UK Power Networks AST 12 001 v2.0 Capturing, Registering or Amending Asset Data Owner Name Barry Hatton Title Director of Asset Management Signature Date 02 February 2018 Authoriser Name Matt Webb Title Head of Asset Information Signature Date 02 February 2018 This document forms part of the UK Power Networks Integrated Management System and compliance with its requirements is mandatory. Departure from these requirements may only be taken with the written approval of the above authoriser. Revision Record Version number 2.0 What has changed? Change to the order of FL and Work Order creation (system reasons), affecting 8.1.1 and 8.2.1. Why has it changed? Change to the order of FL and Work Order creation (system reasons). Date published 13/02/2018 Next review date 02/02/2023 Prepared by Craig Jeffrey Version number 1.0 What has changed? New Procedure Why has it changed? Following Business Transformation Programme implementation Date published 11/01/2017 Next review date 11/01/2018 Prepared by Craig Jeffrey Version number What has changed? This printed document is valid at 08/05/22, check after this date for validity. Page 1 of 31

Upload: nguyendan

Post on 10-Apr-2018

230 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

Capturing, Registering or Amending Asset DataOwner

Name Barry HattonTitle Director of Asset Management

Signature

Date 02 February 2018

Authoriser

Name Matt WebbTitle Head of Asset Information

Signature

Date 02 February 2018

This document forms part of the UK Power Networks Integrated Management System and compliance with its requirements is mandatory. Departure from these requirements may only be taken with the written approval of the above authoriser.

Revision Record

Version number 2.0 What has changed?Change to the order of FL and Work Order creation (system reasons), affecting 8.1.1 and 8.2.1.

Why has it changed?Change to the order of FL and Work Order creation (system reasons).

Date published 13/02/2018

Next review date 02/02/2023

Prepared by Craig Jeffrey

Version number 1.0 What has changed?New Procedure

Why has it changed?Following Business Transformation Programme implementation

Date published 11/01/2017

Next review date 11/01/2018

Prepared by Craig Jeffrey

Version number What has changed?

Why has it changed?Date published

Next review date

Prepared by

This printed document is valid at 07/05/23, check after this date for validity.Page 1 of 22

Page 2: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

Who needs to know?

☐ All UK Power Networks Staff☒ Asset Management☒ Capital Programme☒ Connections☒ Contractors☐ Customer Services☐ Finance

☐ Legal☒ G81 External website☐ HR & Communications☐ SHE&TT

☐ In Business HSS☐ Safety Reps

☒ ICPs (Independent Connection Providers)☒ IDNOs (Independent Distribution Network Operators)☐ Information Systems☐ Meter Operators

☒ Network Operations☐ EPN☐ LPN☐ SPN☐ Distribution Capital Delivery☐ Logistics☐ Network Control☐ Network Operations Connections☐ Transport Services

☒ Strategy and Regulation☒ UK Power Networks Services

☐ Airports☐ Rail☐ Strategic projects☐ HS1, DLR & Commercial buildings☐ MUJV / Allenby☐ Business Development

☐ Others (specify)

Contents

1.0 Introduction and Purpose...............................................................................................32.0 Scope................................................................................................................................33.0 Objective...........................................................................................................................44.0 References.......................................................................................................................45.0 Definitions........................................................................................................................46.0 Responsibilities...............................................................................................................67.0 Records............................................................................................................................78.0 Process Detail..................................................................................................................8

This printed document is valid at 07/05/23, check after this date for validity.Page 2 of 22

Page 3: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

1.0 Introduction and PurposeDuring any work activity where asset data needs to be captured or amended, it is essential that this is undertaken in an accurate and timely manner. At a high level, this includes the registration of new assets, the capture or amendment of fixed attribute (nameplate) data on new or existing assets and the removal of disposed assets.

The work activities that will typically include changes to asset data are:

Connections Projects; Competition in Connections Projects; Major Projects; Distribution Capital Delivery (DCD) Projects; Inspection and Maintenance (I&M) activities; Logistics Goods In / Waste Management.

