INTEGRATED PROJECT MANAGEMENT PLAN WINSLOW CONSTRUCTORS PTY. LTD. AND DEVINE BACCHUS MARSH P/L & THE GULL GROUP BACCHUS MARSH P/L PROJECT: Stonehill Stage 4A DATE OF FIRST ISSUE: 4/12/13
Integrated Management System
Integrated Project Management Plan
WIN-SP-11-A IPMP Revision No. 1 Page No. 2 DEC 2013
TABLE OF CONTENTS
1. INTRODUCTION 2. PROJECT SCOPE 3. MILESTONE DETAILS 4. PROJECT DETAILS 5. PROJECT MANAGEMNT APPROACH 6. ROLES, REPONSIBILITIES & AUTHORITY 7. PROJECT OBJECTIVES 8. PROGRAM MANAGEMENT AND WORK BREAKDOWN STRUCTURE 9. HUMAN RESOURCE MANAGEMENT 10. PROJECT RISK MANAGEMENT 11. QUALITY MANAGEMENT 12. PROCESS CONTROL 13. PROJECT CHANGE CONTROL PROCESS 14. COMMUNICATION MANAGEMENT 15. COST MANAGEMENT 16. PROCUREMENT MANAGEMENT 17. CONTRACT SPECIFIC CONDITIONS/REQUIREMENTS 18. DOCUMENT & DATA CONTROL 19. HEALTH & SAFETY RISK ASSESSMENT/MANAGEMENT 20. ENVIRONMENTAL RISK ASSESSMENT/MANAGEMENT 21. LEGAL & OTHER REQUIREMENTS 22. SUB CONTRACTORS AND SUPPLIERS 23. COMPETENCE AWARENESS & TRAINING 24. EMERGENCY AND INCIDENT PREPAREDNESS 25. MONITORING AND MEASUREMENT 26. COMMUNICATION AND CONSULTING AND REPORTING 27. PROJECT AUDITS 28. STATUS MEETINGS 29. PROJECT REVIEW 30. CLIENT ACCEPTANCEOF THE PMP
VERSION HISTORY
Rev No Date Revision Details Pages Prepared
by Reviewed
by Approved
by Issued by
1 4/12/13 FIRST ISSUE - RC CL CL CL
DOCUMENT DISTRIBUTION
Copy No. Issued to Company Rev No. Date Issued
1 FOREMAN WINSLOW 1
2 CONSULTANT COUGHLAN 1
Integrated Management System
Integrated Project Management Plan
WIN-SP-11-A IPMP Revision No. 1 Page No. 3 DEC 2013
1.0 INTRODUCTION This Integrated Project Management Plan (IPMP) has been prepared to establish the processes for achieving quality, environmental, and health & safety policies and objectives specifically for Contract No. ___. The Integrated Project Management Plan includes: Contract details and scope of work; Client specifications; Project objectives and targets covering quality, environmental and health & safety management performance; Processes, and their interactions, necessary for meeting client requirements and enhancing client satisfaction; Procedures required for the conduct and monitoring of project operations; Analyses of environmental, and health and safety risks specific to project operations, and Controls to avoid or reduce risks whilst ensuring expected quality of work. The Integrated Project Management Plan established a mechanism for demonstrating conformance with policies, objectives, quality, environmental and health & safety management systems, legal requirements, and the expectations of clients and stakeholders.
2.0 PROJECT SCOPE
Project Name:
STONEHILL STAGE 4A
Location of Works:
GRIFFITH ST, BACCUSMARSH
Scope of Works:
Construction of a subdivision
3.0 PROJECT DELIVERY
Contract No.: 559-04A Job No.: Contract Duration: 16 weeks
Start Date: 20th January 2013 Completion Date: Completion Date: 9th May 2013
Defects Liability Period: 12 months Final Completion Date: Final Completion Date: 3 Months after Practical Completion
4.0 PROJECT DETAILS:
Company's Representative: Cameron Lee Telephone: 9358 7700
Facsimile: 9358 7701 Mobile: 0488 489 030
Customer: Divine Bacchus Marsh P/L & The Gull Group Bacchus Marsh P/L
Contact Person: C/O Coughlan Civil Pty Ltd Telephone:
Facsimile: Mobile:
Superintendent on site: Gary Malloy Mobile: 0418 103 590
Consultant: Coughlan Civil Pty Ltd
Contact Person: Michael Parker Telephone: 03 5327 7400
Facsimile: - Mobile: 0438 412 447
Integrated Management System
Integrated Project Management Plan
WIN-SP-11-A IPMP Revision No. 1 Page No. 4 DEC 2013
5. PROJECT MANAGEMENT APPROACH The Winslow Group operate an Integrated Management System (IMS) incorporating quality, health & safety and environmental management. The IMS has been progressively developed according to the requirements detailed in international standards: AS/NZS ISO 9001:2008 (Quality Management System) AS/NZS ISO 14001: 2004 (Environmental Management System) AS/NZS 4801: 2001 (Occupational Health & Safety Management System) OHSAS 18001:2007 (Occupational Health & Safety Management System)
The Integrated Management System is documented and recorded through: IMS Manual - This Manual includes documented statements of quality, environmental and health & safety policies and corporate objectives, and the scope and requirements of the Integrated Management System, including a description of IMS procedures and details of the interaction between the processes of the IMS. This Manual is available for viewing upon request by the client. Integrated Management System Procedures and Operating Procedures Manual - This Manual is divided into two parts. Part 1. Includes documented procedures (i.e. “system procedures”) required by the quality, environmental and health & safety standards on which the IMS has been based, and those deemed necessary by Winslow to ensure the effective functioning of the IMS. Part 2. Includes instructions to ensure the effective planning, operation and control of processes necessary for the provision of desired product in accordance with quality, environmental and health & safety policies, objectives and IMS procedures. Integrated Management System Register. This Register comprises of various plans, records and registers that support the application of the IMS and demonstrate operational conformance with the requirements of the IMS. (APPENDIX A) contains a copy of the IMS Document Register together with copies of ISO Standard Certifications
6. ROLES, RESPONSIBILITIES AND AUTHORITIES Winslow maintains an IMS Procedure “Management Roles, Responsibilities and Authorities” (WIN-SP-01) which includes quality, environmental and health & safety project management planning. Overall roles, responsibilities and authorities and an Organisational Chart are included in the IMS Manual. The Project Manager has the overall authority and responsibility for managing and executing this project according to this Project Plan and it Subsidiary Management Plans. (APPENDIX B) contains modified “Organisational Structure” showing roles, responsibilities and authorities specific to this project together with a copy of the project specific Health & Safety Coordination Plan
7. PROJECT OBJECTIVES AND TARGETS ensure client confidence of capability to undertake and complete works to specified requirements; operate in a safe and healthy environment; have zero workplace environmental and safety incidents; maintain or improve the state of the environment where we work; promote and support our suppliers and subcontractors to operate with similar commitment and objectives; be competent and able to apply best possible technology for planning and operations, including project planning, operational equipment and plant, infrastructure and monitoring, measurement and testing. provide the level of quality in work that is never less than that specified within the contract or internal expectations.
8. PROGRAM MANAGEMENT The integrated program is developed in sufficient detail to define resource requirements, material timing and integration requirements with existing plans and programs. The integrated master plan is built around the contract works program and is supported by a hierarchy of intermediate and detailed programs. All critical dependencies, resources needed, and critical path items are clearly identified in the integrated master program. The Program Management Structure is provided in APPENDIX C
Integrated Management System
Integrated Project Management Plan
WIN-SP-11-A IPMP Revision No. 1 Page No. 5 DEC 2013
9. HUMAN RESOURCE MANAGEMENT Resource management (Staffing for example) is managed in accordance with the HR Manual by the construction/project manager and staffing requirements are reviewed with HR on a monthly basis including sub contractor staffing requirements on the project.
10. PROJECT RISK MANAGEMENT Risk management is designed to reduce the impact of program related and technical uncertainties to acceptable and manageable levels. Risks are inherent in every endeavour especially during the development stages of a programs life cycle. Risk management workshops are conducted by the project at required intervals. Each person is responsible for overall risk management and uses the same process to identify and control risks.
11. QUALITY MANAGEMENT The quality management activities for the program are documented in the quality management plan and the quality management plan describes the procedures to be used in implementing a quality system and provide management personnel with visibility into product quality e.g.; product and process evaluations, document and data management, non conformance tracking and reporting channels.
12. PROCESS CONTROL Quality management requirements include verification, validation; monitoring, inspection and test activities associated with, plant and equipment requirements, contract specific requirements, works program, bill of quantities, hold points, and control of non-conforming product have been identified as part of Winslow’s Tender & Document Review Procedure (WIN-SP-10). These include Inspection Test Plans and Checklists applicable to the project.
13. PROJECT CHANGE CONTROL PROCESS The General Manager/Project Manager has approval authority for changes to the project and the Project Manager submits the changes and how they are tracked and monitored to the client.
14. COMMUNICATIONS MANAGEMENT The project communication framework is extremely vital as to how information will be distributed. It could be defined as follows:
Communication requirements based on roles
What information will be communicated
How the information will be communicated
When will information be distributed
Who does the communication
Who receives the communication It identifies and defines the roles of persons involved in this project. A project team directory is included to provide contact information for all stakeholders directly involved in the project. The Project Manager will take a proactive role in ensuring effective communications on this project.
15. COST MANAGEMENT (KPI’S) The Cost Management framework clearly defines how the costs on a project will be managed throughout the project’s lifecycle. It sets the format and standards by which the project costs are measured, reported and controlled. The framework:
Identifies who is responsible for managing costs
Identifies who has the authority to approve changes to the project or its budget
How cost performance is quantitatively measured and reported upon
Report formats, frequency and to whom they are presented The Project Manager will be responsible for managing and reporting on the project’s cost throughout the duration of the project. During the weekly/monthly project status meeting, the Project Manager will meet with management to present and review the project’s cost performance (KPI’s) for the preceding month. Performance will be measured using KPI’s
Integrated Management System
Integrated Project Management Plan
WIN-SP-11-A IPMP Revision No. 1 Page No. 6 DEC 2013
(Key Performance Indicators). The Project Manager is responsible for accounting for cost variations and presenting the Project client with such deviations for approval. The management has the authority to make changes to the project to bring it back within budget when required.
16. PROCUREMENT MANAGEMENT The Project Manager will provide oversight and management for all procurement activities under this project. The Project Manager will work with the project team to identify all items to be procured for the successful completion of the project. The Project Manager will review the procurement list for all centralised purchases prior to submitting it to the purchasing department. The purchasing department will review the procurement items and begin the vendor selection, purchasing and the contracting process.
17. CONTRACT SPECIFIC CONDITIONS/REQUIREMENTS The project manager has the responsibility to review the contract specific conditions if applicable for the project immediately after the contract has been awarded and ensure such specific conditions are met in accordance with the client’s specifications in terms of overall project delivery.
18. DOCUMENT AND DATA CONTROL Winslow maintains a documented procedure (WIN-SP-02) to control documents required by the IMS. Defined controls include approval and issue, review and revision status, distribution and availability at points of use, legibility, and storage and disposition of obsolete documents. The Document and Data Control Procedure (WIN-SP-02) procedure also defines controls for the identification, storage, protection, retrieval, retention time and disposition of records associated with the planning and management of the project to provide evidence of conformity to the requirements and the effective operation of the IMS.
19. HEALTH AND SAFETY MANAGEMENT PLAN A health and safety management plan is developed as part of the PMP and includes (but not limited to) the following Health and Safety Hazards associated with the project have been identified and analysed for level of risk according to IMS Procedure (WIN-SP-06). This Procedure establishes a Health & Safety Register (WIN-SP-06-A Refer Appendix F) which identifies all potential health & safety hazards for Winslow operations and models generic risk. The Register also identifies existing system and operational procedures that have been developed to avoid or minimise risks associated with each identified hazard. A health & safety coordination plan specific to the project shall be maintained on site. This Register has been revisited considering specific contract requirements and the nature, type and location of operations to determine project risk levels, identify existing IMS controls, and to identify the need to develop further or special controls. Attention has been given to this process for all health and safety hazards that have scored a “high” level of generic and project specific risk.
