenever
possible, specifications, invitations to negotiate, and conditions are designed to accomplish
this objective, consistent with the necessity to satisfy the University’s needs and the
accomplishment of a sound economical operation. The Private Entity’s signature on their
ITN proposal guarantees that the proposals have been established without collusion with
other Private Entities and without effort to preclude the University from obtaining the lowest
possible competitive contract.
19. ORAL PRESENTATION
After ITN proposals have been opened, Private Entities submitting ITN proposals may be
requested, at the sole option of the University, to make oral presentations or provide written
clarifications. Such presentations or clarifications will provide an opportunity for the Private
Entity to clarify the proposal. Oral presentations may be recorded. Recorded oral
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
42 of 48
presentations and written clarifications will be affixed to the Private Entity’s ITN proposal
and become part of the same as if originally submitted.
20. MISTAKES
Private Entities must check their proposals for any errors. Failure to do so will be at the
Private Entity’s risk.
In the event a mistake results in the written request of a Private Entity withdrawing any part
of the proposal, the Private Entity must withdraw the entire proposal package and the
University will not consider that proposal for award of ANY of the subject ITN. This applies
to all requests for withdrawal. The only exception to this policy would be a case where the
mistake was the result of misinformation unknowingly supplied by the University. In this
event, a waiver of policy must be approved by Purchasing, whose decision shall be final.
21. RIGHT TO TERMINATE
In the event any of the provisions of the contract are violated by the successful Private
Entities, the University may serve written notice upon Private Entity of its intention to
terminate the contract. Such notice will state the reason(s) for the intention to terminate the
contract. If the violation does not cease and satisfactory arrangements for correction are not
made within ten (10) days after the notice is served upon the Private Entity, the contract shall
cease and terminate. The liability of the Private Entity and/or his surety for any and all such
violation(s) shall not be affected by any such termination.
22. TERM OF AGREEMENT AND RENEWALS
The term of this Agreement is intended for an initial one (1) year period commencing on a
negotiated date. The University will have the option to renew the Agreement for additional
time periods to meet project development requirements if it is judged to be in the best
interests of the University to do so. For the protection of both parties, this Agreement may
be cancelled, in whole or in part, by either party by giving thirty (30) days written notice to
the other party.
10. EXHIBITS
10.1 Key Project Assumptions Matrix
Project Component / Financial Input Fixed Variable Assumption Notes / Considerations
Phase I Housing
Opening X Fall 2017
Total Beds X 1,550 Includes all beds (revenue and non-revenue)
Resident Assistant Beds X 48 RA's do not pay rental rates
Live-In Professional Staff X 5 Live-in faculty do not pay rental rates
Unit-Type X Traditional and Semi-Suites Except for live-in faculty/staff apartments
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
43 of 48
Rental Rates X Provided by Private Entity
Total Phase I Housing SF X Provided by Private Entity
Average Double-Occupancy Unit Size X Provided by Private Entity
Non-Living Space / Common Area SF X Co-curricular / Programming Space
Occupancy Rate Yr 1 X Provided by Private Entity
Occupancy Rate Yr 2 Provided by Private Entity
Occupancy Rate Yr 3 Provided by Private Entity
Occupancy Rate Yr 4 and Beyond Provided by Private Entity
Summer Rentals X $0 Accommodated elsewhere on campus
Non-Rent Revenue X Provided by Private Entity
Revenue Inflation X Provided by Private Entity
Programming / Staffing Expenses Per Bed X $1,300
Maintenance / Operations Expenses Per SF (no utilities and no direct costs) X $4.90 IF BEING PROVIDED BY USF
Maintenance / Operations Expenses Per SF X IF BEING PROVIDED BY PRIVATE ENTITY / 3RD PARTY
All Other Expenses Per SF X Provided by Private Entity
Expense Inflation X Provided by Private Entity
Capital Project Reserve Per Bed X Provided by Private Entity
Capital Project Reserve Annual Inflation X Provided by Private Entity
Construction Cost Per SF X Provided by Private Entity
Soft Cost Per SF X Provided by Private Entity
