Gujarat Industrial
Development Corporation
Investment
Opportunities
in Gujarat
GIDC Sanand-III(Khoraj) Industrial Estate
Under the flagship Make in India and further enhance
partnership with Japan, GIDC has established exclusively
Japan Industrial Township at Khoraj (Sanand-III). It spans
across 1438 ha of land, out of which 612 ha of land is
developed as Japan Industrial Township
Infrastructure Facilities
Available Space Target Sectors
Allotment Price
Land Parcel Size (sqm)
Connectivity
Rates
Ahmedabad International Airport
45 KM
Ahmedabad Railway Junction
45 KM
Kandla Dahej Hazira Mundra JNPT Mumbai
266 KM 272 KM 318 KM 324 KM 586 KM
• Provide by GIDC at doorstep.
• Permissible limit of 11 KLD/ ha area of land allotted
• Planning of 30 lakhs ltr capacity of Sump & 15 lakh ltr.
Capacity ESR
• Planning of 3.68 capacity SUMP in residential zone
Yet to finalized
• Five 66/11 KV substation and one 200KV substation is under
planning
• Three 66/11 KV substation is under planning exclusively for
Japanese zone.
INR 7.50 per
kwh (USD 0.09*)
• GSPL would supply GAS at doorstep of factory
• The gas distribution within the factory will be done by
Company's own cost.
INR 32 per SCM
(USD 0.4*)
450 ha. ( including 36 ha. for Japanese
residential zone)
•Aerospace
•Defense
•Automobile & Ancillary
Engineering
• ElectronicsINR 3735/- (Tentative) (USD 49.5*)
>10,00010,000-
25,000
25,000-
50,000
50,000-
100,000>1,00,000
INR 1=75 USD*
GIDC Sanand-II Industrial Estate
Sanand –II spread over 2056 ha of land with well developed
infrastructure facilities for industries. Located just 25-
30kms from Ahmedabad City and hub of automobile sector
Infrastructure Facilities
Available Space Target Sectors
Allotment Price
Connectivity
Rates
Ahmedabad International Airport
45 KM
Ahmedabad Railway Junction
45 KM
Kandla Dahej Hazira Mundra JNPT Mumbai
266 KM 272 KM 318 KM 324 KM 586 KM
• Provide by GIDC at doorstep.
• Permissible limit of 13.5 KLD/ ha area of land allotted INR 33 per KL
(USD 0.4*)
• Four 66/11 KV substation area operational
• One 66/11 KV substation is under planning
• 400/200 KV substation located within estate to be
operational soon
INR 7.50 per
kwh (USD 0.09*)
• GSPL would supply GAS at doorstep of factory
• The gas distribution within the factory will be done by
Company's own cost.
INR 32 per SCM
(USD 0.4*)
493 ha • Engineering,
• Automobile & ancillary
• Plastics
• Electronics
• PharmaINR 3780/- (USD 50.1*)
>10,00010,000-
25,000
25,000-
50,000
50,000-
100,000>1,00,000
INR 1=75 USD*
Land Parcel Size (sqm)
GIDC Japanese Zone Industrial Estate
To Promote Japanese investment in the State, GIDC has
earmarked and developed Gujarat’s first country-specific
industrial estate spreading over 123 ha near Vithalapur,
Mandal
Infrastructure Facilities
Available Space Target Sectors
Allotment Price
Connectivity
Rates
Ahmedabad International Airport
90 KM
Viramgam Railway Station
30 KM
Kandla Dahej HaziraMundra JNPT Mumbai
275 KM 330 KM 381 KM325 KM 633 KM
• Water supply available from Narmada main canal NC-14.
• Zinzuwada branch canal passes through Bechraji Mandal and
Dasada taluka
INR 47.3 per
KL (USD 0.6*)
• One 66 KV substation is operational and one 220 KV
substation is to be proposed by GETCO . To be operational
in near future
INR 7.50 per
kwh (USD 0.09*)
• Existing pipeline from Vapi to Mehsana by GSPL.
• GSPC network to be extended from Mehsana to Becharaji.
