Joni LukkaroinenCEO25 October 2017
»Interim report Q3 2017
Further processors
Manufacturers
Nickel Zinc
Cobalt
»Demand for metals is increasing in modern society
Energy productionand storage
RecyclabilitySustainability
»Q3 in brief
Net sales Q1–Q3 exceeded EUR 150 million –profitability improved clearly.
Metals production plant: quarterly production records in nickel and zinc as well as a yearly production record in zinc (Q1–Q3).
Cooperation negotiations to adapt personnel resources were concluded.
Key points
» Markkinahinnat
» Average nickel and zinc prices increased
»Global market price of nickel increased in July–August
In Q3, average price was 10,528 USD/t – 14.1% higher than in Q2.
Compared with 2016 Q3, average price was 2.6% higher.
China’s stainless steel production grew strongly; nickel producers made announcements regarding cuts in mine production.
The decrease of LME’s and SHFE’s combined nickel stocks stopped in Q3 and were at the same level as in Q2, approx. 438,000 tonnes.
Data source: Metal BulletinLME = London Metal ExchangeSHFE = Shanghai Futures Exchange
Day price for nickel on the London Metal Exchange (USD/t)
Day price for nickel on the London Metal Exchange (USD/t), 90 day average
Nickel price development 1 Jan 2016–30 Sept 2017
7,000
8,000
9,000
10,000
11,000
12,000
13,000
01
Jan
20
16
31
Mar
20
16
29
Ju
n 2
01
6
27
Sep
20
16
26
Dec
20
16
26
Mar
20
17
24
Ju
n 2
01
7
22
Sep
20
17
1,000
1,500
2,000
2,500
3,000
3,500
1 J
an 2
01
6
31
Mar
20
16
29
Ju
n 2
01
6
27
Sep
20
16
26
Dec
20
16
26
Mar
20
17
24
Ju
n 2
01
7
22
Sep
20
17
»Global market price of zinc at a good level
Day price for zinc on the London Metal Exchange (USD/t)
Day price for zinc on the London Metal Exchange (USD/t), 90 day average
Zinc price development 1 Jan 2016–30 Sept 2017
Data source: Metal BulletinLME = London Metal ExchangeSHFE = Shanghai Futures Exchange
In Q3, average price was 2,963 USD/t – 14.1% higher than in Q2.
Compared with 2016 Q3, average price was 31.4% higher.
Good price level resulted mainly from the decrease of stocks, which has continued for a long time.
LME’s and SHFE’s combined zinc stock levels continued to decrease in Q3 by approx. 38,000 tonnes and were approx. 318,000 tonnes.
» Ramp-up and stabilisation of operations continued
5,5
06
5,1
76
4,7
87
3,8
75
2,3
70
1,7
54
1,5
55
0
5 000
10 000
15 000
20 000
Q3
20
17
Q2
20
17
Q1
20
17
Q4
20
16
Q3
20
16
Q2
20
16
Q1
20
16
mto
7,1
97
5,3
61
5,0
86
4,8
85
3,0
46
2,1
58
1,4
95
0
5 000
10 000
15 000
20 000
Q3
20
17
Q2
20
17
Q1
20
17
Q4
20
16
Q3
20
16
Q2
20
16
Q1
20
16
BioliuotusBioleaching (t)
»Steady increase in nickel production
13
,19
2
11
,03
8
10
,07
0
11
,75
7
10
,89
4
7,7
61
6,6
30
,0
5,000
10,000
15,000
20,000
Q3
20
17
Q2
20
17
Q1
20
17
Q4
20
16
Q3
20
16
Q2
20
16
Q1
20
16
Kaivostuotanto (t)Ore processing (t) Metals production plant (t)
Q3
20
17
2017: 34,300 t (Q1–Q3)2016: 37,042 t
2017: 17,644 t (Q1–Q3)2016: 11,584 t
2017: 15,469 t (Q1–Q3)2016: 9,554 t
Q3
20
17
Q3
20
17
12
,24
2
11
,20
4
9,7
91
8,6
80
6,3
28
4,0
70
3,4
97
0
10 000
20 000
30 000
40 000
Q3
20
17
Q2
20
17
Q1
20
17
Q4
20
16
Q3
20
16
Q2
20
16
Q1
20
16
MTO
13
,02
7
12
,65
7
10
,38
0
10
,69
7
8,7
