introduction

19
INTRODUCTION Develop fully functional system for RSA (Recruitment Solution Agency). Job seeker can register online. Apply for jobs after registration. Employer can hire required staff from RSA system.

Upload: judson

Post on 23-Feb-2016

40 views

Category:

Documents


0 download

DESCRIPTION

INTRODUCTION. Develop fully functional system for RSA (Recruitment Solution Agency). Job seeker can register online. Apply for jobs after registration. Employer can hire required staff from RSA system. SYSTEM STRUCTURE. CLIENT. Company: RSA Recruitment Solution Agency - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: INTRODUCTION

INTRODUCTION• Develop fully functional system for RSA (Recruitment Solution Agency).• Job seeker can register online.• Apply for jobs after registration.• Employer can hire required staff from RSA system.

Page 2: INTRODUCTION

Website Structure

RSA Recruitment Solution Agency

Admin

Login

User Management Add User

Remove User

Change User Level

Site Management

Setting Website

Assign Permission

Logout

Employer

Register

Personal Admin Area Check Seeker Records

Login

Search Candidates

Send email to seeker

View Profile

Edit Profile

Job Posting

Logout

Logout

Job Seeker

Register

Login

Job Search

Create Job Alert

Check Status

Personal Private Area Upload Resume

View Profile

Edit Profile

Delete Profile

Add Credentials Education

Experience

Cover Letter

Download Timesheet

SYSTEM STRUCTURE

Page 3: INTRODUCTION

CLIENT• Company: RSA

Recruitment Solution Agency

• Name: Anna Damos• Role: CEO• Contact Info: 0415559142

Page 4: INTRODUCTION

TEAM• Name: Shining Stars• Logo:

• Contact Info: Email: [email protected] Repository : http://shiningstars6.weebly.com

Page 5: INTRODUCTION

PROJECT MANAGER/ CLIENT LIASION OFFICER

Responsibilities:• Divide team tasks• Check on the progress• Organize team meetings• Solve any issues or disputes• Arrange meetings with client• Report the progress to clientEmail : [email protected]:0416987781 UMA RANA(30097479)

Page 6: INTRODUCTION

DESIGNER/ DEVELOPER

Responsibilities:• Design the interface• Develop codes• Quality Assurance

Manager• Back up managerEmail :

[email protected]: 0430717000 POONAM SEN(30099177)

Page 7: INTRODUCTION

DATABASE DESIGNER/DEVELOPER

Responsibilities:• Design the interface• Develop codes• Design Database• Website Maintainer

Email : [email protected]:0468315056

ANMOLDEEP SINGH (30102252)

Page 8: INTRODUCTION

RESEARCHER/TESTER

Responsibilities:• Research on documents• System Testing• Research on the

requirements • Minute takerEmail :

[email protected]:0416793134

BILLAWAL ANSARI (30091848)

Page 9: INTRODUCTION

DOCUMENTERResponsibilities:• Design documents• SPMP• SRS• SDD

Contact info:Email :

[email protected]:0413242552

NASSER ALZUABI (30101848)

Page 10: INTRODUCTION

DOCUMENTER

Responsibilities:• Design document• Prepare documents• SPMP designed• SRS Version 1• SDD version 1Contact info:Email: [email protected]:0424676155 XIAOPING ZHENG

(30099748)

Page 11: INTRODUCTION

DEVELOPMENT PROCESS: AGILE METHODODLOGY

• Agile methodology• Easy to use• Testing and feedback

after each phase• Errors detection • Adapt changes without

hassle

Page 12: INTRODUCTION

DESIGNING PROCESS• HTML: Hypertext Markup Language• PHP: Hypertext Preprocessor• CSS: Cascading Style Sheets• My SQL: Structured Query Language

Reason for using:• Easy to maintain.• Open Source.• Compliments with each other really well.

Page 13: INTRODUCTION

WORK BREAKDOWN STRUCTURE(WBS)

Week Process/ tasks Members involved

Week 1:Initialization Team formation/ Project proposal

Whole team

Week 2: Planning Resources, requirements, scopes, limitations, process involved, task distribution

Whole team

Week 3: Designing Database designing/ SPMP Documentation/ Designer

Week 4: Designing/ Development/ SPMP

Database testing, feedback, and further development

Documentation/ Designer/ developer

Page 14: INTRODUCTION

WORK BREAKDOWN STRUCTURE(WBS) Week Process/ Tasks Members involved

Week 5: Designing/ Development

Sketch story boards, start coding, selection of colors, SRS, SDD

Whole team

Week 6: Further development/ Designing

Designing with HTML,PHP,CSS and testing

Designer/ Developer and tester

Week 7: SRS/ SDD( version1)

Drafts of SRS, SDD along with GUI and Diagrams

Documentation

Week 8-10: Development Coding continues, SRS, SDD

Developers, Documentation

Week 11-12Implementation/testing

Testing, implementation and closing of project

Tester, rest of the team

Page 15: INTRODUCTION

WORK SCHEDULES

WEEK PROCESS

Week 1 Team formation, project proposal

Week 2 Requirements discussed/ sources gathered

Week 3 SPMP version 1/ Database design

Week 4 Database design completed/System design

Week 5 SDD/SRS/ Coding

Week 6 SDD/SRS/ 20% functionality

Week 7 50% of system completed

Page 16: INTRODUCTION

WORK SCHEDULE

Week 8: 50% of the final product is to be presented

Page 17: INTRODUCTION

FUTURE WORK SCHEDULE

Documentation

SRS

SDD

Developer

Finished final

product

Feedback from Client

Tester/Implementation

Implement systemTest it

Close it

Page 18: INTRODUCTION

CONFLICTS AND DECISIONS

• Use of PHP instead of others languages

• Agile methodology• Level of systems• Confusions with

requirements at early stage

Page 19: INTRODUCTION

THANK YOU