Page 1: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Introduction to Life Cycle Cost

Prof. Rajkumar S. PantAerospace Engineering Department

IIT Bombay

Page 2: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Over the life cost

Costs incurred from inception to disposal

LCC components in Engg. Design

Design & Development

Production

Support Equipment & Initial Spares

Operation & Support (O&S)

Disposal

Life Cycle Cost (LCC)

Page 3: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Reduction in system cost Social requirements, inflation, economic recession, ..

Paradigm shift in Engg. Design‘Performance at any cost’

‘Design-to-cost’

‘Design-to-LCC’

Helps in selection of competing solutions

Helps in identification of cost reduction areas

Most of LCC gets determined quite early

Importance of LCC in Engg. Design

Page 4: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Typical LCC breakupModern Combat Aircraft

Operation & Support

50%

Production 30%

Ground Support Eqpt.

& Initial Spares

5%

RDT & E14%

Disposal 1%

Source: Woodford S, Recent Combat Aircraft Life Cycle Costing Developments within DERA, RTO AVT Specialists meeting on Design for Low Cost Operation and Support, Ottawa, Canada, October 1999.

Page 5: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

LCC Determination Phases

Majority Of LCCCosts Are Determined

Early In Design

Page 6: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Design & Developmento CERs for factors, parameters and features that affect cost

Productiono Mostly activity based costing

• Tooling, Material, Fabrication, Assembly, QC, ……..

Support Equipment & Initial Spareso Can be reduced by careful design

Operation & Support (O&S)o Usually the largest component; models available

Disposalo Major issue of concern from environmental considerations

Estimation of LCC components

Page 7: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Largely statistical Based on actual costs of previous aircraft Difficult to determine the actual cost

a/c procurement spread over many years Non-optimal production rate; higher costs

Differences in Accounting procedure Then-Year Rupees

o Actual Money spent in each year of the program Constant Year Rupees

o Money spent ratioed by inflation to some specific year

Problems in Cost Estimation

Page 8: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Then-Year v/s Constant YearAircraft Then-Year (different years) Constant-Year (1978)F-15 USD 17.6 million USD 18.8 millionF-16 USD 10.8 million USD 08.2 million% diff 60% 130%

Page 9: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Production quantity & Rates

Source: Aircraft Design: A Conceptual Approach, D R Raymer

a/c prodn.

Page 10: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Light Combat Aircraft Sanctioned in 1983 : Rs. 560 Crores Amount spent till 2008: Rs. 5489.78

Crores Two TDs and 3 Prototypes developed

o Max. speed of Mach 1.4 achieved IOC in 2010, FOC in 2012 IAF & IN wanted 220 a/c, Current Orders = 20

Kaveri Engine Initial Sanction: Rs. 382 Crores Expenditure till date: Rs. 2839 Crores

Example of Cost Over-runs

Page 11: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

A Cost ComparisonName Country Cost

(Crore Rs.)

F/A-22 Raptor USA 480

Rafale France 270

JAS-Gripen Sweden 160

Mirage 2000 France 130

LCA India 110

Page 12: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Aircraft LCC Estimation

Page 13: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Aircraft LCC components

Size of Boxes proportional to

magnitude of costs

Page 14: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Estimation of Research Development Test & Evaluation

(RDT&E) Cost

Page 15: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Technology Research Design Engineering Prototype Fabrication Ground & Flight testing Evaluation of Operational Suitability Certification Airworthiness Mission Compliance

Design Documentation

RDT&E Components

Page 16: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Cost Estimation Methods

Aircraft Cost (US $) =150-300* DCPR weightDCPR = Defense Contractor’s Planning ReportWDCPR = Wt. of parts made by a/c manufacturer Empty Weight – Weight of Bought Out items Typical List of Bought Out Items:

o Wheels, Brakes, Tires, Engines, Starter, Cooling Fluids, Instruments, Batteries, Power supplies, Fire-control systems, Air-conditioning systems, Avionics, Furnishings, APU,…

Two-main approaches Activity Based

o Detailed assessment of actual tasks, WBS creation CER based

o Formula based on DCPR weight, Max. speed, Production rate, ….

Page 17: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

RAND DAPCA IV Model Estimates hours required for RDT&E & Prodn.

o Engineering, Tooling, Manufacturing, QCo Costs estimated by multiplying with MHRs

Other costs estimated directlyo Development Supporto Manufacturing Materialo Flight Test

Additional Cost elementso Financingo Profit

CER based RDT&E Estimation

Page 18: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Effort Hours Airframe Design & Analysis, Test Engineering Configuration control, Systems Engineering

Support Hours Propulsion and avionics system integration Tooling & production Planning

Mainly during RDT&E, but also during prodn. EE500 = 3*EE1

Engineering Hours

Page 19: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Tooling Hours

Preparation for Production

o Tools and Fixtures

o Moulds and Dies

o Programming of NC machines

o Design & fabrication of production test

apparatus

Tooling support during production

Tooling

Page 20: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Manufacturing Forming, Machining & Fastening Sub assembly & Final assembly Routing

o Hydraulics, Pneumatics, Electrics BO item installation

o Engine, Avionics, Subsystems Effort by Airframe subcontractors

Quality Control Inspection at receiving, production, assembly Tools, Fixtures, Components, sub-assemblies, Major

assemblies, Final Assembly

Manufacturing & QC Labor

Page 21: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Mock Up

Structural test rigs

LG Drop test

System Integration test-Rigs

Iron Bird Simulators

Development Support Costs

Page 22: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Iron Bird Simulator for F-728

Page 23: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

CERs in DAPCA IV model

Page 24: Introduction to Life Cycle Cost

AE-332M / 714 Aircraft Design Capsule-4

Formula for RDT&E Cost