20
5,8
73
2,5
78
0
10 000
20 000
30 000
40 000
Q3
20
17
Q2
20
17
Q1
20
17
Q4
20
16
Q3
20
16
Q2
20
16
Q1
20
16
bl
»Yearly record in zinc production
25
,69
7
23
,14
9
20
,23
9
22
,14
4
20
,61
2
14
,76
7
12
,77
6
,
10,000
20,000
30,000
40,000
Q3
20
17
Q2
20
17
Q1
20
17
Q4
20
16
Q3
20
16
Q2
20
16
Q1
20
16
2017: 69,085 t (Q1-Q3)2016: 70,299 t
2017: 36,064 t (Q1–Q3)2016: 27,868 t
2017: 33,237 t (Q1–Q3)2016: 22,575 t
Bioleaching (t)Ore processing (t) Metals production plant (t)
Q3
20
17
Q3
20
17
Q3
20
17
»Unit costs per nickel tonne decreased as predicted
Ore mining and processing volumes were at target level.
Bioleaching performance stayed at a good level.
Construction work of the fourth secondary bioleaching heap continued to increase production capacity.
The autumn maintenance stoppage at the metals production plant in September–October limited production and sales.
» Occupational safety culture developed well
»New record: 131 days without injuries resulting in absence
Lost-time injury frequency = number of injuries per one million person-hours worked. Situation in 30 Sep 2017.
Partners
681employeesTerrafame
685employees
23.3
8.4
3.50
5
10
15
20
25
2015 2016 Liukuva 12 kkRolling 12 months
Lost-time injury frequencyTerrafame’s employees
Target in 2017
< 5.0
» Ympäristöturvallisuus» Sulamisvesien käsittely sujuihyvin luparajojen puitteissa
Vesikuva
» Environmental safety at good level
»Environmental effects are widely monitored
Terrafame monitors the mine’s operations and its effects based on an extensive and detailed environmental monitoring programme agreed with the supervisory authority.
The company also actively collects and analyses additional samples from the mine area and its surrounding environment.
Terrafame keeps close contact with nearby residents, and their observations are taken into consideration.
0
5
10
15
20
25
30
Jan
Ap
ril
July
Oct
Jan
Ap
ril
July
Oct
Jan
Ap
ril
July
Oct
Jan
Ap
ril
July
Oct
Jan
Ap
ril
July
Oct
Jan
Ap
ril
July
Oct
Jan
Ap
ril
July
Oct
Jan
Ap
ril
July
Oct
2010 2011 2012 2013 2014 2015 2016 2017
Environmental observations by neighbours 2010–2017
Other
Water
Dust
Vibration
Noise
Smell
»Approximately half of 2017 sulphate quota unused
Sulphate quota 16,300 t in 2017Discharge pipe 15,000 t/a and old routes 1,300 t/a
Q1–Q3 2017 7,794 t
Q12,306
Q23,012
Q32,4760
.00
1
0.0
34
0.0
44
0.5
55
0.4
48
1,9
88
0.6
93
<0.0
2
<0.0
57 0
.11
2
<0.0
01
43
0
0.31)
mg/l0.31)
mg/l0.51)
mg/l6
mg/l4,000mg/l
4mg/l
101)
µg/l1.5µg/l
3µg/l
0.5mg/l
Cu (mg/l)
Ni (mg/l)
Zn (mg/l)
Mn(mg/l)
Fe (mg/l)
SO4
(mg/l) U
(µg/l) Hg
(µg/l) Cd
(µg/l) Al
(mg/l) Pb2)
(mg/l) Na2)
(mg/l)
Concentrations in the water discharged
1 Jan 2017–30 Sept 2017
Concentrations in relation to permit limits
1) Max. allowed concentration in a single sample2) No permit limits for Pb and Na
26/10/2017
Dokumentin nimi17
» Liikevaihto kehittyi xxx» Terrafame is advancing
towards a profitable business
»Net sales developed positively
63
.9
47
.2
41
.347
.6
21
.2
18
.0
14
.2
0
10
20
30
40
50
60
70
80
Q3
20
17
Q2
20
17
Q1
20
17
Q4
20
16
Q3
20
16
Q2
20
16
Q1
20
16
LiikevaihtoNet sales, M€
Q3
20
17
Q3’s record production volume also evident in sales volumes.