20. ENVIRONMENTAL RISK ASSESSMENT AND MANAGEMENT An Environmental management plan is developed as part of the PMP and includes (but not limited to) the following Environmental Aspects and Impacts associated with the project have been identified and analysed for level of risk according to IMS Procedure (WIN-SP-05). This Procedure establishes an Environmental Aspect Register (WIN-SP-05-A Refer Appendix G) which identifies all potential environmental aspects and impacts resulting from Winslow operations and determines the level of generic risk. The Register also identifies existing system and operational procedures that have been developed to avoid or minimise adverse impacts associated with each identified environmental aspect. This Register has been revisited considering specific contract requirements and the nature, type and location of operations to determine project risk and significance levels, identify existing IMS controls, and to identify the need to develop further or special controls. Attention has been given to this process for all environmental hazards that have scored a high level of generic and project specific risk.
21. LEGAL AND OTHER REQUIREMENTS Winslow maintain a documented procedure (WIN-SP-07) to identify and access statutory and regulatory requirements related to services and environmental and health and safety legal and other requirements to which the company subscribes. This Procedure establishes Legal and Other Requirements Registers that identify and maintain access to
Integrated Management System
Integrated Project Management Plan
WIN-SP-11-A IPMP Revision No. 1 Page No. 7 DEC 2013
legislation and associated regulations, policies, guidelines, standards, codes of practice etc. These Registers relating to relevant legal and other requirements for this project are listed in APPENDIX D. All necessary permits from relevant regulatory authorities shall be obtained prior to start of any work requiring permits, e.g. Confined Space/Trenching/Location of essential services etc.
22. SUBCONTRACTORS AND SUPPLIERS Winslow maintain a Purchasing Procedure (WIN-SP-14) designed to ensure that that purchased products (i.e. equipment, materials and suppliers and subcontractors services) conform to specified requirements, including: Determining product requirements and clearly specifying these requirements at time of ordering Evaluating the ability of potential sub contractors and suppliers to meet specified requirements, including quality, health & safety, and environmental requirements, and Verification that purchased materials and services conform to order specifications. A Register of acceptable, approved suppliers and sub-contractors is maintained to assist in evaluation and appointment. All subcontractors in relation to Plant and Equipment hire shall be evaluated and approved in accordance with the Company's System Procedure, WIN-OP-03 Plant & Equipment. The list of Subcontractors engaged in relation to Plant and Equipment shall be listed on Plant Register available on site and is subject to changes as the project progresses and revision copies made available to the Client as and when such revisions happen. Sub contractors operating under their own safety systems shall submit a copy of their safe work method statement (SWMS) to Winslow’s project management team for review and sign off by the project supervisor against criteria as outlined in the SWMS review checklist WIN-SP-11-D. All other sub contractors operating plant or machinery on site shall subscribe to Winslow’s site safety plan in the absence of their own system documentation and sign off on Winslow’s SWMS’s wherever applicable. The Contractor shall conduct regular surveillance audits of all on-site subcontractors, sufficient to ensure that all work and materials comply with project requirements. The Subcontractors and Suppliers to be used for this Project are detailed under Appendix H.
23. COMPETENCY & TRAINING REQUIREMENTS Winslow maintain a documented procedure (WIN-SP-09) to determine competence levels of all staff with respect to their work affecting the quality of service or product and having the potential to cause risk to the health and safety of themselves and others, and having the potential to cause significant risk to the environment. This Procedure generates a training matrix (WIN-SP-09-A) identifying competency and awareness requirements and training needs. Training includes project induction for relevant operational staff, subcontractors and suppliers regarding quality, health and safety, and environmental requirements of the Project, and the potential impacts and consequences of their work. Key competencies to be signed off include first aid, qualified spotter, traffic controller, trenching supervisor and applicable plant and equipment operators.
24. EMERGENCY AND INCIDENT PREPAREDNESS & RESPONSE Winslow maintain an Emergency and Incident Preparedness & Response Procedure (WIN-SP-08) that addresses the potential for emergency situations and potential incidents that can impact on the environment, and on the health and safety of all personnel associated with Winslow activities. All incidents must be reported to the Head Office immediately and in writing within 48 hours vide (WIN-SP-08G) (Incident Report Form). The Winslow Emergency and Incident Preparedness & Response Plan (WIN-SP-08-A) is reviewed and revised considering the nature, type and location of operations for this Project. The Plan will ensure a first aider is on site at all times, include list of emergency and incident contact numbers and a plan showing an emergency assembly area. These and other key incident response requirements will be prominently displayed on site at all times. Winslow signage displaying key contact numbers shall be installed as part of after hour’s site security and response in the event of any Safety/Environmental incidents and their management. The plans are detailed in respective safety and environment management plans. Refer to Appendix J
25. MONITORING & MEASUREMENT Winslow maintain a procedure (WIN-SP-15) to monitor and measure, on a regular basis, the key characteristics of its operations that may have a significant impact on safety and environment, that can cause illness and injury, and that may influence client satisfaction. Monitoring and measurement requirements identified for this Project are detailed in
Integrated Management System
Integrated Project Management Plan
WIN-SP-11-A IPMP Revision No. 1 Page No. 8 DEC 2013
respective safety and environment management plans. As part of its commitment to safety on site, senior management must complete checklist WIN-SP-15-E during their project site visits. Refer to Appendix I
26. COMMUNICATION, CONSULTATION & REPORTING Winslow maintains a documented procedure (WIN-SP-03) for internal and external communication of quality, environmental and health & safety issues and reporting requirements. All employees and subcontractors are inducted into Winslow’s project specific Safety/environmental Management Plan at the start of the Project. Induction includes review of all Health & Safety/Environmental Policies and Procedures specific to the project and other site issues including health and safety/environmental hazards. Works Breakdown Structure and any other safety/environmental issues specific to the project are discussed as part of Daily Prestart meetings and recorded and signed off by all concerned. Tool Box Meetings are to be held on site either monthly or fortnightly to discuss health & safety, environmental or other related issues. All potential hazards and incidents (including near misses) shall be reported to Site Management and clients, regulatory bodies (e.g. Work cover, EPA) and other authorities as required and thorough investigations conducted to ascertain the root causes. All complaints shall be received, documented and responded promptly. All internal and external communication records are kept according to IMS Procedure (WIN-SP-02.)
27. INTERNAL/EXTERNAL AUDITING, NON-CONFORMITY, CORRECTIVE AND PREVENTIVE ACTION An Audit program shall be prepared according to the IMS Auditing Procedure (WIN-SP-17). The audit program of the project management plan includes management system audits, operational and technical audits (including workplace and housekeeping inspections), and legal compliance evaluations to verify compliance to the adequacy and effectiveness of its stated requirements. APPENDIX E contains an audit program specific to the project. All subcontractors engaged by the project are invited to participate in such audits and safety inspections and provide feedback to the project management team. External Compliance audits of the Project Management Plan shall be carried out by an Independent third party Auditor wherever contractually required.
28. STATUS MEETINGS This section describes progress reviews used on the project to status the project’s performance. These reviews include the results and analysis of internal and external commitments, risks, data management and stakeholder involvement. These reviews are performed at various project levels and include both project and senior management representation. Minutes are documented and circulated for follow up and action.
29. PROJECT REVIEW On completion of the Project, the Project Manager will carry out a review of the performance of the project. This review will cover issues of a time / cost / quality nature, as well as Occupational Health and Safety Performance and Environmental Management Performance, paying particular attention to lesson learnt from near misses or audits. Any apparent opportunities for improvement to Winslow’s Systems / Operating Procedures resulting from the Project Manager’s review will be referred to the Systems Manager for discussion / action.
Integrated Management System
Integrated Project Management Plan
WIN-SP-11-A IPMP Revision No. 1 Page No. 9 DEC 2013
APPENDICES
APPENDIX A INDEX OF INTEGRATED MANAGEMENT SYSTEM DOCUMENTS
APPENDIX B
“ORGANISATIONAL STRUCTURE” SHOWING ROLES, RESPONSIBILITIES AND AUTHORITIES SPECIFIC TO THIS PROJECT
APPENDIX C SITE INFORMATION SHEET
APPENDIX D HEALTH AND SAFETY HAZARDS AND THEIR CONTROLS
APPENDIX E ENVIROMENTAL ASPECTS AND IMPACTS AND THEIR CONTROLS
APPENDIX F PROJECT SPECIFIC LEGAL & OTHER REQUIREMENTS
APPENDIX G SUBCONTRACTORS AND SUPPLIERS
APPENDIX H INSPECTION TEST PLANS AND CHECKLISTS
APPENDIX I MONITORING AND MEASUREMENT
APPENDIX J INTERNAL AUDIT PROGRAM
APPENDIX K PRECOMMENCEMENT NOTIFICATIONS
APPENDIX L INSURANCE
APPENDIX M TRAFFIC MANAGEMENT PLAN
APPENDIX N WORKS PROGRAM
30. CLIENT ACCEPTANCE Approved by the Project Client DEVINE BACCHUS MARSH P/L & THE GULL GROUP
BACCHUS MARSH P/L
Date
Name of the Client
WINSLOW Contract No:
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan 1 1 MAY 2013
APPENDIX A:
INDEX OF INTEGRATED MANAGEMENT SYSTEM DOCUMENTS
WIN-SP-02-A IMS DOCUMENT REGISTER Revision No. 1 Page No.1 December 2013
DOCUMENT MASTER LIST
DOCUMENT TYPE: MANUALS REVIEW ANNUALLY
Number Issue Document Title
WIN-MAN-01 March 2013 IMS System Manual
WIN-SP-04-A Human Resource Manual
WIN-OP-08-B March 2012 Traffic Management Manual
DOCUMENT TYPE: MANAGEMENT SYSTEM PROCEDURES
REVIEW ANNUALLY
Number Issue Document Title
WIN-SP-01 March 2013 Management Roles and Responsibilities
WIN-SP-02 March 2013 Document & Data Control
WIN-SP-03 March 2013 Communication, Consultation & Reporting
WIN-SP-04 March 2013 Human Resources Management
WIN-SP-05 March 2013 Environmental Aspects
WIN-SP-06 March 2013 Health & Safety Hazards
WIN-SP-07 March 2013 Legal and Other Requirements
WIN-SP-08 March 2013 Emergency & Incident Preparedness & Response