Ground Lease Payment X Provided by Private Entity
Ground Lease Term X Provided by Private Entity
Project Component / Financial Input Fixed Variable Assumption Notes / Considerations
Phase II Housing
Opening X Fall 2019
Total Beds X 575 Includes all beds (revenue and non-revenue)
Resident Assistant Beds X 18 RA's do not pay rental rates
Live-In Professional Staff X 3 Live-in faculty/staff do not pay rental rates
Unit-Type X Traditional/Semi-Suites Except for live-in faculty/staff apartments
Rental Rates X Provided by Private Entity
Total Phase II Housing SF X Provided by Private Entity
Average Double-Occupancy Unit Size X Provided by Private Entity
Non-Living Space / Common Area SF X Co-curricular / Programming Space
Occupancy Rate Yr 1 X Provided by Private Entity
Occupancy Rate Yr 2 X Provided by Private Entity
Occupancy Rate Yr 3 Provided by Private Entity
Occupancy Rate Yr 4 and Beyond Provided by Private Entity
Summer Rentals X $0 Accommodated elsewhere on campus
Non-Rent Revenue X Provided by Private Entity
Revenue Inflation X Provided by Private Entity
Programming / Staffing Expenses Per Bed X $1,300
Maintenance / Operations Expenses Per SF (no utilities and no direct costs) X $4.90 IF BEING PROVIDED BY USF
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
44 of 48
Maintenance / Operations Expenses Per SF X IF BEING PROVIDED BY PRIVATE ENTITY / 3RD PARTY
All Other Expenses Per SF X Provided by Private Entity
Expense Inflation X Provided by Private Entity
Capital Project Reserve Per Bed X Provided by Private Entity
Capital Project Reserve Annual Inflation X Provided by Private Entity
Construction Cost Per SF X Provided by Private Entity
Soft Cost Per SF X Provided by Private Entity
Ground Lease Payment X Provide Summary Through Ground Lease Term
Ground Lease Term X Provided by Private Entity
Project Component / Financial Input Fixed Variable Assumption Notes / Considerations
Indoor Recreation
Opening X Fall 2017
Total NASF X 18,250
Total GSF X Provided by Private Entity
Programming / Staffing Expenses Per SF X Assumed by USF
All Other Expenses Per SF X Provided by Private Entity
Expense Inflation X Provided by Private Entity
Construction Cost Per SF X Provided by Private Entity
Soft Cost Per SF X Provided by Private Entity
Project Component / Financial Input Fixed Variable Assumption Notes / Considerations
Outdoor Recreation
Opening X Fall 2017
Total NASF X 10,000 Pool and deck space
Total GSF X Provided by Private Entity
Programming / Staffing Expenses Per SF X Assumed by USF
All Other Expenses Per SF X Provided by Private Entity
Expense Inflation X Provided by Private Entity
Construction Cost Per SF X Provided by Private Entity
Soft Cost Per SF X Provided by Private Entity
Project Component / Financial Input
Fixed
Variable
Assumption
Notes / Considerations
Dining
Opening X Fall 2017
Total NASF X 10,000
Total GSF X Provided by Private Entity
Programming / Staffing Expenses Per SF X Assumed by USF
All Other Expenses Per SF X Provided by Private Entity
Expense Inflation X Provided by Private Entity
Construction Cost Per SF X Provided by Private Entity
Soft Cost Per SF X Provided by Private Entity
Project Component / Financial Input Fixed Variable Assumption Notes / Considerations
Retail
Opening X Fall 2017
Total NASF X 7,000
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
45 of 48
Total GSF X Provided by Private Entity
Rental Rate Per SF X Provided by Private Entity
Programming / Staffing Expenses Per SF X Assumed by USF
All Other Expenses Per SF X Provided by Private Entity
Rental Rate Inflation X Provided by Private Entity
Construction Cost Per SF X Provided by Private Entity
Soft Cost Per SF X Provided by Private Entity
10.2 Key Project Assumptions Further Details / Notes
Student Housing (Phase I and Phase II)
o Resident Assistants will have single-occupancy bedrooms and do not pay rental rates
o Live-in professional staff will have an apartment-style unit (two bedrooms or greater) and do
not pay rental rates
o Private Entities are expected to provide information regarding the following:
Total building(s) square footage
Average unit size for suite-style units – living area component only (not bathroom)
Total non-living space / common area square footage
Assumed occupancy rate for years 1, 2, 3, 4, and beyond
Annual non-rental revenue
Revenue inflation
- Please indicate if a different inflation rate is utilized for rental rates and non-
rent revenue
Non-programming / staffing expenses per square foot
- These expenses include utilities, supplies, general and administrative,
property insurance, turnover, etc.