Average global market price of nickel increased by 14.1% compared with Q2.
Average price of zinc also increased by 14.1% compared with Q2.
In Q3, the average exchange rate of the dollar against the euro decreased by 6.6% compared with Q2.
The autumn maintenance stoppage limited production and sales volumes.
2017: 152.4 M€ (Q1–Q3) 2016: 101.0 M€
»EBITDA developing to right direction
WIP = value of work in process
-60
-40
-20
0
20
40
60
Q3
20
17
Q2
20
17
Q1
20
17
Q4
20
16
Q3
20
16
Q2
20
16
Q1
20
16
EBITDA, M€
Q3
20
17
-53
.1
-44
.8
-38
.5
16
.0
-18
.4
47
.6
2017: -3.7 M€ (Q1–Q3)2016: -120.4 M€
-60
-40
-20
0
20
40
60
Q3
20
17
Q2
20
17
Q1
20
17
Q4
20
16
Q3
20
16
Q2
20
16
Q1
20
16
EBITDA excl. change in WIP, M€
Q3
20
17
-53
.0
-45
.2
-40
.6
-31
.2
-33
.3
-7.9
2017: -65.4 M€ (Q1–Q3)2016: -170.0 M€
-32
.9
-24
.2
»Investments in the third quarter EUR 28,3 million
0
20
40
60
80
100
20172016 Q1–Q3 2017
Key investments in Q3:
The construction work of the fourth secondary bioleaching heap and a new waste rock area.
The construction of a third hydrogen sulphide production line.
Investments, M€
2016: 84.3 M€
64.169.7
Q1–Q3 2016
26/10/2017
Dokumentin nimi21
» Liikevaihto kehittyi xxx» Talous» Uraanin talteenotto» Terrafame applies for a permit to recover uranium
»Terrafame prepares to recover uranium
Terrafame has decided to apply the government for a permit to recover uranium, in accordance with the Finnish Nuclear Energy Act.
The permit application will be submitted in the weeks to come.
If the government grants the permit, Terrafame estimates that uranium recovery could commence towards the end of 2019.
The uranium recovery plant requires from Terrafame an investment of 10 million euros. Previously 75 million euros have been invested in the plant.
»Natural uranium can be found almost everywhere on Earth
Natural resources must be used efficiently
• Uranium is present in the ore Terrafame is mining, but it is not recovered currently.
• Uranium recovery would be an addition but not a key factor for Terrafame’s business.
In its environmental permit application, Terrafame is applying a permit to produce a maximum of 37,000 tonnes of nickel, 80,000 tonnes of zinc and 250 tonnes of uranium per year.
Very small concentration in the water
• The uranium concentration in the purified water discharged from the mine area was approx. 0.5 μg per litre in 2016.
• The Radiation and Nuclear Safety Authority recommends removing uranium from drinking water if the concentration exceeds 100 μg per litre.
The uranium concentration in normal tap water is approx. 1 μg per litre.
Responsible processing
• Transports will be done in accordance with authority regulations.
• The recovered natural uranium will be transported abroad from Finland forprocessing.
The natural uranium recovered by Terrafamewill be used in energy production.
»Near-term outlook
Ramp-up and stabilisation of operations continues.
Profitability will be systematically improved by focusing on operational cost-efficiency.
We aim to further increase the production and delivery volumes of nickel, zinc and cobalt.
We are studying two alternative options to upgrade the nickel product:
1. NiFe alloy for stainless steel production
2. Nickel and cobalt sulphates for battery applications
www.terrafame.com