WIN-SP-09 March 2013 Competence, Awareness & Training
WIN-SP-10 March 2013 Tender & Contract Review
WIN-SP-11 March 2013 Project Management
WIN-SP-12 March 2013 Sub Contractor Management
WIN-SP-13 March 2013 Control of Design
WIN-SP-14 March 2013 Purchasing
WIN-SP-15 March 2013 Monitoring & Measurement
WIN-SP-16 March 2013 Non Conformance
WIN-SP-17 March 2013 Auditing
DOCUMENT TYPE: OPERATING SYSTEM PROCEDURES
REVIEW ANNUALLY
Number Issue Document Title
WIN-OP-01 March 2013 Inspection & Testing
WIN-SP-02-A IMS DOCUMENT REGISTER Revision No. 1 Page No.2 December 2013
WIN-OP-02 March 2013 Handling, Storage, Preservation & Delivery
WIN-OP-03 March 2013 Plant & Equipment
WIN-OP-04 March 2013 Trenching & Excavation
WIN-OP-05 March 2013 Dangerous Goods & Hazardous Substances
WIN-OP-06 March 2013 Manual Handling
WIN-OP-07 March 2013 Confined Spaces
WIN-OP-08 March 2013 Traffic Management
WIN-OP-09 March 2013 Crane Work
WIN-OP-10 March 2013 Rock Crushing
WIN-OP-11 March 2013 Installation of U/G Electrical Infrastructure
WIN-OP-12 March 2013 Tipping Material from Semi Tippers
WIN-OP-13 March 2013 Crushed Concrete Road Base
WIN-OP-14 March 2013 Installation & Management of Mobile Crushers
DOCUMENT TYPE: ENVIRONMENTAL PROCEDURES REVIEW ANNUALLY
Number Issue Document Title
WIN-EP-01 March 2013 Fuel & Chemical Bund Installation
WIN-EP-02 March 2013 Concrete Management
WIN-EP-03 March 2013 Environmental Incident Procedure
WIN-EP-04 March 2013 Dewatering
WIN-EP-05 March 2013 Contaminated Substances
WIN-EP-06 March 2013 Handling & Disposal of Asbestos
WIN-EP-07 March 2013 Groundwater Monitoring
WIN-EP-08 March 2013 Spill Management
WIN-EP-09 March 2013 Tender Information
WIN-EP-10 March 2013 Soil Conservation
WIN-EP-11 March 2013 Waterways and Flood Plains
WIN-EP-12 March 2013 Erosion and Sediment Control
WIN-EP-13 March 2013 Protection of Flora and Fauna
WIN-EP-14 March 2013 Waste Minimization
WIN-EP-15 March 2013 Air Quality Monitoring
WIN-SP-02-A IMS DOCUMENT REGISTER Revision No. 1 Page No.3 December 2013
WIN-EP-16 March 2013 Ground Vibration
WIN-EP-17 March 2013 Water Quality Monitoring
WIN-EP-18 March 2013 Weed Management
WIN-EP-19 March 2013 Archaeological & Heritage Protection
WIN-EP-20 March 2013 Environmental Incident Report
WIN-EP-21 March 2013
DOCUMENT TYPE: ENVIRONMENTAL REGISTERS REVIEW ANNUALLY
Number Issue Document Title
WIN-ER-01 March 2013 Sediment Control Inspection Register
WIN-ER-02 March 2013 Complaint Register
WIN-ER-03 March 2013 Erosion Control Register
WIN-ER-04 March 2013 Environmental Incident/Injury Register
WIN-ER-05 March 2013 Environmental Induction Register
WIN-ER-06 March 2013 Water Quality Register
WIN-EP-06-A March 2013 Asbestos Removal Register
DOCUMENT TYPE: MANAGEMENT SYSTEM FORMS REVIEW ANNUALLY
Number Issue Document Title
WIN-SP-01-A March 2013 Management Review Minutes
WIN-SP-02-A March 2013 IMS Document Register
WIN-SP-02-B March 2013 Document Transmittal Form
WIN-SP-02-C March 2013 Retention of Records
WIN-SP-02-D March 2013 Archive Form
WIN-SP-03-A March 2013 OHS Representatives and Designated Work Groups
WIN-SP-03-B March 2013 Record of OHS Consultative Meeting
WIN-SP-03-C March 2013 Record of Tool Box Meeting
WIN-SP-03-D March 2013 Daily Pre- Start Meeting
WIN-SP-03-E March 2013 OHS Resolution Flow Chart
WIN-SP-04-B March 2013 Personnel Protective Equipment Register
WIN-SP-04-C March 2013 Basic Site Amenities Checklist
WIN-SP-04-D March 2013 Register of Injuries
WIN-SP-04-E March 2013 Disciplinary Action Report
WIN-SP-04-F March 2013 Return to Work & Suitable Employment Template
WIN-SP-02-A IMS DOCUMENT REGISTER Revision No. 1 Page No.4 December 2013
WIN-SP-05-A March 2013 Environmental Aspects & Impacts Register
WIN-SP-06-A March 2013 Health & Safety Hazards Register
WIN-SP-08-A March 2013 Emergency Numbers Template
WIN-SP-08-B March 2013 Evacuation Plan Template
WIN-SP-08-C March 2013 Emergency Equipment Register
WIN-SP-08-D March 2013 Emergency Action Plan
WIN-SP-08-E March 2013 Incident Notification Form
WIN-SP-08-F March 2013 First Aid Record
WIN-SP-08-G March 2013 Incident/Injury Report Format
WIN-SP-08-H March 2013 Incident Report-Vehicle/Plant/Equipment
WIN-SP-08-I March 2013 Incident Report- Loss/Theft/ Damage
WIN-SP-08-J March 2013 Close Out Report- Loss/Theft/ Damage
WIN-SP-08-K March 2013 Incident Report- Damage to Services
WIN-SP-08-L March 2013 Incident Reporting Policy
WIN-SP-08-M March 2013 Hot Work Permit
WIN-SP-09-A March 2013 Register of Inductees
WIN-SP-10-A March 2013 Tender & Contract Review
WIN-SP-10-B March 2013 Tendering Procedure
WIN-SP-11-A March 2013 Project Management Plan
WIN-SP-11-B March 2013 Project Administration Manual
WIN-SP-12-A March 2013 Sub Contractors SSMP/SWMS Review Checklist
WIN-SP-12-B March 2013 Sub Contractor OHS Questionnaire
WIN-SP-12-C March 2013 Sub Contractor Pre-Start Requirement
WIN-SP-12-D March 2013 Register of Approved Sub Contractors
WIN-SP-13-A March 2013 Control Plan for Design
WIN-SP-13-B March 2013 Design Change Request
WIN-SP-14-A March 2013 Request for Quotation
WIN-SP-14-B March 2013 New Supplier Assessment Form
WIN-SP-14-C March 2013 Purchase Order Template
WIN-SP-14-D March 2013 Purchase Order- Terms & Conditions
WIN-SP-14-E March 2013 Supplier Performance Monitor
WIN-SP-14-F March 2013 Vendor Edit Form
WIN-SP-15-A March 2013 Weekly Safety Inspection Checklist
WIN-SP-15-B March 2013 Weekly Environmental Inspection Checklist
WIN-SP-15-C March 2013 Inspection, Measuring Test Equipment Register
WIN-SP-15-D March 2013 Calibration Register
WIN-SP-02-A IMS DOCUMENT REGISTER Revision No. 1 Page No.5 December 2013
WIN-SP-15-E March 2013 Management Site Visit CL
WIN-SP-16-A March 2013 Non Conformance Report
WIN-SP-16-B March 2013 Non Conformance Register
WIN-SP-17-A March 2013 Audit Schedule Format
WIN-SP-17-B March 2013 Surveillance Audit Format
WIN-SP-17-C March 2013 Audit Report Summary
DOCUMENT TYPE: OPERATING SYSTEM FORMS REVIEW ANNUALLY
Number Issue Document Title
WIN-OP-03-A March 2013 Plant Pre-Start Checklist
WIN-OP-03-B March 2013 Pre Purchase Plant Hazard Checklist
WIN-OP-03-C March 2013 Sub Contractor Registration Form- Plant
WIN-OP-03-D March 2013 Plant Hire Agreement- Constructors
WIN-OP-03-E March 2013 Plant Hire Agreement- Infrastructure
WIN-OP-03-F March 2013 Plant Register
WIN-OP-03-G March 2013 Verification of Operator Competency- Plant
WIN-OP-04-A March 2013 WorkSafe Trenching Notification
WIN-OP-04-B March 2013 Trenching Safety Checklist
WIN-OP-04-C March 2013 Permit to Work- Internal
WIN-OP-05-A March 2013 Register- MSDS
WIN-OP-05-B March 2013 Risk Assessment- Haz’ Substances & Dang’ Goods
WIN-OP-07-A March 2013 Confined Space Entry Permit-Internal
WIN-OP-07-B March 2013 Confined Spaces- Warning Signs
WIN-OP-08-A March 2013 Traffic Safety Checklist
WIN-OP-09-A March 2013 Crane Work Permit-Internal
WIN-OP-09-B March 2013 Pre-Start Checklist- Cranes
WIN-OP-10-A March 2013 Guide- Crushing Hazards
DOCUMENT TYPE: LEGAL REGISTERS REVIEW ANNUALLY
Number Issue Document Title
WIN-SP-07-A March 2013 Environmental Legal & Other Register
WIN-SP-07-B March 2013 OHS Legal & Other Register
WIN-SP-02-A IMS DOCUMENT REGISTER Revision No. 1 Page No.6 December 2013
Document Type: SAFE WORK METHOD STATEMENTS Review Annually
Number Issue Document Title
SWMS 01 March 2013 Site works
SWMS 02 March 2013 Stripping
SWMS 03 March 2013 Boxing
SWMS 04 March 2013 Manual Handling
SWMS 05 March 2013 Trenching and Excavation
SWMS 06 March 2013 Locating Services
SWMS 07 March 2013 Traffic Control
SWMS 08 March 2013 Agi Drain
SWMS 09 March 2013 Operating Power Tools
SWMS 10 March 2013 Operating Demo Saw
SWMS 11 March 2013 Refuelling from Fuel Truck
SWMS 12 March 2013 Laying Pipe
SWMS 13 March 2013 Plant Maintenance over 2.0 M high
SWMS 14 March 2013 Working & Heights
SWMS 15 March 2013 Overhead Power Lines
SWMS 16 March 2013 Tree Felling & Removal
SWMS 17 March 2013 Confined Space
SWMS 18 March 2013 Work in and around Pits
SWMS 19 March 2013 Working in and around Pits
SWMS 20 March 2013 Asphalt Placement
SWMS 21 March 2013 Laying Crushed Rock
SWMS 22 March 2013 Road Trucks
SWMS 23 March 2013 Operating a Moxy
SWMS 24 March 2013 Installation of Electrical Conduits & Pits
SWMS 25 March 2013 Lifting Forms and Reo into Position
SWMS 26 March 2013 Bulk Earthworks
SWMS 27 March 2013 Site Works- Rail
SWMS 28 March 2013 Operating Compressor & Hammer
SWMS 29 March 2013 Crusher
SWMS 30 March 2013 Paver Crew
SWMS 31 March 2013 Welding Workshop
SWMS 32 March 2013 Loading and Unloading of Trucks
WIN-SP-02-A IMS DOCUMENT REGISTER Revision No. 1 Page No.7 December 2013
SWMS 33 March 2013 Installation of Iron Man Barriers
Document Type: SAFE WORK METHOD STATEMENTS Review Annually
Number Issue Document Title Date
Reviewed
SWMS 34 March 2013 Maintenance Crew
SWMS 35 March 2013 Maintenance of all Terrain Site Dumper
SWMS 36 March 2013 Landscaping
SWMS
SWMS
SWMS
SWMS
SWMS
SWMS
SWMS
SWMS
SWMS
Global-Mark Pty Ltd, Copyright 2005
Certification Manager
Certificate of Approval
This certificate confirms that the company below complies with the following standard:
Company Name Winslow Group of Companies
Company Other Name Winslow Infrastructure Pty Ltd ABN 72119092385, Winslow Constructors Pty Ltd ABN 73006581764, Trafman Solutions Pty Ltd ABN 58116624689, Survey Management Solutions Pty Ltd ABN 11116624867, Winslow Plant Hire Pty Ltd ABN 26067253658, Civil Contractors (AUST) Pty Ltd ABN 69112210072
Client ID 100573
Certification Standard AS/NZS 4801-2001 : Occupational Health and Safety Management Systems
Scope of Certification Design and construction of civil construction projects inclusive of surveying, roadworks, bridgeworks, earthworks, drainage, sewer and water main construction, traffic management, large pipeline construction, trenchless or directional boring, underground power reticulation and general pavement works, plant and labour hire.
Type of Certification Management System
CERTIFICATE DATES:
Certification Review Date 4/02/2013
Certification Expiry Date 4/02/2016
Certificate Issue Date 29/06/2007
Certificate Last Update Date 15/03/2013
APPROVED COMPANY/SITE ADDRESS (ES):
50 Barry Road Campbellfield 3061 VIC Australia
1587 Ipswich Road Rocklea 4106 QLD Australia
This certification remains valid until the above mentioned expiry date and subject to the organisation’s continued compliance with the certification standard, and Global-Mark’s Terms and Conditions. This Certificate of Approval remains the property of Global-Mark Pty Ltd, Company Number: ACN.108-087-654
The use of the Accreditation Mark indicates accreditation by the Joint Accreditation System of Australia and New Zealand in respect to those activities covered by JAS-ANZ accreditation. Refer to www.jas-anz.org/register for verification.
Global-Mark Pty Ltd, Copyright 2005
Certification Manager
Certificate of Approval
This certificate confirms that the company below complies with the following standard:
Company Name Winslow Group of Companies
Company Other Name Winslow Infrastructure Pty Ltd ABN 72119092385, Winslow Constructors Pty Ltd ABN 73006581764, Trafman Solutions Pty Ltd ABN 58116624689, Survey Management Solutions Pty Ltd ABN 11116624867, Winslow Plant Hire Pty Ltd ABN 26067253658, Civil Contractors (AUST) Pty Ltd ABN 69112210072
Client ID 100573
Certification Standard AS/NZS ISO 9001-2008: Quality Management Requirements
Scope of Certification Design and construction of civil construction projects inclusive of surveying, roadworks, bridgeworks, earthworks, drainage, sewer and water main construction, traffic management, large pipeline construction, trenchless or directional boring, underground power reticulation and general pavement works, plant and labour hire.