Comprehensive updating of all asset data is essential for the ongoing maintenance and development of the asset throughout its lifecycle. For instance:

Entry of all required attributes is necessary to ensure that correct maintenance regimes are implemented and similarly that defects may be identified and resolved.

Comprehensive and accurate asset information is necessary to facilitate effective and optimal development and running of the networks.

The level of funding allowed by the Regulator is based upon the asset volumes / value recorded in our network databases. Achievement can only be claimed within the Regulatory year that is performed, so late recording of asset data results in lost revenue to the business.

Asset data is principally held within the Asset Register (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld / NetMap) and the Distribution Management System (PowerOn Fusion).

2.0 ScopeThis procedure applies to all changes to asset data, whether commissioning new assets, amending existing assets or decommissioning and disposal of redundant assets. It applies to all activities that initiate or require a change to any asset data.

This procedure details the business processes and functions that necessitate asset data changes and describes the actions necessary.

It applies to the updating of the Asset Register (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE Smallworld / NetMap) and the Network Control System (PowerOn Fusion).

This procedure does not cover Protection Settings or Small Tools.

This procedure does not relate to asset condition data or defects as neither of those are considered a change to asset data within the context of this document.

This printed document is valid at 07/05/23, check after this date for validity.Page 3 of 22

Page 4: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

3.0 ObjectiveThe purpose of this procedure is to ensure that all necessary actions to correctly capture asset data are performed in a timely, accurate and consistent manner.

Actions that responsible individuals are required to execute include:

Familiarise themselves with this procedure and implement all defined steps; Capture of asset data at each step, as required; Review and amendment / correction of asset data as appropriate throughout all

work activities; Completion of all asset data and relevant form submission during close work stage.

4.0 References

COP 01 006 System Alteration Notice Procedure

EDS 12-0025 Updating the Asset Register

EOP 00-0040 Disposal of Distribution Assets

EOS 09-0100 Site Recording of Cables Plant and Equipment

5.0 Definitions

AGT Asset Governance Team (Asset Register, Network Diagram, GIS)

ART Asset Registration Team

CAD Computer Aided Design

CiC Competition in Connections

CU Compatible Unit

DID Design ID (NetMap generated for SAP use)

EQ Equipment

FL Functional locations

GIS Geographic Information System (i.e GE SmallWorld / NetMap)

ICP Independent Connection Provider

Non-serialised Assets

Assets without serial numbers provided by manufacturers (explained in Logistics blueprint)

PDC Programme Deliver Close

PID Patch ID (PowerOn generated for PowerOn use)

This printed document is valid at 07/05/23, check after this date for validity.Page 4 of 22

Page 5: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

RIGs Regulatory Information Guidance (Regulatory Reporting to OFGEM)

SADS Small Assets Data Solution (Portable equipment)

SAN System Alteration Notice (change to PowerOn diagram)

SAP The Company Finance, Project & Work Management System

SAP PM SAP asset management system – Plant maintenance.

Serialised Assets

Assets with serial numbers provided by manufacturers (explained in Logistics blueprint)

SID Serial ID

Sigma 7 - GeoField

Mobile GIS app

SUS Supplier self-services

WO Work Order

This printed document is valid at 07/05/23, check after this date for validity.Page 5 of 22

Page 6: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

6.0 Responsibilities

6.1 Asset Strategy / Technical Sourcing ManagersAccountable for defining full asset data requirements and ensuring asset data templates are in place.

6.2 Asset & Technical Sourcing Engineers Responsible for defining full asset data requirements in order to fulfil all business requirements.

6.3 Asset Systems Responsible for preparing and configuring asset data templates based on Asset Engineer requirements.

6.4 Planning / Design ManagersAccountable for ensuring Functional Locations are created and fixed attribute data updated within the asset register.

6.5 Planner / Designer Responsible for creating Functional Locations and updating fixed attribute data within the asset register.

