  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    1/16

    Introduction ofRailway R&D Center

    Daewoo Engineering

    Signaling & Communication TeamRailway System Group

    2011.05.04

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    2/16

    Railway R&D CenterIntroduction

    1. Vision

    2. Organization

    3. Facilities

    4. Business Cluster Chain

    5. System Solutions

    Appendix #1 Developed Technologies

    #2 Plan for 2011s R&D Project

    0 . Contents

    2

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    3/16

    Railway R&D CenterIntroduction

    RAMSVerification & ValidationQualification

    Innovation

    Maturity

    1 . Vision

    New

    CreatingNew Generation

    Business

    SystemCore

    Process

    SystemSolution

    Core

    Tech.R&DProcessManagement

    Railway SystemTotal Solution Provider

    System Integration

    Fail-safeSIL4 Certificate

    Maglev SystemDriverless SystemERTMS System

    Oversea MarketSystem Package

    Transportation

    3

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    4/16

    Railway R&D CenterIntroduction

    2 . Organization

    Requirement Management Configuration Management RAMS Verification & Validation

    Qualification

    System Integration Onboard Wayside Interlocking

    ATS

    Material Manufacturing Management QA/QC CS

    Railway R&D Center

    Test & Assurance

    Test & AssuranceResearch &

    Development

    Research &Development Manufacture & QA

    Manufacture & QA

    Members

    1

    3

    3

    2

    2

    3

    1

    1

    1

    0 1 2 3 4

    Manuf.&QA

    R&D

    Test & AssuranceSenior Research Engineer

    Research Engineer

    Researcher

    Total 17

    4

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    5/16

    Railway R&D CenterIntroduction

    3 . Facilities

    Area Picture Location

    Proto Type Facility Validate proto type system

    ATS Development RoomSystem Development Room

    Software Development

    Module Development

    Manufacturing PlantIntegration Test Shop

    Assembling Products

    Functional Integration Test

    DAKOS

    Establishment: 2009.12.29.

    Maglev System

    Transfer of Tech. , Localization

    ProtoType

    Guest

    Engineer

    Room

    DAKOS

    5

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    6/16

    Railway R&D CenterIntroduction

    4. Business Cluster Chain

    6

    Railway

    R&D Center

    RailwayR&D Center

    Customer

    Government

    ISA

    GovernmentISA

    Sharing Information between Cluster

    Cooperation Associate between Cluster

    Responding to Market Condition and Requirements

    Reflecting the Customers Needs

    Supplier

    Supplier

    Creating Government Business Participating in the Board for

    Certificate Policy

    Business Proposal & Joint Research Supply of Customer Required System

    Development of Core Technology Implementing System Engineering

    and System Assurance

    Manufacturing COTSand Developed Product

    Sharing Business Figures Cooperation of Technologies

    for a long-term

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    7/16

    Railway R&D CenterIntroduction

    7

    5. System Solutions

    Steel Mill Package GUARDIAN Steel Mill Solution

    Metro Package GUARDIAN Metro Solution

    Maglev Package - GUARDIAN Maglev Solution

    Interlocking iLis Distribution & Centralization Type

    Operating with Perfect Logical Scenario and Fail-Safe for Train Safety

    Core system securing ultimate Safety and Reliability

    Interface with Train for Train Position, Movement and Fault Information

    Consist of Onboard/Wayside, ATS and Interlocking

    What is Signaling System?

    What is Signaling System?

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    8/16

    Railway R&D CenterIntroduction

    5. System Solution GUARDIANMaglevSolution: Train Control Signaling Solution for Maglev

    8

    Wayside Equipment

    ATP/ATO Track circuit(or Loop)