INR 32 per SCM
(USD 0.4*)
22 ha • Engineering
•Automobile & ancillary
INR 2900 (USD 38.4*)
25,000-50,000 50,000-100,000 >1,00,000
INR 1=75 USD*
Land Parcel Size (sqm)
GIDC Bhagapura Industrial Estate
To create value chain with the auto giants such as Maruti
Suzuki, GIDC has identified & acquired approximately 273
ha of land in Bhagapura, Ahmedabad for developing Maruti
Suzuki Vendors Park
Infrastructure Facilities
Available Space Target Sectors
Allotment Price
Connectivity
Rates
Ahmedabad International Airport
90 KM
Viramgam Railway Station
30 KM
Kandla Dahej HaziraMundra JNPT Mumbai
275 KM 330 KM 381 KM325 KM 633 KM
• Water supply available from Narmada canal INR 47.3 per
KL (USD 0.6*)
• One 66 KV substation is operational by 2021 and two 66KV
and one 220 KV substation is under planning
INR 7.50 per
kwh (USD 0.09*)
• Existing pipeline from Vapi to Mehsana by GSPL.
• GSPC network to be extended from Mehsana to Becharaji.
INR 32 per SCM
(USD 0.4*)
100 ha • Engineering
• Automobile & ancillary
• Plastics
• ElectronicsINR 3550 (USD 47.0*)
25,000-50,000 50,000-100,000 >1,00,000
INR 1=75 USD*
Land Parcel Size (sqm)
GIDC Saykha Industrial EstateGujarat Petroleum, Chemical and Petrochemical Investment Region(PCPIR) comprise of 453 sq.km(45,300 ha) Bharuch district , is thefirst operational and most developed PCPIR in the country.Within PCPIR GIDC has existing Industrial estates as Dahej
I, Dahej II, Dahej III, Vilayat, Saykha and Dahej SEZ
Infrastructure Facilities
Available SpaceTarget Sectors
Allotment Price
Connectivity
Rates
Vadodara International Airport
85 KM
Bharuch Dahej Railway Station
62 KM
• Permissible limit for Chemical zone is 55 KL/ per ha /per day
• Permissible limit for Engineering zone is 22 KL/per ha/per
day
INR 39.5 per
KL (USD 0.5*)
INR 21,975 per
Kl (USD 291*)
• Effluent collection network is laid down Norms :
33kl/ha/day
• If the quantity of effluent is more than permissible limit,
factory shall have to lay down the line from their
premises upto the drainage pumping station.
INR 32 per SCM
(USD 0.4*)
201 ha• Chemical & Petrochemical,
• Dyes & Pigments
• Textile
• Plastics
• EngineeringINR 2100 (USD 27.8*)
>10,000 10,000-15,000
INR 1=75 USD*
Surat Airport
93 KM
Adani Petronet GCPTCL Liquid
Chemical Terminal
LNG Petronet
(Gas Terminal)
Reliance Liquid Fuel
Jetty
Birla Copper Bulk cargo
Jetty
Within 30
km
• ONGC, Gujarat Gas Limited would supply GAS at
doorstep of factory
Drainage Cess
• Common Effluent Treatment Facility: 40 MLD
Land Parcel Size (sqm)
GIDC Dahej SEZ Industrial EstateGujarat Petroleum, Chemical and Petrochemical Investment Region(PCPIR) comprise of 453 sq.km(45,300 ha) Bharuch district , is thefirst operational and most developed PCPIR in the country.Within PCPIR GIDC has existing Industrial estates as Dahej
I, Dahej II, Dahej III, Vilayat, Saykha and Dahej SEZ
Infrastructure Facilities
Available Space Target Sectors
Allotment Price
Connectivity
Rates
Vadodara International Airport
130 KM
Bharuch Dahej Railway Station
44 KM
• Provide by GIDC at doorstep.
• Permissible limit of 55 KLD/ ha area of land allotted for
chemical & 33 KLD/Hac area of land allotted for Engineering
INR 38.2 per
KL (USD 0.5*)
• Four 33/66 KV substation area operational.
• Torrent Power Ltd:- 1200 Mega KV power plant functional
co-developer for power distribution
INR 32 per SCM
(USD 0.4*)
158.1 haMulti Products
INR 1650 (USD 21.8*)
INR 1=75 USD*
Surat Airport
136 KM
Adani Petronet GCPTCL Liquid
Chemical Terminal
LNG Petronet
(Gas Terminal)Within 30
km
• Gujarat State Petronet Limited would supply GAS at
doorstep of factory
• The gas distribution within the factory will be done by
Company's own cost.