Type of Certification Management System
CERTIFICATE DATES:
Certification Review Date 4/02/2013
Certification Expiry Date 4/02/2016
Certificate Issue Date 29/06/2007
Certificate Last Update Date 15/03/2013
APPROVED COMPANY/SITE ADDRESS(ES):
50 Barry Road Campbellfield 3061 VIC Australia
1587 Ipswich Road Rocklea 4106 QLD Australia
The use of the Accreditation Mark indicates accreditation by the Joint Accreditation System of Australia and New Zealand in respect to those activities covered by JAS-ANZ accreditation.
Refer to www.jas-anz.org/register for verification.
This certification remains valid until the above mentioned expiry date and subject to the organisation’s continued compliance with the certification standard, and Global-Mark’s Terms and Conditions.
This Certificate of Approval remains the property of Global-Mark Pty Ltd, Company Number: ACN.108-087-654
Global-Mark Pty Ltd, Copyright 2005
Certification Manager
Certificate of Approval
This certificate confirms that the company below complies with the following standard:
Company Name Winslow Group of Companies
Company Other Name Winslow Infrastructure Pty Ltd ABN 72119092385, Winslow Constructors Pty Ltd ABN 73006581764, Trafman Solutions Pty Ltd ABN 58116624689, Survey Management Solutions Pty Ltd ABN 11116624867, Winslow Plant Hire Pty Ltd ABN 26067253658, Civil Contractors (AUST) Pty Ltd ABN 69112210072
Client ID 100573
Certification Standard AS/NZS ISO 14001-2004: Environmental Management Systems
Scope of Certification Design and construction of civil construction projects inclusive of surveying, roadworks, bridgeworks, earthworks, drainage, sewer and water main construction, traffic management, large pipeline construction, trenchless or directional boring, underground power reticulation and general pavement works, plant and labour hire.
Type of Certification Management System
CERTIFICATE DATES:
Certification Review Date 4/02/2013
Certification Expiry Date 4/02/2016
Certificate Issue Date 29/06/2007
Certificate Last Update Date 15/03/2013
APPROVED COMPANY/SITE ADDRESS(ES):
50 Barry Road Campbellfield 3061 VIC Australia
1587 Ipswich Road Rocklea 4106 QLD Australia
The use of the Accreditation Mark indicates accreditation by the Joint Accreditation System of Australia and New Zealand in respect to those activities covered by JAS-ANZ accreditation.
Refer to www.jas-anz.org/register for verification.
This certification remains valid until the above mentioned expiry date and subject to the organisation’s continued compliance with the certification standard, and Global-Mark’s Terms and Conditions.
This Certificate of Approval remains the property of Global-Mark Pty Ltd, Company Number: ACN.108-087-654
Global-Mark Pty Ltd, Copyright 2005
Certification Manager
Certificate of Approval
This certificate confirms that the company below complies with the following standard:
Company Name Winslow Group of Companies
Company Other Name Winslow Infrastructure Pty Ltd ABN 72119092385, Winslow Constructors Pty Ltd ABN 73006581764, Trafman Solutions Pty Ltd ABN 58116624689, Survey Management Solutions Pty Ltd ABN 11116624867, Winslow Plant Hire Pty Ltd ABN 26067253658, Civil Contractors (AUST) Pty Ltd ABN 69112210072
Client ID 100573
Certification Standard OHSAS 18001-2007 : Occupational Health and Safety Management Systems
Scope of Certification Design and construction of civil construction projects inclusive of surveying, roadworks, bridgeworks, earthworks, drainage, sewer and water main construction, traffic management, large pipeline construction, trenchless or directional boring, underground power reticulation and general pavement works, plant and labour hire.
Type of Certification Management System
CERTIFICATE DATES:
Certification Review Date 4/02/2013
Certification Expiry Date 4/02/2016
Certificate Issue Date 22/06/2010
Certificate Last Update Date 15/03/2013
APPROVED COMPANY/SITE ADDRESS (ES):
50 Barry Road Campbellfield 3061 VIC Australia
1587 Ipswich Road Rocklea 4106 QLD Australia
This certification remains valid until the above mentioned expiry date and subject to the organisation’s continued compliance with the certification standard, and Global-Mark’s Terms and Conditions. This Certificate of Approval remains the property of Global-Mark Pty Ltd, Company Number: ACN.108-087-654
The use of the Accreditation Mark indicates accreditation by the Joint Accreditation System of Australia and New Zealand in respect to those activities covered by JAS-ANZ accreditation. Refer to www.jas-anz.org/register for verification.
Global-Mark Pty Ltd, Copyright 2005
Certification Manager
Certificate of Approval This certificate confirms that the company below complies with the following standard:
Company Name Winslow Group of Companies
Company Other Name Winslow Infrastructure Pty Ltd ABN 72 119 092 385, Winslow Constructors Pty Ltd ABN 57 087 432 237, Trafman Solutions Pty Ltd 58 116 624 689, Survey Management Solutions Pty Ltd 11 116 624 867, Civil Contractors (AUST)Pty Ltd ABN 69112210072
Client ID 100573
Certification Standard Civil Contractors Federation Construction Management Code
Scope of Certification E1 Earthworks E2 Agricultural Earthworks E3 Dams & Tailing Dams R1 Minor Road Reconstruction R2 Major Road Reconstruction R3 Subdivisional Roadworks R4 Freeway Construction D1 Stormwater & Outfall Drainage W1 Water Reticulation and Renewal S1 Reticulation and Renewal Sewer PL1 Large Pipeline Construction B1 Bridge & Non-building Constructions U1 Underground Power Reticulation U2 Telecommunication Reticulation U3 Trenchless or Directional Boring L1 Landscaping & Tree Management L2 Retaining Walls P1 Asphalt & Sealing KP1 Kerbing & Concrete Paving KP2 Block & Other Paving PH1 Plant Hire O1 Installation of Underground Electrical Infrastructure
Type of Certification Management System
CERTIFICATE DATES:
Certification Review Date 14/08/2013
Certification Expiry Date 21/09/2014
APPROVED COMPANY/SITE ADDRESS (ES):
50 Barry Road, Campbellfield, 3061 VIC, Australia
1587 Ipswich Road, Rocklea, 4106 QLD, Australia
This certification remains valid until the above mentioned expiry date and subject to the organisation’s continued compliance with the certification standard, and Global-Mark’s Terms and Conditions. This Certificate of Approval remains the property of Global-Mark Pty Ltd, Company Number: ACN.108-087-654
The use of the Accreditation Mark indicates accreditation by the Joint Accreditation System of Australia and New Zealand in respect to those activities covered by JAS-ANZ accreditation. Refer to www.jas-anz.org/register for verification.
WINSLOW Contract No:
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan 1 1 MAY 2013
APPENDIX B:
“ORANISATIONAL STRUCTURE” SHOWING ROLES, RESPONSIBILITIES AND AUTHORITIES
SPECIFIC TO THIS PROJECT
Integrated Management System
PROJECT MANAGEMENT PLAN
Stonehill Stage 4A
DOCUMENT ISSUE DATE
WIN-SP-11-A Project Management Plan 2 December 2013
CONSTRUCTION MANAGER (Darren Bunnett)
OH&S MANAGER
(Richard Brown)
PROJECT
MANAGER
(Cameron Lee)
OPERATIONS
MANAGER
(Peter Albert)
SITE ENGINEER
(Ryan Capron)
SITE
SUPERVISOR
(Andrew Grima)
LEADING HAND
LABOURER
SUBCONTRACTORS & SUPPLIERS
WINSLOW Contract No
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan No. 1 1 May 2013
APPENDIX C:
SITE INFORMATION SHEET
Integrated Management System
PROJECT: Stonehill Stage 4ALOCATION:
JOB No.: 7199 CUSTOMER:
FORMAN: Andrew Grima MOB. 0408 622 262
AMBULANCE 000
FIRE BRIGADE 000
POLICE 000
FIRST AIDER Andrew Grima Tel No.: 0408 622 262
FIRST AIDER Tel No.:
DOCTOR Bacchus Marsh Medical Centre Tel No.: (03) 5367 3333
Address: Turner Street
Bacchus Marsh 3340
Hours:
HOSPITAL
Address: Bacchus Marsh Hospital Tel No.: 5367 2000
Grant St
Bacchus Marsh VIC 3340
TELEPHONE
ELECTRICITY Citipower 131 280
Eastern Energy 131 799
Powercor 132 412
AGL Electricity 131 626
United Energy 132 099
GAS Multinet Gas 132 771
Stratus Network 132 771
ENVIRONMENT EPA 9695 2700
SEWERAGE City West Water 132 642
& WATER South East Water 132 812
Yarra Valley Water 132 762
Melbourne Water 9235 2161
WORK COVER 9641 1444
POISON INFORMATION - Info. Centre Melb 131 126
WORKSAFE INCIDENT NOTIFICATION 132 360
EMERGENCY CONTACTS
December 2013Page No. 1Revision No. 1WIN-SP-08-A Emergency Contacts
Griffith St, Bacchus Marsh
Integrated Management System
EMERGENCY EVACUATION PLAN
WIN-SP-08-B Emergency Evacuation Plan Revision No. 1 Page No. 1 December 2013
IN THE EVENT OF AN EMERGENCY PROCEED TO THE DESIGNATED
EVACUATION POINT
DO NOT LEAVE THIS AREA UNLESS DIRECTED.
FOLLOW THE
PLAN OUTLINED BELOW:
Stonehill Stage 4A Griffith St, Bacchus Marsh
Ryan Capron 4/12/2013
Name of principal Winslow Constructors 9358 7700
contractor:
Name Position Phone number Brief description of OHS responsibilities
Cameron Lee Project Manager 0488 489 030 The company Project Manager is responsible for the implementation of the company's OHS
policies, systems, SWMS and instructions to be used on company's projects. They are also
responsible for preparing, implementing and monitoring the Health and Safety Coordination
Plan ("HSCP"). They are responsible for the revision and distribution of new copies of the
HSCP. They are to prepare and monitor the OHS aspects of the Project Management Plan.
Peter Albert Operations Manager 0408 991 492 The company's Operations Manager is responsible for the implementation of the company's
OHS policies, systems, SWMS and instructions to be used on company's projects. They are
also responsible for preparing, implementing and monitoring the Health and Safety
Coordination Plan ("HSCP"). They are responsible for the revision and distribution of new
copies of the HSCP. They are to prepare and monitor the OHS aspects of the Project
Management Plan.
Richard Brown HSE Manager 0438 892 070 The company Health and Safety Manager is responsible for the development and
implementation of OHS policies, systems, SWMS and instructions to be used on all company
projects.
Heather Barnard HSE Co-ordinator 0409 223 286 The company Return to Work Co-ordinator is to assist the Health and Safety Manager in the
responsible development and implementation of Return to Work and Rehabilitation plans for
employees with work related injuries.
Health and Safety Co-ordination Plan
Project: Location:
Prepared by: Date:
Phone number:
Note: This co-ordination plan must be reviewed if there are any significant changes to the work. It must be available for inspection by anyone doing construction
work on the project, new employees, health and safety representatives, and members of the health and safety committee.
People with specific health and safety responsibilities
HSCP Template Job No. Revision No. Date:
Andrew Grima Andrew Grima 0408 622 262 The site Foreman is responsible for supporting the Engineer/Project Manager with the
implementation of the company's OHS policies, systems, SWMS's and instructions which are
to be used on company's projects.
Andrew Grima First Aid Officer 0408 622 262 The company Leading Hand/First Aid Officer acts as the responsible representative on site if
the Foreman is unavailable. They are to support the Foreman in his OHS responsibilities.
They are required to report directly to the Foreman and provide First Aid treatment when
required.
See appendix G Subcontractors Subcontracted that are hired and provided material for the company on the company's
projects are responsible for the Health and Safety of themselves, their own employees and
those who may be affected by their work.
Responsible person
Project Manager
Foreman
Project Manager
HSEQ Manager HSE
Co-ordinator
Foreman
Project Manager
Foreman
Safe work practices and procedures:
- identify and assess safety hazards involved in the project .
- Develop control measure to eliminate or reduce the hazards as far as is responsibly
practicable.