    ATP/ATO DataTransmission

    SubsystemLevel

    SystemLevel Onboard ATP/ATO

    ADU

    Wayside

    ATSInterlocking

    SignalingSystem

    OnboardRollingstock

    Interface

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    9/16

    Railway R&D CenterIntroduction

    5. System Solution GUARDIANMetro Solution: Train Control Signaling Solution for Metro Line

    MatchingTransformer

    ATP Antenna

    9

    Onboard ATP/ATO

    MMI

    Track

    Rolling stock Bogie

    ATO Antenna

    ATO Marker

    TWC Device

    Wayside Signaling Room

    ATP Equipment

    ATO Equipment

    Interlocking Equipment

    iLis

    ATS System

    GUARDIAN IRM

    Wayside

    ATS

    Interlocking

    Onboard

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    10/16

    Railway R&D CenterIntroduction

    5. System Solution GUARDIANSteel Mill Solution: Train Control Signaling Solution for Steel Mill Yard and Train

    10

    CTC

    RF Tag

    MMI

    InterlockingEquipment

    CommandCenter

    WirelessCommunication

    Signal

    Point Machine

    AVI Equipment

    Track CircuitWayside

    TTC

    Interlocking

    TrainCommunication

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    11/16

    Railway R&D CenterIntroduction

    Appendix

    #1 Developed Technologies#2 Plan for 2011s R&D Project

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    12/16

    Railway R&D CenterIntroduction

    Appendix#1 DevelopedTechnologies

    3rdEdition

    2005~

    4thEdition

    2010~

    2nd Edition

    1992-2000

    1stEdition

    1987-1992

    1. ATS(Automatic Train Supervision) System1. ATS(Automatic Train Supervision) System

    Name

    TCM

    ATS-SB

    Total TrafficControl System

    Driverless ATSSystem

    Type

    Train Control andMonitoring System

    ATS Systemwith Schedule-Based

    ATS System interlockedwith SCADA andCommunication

    Equipments

    ATS System forDriverless Operation

    POSCO(Gwangyang) Steel Mill No.1, 2

    POSCO(Gwangyang) Steel Mill No.3, 4

    POSCO(Pohang) Steel Mill

    Seoul No.1,3,4 and 5

    Incheon No.1

    POSCO(Pohang/Gwangyang) Steel Mill

    Daegu No.2

    Busan No.1,2,3

    Seoul No.9

    Overseas

    Incheon Maglev Line

    Picture Applied Project

    Present

    ATSATS

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    13/16

    Railway R&D CenterIntroduction

    Appendix#1 DevelopedTechnologies

    1stEdition1996-1999

    Relay TypeInterlocking

    POSCO(Pohang/Gwangyang)Taebaek Line

    Relay Logic with Fail-Safe

    2. Interlocking (iLis, Intelligent Logic interlocking System)2. Interlocking (iLis, Intelligent Logic interlocking System)

    Name

    3rdEdition2010-

    iLisinterlocking

    Maglev LineOverseas

    2ndEdition2000-2009

    Korea RailwayStandard

    Interlocking

    Suncheon, Gwangyang, andPyeonghwa Stations

    High Speed Railway Line Phase2(Busan, Osong, Daejeon Station)

    Type

    Relay-less LogicDistribution Type

    Relay Logic BasedRedundancyKorea Railway Standard Product

    Picture Applied ProjectInterlockingsystem

    Interlockingsystem

    Present

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    14/16

    Railway R&D CenterIntroduction

    Appendix#1 DevelopedTechnologies

    Digital ATP Type(Wayside Type)

    Distance-To-Go Type(Onboard Type)

    ERTMS L1/L2

    Type

    3. Onboard / Wayside System3. Onboard / Wayside System

    1stEdition

    2003-2010

    2ndEdition

    2010~

    3rd Edition

    2011~

    Busan Metro No.3 Line

    OverseasMaglev Line

    Domestic : Jeola, Gyeongjeon,Janghang Line

    Overseas : Main Line

    Onboard /Wayside

    Onboard /Wayside

    Onboard

    Picture

    Wayside

    PictureApplied Project

    Present

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    15/16

    Railway R&D CenterIntroduction

    Nov. 2010 ~ Nov. 2012 Dec. 2012~ Nov. 2013 Dec. 2013 ~ Dec. 2014

    1 phase 2 phase 3 phase

    Mission : Advance into the next Generation Signal/Transportation Market withERTMS based System

    LEUBalise

    EVC Lv1

    RTMEVC Lv2

    RBCEVC Lv3

    Base Line Elements

    System Configuration - 2oo3/2oo2

    Platform- Standard Onboard/Wayside Baseline Platform Standards Comply with EN, IEC, IEEE (SIL4 Level)

    Adaptive Elements

    Development for each

    Interface Type andPackage Specification

    Element

    Technology

    Developmentfor ERTMS

    CoreTechnology

    ERTMS : European Railway Traffic Management System / LEU : Lineside Electronic Unit EVC : European Vital Computer / RBC : Radio Block Centre / IXL : Interlocking System ERTMS : European Railway Traffic Management System / LEU : Lineside Electronic Unit EVC : European Vital Computer / RBC : Radio Block Centre / IXL : Interlocking System

    Appendix#2 2011s R&D Project - GUARDIANERTMS Solution: Train Control Signaling Solution with ERTMS

  • 8/3/2019 Introduction of Daewoo Engine Ring Railway R&D Center

    16/16

    Daewoo Engineering

    Railway R&D Center

    Daewoo Engineering

    Railway R&D Center

    Thank you.Thank you.