Annual expense inflation for non-programming / staffing expenses
Construction cost per square foot
- Including all demolition, site preparation, and vertical construction
Soft costs per square foot
- Including all demolition, site preparation, and vertical construction
Annual ground lease payment and any escalations
Length of ground lease agreement
Indoor Recreation
o Private Entities are expected to provide the following information
Gross square footage of facility based on NASF provided by USF
Non-programming / staffing expenses per square foot
- These expenses include utilities, supplies, general and administrative,
property insurance, turnover, etc.
Annual expense inflation for non-programming / staffing expenses
Construction cost per square foot
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
46 of 48
- Including all demolition, site preparation, and vertical construction
Soft costs per square foot
- Including all demolition, site preparation, and vertical construction
Outdoor Recreation
o Private Entities are expected to provide the following information
Gross square footage of facility based on NASF provided by USF
Non-programming / staffing expenses per square foot
- These expenses include utilities, supplies, general and administrative,
property insurance, turnover, etc.
Annual expense inflation for non-programming / staffing expenses
Construction cost per square foot
- Including all demolition, site preparation, and vertical construction
Soft costs per square foot
- Including all demolition, site preparation, and vertical construction
Dining
o Private Entities are expected to provide the following information
Gross square footage of facility based on NASF provided by USF
Non-programming / staffing expenses per square foot
- These expenses include utilities, supplies, general and administrative,
property insurance, turnover, etc.
Annual expense inflation for non-programming / staffing expenses
Construction cost per square foot
- Including all demolition, site preparation, and vertical construction
Soft costs per square foot
- Including all demolition, site preparation, and vertical construction
Retail
o Private Entities are expected to provide the following information
Gross square footage of facility based on NASF provided by USF
Rental rate per square foot to be charged to USF
Non-programming / staffing expenses per square foot
- These expenses include utilities, supplies, general and administrative,
property insurance, turnover, etc.
Annual expense inflation for non-programming / staffing expenses
Annual rental rate inflation
Construction cost per square foot
- Including all demolition, site preparation, and vertical construction
Soft costs per square foot
- Including all demolition, site preparation, and vertical construction
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
47 of 48
ADMINISTRATIVE SERVICES 4202 E. FOWLER AVENUE, FPC110 PHONE: (813) 974-2625) FACILITIES PLANNING & CONSTRUCTION TAMPA, FLORIDA 33620-7550 WEBSITE: usf.edu/fpc
BUILDING DEMOLITION APPROVAL
DATE:
BUILDING NO. & NAME: Building ,
BUILDING REPLACEMENT COST $0,000,000.00
REQUESTED BY:
DEMOLITION BUDGET: $0,000,000.00
DEMOLITION SCHEDULE: Anticipated Start:
Anticipated Completion:
FUNDING SOURCE:
JUSTIFICATION:
EDUCATIONAL PLANT SURVEY
RECOMMENDATION FOR DEMOLITION:
(CHECK ALL THAT APPLY)
Replacement value is greater than $1,000,000.00 and require an Educational Plant Survey recommendation for demolition in accordance with: FBOG Regulation 9.0004 (Razing of Buildings)
Replacement value is less than $1,000,000.00 and does not require Educational
Plant Survey recommendation.
Identified in the approved Campus Master Plan (Element 4, Future Land Use) as
a Potential Demolition.
The building is / is not identified as a historic resource or is located in an
archeological site.