Hazira 100 KM
INR 7.50 per
kwh (USD 0.09*)
Depending upon the requirement of individual
companies contiguous land can be carved out.Land Parcel Size (sqm)
GIDC Halol II Industrial EstateHalol estate is located in Panchmahal District and has an area
of 461 hectares while Halol Expansion has an area of 601
hectares. Additionally, Halol-Savli has been declared as a
Special Investment Region, under the Special Investment Region
Act - Government of Gujarat, spread over an area of 123 sq
kms
Infrastructure Facilities
Available Space Target Sectors
Allotment Price
Connectivity
Rates
Vadodara Airport
42 KM
Broad Gauge track line from Baroda to Godhra
6 KM
• Water supply network is laid. Adequate water availableINR 50 per KL
(USD 0.6*)
• 220 KV power station and 220 KV power line passing
through Halol
• Two 66 KV substation has been proposed in GIDC Halol
INR 32 per SCM
(USD 0.4*)
116 ha• Automobile & ancillary units
• Engineering
• Plastics
• ElectronicsINR 1520 (USD 20.1*)
INR 1=75 USD*
Ahmedabad International Airport
155 KM
• Gujarat gas limited would supply GAS at doorstep of
factory
INR 7.50 per
kwh (USD 0.09*)
Dahej KandlaHazira JNPT Mumbai
175 KM 450 KM 485 KM220 KM 500 KM
Mundra
>10,00010,000-
25,000
25,000-
50,000
50,000-
100,000>1,00,000Land Parcel Size (sqm)
Dholera Investment RegionDholera SIR spread over 920 kms, is a proposed industrial hub
located 100 km of South of Ahmedabad and 130 km from
Gandhinagar. It’s the first investment region to be designed
under DMIC proejct
Infrastructure Facilities
Available Space Target Sectors
Allotment Price
Land Parcel Size
Connectivity
Rates
• Water Treatment Plant having
capacity of 50 MLD
INR 40 per KL (USD 0.5*)
• 24x7 uninterrupted Power Supply with Lowest Tariff in
the country
400 ha Multi Products (Non Chemical)
INR 2750 (USD 36..4*)
INR 1=75 USD*
• Provision for supply of Natural Gas to Industries and
Residential Areas
INR 4.50-5.50 per
kwh (USD 0.05-
0.07*)
20,000-50,000 >1,00,000
• Ahmedabad International Airport
• Proposed Dholera International Airport by
AAI
125 Km
15 Km
• Rail Connection – Proposed Bhimnath – Dholera Freight Line
connecting to Dedicated Freight Corridor (DFC)
Pipava Port Kandla Port209 KM 330 KM Mundra Port 396 KM
INR 20 per KL (USD 0.2*)
Portable Water
Treated Water
USD 8.5-10* MMBTU
• Common Effluent Treatment Plant having capacity of 20 MLD
• Sewage Treatment Plant having capacity of 15 MLD
Industrial IncentivesElectronics Policy
Incentive Incentive Type Ceiling/Cap
Incentives to Electronics Manufacturing Clusters (EMCs)
Capital
Assistance• Up to 25% of project cost
• INR 25 crores (USD
3,750,000) for
Greenfield EMCs of area
less than 200 acres
• INR 100 crores (USD
15,000,000) for
Greenfield EMCs of area
more than 200 acres
Stamp Duty &
Registration Fee
Reimbursement
• Reimbursement of 100% of Stamp Duty &
Registration fees paid to the
Government of Gujarat towards the
lease/sale/transfer of land for the EMC
• Nil
Power & Power
Tariff Subsidy
• Power tariff subsidy of INR 1 (USD 0.015)
per unit on the billed amount on
reimbursement basis for 5 years
• 100% reimbursement of electricity duty
paid from date of approval of EMC
• None
Support for
continuous
power supply
availability
• Financial contribution for creation of a
feeder or a sub station for supply of
continuous and good quality power
supply to EMCs on a need basis
• INR 5 crores (USD
750,000)
Incentives to the ESDM Units
Capital
Subsidy
Capital Subsidy on the Gross Fixed Capital
Investment (GFCI):
• 10% of GFCI for ESDM units with GFCI up to
INR 10 Crore (USD 1,500,000)
• INR 1 Crores (USD 150,000) plus 5% of
incremental GFCI above INR 10 crores (USD
1,500,000) for ESDM units with GFCI
between INR 10 core to INR 1000 crores
(USD 150,000,000)
• INR 25 Crores (USD 3,750,000) plus 5% of
GFCI above 1000 Crores (USD 150,000,000)
for ESDM units with GFCI greater than 1000
crores (USD 150,000,000)
• INR 1 crore (USD
150,000) for ESDM units
with GFCI up to INR 10
Crores (USD 1,500,000)
• INR 25 Crores (USD
3,750,000) for ESDM
units with GFCI
between INR 10 crores