6.6 Logistics Responsible for ensuring Equipment objects are created through Goods Receipt (GR) process.

6.7 Materials Procurement Responsible for ensuring that all new supplier contracts include provision to provide Equipment details as part of order dispatch / fulfilment.

6.8 Programme / Area Managers (or any Line Manager of a Project Manager)Accountable for creating and assigning Equipment to Functional Locations and updating attribute data in the Asset Register and update of GIS records, where required.

6.9 Project Manager / Engineer Responsible for creating and assigning Equipment to Functional Locations and updating attribute data in the Asset Register and update of GIS records, where required.

6.10 Contractor Responsible for providing the Project Manager with data to create and assign Equipment to Functional Locations and update attribute data within the Asset Register, and update GIS records, where required.

This printed document is valid at 07/05/23, check after this date for validity.Page 6 of 22

Page 7: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

6.11 Contract Management Responsible for ensuring that all future contract renewals include requirement to provide asset data as required.

6.12 Asset Registration Team Responsible for checking quality of data captured / amended and update of the Asset Register where required.

6.13 GIS Drawing Office Responsible for checking quality of data captured / amended and update of the Geographic Information System (GIS).

7.0 RecordsThis procedure relates specifically to the recording of changes to asset details. Refer to Section 8 - Process Detail for specific details of record requirements.

This printed document is valid at 07/05/23, check after this date for validity.Page 7 of 22

Page 8: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

8.0 Process DetailThis section details five primary processes where asset data changes are made within which all work activities should fit. They are:

New assets installed by, or on behalf of, the Company (including non-like for like Asset Replacement);

Asset Replacement (like for like only);

New assets adopted under CiC;

Amending asset details during I&M (“As found”);

Asset Disposal.

This section includes high level process steps aligned to the Programme, Deliver and Close process (vertical swim lanes), which include systems (horizontal swim lanes) and high level data capture details.

It also contains more detailed process diagrams aligned to the Programme, Deliver and Close process (vertical swim lanes), which include responsibilities (horizontal swim lanes) and specific data capture related steps (highlighted green).

This printed document is valid at 07/05/23, check after this date for validity.Page 8 of 22

Page 9: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

8.1 New AssetsThis process relates to any Project that includes installation of new Equipment by, or for, the Company which is not a like-for-like Asset Replacement. For like-for-like Asset Replacement see section . For CiC or installation by an ICP see section .

8.1.1 Overview

1. Project identified to progress to design phase.

Note: this could be following a Connections quotation or a CAPEX project.

2. CU Design is completed in SAP.

3. Technical Design is completed. If done in Smallworld / NetMap then DID should be appended to Work Order.

This printed document is valid at 07/05/23, check after this date for validity.Page 9 of 22

Page 10: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

4. Functional Locations (FLs) are created in SAP using the Asset Registration (AR) tool. The CU Design ID needs to be entered into AR tool.

5. Detailed Work Order (WO) created from CU Design. The WO will have a series of Operations related to the installation of Equipment. Each Operation should reference the relevant Functional Location.

6. System Alteration Notice (SAN) is prepared and submitted.

7. Field Staff complete operations on their mobile device. This includes elements associated with asset data changes, installation of new Equipment (EQ) and removal of old EQ from different Functional Locations.

Field Staff should carry out a check of all fixed attribute data for all assets related to the WO, amending where necessary.

Note: non-Company staff (such as 3rd party Contractors) may use AR Forms. The AR forms are electronic forms which mimic those on the mobile device. These forms are submitted via the Project Manager for checking/loading (see step 10).

8. PowerOn patch is applied during work, where required.

9. Where required Field Staff complete a ‘red-line’ drawing and submit it via their mobile device. This is a drawing on GeoField which is used to amend Smallworld / NetMap.

Note: non-Company staff (such as 3rd party Contractors) may use alternative methods, typically editing a paper copy before scanning and submitting via Project

10. Asset Registration Team (ART) undertake data quality checks, involving creation of FLs and EQ, the correct assignment of EQ to FL and the completion of fixed attribute data.