REVIEWED AND APPROVED: UNIVERSITY OF SOUTH FLORIDA: Dr. Judy Genshaft, President
RECOMMENDED FOR APPROVAL: OFFICE OF FINANCE AND ADMINISTRATION: Sandy Lovins, Vice-President
FACILITIES PLANNING AND CONSTRUCTION , Director
AFFECTED PARTY: ,
REQUESTING AGENCY: ,
File: PMG-03 Building Demolition Approval.docx
University of South Florida Phase II Invitation to Negotiate #15-01-GC
STUDENT HOUSING DEVELOPMENT PROJECT Additional Materials for Qualified Proposers
Addendum No. 2
48 of 48
DEMOLITION CHECKLIST FOR FPC PM ALL APPLICABLE ITEMS MUST BE VERIFIED PRIOR TO SUBMISSION FOR PRESIDENTIAL APPROVAL
BUDGET COMPLETED /VERIFIED
☐ USF BUILDING DEMOLITION APPROVAL
☐ FLORIDA DIVISION OF HISTORIC RESOURCES: APPROVAL TO DEMOLISH HISTORIC
PROPERTY
☐ ARCHEOLOGICAL SENSITIVITY ZONE: DEMOLITION ACTIVITY IMPACT ON
ARCHEOLOGICAL ZONE
☐ BUREAU OF ELEVATOR SAFETY: APPROVAL TO DECOMMISSION ELEVATORS, ESCALATORS AND DUMBWAITERS.
☐ HAZMAT SURVEY:
☐ ASBESTOS CONTAINING CONSTRUCTION MATERIAL
☐ LEAD CONTAINING PAINT & CONSTRUCTION MATERIAL
☐ PCB (POLYCHLORINATED BIPHENYLS) CONTAINING EQUIPMENT
☐ MERCURY CONTAINING EQUIPMENT & CONSTRUCTION MATERIAL
☐ CFC (CHLOROFLUOROCARBON) CONTAINING EQUIPMENT
☐ HAZMAT ABATEMENT
☐ ASBESTOS CONTAINING CONSTRUCTION MATERIAL
☐ LEAD CONTAINING PAINT & CONSTRUCTION MATERIAL
☐ PCB (POLYCHLORINATED BIPHENYLS) CONTAINING EQUIPMENT
☐ MERCURY CONTAINING EQUIPMENT & CONSTRUCTION MATERIAL
☐ CFC (CHLOROFLUOROCARBON) CONTAINING EQUIPMENT
☐ RELOCATION: SWING SPACE FOUND FOR USER GROUP
☐ LEASE: LONG TERM SPACE NEEDS:
☐ STORAGE: LONG TERM STORAGE NEEDS:
☐ MOVERS: COST OF MOVING FF&E TO BE REUSED
☐ SETUP: BREAK DOWN AND SETUP OF EXPERIMENTS
☐ UTILITY OUTAGE: NOTIFY PPD, EHS, USF IT TO DECOMMISSION ALL BUILDING
UTILITIES SERVICES
☐ ALARMS: NOTIFY UPD AND PPD OF DEACTIVATION OF BUILDING SECURITY AND
FIRE ALARMS
☐ SITE LOGISTICS AND TRAFFIC MANAGEMENT PLAN
☐ CONSTRUCTION NOTIFICATION: ALERT USF COMMUNITY OF ATYPICAL
CONSTRUCTION ACTIVITY
☐ ADA ACCOMMODATIONS & PATHWAYS
☐
DIRECTIONS TOUSF PURCHASING & PROPERTY SERVICES (INCLUDING P-CARD)
4202 E. Fowler Avenue, AOC 200Tampa, FL 33620-9000
(813) 974-2481
Enter at the University’s main entrance off of Fowler Avenue
Pull into the USF Campus Information Center (building on your right that looks like a drive-through bank) and purchase a USF Visitor Parking Permit for $3.00. NOTE: Parking permits are required in all non-metered spaces. Parking lots are monitored 24/7 and vehicles that are parking illegally will receive a citation.