(USD 1,500,000) and
INR 1000 crores (USD
150,000,000)
• INR 100 crores (USD
15,000,000) for ESDM
units with GFCI greater
than INR 1000 crores
(USD 150,000,000)
Incentive Incentive Type Ceiling/Cap
Incentives to the ESDM Units
Stamp Duty &
Registration Fee
Reimbursement
• Reimbursement of 100% of Stamp Duty
& Registration fees paid to the
Government of Gujarat towards the
lease/sale/transfer of land
• Nil
Interest Subsidy
Interest Subsidy for the interest on
borrowing at:
• 7% per annum for ESDM units with
borrowings up to INR 10 Crore (USD
1,500,000)
• INR 1 Crores (USD 150,000) plus 2% of
borrowings in excess of INR 10 crores
(USD 1,500,000) for ESDM units with
borrowings between INR 10 core
(1,500,000) to INR 1000 crores (USD
150,000,000)
• INR 5 Crores (USD 750,000) plus 5% of
borrowings in excess of 1000 Crores
(USD 150,000,000) for ESDM units with
borrowings greater than 1000 crores
• INR 1 crore (USD
150,000) for ESDM units
with GFCI up to INR 10
Crores
• INR 5 Crores (USD
750,000) for ESDM units
with GFCI between INR
10 crores and INR 1000
crores
• INR 10 crores (USD
1,500,000) for ESDM
units with GFCI greater
than INR 1000 crores
Tax Incentive• Reimbursement of tax
• To be finalized under
GST regime
Tax Incentive on
sales• Reimbursement of tax on Inter State
Sales
• To be finalized under
GST regime
Power & Power
Tariff Subsidy
• Power tariff subsidy of INR 1 (USD
0.015) per unit on the billed amount on
reimbursement basis for 5 years
• 100% reimbursement of electricity duty
paid from date of approval of EMC
• None
Employment
Generation
Incentive
• Reimbursement of EPF contribution
made for employees:
• 100% of EPF of female employees
• 75% of EPF for male employees
• INR 1 crore (USD
150,000) per annum
Single Window
Clearance System
• Set up of an empowered ‘Single
Window Competent Authority’ for
expediting approval processes,
supported by a 24*7 centralized
helpdesk call center
• Not Applicable
Industrial IncentivesElectronics Policy
Industrial IncentivesElectronics Policy
Incentive Incentive Type Ceiling/Cap
Patent
Assistance
• Up to 50% of expenditure incurred on
obtaining the patent
• INR 2 Lakhs (USD 3,000)
per patent for domestic
and INR 5 Lakhs (USD
7,500) for International
patents with a maximum
cap of INR 10 lakhs (USD
15,000) for domestic and
INR 25 Lakhs (USD 37,500)
for International patents
Market
Development
Support
• Financial Assistance of up to 50% of
expenditure incurred towards rental
expenses, creation of catalogues/
product literature and Display material
• INR 2 Lakhs (USD 2,000)
• Financial Assistance of up to 50% of the
total rental expenses incurred in
participation in International Trade
Fairs as Gujarat Pavilion outside India
• INR 10 Lakhs (USD 15,000)
• Viability Gap Funding to Industrial
Associations for organizing
Seminars/Exhibitions outside Gujarat
• INR 4 Lakhs (USD 6,000)
for National and INR 8
Lakhs (USD 12,000) for
International Events
Support to
R&D
Institutions
• Financial Assistance of 60% of Project
Cost, excluding land and building for set
up of new R&D institutes, testing
centers, finishing schools
• Up to 50% of cost incurred on
contract/sponsored research work from
industrial units/ industry associations to
recognized R&D Institutions & Colleges
recognized by AICTE
• INR 50 Lakhs (USD 75,000)
of project cots for set up
of new facilities
• INR 50 Lakhs (USD 75,000)
incurred on the research
projects
Quality
Certification
• Financial Assistance to cover the
expenditure incurred on obtaining the
quality certification including fees
charged by certification agency,
consulting fees and training charges,
cost of testing equipment, calibration
charges and other charges incurred
• INR 6 Lakhs (USD 9,000)
Assistance to
Training
Institutions &
Trainees
• New Scheme with customized courses
with on-floor training for skill
development to be set up by State
Labor & Employment Department
• Not Applicable
Industrial IncentivesAerospace and Defense Policy
Area of Assistance Incentive
Land incentives
• Mega/ Large A&D enterprises, with investment of >INR.