- Monitor and review risk control measures. - Develop, implement and monitor safe
work method statements ("SWMS") for high risk work.
- Communicate with the Leading Hand about all site hazards and SWMS.
- Consult with workers involved in hazardous work about relevant OHS issues and
control measures.
Conduct weekly site safety inspections:
- develop a checklist to guide the daily site safety inspections
Arrangements for co-ordinating the health and safety of the project
Describe the responsibilities for the arrangements. Include the arrangements for communicating with contractors and others who may be off-site from time to time.
Item
Ensure that the company OHS policy is read and clearly understood by all employees
and subcontractors working on site:
- ensure that a copy of the OHS policy and emergency numbers are located on site and
made available to all employees on site.
- Communicate this to all workers during the sire induction.
Record all risk assessments and SWMS and keep a copy with this plan
HSCP Template Job No. Revision No. Date:
Project Manager
Foreman
Project Manager
Foreman
Project Manager
Foreman
HSEQ Manager
Richard Brown
Foreman
HSEQ Manager
HSE Co-ordinator
Responsible person
The designated contact for employees and others with health and safety concerns:
- Will communicate these concerns to Health and Safety Manager and Engineer.
- Will help to address these concerns
Conduct monthly toolbox meetings. -
Consult workers about site safety issues during the monthly toolbox meetings.
Follow the incident response and reporting procedures:
- Take necessary follow-up action, such as an investigation into the incident. -
Advise the person responsible for the safe work practices.
- Ensure that the safety risk involved has been appropriately address. -
If necessary, notify emergency services, the Project Manager and the Engineer
Item
Induction of all new works onto the site:
- Complete site induction, including communication of emergency procedures and
incident response procedures.
- Check and record qualifications, including construction induction training of all new
workers. - Maintain a
register of names and/or positions of employees and sub-contractors with authorisation
permits, competency certificates, licences, etc, who may be required to supervise or
undertake specialist work activities.
Receive all visitors to site and ensure that they will be accompanied on site at all times
Communicate with regularity authorities and other services about any safety concerns
Arrangements for managing health and safety incidents
Include responsibilities for notifying the emergency services and WorkSafe.
HSCP Template Job No. Revision No. Date:
Project Manager
Foreman
HSE Co-ordinator
Project Manager
Foreman
HSE Co-ordinator
All workers on site
Project Manager
All workers on site
Responsible person
Project Manager
Foreman
Project Manager
Foreman
All workers on site Personal Protective Equipment including, boots, high visibility upper clothing, safety
glasses and hearing protection where needed, must be worn at all times. Hard hats
must be worn wherever trenches exceed 1.5 meters and whenever working with or
adjacent to earth moving plant that lifts freely suspended loads.
Specific Site Rules
Winslow has a detailed OHS policy. All new employees must familiarise themselves
with this policy when they commence work for Winslow and comply with the policy.
Each subcontractor working on the site must be inducted to the site and sign an
agreement to conform to the Winslow OHS policy and site rules.
Have all persons trained in the Emergency Incident Procedure:
- SAFE: Secure the site. Aid the injured. Fast notification of the emergency services.
- Assist the psychological needs of those involved in the incident, eg by providing a
counsellor.
- Ensure all employees understand the emergency evacuation procedure and the
location of the evacuation site.
- Ensure that all employees and workers know the location of the nearest medical
facilities and the location.
Monitor all incidents: -
Maintain a register if all incidents and near misses including any incidents or near
misses involving subcontractors: - Notify the
foreman of all incidents and notify the site engineer and project manager of any serious
incident or safety risk identified as a result of the incident.
- Undertake investigation process and recommendations.
- Consult with workers on site about related safety issues.
- Review investigation process and recommendations. -
Decide on appropriate controls and ensure they are implemented.
Ensure all incidents, near misses and injuries are notified to the person responsible for
monitoring incidents.
Notify WorkSafe Victoria of all notifiable incidents. 132360 (24 hours)
Rule
Ensure the scene of any major incident or near miss is preserved unit notified that work
can recommence by WorkSafe
Site safety rules
Each rule should be simple and clear, covering only one issue. Set out who is covered by each rule, and who is responsible for communicating it.
HSCP Template Job No. Revision No. Date:
All workers on site
All workers on site
All workers on site
All workers on site
All rubbish form site sheds and areas must be removed and binned each day.
All movements by plant, trucks carting off site or delivery trucks shall be directed by the
respective foreman or leading hand. Movements are to be limited to the least possible
and reversing must be minimised. Final decision on the need for specific movements
rests with the Foreman (Vince Alampi).
Operators of mobile earthmoving plant shall not use the mobile phone when operating.
Calls should be restricted to meal breaks. No personal calls during works hours.
The personal vehicles of employees and subcontractors shall be parked off site at a
location set by Winslow.
HSCP Template Job No. Revision No. Date:
WINSLOW Contract No:
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan 1 1 MAY 2013
APPENDIX D:
HEALTH AND SAFETY HAZARDS AND THEIR CONTROLS
Activity Hazards Risks Legal & Other Reqs.IMS Procedures
& Instructions
Competency
RequirementsLikelihood Consequence Risk Level
Risk
Score
Project
Objectives
& Targets
Likelihood Consequence Project Risk Project Operational Controls Additional Site controls Priorty Likelihood ConsequenceProject
Risk
Public fatality or injury due to accessing work sites
Need site
establishment
operating
procedure
Unlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic MediumNo public access. Adequate warning signage, Induction
prior site accessFencing to be maintained at all times 2 Rare Catastrophic Low
Public and worker injuring themselves due to trip
hazards
http://www.legislation.vi
c.gov.au/Domino/Web_
Notes/LDMS/PubLawTo
day.nsf/95c43dd4eac71
a68ca256dde00056e7b/
E9579446A7787F37CA
25728900169AAB/$FIL
E/04-107a010.pdf
Possible Major Medium 12 0 LTI's Possible Major Medium
Adequate warning signage, Induction prior site access,
general house keeping to be maintained through out the
duration of the job.
Weekly safety inspections, trip hazards identified and
rectified immediately.3 Possible Major Medium
Public and worker fatality or injury due to being
struck by vehicles exiting or entering work sitesRoad Management Act
2004Unlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium
PPE, Adequate warning signage, Induction prior site
access. Worksite speed limit to be maintained
Adequate warning sign's, separation of workers/pedestrians
and traffic to be maintained where practicable. Traffic
controllers to be used where necessary.
1 Rare Catastrophic Low
Worker fatality or injury due to unsafe or blocked
egress in case of emergencyRare Catastrophic Low 5 0 LTI's Rare Catastrophic Low PPE, Adequate warning signage, Induction prior site access
Access to remain clear at all times. Alternate emergency
exit to be implemented. Emergency drills to be carried out
on a regular basis.
2 Rare Catastrophic Low
Worker fatality or injury due to asphyxiation or lung
damage from inhalation of fumes
http://www.safeworkaust
ralia.gov.au/NR/rdonlyre
s/3D1B1ACF-A627-
48DF-8B19-
8D56C91052BB/0/Work
placeHazardousSubsta
nces_COP_NOHSC200
7_1994.pdf
MSDS RegisterInduction
TrainingRare Catastrophic Low 5 0 LTI's Rare Catastrophic Low
Restrained storage of chemicals on site, less hazardous
goods to be substituted where possible.
Dangerous goods to be used in ventilated area. Correct PPE
to be worn where necessary. Correct signage to be installed
at storage areas.
2 Rare Catastrophic Low
Worker injury due to chemical burns to body from
spill on skin
http://www.safeworkaust
ralia.gov.au/NR/rdonlyre
s/3D1B1ACF-A627-
48DF-8B19-
8D56C91052BB/0/Work
placeHazardousSubsta
nces_COP_NOHSC200
7_1994.pdf
WIN-OP-05Induction
TrainingUnlikely Moderate Medium 6 0 LTI's Unlikely Moderate Medium
Restrained storage of chemicals on site, less hazardous
goods to be substituted where possible.
Appropriate PPE and signage. Appropriate washing facilities
to be provided where necessary.2 Unlikely Moderate Medium
Worker fatality or injury due to internal organ
damage from ingestion of substances " " MSDSInduction
TrainingRare Catastrophic Low 5 0 LTI's Rare Catastrophic Low
Restrained storage of chemicals on site, less hazardous
goods to be substituted where possible. All chemicals to
be clearly marked and never to be decanted into
unmarked containers.
Appropriate PPE 3 Rare Catastrophic Low
Worker injury with blindness due to chemical contact
with eyes " " MSDS
Induction
TrainingUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium
Restrained storage of chemicals on site, less hazardous
goods to be substituted where possible.
Appropriate PPE, All first aid kits to be easily accessible and
have eye washing facilities available1 Unlikely Catastrophic Medium
Worker fatality or injury due to burns on body from
inflammable chemicals " " MSDS
Induction
TrainingPossible Catastrophic High 15 0 LTI's Possible Catastrophic High
Restrained storage of chemicals on site, less hazardous
goods to be substituted where possible.
Appropriate tested and tagged Fire extinguishers available
and working1 Unlikely Catastrophic Medium
Public fatality or injury due to chemical fire entering
adjoining properties
Dangerous Goods
(Storage and Handling)
Regulations 2000.
Amendments 2000
Regulations (Part 9.2
2007 Regulations)
MSDSInduction
TrainingRare Catastrophic Low 5 0 LTI's Rare Catastrophic Low Restrained storage of chemicals on site
Chemicals stored away from existing houses. Appropriate
hazchem signage where appropriate.3 Rare Catastrophic Low
Worker fatality or injury due to incorrect storage of
chemicals
Dangerous Goods
(Storage and Handling)
Regulations 2000.
Amendments 2000
Regulations (Part 9.2
2007 Regulations)
MSDSInduction
TrainingUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium Restrained storage of chemicals on site 2 Unlikely Catastrophic Medium
Company or public property burnt due to lack of fire
controlMSDS
Induction
TrainingPossible Catastrophic High 15 0 LTI's Possible Catastrophic High Restrained storage of chemicals on site
Appropriate Tested and Tagged Fire extinguishers available
on site.1 Unlikely Catastrophic Medium
Worker or public fatality or injury due storage of
chemicals in unprotected places " " MSDS
Induction
TrainingRare Catastrophic Low 5 0 LTI's Rare Catastrophic Low Restrained storage of chemicals on site No Public access to site 3 Rare Catastrophic Low
Worker fatality or injury due to poisoning or burns
from storing chemicals in unlabeled decantersMSDS
Induction
TrainingUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium
Restrained storage of chemicals on site, less hazardous
goods to be substituted where possible. All chemicals to
be clearly marked and never to be decanted into
unmarked containers.
Adequate labels on all chemicals 2 Rare Catastrophic Low
DEC 2013Page No. 1WIN-SP-06-A HAZARD & RISK REGISTER
Project Risk AssessmentReviewed By: Richard Brown Approved By: Srini Krishnamurti
Revision No. 1
GENERIC HEALTH & SAFETY HAZARDS/RISK REGISTER DECEMBER 2013
Generic Risk Assessment
Trip
s an
d F
alls
Han
dlin
g, t
ran
spo
rt, s
tora
ge, u
se, s
pill
s, d
isp
osa
l
Haz
ard
ou
s Su
bst
ance
s &
Dan
gero
us
Go
od
sSecondary Assessment taking into
account all controls
Site
Acc
ess
and
Egr
ess
(in
clu
de
off
ice
an
d
wo
rksh
op
)
Activity Hazards Risks Legal & Other Reqs.IMS Procedures
& Instructions
Competency
RequirementsLikelihood Consequence Risk Level
Risk
Score
Project
Objectives
& Targets
Likelihood Consequence Project Risk Project Operational Controls Additional Site controls Priorty Likelihood ConsequenceProject
Risk
Project Risk AssessmentReviewed By: Richard Brown Approved By: Srini Krishnamurti
GENERIC HEALTH & SAFETY HAZARDS/RISK REGISTER DECEMBER 2013
Generic Risk Assessment
Trip
s an
d F
alls
Secondary Assessment taking into
account all controls
Site
Acc
ess
and
Egr
ess
(in
clu
de
off
ice
an
d
wo
rksh
op
)
Worker fatality or injury due to trench wall collapsing
F:\System IMS\OHS
Files\VicActs&Regulatio
ns,COP's etc\COP
TrenchingWorkSafe.pdf
WIN-OP-04
Mine Manager
Ticket or
Trenching &
Shoring ticket
Possible Catastrophic High 15 0 LTI's Possible Catastrophic High
Trenches greater than 1.5 meters, batter/bench sides of
trench or use shields where needed. Worksafe must be
notified 3 days prior to any excavation works.