Upon leaving the Campus Information Center, turn right onto Leroy Collins Boulevard and get into the left-hand turn lane.
Turn left at the traffic light on to Alumni Drive.
Proceed to the next traffic light. Make a right turn onto Magnolia Avenue. Continue to the second traffic light (corner of Magnolia Drive and West Holly Drive).
At the light, make a right turn on to West Holly until the road makes a left turn and be-comes Palm Drive.
Stay in the right-hand lane and turn right again on Holly Drive. On your right, you will see the Crescent Hill Parking Garage. Visitor parking is available in the garage on levels1-4. If no spaces are open in the garage, go back to Palm Drive, turn left at the traffic light (just after you pass the USF Credit Union on your right.) Visitor parking is available in Lots 20, 44 or 43 (outlined in red on the map provided). DO NOT PARK IN LOTS 13 OR 13T ADJACENT TO THE ANDROS CENTER.
Once parked, walk (along the dotted line on the map provided) to the Andros Classroom Building located on the east side of the Andros Center and to the south of the Andros Pool. (Follow the dotted line on the map provided.)
Use the stairs at the west entrance to the Andros Classroom Building. USF Purchasing & Property Services is located on the second floor.
NOTE: A campus map with vehicle and pedestrian routes highlighted is included with these instructions. Do not forget to stop at the Campus Information Center to obtain a Visitor parking permit prior to visiting Purchasing & Property Services.
Eas
t Fle
tche
r A
venu
e E
ast F
letc
her
Ave
nue
Eas
t Fow
ler
Ave
nue
Eas
t Fow
ler
Ave
nue
Bruce B. Downs Boulevard
US
F-P
ine
Alu
mni
Driv
e
USF-Magnolia
USF-Magnolia
Leroy Collins Boulevard
Alu
mni
Driv
e
Alu
mni
Driv
e
USF-Maple
USF-Maple
USF-Sycamore
USF-Palm USF-Palm
US
F-L
aure
l
42nd
Str
eet
46th
Str
eet
US
F-H
olly
Driv
e
US
F-H
olly
Driv
e
US
F-H
olly
Driv
e
USF-Pine
Spe
ctru
mB
oule
vard
50th Street 50th Street
BullRun
USF-Cypress
Medica
lC
ente
rD
rive
USF-Will
owD
rive
USF-Banyan
Cres
cent
Hill
Park
ing
Faci
lity
Visi
tor
Park
ing
Leve
ls 1
-4
Lo
t
44L
ot
20
Flor
ida
Men
tal
Heal
thIn
stitu
te
Map
to U
SF P
urch
asin
g &
Prop
erty
Ser
vice
s
Heal
thSc
ienc
es
Heal
thSc
ienc
es -
Ther
apy,
Psyc
hiat
ry,
Scho
ol o
f Phy
sica
lTh
erap
y Psyc
holo
gy &
Com
m. S
cien
ces
&Di
sord
ers
Univ
ersi
tyDi
agno
stic
Inst
itute
Univ
ersi
tyTe
chno
logy
Cent
er I
Univ
ersi
tyRe
sear
ch II
I
Emba
ssy
Suite
sHo
tel
Mag
nolia
Apar
tmen
ts
Univ
ersi
tyTe
chno
logy
Cent
er II
Adm
inis
tratio
nBu
ildin
g/Ad
mis
sion
sW
elco
me
Ctr.