200 crore and having potential for cluster formation, would
be given preference in allotment of government land or
land in GIDC estates.
• Govt. land would be provided @ 50% of prevailing rate
• 100% reimbursement of stamp duty and registration
charges paid for on purchase of land
Interest subsidy
• Interest subsidies upto a maximum amount of INR 10 Crore
for Mega and INR 5 Crore for Large A&D projects
• Subsidies valid on interest against both External
Commercial Borrowing (ECB) and Domestic borrowing
Reimbursement of
taxes
• A&D enterprise would be allowed reimbursement of 100%
Net SGST with maximum cap of 90% of Gross Fixed Capital
Investment
Electricity Duty and
Power Tariff
incentives
• All A&D units shall be given 100% exemption on Electricity
Duty for the first 5 years from the date of commencement
of commercial production
• Power tariff subsidy of INR 1 per unit in the billed amount
for all units purchasing power only from Government of
Gujarat discoms for a period of 5 years
Miscellaneous
• Reimbursement of employee training and skill development
costs
• R&D investments within A&D units to be eligible for 25%
assistance
Industrial IncentivesIncentives under Mega and Innovative Policy
Industry which falls in the following sectors and having
investment of at least Rs. 1,000 Crore and provides
employment to at least 2000 people, may be given
incentives on case to case basis
• Auto and auto components
• Ship building and ship repair
• Semi conductor fabrication
• Industries having nanotechnology applications
• Maintenance, Repair and Overhaul (MRO) hub for
aircraft
Industrial IncentivesGujarat Industrial Policy 2015
Incentive Incentive Type Ceiling/Cap
Tax
Incentive
For Sanand II , Sanand III
(Khoraj), Halol II and Saykha
• 70% Net SGST reimbursement
will be payable for the period
of 10 years
For Bagapura, Vithlapur and
Dholera
• 90% Net SGST reimbursement
will be payable for the period
of 10 years
For Sanand II , Sanand III (Khoraj),
Halol II and Saykha
• 70% of Gross Fixed Capital
Investment
For Bagapura, Vithlapur and
Dholera
• 100% of Gross Fixed Capital
Investment
Plastic Industries – Gujarat Industrial Policy 2015
Incentive Incentive Type Ceiling/Cap
Interest
Subsidy• Interest subsidy at 7%
• INR 1 Crore (USD 150,000) Per
Annum
Tax
Incentive
For Sanand II , Sanand III
(Khoraj), Halol II and Saykha
•70% Net SGST
reimbursement will be
payable for the period of 10
years
For Bagapura, Vithlapur and
Dholera
•90% Net SGST
reimbursement will be
payable for the period of 10
years
For Sanand II , Sanand III (Khoraj),
Halol II and Saykha
• 70% of Gross Fixed Capital
Investment
For Bagapura, Vithlapur and
Dholera
• 100% of Gross Fixed Capital
Investment
Industrial IncentivesLabour Intensive Industries- Gujarat Industrial Policy 2015
Incentive Incentive Type Ceiling/Cap
Payroll
Assistance
• INR 1200 (USD 18) per person and
additional INR 300 per women
employment for new enterprises and
existing enterprises for one time
expansion
• Nil
Interest Subsidy• Interest Subsidy of 7% for the period of 5
years
• Rs. 1 Crore per
annum
Tax Incentive • 80% Net SGST reimbursement for 5 years• 70% of Gross Fixed
Capital Investment
Industrial IncentivesIncentive under Textile Policy 2019
• Interest Subsidy to eligible activities for a period of 5 years with a cap of Rs.20
crores per annum as per following rates:
Category Employment Interest subsidy
MSME - 6%
Large Enterprise
Up to 100 4%
101 to 200 4.5%
201 to 500 5%
More than 500 6%
• Power Tariff Subsidy Rs. 2 per billed unit
• Other incentive benefits such as:
• Assistance for Energy and Water Conservation and Environment Compliances
• Assistance for Technology Acquisition and Up-gradation