Name: Kas Carpet Yarn Dyers
Ch.No Clause Check PointsStatus Root Cause Corrective Action
1 Start-up requirements (I WAY Must) :
1.1 Prevention of child Labour No,Child labour, OK
1.2 Forced and bonded labour Nil,Ok
1.3 Severe Environmental pollution
1-ETP Functional -OK
2- Severe Ground Contamination-OK
3- Smoke & Untested Air emissions-OK
1.4 Severe safety hazardous OK
1.5 Records on working hours and wages
Biometric attendence system for in & out time
for workers.
1.6 Workers' accidental insurances
1- Group Janta Insurance for 150 emp valid till-03/03/2014
2- Medical Policy are available.
1.7 Factory Licence
OK
Factory lacense (JPR-193 valid up to
31/12/2013 for (150Emp & 500HP)
Stability Certificate -OK , Buliding
Plan -OK Annual returns -
(Annual return deposit to the dept as on
09/01/2013 by Speed post)
2 General Conditions & Legal Compliance :2.1 IWAY Compliance Commitment NA
2.2 IWAY Responsibilities
OK
I-Way organization available
2.3 IWAY communication to sub-suppliers NA
2.4 IWAY communication to workers OK
2.5 IWAY Internal audits Last Internal audit report dated 23.01.2013
2.6 Updated of laws and regulations OK3 Environment :
3.1 Environmental classification,reporting and inspections
OK 1-Environmental Classification-Red Catogery
2- Environmental Statement (Form-5) -Sent
08.04.2013 for the Year 1st april 2012 to 31st
march 2013.
3.2 Outdoor Air pollution
1- Air Consent no. F20373/C9/Air Pollution /37/17
Valid Till 2013 2- Test
Report (Ambient Air -Valid Till-30/04/2014 ,
Stack Monitoring Report & Boiler stack testing
report) valid till 09/08/2013)
3.3 Outdoor Noise pollut ionNoise Monitoring report valid till 09.08.2013
Internal Audit Report
Date of Audit : 28.06.2013
-
7/30/2019 Internal Audit Programm_kas
2/6
3.4 Ground and Water pollution
1- Water Consent- Water Consent No.
F20373/C9/Water Pollution/110/13 , Valid till 2013.
2-Test Report of the Inlet & Outlet- Valid till
09.08.2013
3- ETP Logbook-OK
4-Water Cess Returns - Ok
3.5 Ground contaminat ion
Drinking water test Report , valid till 11.08.2013-
OK
3.6 Energy Reduction OK
3.7 Reduction of Other Environmental Impacts OK
4 Chemicals :
4.1 Legal Compliance OK
4.2 List of chemicals with valids MSDS's OK
4.3 Procedure for chemicals OK
4.4 Competence and training OK
4.5 Storage,handling and transportation of chemicals OK
4.6 Labelling of chemicals OK5 Hazardous and Non-Hazardous Waste :
5.1 Legal Compliance OK
5.2 List of Waste OK
5.3 Procedure for Waste OK
5.4 Competence and training OK
5.5 Storage,handling and transportation of waste OK
5.6 Licensed contractors
1. Agreement with Ramky for Purchase of Tube
Light , Mobil Oil & Sludge.
2-Battery Replacement Agreement-OK
5.7 Incineration / Landfill on site OK
6 Fire Prevention :
6.1 Fire classification,reporting and inspections.Fire Classification & Fire NOC available - OK
6.2 Fires No Incident took place
6.3 Competence and training OK
6.4 Fire fighting equipment OK
6.5 Escape routes and emergency exits OK
6.6 Evacuation alarm OK
6.7 Evacuation drill Last Fire drill as on 20.06.2013 - OK
7 Worker Health & Safety :7.1 Health & Safety classification,reporting and inspection
7.2 Accidents and incidents
No Incident / Accident took place. Record
register is there . OK
7.3 Health & Safety training OK
7.4 Machine safety devices OK
7.5 Safety instructions
Safety Instruction board is required in Polyster
Dabul Unit.
7.6 Safety hazards OK
7.7 Personal protective equipment PPE were not using by workers
Many training has given to
the worker for using of PPEbut they are realise
uncomfort
Training would be given
to the workers and also
importence of using of
PPE.
7.8 First aid equipment OK
7.9 First aid trained persons OK
-
7/30/2019 Internal Audit Programm_kas
3/6
7.1 Internal air quality OK
7.11 Temperature OK
7.12 Workplace noise OK
7.13 Workplace light Ok
7.14 Drinking water OK
7.15 Hygiene OK
7.16 Canteens-food services NA7.17 Health and Safety Committee Last metting as on 15.06.2013
8 Housing Facilities :
8.1 Requirements for housing NA
9 Wages,Benefits and Working Hours :
9.1 Contracts Available,OK
9.2 Payrolls and attendance records OK
9.3 Working hours and overt ime
Biometric attendence system for in & out time
for workers.
9.4 Wages OK
9.5 Overtime compensation OK
9.6 Regular Payments OK9.7 One day off in seven On Sunday, OK
9.8 Leaves OK
9.9 Breaks OK
9.10 Benefits OK10 Prevention of child Labour :
10.1 Prevention of child Labour No Child labour found , OK
10.2 Young workers OK11 Forced and bonded labour :
11.1 Forced and bonded labour Ok ,no bounded labour
12 Discrimination :12.1 Discrimination Policy Present Ok
13 Freedom of Association :
13.1 Freedom of Association Policy Present Ok
13.2 Collective Bargaining
Last Works Committee meeting dated
03.05.2013
14 Harassment,Abuse and Displinary Actions :
14.1 Punishments and appeal Procedure is present OK
14.2 Harassment and Abuse OK
Internal Audit Conducted By Auditee Mr.Shrish Tiwari
-
7/30/2019 Internal Audit Programm_kas
4/6
Accountable Resp.
-
7/30/2019 Internal Audit Programm_kas
5/6
-
7/30/2019 Internal Audit Programm_kas
6/6
Reported To Jitendra Kumar