Engi
neer
ing
(Edg
ar W
. Kop
p)
Phyl
lis P
.M
arsh
all
Cent
er
Cent
ral
Rece
ivin
g
USF
Wat
er
Tow
er
Park
ing
&Tr
ansp
orta
tion
Serv
ices
Flor
ida
Alzh
eim
er’s
Ce
nter
& Re
sear
ch
Inst
itute
(und
erco
nstru
ctio
n)
Shrin
ers
Hosp
ital
for C
hild
ren
Art
Mus
eum
The
atre
II
Danc
e Thea
treTh
eatre
Art
s Re
hear
sal
Fine
Art
s
Mof
fitt R
esea
rch
Inst
itute
Park
ing
Faci
lity
(und
erco
nstru
ctio
n)
Cred
it Un
ion
H. L
eeM
offit
tCa
ncer
Cent
er
Stud
ent
Serv
ices
Spec
ial
Even
tsCe
nter
Argo
sCe
nter
Beta
Hal
l
Cypr
ess
Hall
Cypr
ess
Apar
tmen
ts
Map
le S
uite
s
Cast
or H
all
Koso
ve H
all
Holly
Apa
rtm
ents
GKX
USF
Book
stor
e
Andr
osCe
nter
Zeta
Hal
lEt
a Ha
ll
Pool
Epsi
lon
Hall
Delta
Hal
l
Purc
hasi
ngO
ffice
(in th
e An
dros
Cla
ssro
om B
ldg)
Cros
swal
k
Cros
swal
k
Lo
t43
Park
ing
Avai
labl
e
Iota
Hal
l
Kapp
a Ha
ll
Lam
bda
Hall
Mu
Hall
Thet
aHa
ll
Univ
ersi
tyPo
liceAu
xilia
rySe
rvic
es
Gre
ek H
ousi
ng
Bapt
ist
Stud
ent
Cent
er
Cath
olic
Cent
er
Chap
elCe
nter
@ U
SFSo
ftbal
lCo
mpl
ex
Stad
ium
Sun
Dom
e
Anth
ony
Pizz
oEl
emen
tary
Sc
hool
Vars
ity Te
nnis
Co
urts
Cros
swin
dsW
esle
yFo
unda
tion
B’Na
iB’
rith
Hille
lHo
use
Inte
rcol
legi
ate
Athl
etic
Faci
lity
Phys
ical
Educ
atio
n
Recr
eatio
nCe
nter
Coop
er H
all
(Art
s &
Scie
nces
)
Busi
ness
Adm
inis
tratio
n(F
ergu
son
Hall)
Cam
pus
/ Par
king
Info
rmat
ion
Cent
er
USF
Mai
n En
tranc
e(Sto
p he
re to
get
a U
SFVi
sito
r Par
king
Per
mit.
)
Educ
atio
n
Com
m.
& In
fo.
Scie
nces
Alum
niCe
nter
Lifs
eyHo
use
Libr
ary
Bota
nica
lG
arde
n
Park
ing
Avai
labl
e
- Par
king
for V
isito
rs w
ith v
alid
USF
par
king
per
mit
- Sid
ewal
k Pa
th to
Pur
chas
ing
& Fi
nanc
ial S
vcs
- Veh
icle
Rou
te to
Pur
chas
ing
Offi
ce
DO N
OT
Park
Her
e
DO N
OT
Park
Her
e
Eas
t Fle
tche
r A
venu
e E
ast F
letc
her
Ave
nue
Eas
t Fow
ler
Ave
nue
Eas
t Fow
ler
Ave
nue
Bruce B. Downs Boulevard
US
F-P
ine
Alu
mni
Driv
e
USF-Magnolia
USF-Magnolia
Leroy Collins Boulevard
Alu
mni
Driv
e
Alu
mni
Driv
e USF-Maple
USF-Maple
USF-Sycamore
USF-Palm USF-Palm
US
F-L
aure
l
42nd
Str
eet
46th
Str
eet
US
F-H
olly
Driv
e
US
F-H
olly
Driv
e
US
F-H
olly
Driv
e
USF-Pine
Spe
ctru
mB
oule
vard
50th Street 50th Street
BullRun
USF-Cypress
Medica
lC
ente
rD
rive
USF-Will
owD
rive
USF-Banyan
Cres
cent
Hill
Park
ing
Faci
lity
Visi
tor
Park
ing
Leve
ls 1
-4
Lo
t
44L
ot
20
Flor
ida
Men
tal
Heal
thIn
stitu
te
Map
to U
SF P
urch
asin
g &
Prop
erty
Ser
vice
s
Heal
thSc
ienc
es
Heal
thSc
ienc
es -
Ther
apy,
Psyc
hiat
ry,
Scho
ol o
f Phy
sica
lTh
erap
y Psyc
holo
gy &
Com
m. S
cien
ces
&Di
sord
ers
Univ
ersi
tyDi
agno
stic
Inst
itute
Univ
ersi
tyTe
chno
logy
Cent
er I
Univ
ersi
tyRe
sear
ch II
I
Emba
ssy
Suite
sHo
tel
Mag
nolia
Apar
tmen
ts
Univ
ersi
tyTe
chno
logy
Cent
er II
Adm
inis
tratio
nBu
ildin
g/Ad
mis
sion
sW
elco
me
Ctr.