Trench safety checklist completed Winslow internal
excavation permit to be completed prior to any excavation
works commencing.
1 Unlikely Catastrophic Medium
Worker fatality or injury due to debris or tools falling
on personnel in the trench.www.legislation.vic.gov.
auWIN-OP-04
Induction/SWMS
TrainingPossible Catastrophic High 15 0 LTI's Possible Catastrophic High
Tools & equipment to be kept a minimum 1m away from
trench edge.Hard hats worn on site at all times 1 Unlikely Catastrophic Medium
Worker fatality or injury due to falling into
trench/shaft
http://www.safeworkaust
ralia.gov.au/swa/About
Us/Publications/Nationa
lStandards/NationalCod
eofPracticeforthePreven
tionofFallsinGeneralCon
struction.htm
WIN-OP-04Induction/
SWMS TrainingPossible Catastrophic High 15 0 LTI's Possible Catastrophic High
Barricading to be installed around all open trenches/Shafts
as per code of practice.1 Unlikely Catastrophic Medium
Worker fatality or injury due to unsafe access &
egress to trench
http://www.safeworkaust
ralia.gov.au/swa/Health
Safety/HazardsSafetyIs
sues/ConfinedSpaces/
WIN-OP-04Induction/
SWMS TrainingPossible Catastrophic High 15 0 LTI's Possible Catastrophic High
Ladders and fall protection to be used for Ingress and
Egress and maintained through out duration of the job.2 Unlikely Catastrophic Medium
Worker injury due to throat or lung injury from dustInduction/
SWMS TrainingUnlikely Moderate Medium 6 0 LTI's Unlikely Moderate Medium
Water cart to spray water onsite when required to
suppress dustAll materials to be delivered to site as wet mix. 3 Rare Moderate Low
Worker fatality or injury due to asphyxiation by
hazardous fumes in trenchCompliance Code:
Confined Space 2008WIN-OP-07
Confined space
entry trainingUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium
Confined space entry procedure and permit system
required where applicable. Confined space rescue plan to
be implemented and known by all on site. Air Quality to be
monitored as per procedure
All staff working in confined space to receive confined space
entry training and competency.1 Rare Catastrophic Low
Worker fatality or injury due to electrocution from
striking underground services
http://www.worksafe.vic.
gov.au/wps/wcm/conne
ct/WorkSafe/Home/For
ms+and+Publications/P
ublications/import_Unde
rground+assets%2C+G
uide+for+undertaking+w
WIN-OP-04 Spotter ticket Possible Catastrophic High 15 0 LTI's Possible Catastrophic High
Dial before you dig to be obtained. Winslow excavation permit
to be completed prior to excavation. All services to be located
and proved by non destructive means and clearly marked and
locations known by all staff.
Maintain Limit of Approach distances contained in Table: A WIN-
OP-04, Operating Procedures for excavation and trenching.1 Unlikely Catastrophic Medium
Worker fatality or injury due to electrocution from
striking overhead services
http://www.worksafe.vic.
gov.au/wps/wcm/conne
ct/WorkSafe/Home/For
ms+and+Publications/P
ublications/import_No+
Go+Zones+for+Overhe
WIN-OP-04 Spotter ticket Possible Catastrophic High 15 0 LTI's Possible Catastrophic High
Maintain "No Go Zone" distances contained table B in WIN-OP-
04 any work that needs to take place closer than approach
limits permission must be obtained from service authority,
SWMS & Training.
No works to be completed in the vicinity of power lines without a
trained spotter present1 Unlikely Catastrophic Medium
Worker burnt or asphyxiated due to striking
underground gas services Gas Safety Act 1997,
Pipelines Act 1967WIN-OP-04 Possible Catastrophic High 15 0 LTI's Possible Catastrophic High
Dial before you dig to be obtained. Winslow excavation permit
to be completed prior to excavation. All services to be located
and proved by non destructive means and clearly marked and
locations known by all staff.
No works to be completed near gas lines without a spotter 1 Unlikely Catastrophic Medium
Worker incapacitated or dying from contracting
asbestosis due to excavating AC pipe
Compliance Code:
Managing Asbestos In
the
Workplace/Removing
Asbestos in Workplaces
2008
WIN-OP-ENV-
06Rare Catastrophic Low 5 0 LTI's Rare Catastrophic Low
If asbestos (or suspected asbestos ) is located on site area
to be barricaded and PM contacted and the substance is to
be removed by a suitably trained sub- contractor.
3 Rare Catastrophic Low
Public injury or fatality due to falling into trench Victorian OHS Act 2004 Rare Catastrophic Low 5 0 LTI's Rare Catastrophic Low Appropriate barricading to be installed and maintained. 2 Rare Catastrophic Low
Worker fatality or injury due to plant overturning
from load being too heavy
Code of Practice Safe
use of Cranes in the
Building Industry No:11
1990
SWMSTicketed
operatorPossible Catastrophic High 15 0 LTI's Possible Catastrophic High
Appropriate personnel to be employed during any lifting
operations. Clear Zones to be maintained.Lifting capacity checked prior to start 2 Unlikely Catastrophic Medium
Worker fatality or injury due to plant overturning
from unbalanced loadWIN-OP-03
Ticketed
operatorPossible Catastrophic High 15 0 LTI's Possible Catastrophic High
Appropriate personnel to be employed during any lifting
operations. Clear zones to be maintained.Balance load prior to start 2 Rare Catastrophic Low
Worker fatality or injury due to being crushed by
falling object
www.legislation.vic.gov.
auWIN-OP-03
Ticketed
operatorUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium
Appropriate personnel to be employed during any lifting
operations. Clear zones to be maintained.No personnel under load 2 Rare Catastrophic Low
Property or plant damaged by falling object " " SWMSTicketed
operatorUnlikely Moderate Medium 6 0 LTI's Unlikely Moderate Medium
Appropriate personnel to be employed during any lifting
operations. Clear zones to be maintained.Lifting not to be done over personnel or plant 3 Rare Moderate Low
Public fatality or injury due to falling objects or
overturning plant " " SWMSTicketed
operatorRare Catastrophic Low 10 0 LTI's Rare Catastrophic Low Signs, Barriers in place. Clear Zones To Be Maintained No public onsite 2 Rare Catastrophic Low
Revision No. 1WIN-SP-06-A HAZARD & RISK REGISTER Page No. 2 DEC 2013
Falli
ng
ob
ject
s, p
lan
t
ove
rtu
rn, p
ub
lic o
r
pro
pe
rty
dam
age
.
Tre
nch
ing/
Exc
avat
ion
Co
llap
se, s
lipp
ing
or
falli
ng
into
exc
avat
ion
, haz
ard
ou
s su
bst
ance
s (e
.g. a
sbe
sto
s, s
har
ps
),
stri
kin
g o
verh
ead
or
un
de
rgro
un
d a
sse
ts, f
um
es,
gas
Lift
ing
Activity Hazards Risks Legal & Other Reqs.IMS Procedures
& Instructions
Competency
RequirementsLikelihood Consequence Risk Level
Risk
Score
Project
Objectives
& Targets
Likelihood Consequence Project Risk Project Operational Controls Additional Site controls Priorty Likelihood ConsequenceProject
Risk
Project Risk AssessmentReviewed By: Richard Brown Approved By: Srini Krishnamurti
GENERIC HEALTH & SAFETY HAZARDS/RISK REGISTER DECEMBER 2013
Generic Risk Assessment
Trip
s an
d F
alls
Secondary Assessment taking into
account all controls
Site
Acc
ess
and
Egr
ess
(in
clu
de
off
ice
an
d
wo
rksh
op
)
Worker physical injury due to load too heavy
http://www.safeworkaust
ralia.gov.au/swa/Health
Safety/HazardsSafetyIs
sues/ManualTasks/Man
ualTasks.htm
WIN-OP-06Induction
TrainingPossible Moderate Medium 9 0 LTI's Possible Moderate Medium
Risk assessments to be carried out. Use appropriate plant
and equipment to shift loads.Manual Handling Training for all staff 1 Unlikely Moderate Medium
Worker physical injury due to load not being stable " " WIN-OP-06Induction
TrainingPossible Moderate Medium 9 0 LTI's Possible Moderate Medium
Appropriate stacking of materials to ensure easy
loading/unloading.Use appropriate plant and equipment to shift loads. 2 Rare Moderate Low
Worker injury due to repetitive nature of work " " WIN-OP-06Induction
TrainingPossible Moderate Medium 9 0 LTI's Possible Moderate Medium
Risk Assessments carried out on all repetitive tasks.
Repetitive tasks to be rotated.3 Unlikely Moderate Medium
Worker physical injury due to not lifting in correct
manner
National Standard for
Manual TasksWIN-OP-06
Induction
TrainingLikely Moderate Medium 12 0 LTI's Likely Moderate Medium
Training to ensure correct lifting techniques are
implemented.Mechanical aids provided where appropriate 1 Possible Moderate Medium
Worker hand injury due to handling sharp objects " " SWMSInduction
TrainingLikely Minor Medium 8 0 LTI's Likely Minor Medium
Training in correct use of PPE. All sharp objects to be
cappedGloves to be provided 2 Unlikely Minor Low
Worker losing hearing due to noisy power tools or
equipment
http://www.safeworkaust
ralia.gov.au/NR/rdonlyre
s/6EE85D16-7D1C-
4FFC-99E7-
E611B7290E18/0/Noise
_COP.pdf
SWMSInduction
TrainingPossible Moderate Medium 9 0 LTI's Possible Moderate Medium
Training in correct use of PPE. Risk assessment carried out
on all plant and equip. All plant and equip to maintained in
good condition.
Hearing protection to be provided. Two Yearly audiometric
test for all staff.2 Unlikely Moderate Medium
Worker fatality or injury due to electrocution from
electrical hand tools
Industry Standard for
Electrical Installations
on construction sites.
SWMSInduction
TrainingUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium
Appropriate training for all staff. All equipment to be kept
in good condition. All generators to be appropriately
earthed and have RCD's
Test and tagging to be completed on all electrical
equipment.2 Rare Catastrophic Low
Worker injury due to vibrating equipment causing
soft tissue damage
http://www.safeworkaust
ralia.gov.au/swa/Health
Safety/HazardsSafetyIs
sues/ManualTasks/Man
ualTasks.htm
WIN-OP-06Induction
TrainingPossible Moderate Medium 9 0 LTI's Possible Moderate Medium
Risk assessments carried out on manual tasks. Repetitive
tasks to be rotated.3 Unlikely Moderate Medium
Worker becoming sick due to heat exhaustion Victorian OHS Act 2004 EBAInduction
TrainingUnlikely Moderate Medium 6 0 LTI's Unlikely Moderate Medium
Suspension of work activities over 35 C. Manual tasks to be
performed earlier in the day and rotated. Extra rest breaks
to be provided. Shade to be provided along a plentiful
supply of cool fresh drinking water.