If the ART find any data quality issues this may result in submissions being returned to the Field Staff for rework. Or it may involve clarification rather than resubmission.

11. GIS Drawing Office quality check red-line drawings and if acceptable process these by updating the GIS (NetMap)

If the GIS Drawing Office find any data quality issues this may result in submissions being returned to the Field Staff responsible for rework. It may also just involve a clarification rather than resubmission.

12. The WO can be changed to TECO (Technically Complete) if all asset data updates have been submitted and processed. This effectively closes the WO.

This printed document is valid at 07/05/23, check after this date for validity.Page 10 of 22

Page 11: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

8.1.2 Detailed

This printed document is valid at 07/05/23, check after this date for validity.Page 11 of 22

Page 12: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

8.2 Asset ReplacementThis process relates to like-for-like Asset Replacement only. For the purposes of this procedure like-for-like means that the Functional Location(s) does not need to be amended and is therefore reused.

An example would be the removal of a Withdrawable Oil Filled Circuit Breaker Equipment (EQ) from a Functional Location called “Panel 10 – High Street Circuit” which is replaced with a Withdrawable SF6 Filled Circuit Breaker EQ. Although the EQ is different the function, the circuit reference, the operating voltage and so on remain constant, i.e. the Functional Location is not amended.

8.2.1 Overview

1. Project identified to progress to design phase.

This printed document is valid at 07/05/23, check after this date for validity.Page 12 of 22

Page 13: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

Note: this could be following a Connections quotation or a CAPEX project.

2. CU Design is completed in SAP.

3. Technical Design is completed. If done in Smallworld / NetMap then DID should be appended to Work Order.

4. Functional Locations (FLs) are identified in SAP, within the CU Design.

5. Detailed Work Order (WO) created from CU Design. The WO will have a series of Operations related to the installation of Equipment. Each Operation should reference the relevant Functional Location.

6. System Alteration Notice (SAN) is prepared and submitted.

7. Field Staff complete operations on their mobile device. This includes elements associated with asset data changes, installation of new Equipment (EQ) and removal of old EQ from the same Functional Location.

Field Staff should carry out a check of all fixed attribute data for all assets related to the WO, amending where necessary.

Note: non-Company staff (such as 3rd party Contractors) may use AR Forms. The AR forms are electronic forms which mimic those on the mobile device. These forms are submitted via the Project Manager for checking/loading (see step 10).

8. PowerOn patch is applied during work, where required.

9. Where required Field Staff complete a ‘red-line’ drawing and submit it via their mobile device. This is a drawing on GeoField which is used to amend Smallworld/NetMap.

Note: non-Company staff (such as 3rd party Contractors) may use alternative methods, typically editing a paper copy before scanning and submitting via Project

10. Asset Registration Team (ART) undertake data quality checks, involving creation of FLs and Equipment (EQ), the correct assignment of EQ to FL and the completion of fixed attribute data.

If the ART find any data quality issues this may result in submissions being returned to the Field Staff for rework. Or it may involve clarification rather than resubmission

11. GIS Drawing Office quality check red-line drawings and if acceptable process these by updating the GIS (NetMap)

If the GIS Drawing Office find any data quality issues this may result in submissions being returned to the Field Staff responsible for rework. It may also just involve a clarification rather than resubmission.

12. The WO can be changed to TECO (Technically Complete) if all asset data updates have been submitted and processed. This effectively closes the WO.

This printed document is valid at 07/05/23, check after this date for validity.Page 13 of 22

Page 14: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

8.2.2 Detailed

This printed document is valid at 07/05/23, check after this date for validity.Page 14 of 22

Page 15: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

8.3 Competition in Connections (CiC) / Independent Connection Providers (ICPs)8.3.1 Overview

The process is broadly similar to that shown in Section - New Assets, however the sequence may vary slightly and creation of Functional Locations and Equipment may occur after work completion.

The data requirements however remain the same and assets should not be adopted on behalf of the Company before the assets are fully registered.