Engi
neer
ing
(Edg
ar W
. Kop
p)
Phyl
lis P
.M
arsh
all
Cent
er
Cent
ral
Rece
ivin
g
USF
Wat
er
Tow
er
Park
ing
&Tr
ansp
orta
tion
Serv
ices
Flor
ida
Alzh
eim
er’s
Ce
nter
& Re
sear
ch
Inst
itute
(und
erco
nstru
ctio
n)
Shrin
ers
Hosp
ital
for C
hild
ren
Art
Mus
eum
The
atre
II
Danc
e Thea
treTh
eatre
Art
s Re
hear
sal
Fine
Art
s
Mof
fitt R
esea
rch
Inst
itute
Park
ing
Faci
lity
(und
erco
nstru
ctio
n)
Cred
it Un
ion
H. L
eeM
offit
tCa
ncer
Cent
er
Stud
ent
Serv
ices
Spec
ial
Even
tsCe
nter
Argo
sCe
nter
Beta
Hal
l
Cypr
ess
Hall
Cypr
ess
Apar
tmen
ts
Map
le S
uite
s
Cast
or H
all
Koso
ve H
all
Holly
Apa
rtm
ents
GKX
USF
Book
stor
e
Andr
osCe
nter
Zeta
Hal
lEt
a Ha
ll
Pool
Epsi
lon
Hall
Delta
Hal
l
Purc
hasi
ngO
ffice
(in th
e An
dros
Cla
ssro
om B
ldg)
Cros
swal
k
Cros
swal
k
Lo
t43
Park
ing
Avai
labl
e
Iota
Hal
l
Kapp
a Ha
ll
Lam
bda
Hall
Mu
Hall
Thet
aHa
ll
Univ
ersi
tyPo
liceAu
xilia
rySe
rvic
es
Gre
ek H
ousi
ng
Bapt
ist
Stud
ent
Cent
er
Cath
olic
Cent
er
Chap
elCe
nter
@ U
SFSo
ftbal
lCo
mpl
ex
Stad
ium
Sun
Dom
e
Anth
ony
Pizz
oEl
emen
tary
Sc
hool
Vars
ity Te
nnis
Co
urts
Cros
swin
dsW
esle
yFo
unda
tion
B’Na
iB’
rith
Hille
lHo
use
Inte
rcol
legi
ate
Athl
etic
Faci
lity
Phys
ical
Educ
atio
n
Recr
eatio
nCe
nter
Coop
er H
all
(Art
s &
Scie
nces
)
Busi
ness
Adm
inis
tratio
n(F
ergu
son
Hall)
Cam
pus
/ Par
king
Info
rmat
ion
Cent
er
USF
Mai
n En
tranc
e(Sto
p he
re to
get
a U
SFVi
sito
r Par
king
Per
mit.
)
Educ
atio
n
Com
m.
& In
fo.
Scie
nces
Alum
niCe
nter
Lifs
eyHo
use
Libr
ary
Bota
nica
lG
arde
n
Park
ing
Avai
labl
e
- Par
king
for V
isito
rs w
ith v
alid
USF
par
king
per
mit
- Sid
ewal
k Pa
th to
Pur
chas
ing
& Fi
nanc
ial S
vcs
- Veh
icle
Rou
te to
Pur
chas
ing
Offi
ce
DO N
OT
Park
Her
e
DO N
OT
Park
Her
e
Clos
e-Up
of P
urch
asin
g &
Prop
erty
Svc
s O
ffice