2 Rare Moderate Low
Worker public & property burnt due to fire on fire
ban day
Hot Work
Permits
Induction
TrainingPossible Catastrophic High 15 0 LTI's Possible Catastrophic High
No hot work to be done on total fire ban days. Fire
extinguisher on hand at all times.2 Unlikely Catastrophic Medium
Worker becoming sick due to fatigue
http://www.worksafe.vic.
gov.au/wps/wcm/conne
ct/WorkSafe/Home/For
ms+and+Publications/P
ublications/Fatigue+pre
Induction
TrainingUnlikely Moderate Medium 6 0 LTI's Unlikely Moderate Medium
Appropriate Rest Breaks Taken. Staff performing Manual
tasks to be rotatedWork scheduling and planning 3 Rare Moderate Low
Worker becoming sick due to hypothermia Victorian OHS Act 2004Induction
TrainingRare Moderate Low 3 0 LTI's Rare Moderate Low
Adequate facilities with a means of heating to be
provided. Appropriate PPE issued.3 Rare Moderate Low
Worker becoming ill due to skin burnt from exposure
to sun
http://www.safeworkaust
ralia.gov.au/swa/Health
Safety/HazardsSafetyIs
sues/UltravioletRadiatio
ninSunlight.htm
Induction
TrainingPossible Minor Medium 6 0 LTI's Possible Minor Medium PPE/Training All personnel to be provided appropriate protection 2 Rare Minor Low
Worker fatality or injury due to lack of control of
plant from icy or muddy conditionsVictorian OHS Act 2004
Ticketed
operatorRare Catastrophic Low 6 0 LTI's Rare Catastrophic Low Risk assessment. 3 Rare Catastrophic Low
Worker fatality or sick due to snake, spider or insect
bitesVictorian OHS Act 2004 Rare Catastrophic Low 6 0 LTI's Rare Catastrophic Low SWMS, PPE/Training 2 Rare Catastrophic Low
Worker injury or fatality due to being struck by public
or site vehicleRoad Management Act
2004WIN-OP-08
Traffic
Management
ticket
Possible Catastrophic High 15 0 LTI's Possible Catastrophic HighWorkers and Traffic to be delineated with the highest
forms of controls as practicable.1 Unlikely Catastrophic Medium
Worker or public fatality or injury due to collision
with construction plant and equipment and/or
leaving designated traffic route (collision, roll-over)
WIN-OP-08 Possible Catastrophic High 15 0 LTI's Possible Catastrophic HighWorkers and Traffic to be delineated with the highest
forms of controls as practicable.
When installing or removing traffic delineation devices
always use the highest possible form of controls such as
elimination of the hazard. Divert traffic if practical. Use
devices to separate worker and traffic if diversion is not
possible.
1 Unlikely Catastrophic Medium
Worker or public fatality or injury due to accident
because of materials on road, mud, water, gravel etc.Road Management Act
2004WIN-OP-08 Likely Catastrophic High 20 0 LTI's Likely Catastrophic High Rumble Grid or truck wash to be installed Daily inspection of all roads conducted 2 Unlikely Catastrophic Medium
Worker injury due to fuel fumes, dust inhalation or
eye irritation
http://www.safeworkaust
ralia.gov.au/NR/rdonlyre
s/317D25BA-E837-
4F5B-AC65-
24FE588888CA/0/Expo
sureStandards4Atmosp
hericContaminants_Nov
06version.pdf
Unlikely Minor Low 4 0 LTI's Unlikely Minor Low Air quality monitoring, PPE 3 Rare Minor Low
Public fatality or injury due to traffic congestion or
confusion from traffic controls, signs not being taken
down when finished
Road Management Act
2004WIN-OP-08
Traffic
Management
ticket
Possible Catastrophic High 15 0 LTI's Possible Catastrophic HighMOC in place. Approved TMP. Traffic Control checklist
(Daily Inspections)1 Unlikely Catastrophic Medium
Pedestrian injury or fatality due to site or company
vehicles running over them when exiting or entering
site
Road Management Act
2004WIN-OP-08 Unlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium All pedestrian access to be delineated from worksite. Traffic controllers in place in heavy pedestrian areas. 1 Rare Catastrophic Low
Revision No. 1WIN-SP-06-A HAZARD & RISK REGISTER Page No. 3 DEC 2013
Traf
fic
Man
agem
ent
UV
exp
osu
re, r
adia
nt
he
at, f
rost
, sn
ow
,
ice
, dan
gero
us
pla
nts
& a
nim
als
Wo
rkin
g in
ext
rem
e (h
ot
&
cold
) o
r h
ost
ile
envi
ron
men
ts
Man
ual
Han
dlin
g
Pu
shin
g , p
ulli
ng,
be
nd
ing,
re
ach
ing,
lift
ing
Ve
hic
les
and
mo
vin
g p
lan
t w
ork
ing
on
sit
e
(en
teri
ng
and
exi
tin
g), w
ork
ing
in c
lose
pro
xim
ity
to r
oad
tra
ffic
, dir
ect
ing
traf
fic
thro
ugh
an
d
aro
un
d w
ork
sit
e, v
isib
ility
, tra
ffic
no
ise
& f
um
es
Activity Hazards Risks Legal & Other Reqs.IMS Procedures
& Instructions
Competency
RequirementsLikelihood Consequence Risk Level
Risk
Score
Project
Objectives
& Targets
Likelihood Consequence Project Risk Project Operational Controls Additional Site controls Priorty Likelihood ConsequenceProject
Risk
Project Risk AssessmentReviewed By: Richard Brown Approved By: Srini Krishnamurti
GENERIC HEALTH & SAFETY HAZARDS/RISK REGISTER DECEMBER 2013
Generic Risk Assessment
Trip
s an
d F
alls
Secondary Assessment taking into
account all controls
Site
Acc
ess
and
Egr
ess
(in
clu
de
off
ice
an
d
wo
rksh
op
)
Worker ill due to lack of clean eating facilities Victorian OHS Act 2004 WIN-SP-04 Unlikely Moderate Medium 6 0 LTI's Unlikely Moderate Medium Good House keeping to be maintained. 3 Rare Moderate Low
Worker sick due to lack of wash facilities Victorian OHS Act 2004 WIN-SP-04 Unlikely Moderate Medium 6 0 LTI's Unlikely Moderate Medium Provision of proper amenities. 3 Rare Moderate Low
Worker fatality or injury due to asphyxiation from
chemicals stored in lunch or work areas
Dangerous Goods
(Storage and
Handling) Regulations
2000. Amendments
2000 Regulations
(Part 9.2 2007
Regulations)
Unlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium Restrained storage of all chemicals. All chemicals to be put in separate container 3 Rare Catastrophic Low
Worker sick due to dehydration from lack of drinking
water
Compliance Code:
Workplace Amenities
and Work Environment
Unlikely Minor Low 4 0 LTI's Unlikely Minor LowProvision of proper amenities. Plentiful supply of fresh
drinking water to be provided.3 Rare Minor Low
Worker fatality or injury due to fire from rubbish
build upUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium
Good house keeping all waste to be disposed of in the
appropriate manner.3 Rare Catastrophic Low
Worker fatality or injury due to inhalation, eye & skin
contact or ingestion of chemicals
Dangerous Goods
(Storage and Handling)
Regulations 2000.
Amendments 2000
Regulations (Part 9.2
2007 Regulations)
Unlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium Restrained storage of all chemicals. All chemicals to be stored in separate container 3 Rare Catastrophic Low
Public or worker injury by sharp materials storage on
work siteUnlikely Moderate Medium 6 0 LTI's Unlikely Moderate Medium
Good house keeping all waste to be disposed of in the
appropriate manner.Maintain a clean environment 3 Rare Moderate low
Worker fatality or injury inflamed due to lack of first
aid facilities & first aider
Compliance Codes:
First Aid in the
Workplace
WIN-SP-04 Level 2 First Aid Unlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic MediumFirst Aid equipment/ trained personnel to be provided as
per compliance codes.2
Rare Catastrophic Low
Worker fatality or injury inflamed due to lack of
emergency procedure or contact details " " WIN-SP-08 Unlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic MediumAll emergency contact numbers to be displayed including
after hours contact details.2
Rare Catastrophic Low
Worker fatality or injury inflamed due to lack of
records about worker allergies, medication
requirements or current illnesses.
Unlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic MediumMedical and Physical tests carried out regularly and
records maintained.3 Rare Catastrophic Low
Worker fatality or injury due to having taken alcohol
or drugs
Winslow D & A
PolicyUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium Implementation of our fit for work policy.
Training for supervisors in recognition of person under the
influence of D & A3 Rare Catastrophic Low
Worker fatality or injury due to worker doing jobs
they are not trained for
http://www.legislation.vi
c.gov.au/Domino/Web_
Notes/LDMS/PubLawTo
day.nsf/95c43dd4eac71
a68ca256dde00056e7b/
E9579446A7787F37CA
25728900169AAB/$FIL
E/04-107a010.pdf
WIN-SP-09 Possible Catastrophic High 15 0 LTI's Possible Catastrophic High Training and SWMS 2 Unlikely Catastrophic Medium
Person being less favorably treated in the workplace
Equal Opportunity Act
1995Winslow Sexual
Harassment &
Equal
Employment
Opportunity
Possible Moderate Medium 9 0 LTI's Possible Moderate Medium Promote principles of equal opportunity 3 Unlikely Moderate Medium
Worker Ill, Injured or killed due to Fatigue and stressor.
http://www.worksafe.vic.
gov.au/wps/wcm/conne
ct/WorkSafe/Home/For
ms+and+Publications/P
ublications/Fatigue+pre
Winslow Fit for
Work, D & A
PolicyUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium Scheduling of work hours within normal day light hours 3 Rare Catastrophic Low
Person being bullied in the work place
http://www.worksafe.vic.
gov.au/wps/wcm/conne
ct/WorkSafe/Home/For
ms+and+Publications/P
Winslow
Workplace
Bullying Policy
Unlikely Moderate Medium 6 0 LTI's Unlikely Moderate MediumDisciplinary action against persons found to engage in
harassment or workplace bullying3 Rare Moderate Low
Person being sexually harassed in the workplaceFederal Sexual
discrimination Act
Winslow Sexual
Harassment &
Equal
Employment
Unlikely Moderate Medium 6 0 LTI's Unlikely Moderate MediumDisciplinary action against persons found to engage in
harassment or workplace bullying3 Rare Moderate Low
Revision No. 1
Less
fav
ora
ble
tre
atm
en
t,
sexu
al h
aras
sme
nt,
Bu
llyin
g
Hu
man
Res
ou
rce
Man
agem
ent
Stro
kes,
alc
oh
ol,
dru
g, f
irst
aid
,
inco
mp
ete
nce
, tra
inin
g re
gist
er
WIN-SP-06-A HAZARD & RISK REGISTER Page No. 4 DEC 2013
Hyg
ien
e
Serv
ice
s &
Uti
litie
s
@p
roje
ct s
ite
, He
ad
off
ice
& w
ork
sho
p.
Lun
ch
Ro
om
sW
ork
Str
ess
Activity Hazards Risks Legal & Other Reqs.IMS Procedures
& Instructions
Competency
RequirementsLikelihood Consequence Risk Level
Risk
Score
Project
Objectives
& Targets
Likelihood Consequence Project Risk Project Operational Controls Additional Site controls Priorty Likelihood ConsequenceProject
Risk
Project Risk AssessmentReviewed By: Richard Brown Approved By: Srini Krishnamurti
GENERIC HEALTH & SAFETY HAZARDS/RISK REGISTER DECEMBER 2013
Generic Risk Assessment
Trip
s an
d F
alls
Secondary Assessment taking into
account all controls
Site
Acc
ess
and
Egr
ess
(in
clu
de
off
ice
an
d
wo
rksh
op
)
Works fatality or injury due to being crushed by
moving equipmentWIN-OP-03
Ticketed
operatorPossible Catastrophic High 15 0 LTI's Unlikely Catastrophic High SWMS/TRAINING/Plant Hazard Assessment/PPE Workers and traffic to be delineated 1 Unlikely Catastrophic Medium
Worker Fatality/injury or plant or property damaged
due to tip truck trailer overturning whilst dumping
material on site.
WIN-OP-12
SWMS
Ticketed
operatorPossible Catastrophic High 15 0 LTI's Possible Catastrophic High
SWMS to be strictly complied with. No go zones of 20m
from tipping trucks to maintained at all times.1 Unlikely Catastrophic Medium
Worker fatality or injury due to plant accident from
plant failure
http://www.safeworkaust
ralia.gov.au/NR/rdonlyre
s/D505903D-BB66-
455F-8E80-
4E5F0AD6A6AE/0/Plant
Standard_NOHSC1010.
Ticketed
operatorUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium
Plant Hazard assessment/Pre start checklist/Regular
Maintenance.Workers and traffic to be delineated 2 Rare Catastrophic Low
Worker fatality or injury due to plant overturning on
unstable ground
http://www.safeworkaust
ralia.gov.au/NR/rdonlyre
s/D505903D-BB66-
455F-8E80-
4E5F0AD6A6AE/0/Plant
Standard_NOHSC1010.