1. Quotation accepted and paid.

2. Work Order (WO) created

3. Technical Design is submitted and accepted by the Company.

This printed document is valid at 07/05/23, check after this date for validity.Page 15 of 22

Page 16: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

4. Functional Locations (FLs) are created in SAP.

6. System Alteration Notice (SAN) is prepared and submitted, if required.

7. Asset Registration (AR) Forms completed by ICP and submitted via CiC.

8. PowerOn patch is applied during work, where required.

9. Red-line drawing submitted, if required, by ICP via CiC.

10. Asset Registration Team (ART) undertake data quality checks of AR Forms. Forms may be returned should data fail to pass quality checks.

11. GIS Drawing Office quality check red-line drawings and if acceptable process these by updating the GIS (NetMap)

If the GIS Drawing Office find any data quality issues this may result in submissions being returned for resubmission.

12. The WO can be changed to TECO (Technically Complete) if all asset data updates have been submitted and processed. This effectively closes the WO.

This printed document is valid at 07/05/23, check after this date for validity.Page 16 of 22

Page 17: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

8.3.2 Detailed

This printed document is valid at 07/05/23, check after this date for validity.Page 17 of 22

Page 18: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

8.4 As-Found assets8.4.1 Overview

‘As-Found’ assets refers to a situation where a routine work activity is being undertaken, such as I&M, but asset details are found to be incorrect or there is no asset recorded at all.

Typically, the action required is to either Amend existing asset details, Remove asset(s) that are no longer at the location or Add asset(s) that are present at the location but not recorded.

This printed document is valid at 07/05/23, check after this date for validity.Page 18 of 22

Page 19: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

1. An asset (EQ) is found to be missing, or unexpectedly present or needs fixed attribute (Nameplate) data changing.

2. Follow SAP Work Manager processes for recording change. For a new asset found this involves completing an AR template (form), for the removal of an asset update the Operation and amend is either performed directly on the asset details (for editable values) or via form submission (for non-editable)

This printed document is valid at 07/05/23, check after this date for validity.Page 19 of 22

Page 20: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

Note: non-Company staff (such as 3rd party Contractors) may use AR Forms. The AR forms are electronic forms which mimic those on the mobile device. These forms are submitted via the Project Manager for checking/loading (see step 10).

3. Inform Network Control of change, if required.

4. Complete a red-line drawing using GeoField, if required, and submit via the mobile.

Note: non-Company staff (such as 3rd party Contractors) may use alternative methods, typically editing a paper copy before scanning and submitting via Project

5. Network Control amend PowerOn

6. ART check asset data changes.

If the ART find any data quality issues this may result in submissions being returned to the Field Staff for rework. Or it may involve clarification rather than resubmission.

7. ART create FLs as required

8. ART create EQ as required and assign to FL.

9. GIS Drawing Office quality check red-line drawings and if acceptable process these by updating the GIS (NetMap)

If the GIS Drawing Office find any data quality issues this may result in submissions being returned for resubmission.

This printed document is valid at 07/05/23, check after this date for validity.Page 20 of 22

Page 21: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

8.4.2 Detailed

This printed document is valid at 07/05/23, check after this date for validity.Page 21 of 22

Page 22: Introduction and Purposelibrary.ukpowernetworks.co.uk/library/en/g81/Records/AST+... · Web view... (SAP Plant Maintenance (PM)); the Geographic Information System (GIS) (GE SmallWorld

UK Power Networks AST 12 001v2.0

8.5 Asset DisposalThe procedure for disposal of assets is detailed in EOP 00-0040 so is not detailed within this document.

With respect to asset data changes (this procedure) it is important to note the following:

Asset Removal details must be captured and submitted to the ART prior to asset being collected. This can be done via the mobile within a WO (internal staff) or through submitting a Form (3rd Party Contractors)

Asset Disposal paperwork must be submitted to the ART upon asset disposal.

Please refer to EOP 00-0040 for detailed process maps.

This printed document is valid at 07/05/23, check after this date for validity.Page 22 of 22