Ticketed
operatorUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium
SWMS, Training & Risk Assessment. ROPS installed on
plant where posible. Seat belts to be worn when fittedCheck ground conditions prior to works 2 Rare Catastrophic Low
Worker injury or fatality due to being struck by
rotating plant
AS 1418.1- Cranes,
hoists and winches –
General requirements+
Amendment 2002
Possible Catastrophic High 15 0 LTI's Possible Catastrophic High SWMS, Training. Workers and traffic to be delineated 1 Unlikely Catastrophic Medium
Worker injury or fatality due to plant collisions
http://www.safeworkaust
ralia.gov.au/NR/rdonlyre
s/D505903D-BB66-
455F-8E80-
4E5F0AD6A6AE/0/Plant
Standard_NOHSC1010.
Ticketed
operatorPossible Catastrophic High 15 0 LTI's Possible Catastrophic High SWMS, Training. Workers and traffic to be delineated 1 Unlikely Catastrophic Medium
Worker injury or fatality due to plant attachments not
locked in with safety pin " " Possible Catastrophic High 15 0 LTI's Possible Catastrophic High SWMS, Training.Ensure all equipment has secondary locking device and is
locked in.1 Unlikely Catastrophic Medium
Worker injury or fatality due to being struck by plant " "Ticketed
operatorPossible Catastrophic High 15 0 LTI's Possible Catastrophic High SWMS, Training. Workers and traffic to be delineated 1 Unlikely Catastrophic Medium
Worker injury (strains & sprains) due to incorrect
entry and exit of plantVictorian OHS Act 2004
Ticketed
operatorUnlikely Moderate Medium 6 0 LTI's Unlikely Moderate Medium SWMS, Training. 3 Rare Moderate Low
Worker or public eyes damaged due to incorrect use
of lasersVictorian OHS Act 2004 Unlikely Major Medium 8 0 LTI's Unlikely Major Medium Training/Signage's. 3 Rare Major Low
Worker fatality or injury due to being crushed by
falling objectPossible Catastrophic High 15 0 LTI's Unlikely Catastrophic High PPE/Training/SWMS Workers and traffic to be delineated 1 Rare Catastrophic Low
Worker injury due to musculoskeletal disorders from
unergonomic equipment
http://www.safeworkaust
ralia.gov.au/NR/rdonlyre
s/6EE85D16-7D1C-
4FFC-99E7-
E611B7290E18/0/Noise
_COP.pdf
Possible Major Medium 12 0 LTI's Possible Major Medium Provision of Ergonomic Equipment. 3 Unlikely Major Medium
Public injury or fatality due to unauthorized use of
equipment
http://www.legislation.vi
c.gov.au/Domino/Web_
Notes/LDMS/PubLawTo
day.nsf/95c43dd4eac71
a68ca256dde00056e7b/
E9579446A7787F37CA
25728900169AAB/$FIL
E/04-107a010.pdf
Ticketed
operatorRare Catastrophic Low 10 0 LTI's Rare Catastrophic Low Only licensed personnel to operate plant and machinery. 3 Rare Catastrophic Low
Operator fatality or injury due to being thrown out of
plant
http://www.legislation.vi
c.gov.au/Domino/Web_
Notes/LDMS/PubLawTo
day.nsf/b12e276826f7c
27fca256de50022686b/
DA19E13CB92A0BECC
A25730700205411/$FIL
E/07-54sr001.pdf
Unlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium Occupants restraints to be worn at all times. 3 Rare Catastrophic Low
Worker injury due to high pressure fluid being
sprayed on their body
http://www.legislation.vi
c.gov.au/Domino/Web_
Notes/LDMS/PubLawTo
Rare Moderate Low 3 0 LTI's Rare Moderate Low Regular Inspection and maintenance. 3 Rare Moderate Low
Crane tippingOccupation Health &
Safety (Plant)
Regulations 2007
WIN-OP-09Ticketed
operatorPossible Catastrophic High 15 0 LTI's Possible Catastrophic High
Load at appropriate height, visually appraise load when
taking weight, keep within load chart rating, ensure
outriggers are locked Assess site for hazard and Prepare site prior to crane set up.
1 Unlikely Catastrophic Medium
Crushing fingers/personOccupation Health &
Safety (Plant)
Regulations 2007
SWMS Ticketed dogman Possible Major Medium 12 0 LTI's Possible Major Medium Clear communications, appropriate PPE i.e. helmets, gloves 3 Unlikely Catastrophic Medium
Slings break/failOccupation Health &
Safety (Plant)
Regulations 2007
Ticketed dogman Unlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic MediumKnow the capacity of slings or chains, never use damaged
slings or chains All chains slings to have tags. All cahins and slings to be
inspected prior to use
2 Rare Major Low
Collision with person or plantTicketed
operatorUnlikely Catastrophic Medium 10 0 LTI's Unlikely Catastrophic Medium Be aware of surroundings while moving Ensure craneage site barricaded appropriately 2 Rare Catastrophic Low
WIN-SP-06-A HAZARD & RISK REGISTER Page No. 5 DEC 2013Revision No. 1
Cra
ne
Op
erat
ion
Ste
ep
slo
pe
s, s
trik
ing
pe
rso
n/p
lan
t, lo
ad f
allin
g
Pla
nt
and
Mac
hin
ery
rollo
ver,
no
ise
, use
of
lase
rs, p
ow
er
too
ls, d
ust
, vib
rati
on
, ele
ctri
cal,
hig
h p
ress
ure
eq
uip
me
nt
and
ve
sse
ls, w
eld
ers
, ro
tati
ng
pla
nt,
flyi
ng
de
bri
s, f
allin
g o
bje
cts,
exh
aust
em
issi
on
s, d
ust
, vis
ibili
ty, e
rgo
no
mic
s -
Exc
avat
ors
, lo
ade
rs, t
ract
ors
, tru
cks,
vib
rato
rs, c
ran
es.
WINSLOW Contract No:
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan 1 1 MAY 2013
APPENDIX E:
ENVIROMENTAL ASPECTS AND IMPACTS AND THEIR CONTROLS
Reviewed By Richard BrownProject Risk Assessment
ActivityAspect (red =
significant)Impact (green = beneficial)
EPA, Legal &
Other Reqs.
Operating
Condition
IMS Procedures &
Instructions
IMS
Objectives &
Targets
Competency
RequirementsLikelihood Consequence Risk
Project
Objectives
& Targets
Project
Operating
Conditions
Likelihood ConsequenceProject
RiskPRIMARY CONTROLS Additional Project Specific Controls Likelihood Consequence
Aesthetics/ VisualsF:\Project\Other\S
rini K\EPA\EPA
Act1970.doc
REFER IMSEnviro. Awareness
TrainingUnlikely Minor Low REFER EMP Unlikely Minor Low Maintain clean & tidy environment Unlikely Minor
Erosion, sedimentation storm water
contaminationEPA 480, 4.4 EP-05 REFER IMS
Enviro. Awareness
TrainingLikely Major High REFER EMP Likely Major High
Sensitive locations to be protected prior any
works, Silt fencing &/or straw bales to be
setup in/around pits & connection points with
existing drainage system
Appropriate Sediment controls and run
off controls to be implemented and
reviewed and maintained
Unlikely Major
Security, risk of vandalism REFER IMS Likely Moderate Medium REFER EMP Likely Moderate MediumAppropriate security measurements to be
implementedPossible Moderate
Storm water Management contamination, erosion, sedimentation EPA 480, 4.4 EP 05 & EP 18 REFER IMSEnviro. Awareness
TrainingLikely Major High REFER EMP Likely Major High
Sensitive locations to be protected prior any
works, Silt fencing &/or straw bales to be
setup in/around pits & connection points with
existing drainage system
Clear water diversions created with
beached catch drain. Monitor water
turbidity levels daily, all dirty water
captured in sedponds along
carriageway
Unlikely Major
Plant Wash Down Areawater use, ground & storm water
pollution
F:\Project\Other\S
rini
K\EPA\840Ground
water.pdf
EP 15 REFER IMSEnviro. Awareness
TrainingUnlikely Moderate Medium REFER EMP Unlikely Moderate Medium
Crushed rock placed at exit & entrance to
provide wash down areaRumble grates installed at entrances Rare Moderate
Fuel/Dangerous Goods
StorageSpills, fire, explosion Emergency WIN-OP-05 REFER IMS
Enviro. Awareness
TrainingUnlikely Catastrophic Medium REFER EMP Emergency Unlikely Catastrophic Medium
Restrained storage of all chemicals. Spill kits
easily accessible.
Fuel tank is double bunded and fuel
trailer kept in bunded area.Rare Catastrophic
Waste disposal, recycling
facilities
Landfill, recycling and reuse
opportunitiesEP 06 REFER IMS
Enviro. Awareness
TrainingUnlikely Moderate Medium REFER EMP Unlikely Moderate Medium
Recyclable materials to be separated and
reused if possibleRare Moderate
Storage, Stockpile Sites Visuals EP 06 REFER IMSEnviro. Awareness
TrainingRare Minor Low REFER EMP Rare Minor Low
Unsuitable material to be cleared from site
ASAPRare Minor
Compound
Demobilization, site
restoration
Waste removal, potential contamination,
visualsEP 02 REFER IMS
Enviro. Awareness
TrainingUnlikely Moderate Medium REFER EMP Unlikely Moderate Medium
Unsuitable material to be cleared from site
ASAPRare Moderate
Secondary Assessment, taking into account
all project specific controls
Pro
ject
Se
tup
, Co
mp
ou
nd
Est
ablis
hm
en
t &
Sit
e
Mai
nte
nan
ce.
Co
mp
ou
nd
De
mo
bili
zati
on
Location & Design of
Amenities - Office,
Crib Rooms, Toilets,
Shelter, Access,
Emergency Planning,
ENVIRONMENTAL ASPECTS REGISTER DECEMBER 2013
Generic Risk Assessment
Approved By Srini Krishnamurti
WIN-S-05-A ENVIRONMENTAL RISK REGISTER DECEMBER 2013PAGE No. 1REVISION No. 1
.
Reviewed By Richard BrownProject Risk Assessment
ActivityAspect (red =
significant)Impact (green = beneficial)
EPA, Legal &
Other Reqs.
Operating
Condition
IMS Procedures &
Instructions
IMS
Objectives &
Targets
Competency
RequirementsLikelihood Consequence Risk
Project
Objectives
& Targets
Project
Operating
Conditions
Likelihood ConsequenceProject
RiskPRIMARY CONTROLS Additional Project Specific Controls Likelihood Consequence
Secondary Assessment, taking into account
all project specific controls
ENVIRONMENTAL ASPECTS REGISTER DECEMBER 2013
Generic Risk Assessment
Approved By Srini Krishnamurti
Destruction of Archaeological &
Heritage SitesEP 09 REFER IMS
Enviro. Awareness
TrainingLikely Major High REFER EMP Likely Major High
Pre construction planning & adequate
protection
Monitors present during all destruction
worksUnlikely Major
Noise & Vibration
F:\Project\Other\S
rini
K\EPA\Tg30292N
oiseControl.pdf
EP-13 REFER IMSEnviro. Awareness
TrainingLikely Moderate Medium REFER EMP Likely Moderate Medium
Silencer on exhausts & designated working
hours. All plant to be maintained to
manufactures specs.
Works limited to hours specified in
Noise Control Guideline 1254/2008
Monitor noise and vibrations levels.
Plant hazard assessments to be
performed on a yearly basis
Rare Moderate
Visual EP-13 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium
Unsuitable material to be cleared from site
ASAPLikely Minor
Land & Biodiversity Disturbance EP 14 REFER IMSEnviro. Awareness
TrainingLikely Major High REFER EMP Likely Major High
Pre construction measures & adequate
protection
Sensitive areas protected with
barricadingRare Major
Emissions - Ground, Water & Air
F:\Project\Other\S
rini
K\EPA\840Ground
water.pdf
EP 18 & EP 10 REFER IMSEnviro. Awareness
TrainingPossible Moderate Medium REFER EMP Possible Moderate Medium
Pre construction measures & adequate
protection. Monitoring of air & ground water
to be undertaken.
Plant emissions checked during weekly
inspectionRare Moderate
Resource Use EP 18 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium Likely Minor
Generation of Waste - LandfillF:\Project\Other\S
rini
K\EPA\448.3Wast
EP 18 REFER IMSEnviro. Awareness
TrainingAlmost Certain Moderate High REFER EMP Almost Certain Moderate High
Recyclable materials to be separated and
reused if possible
Purchase of recycled materials where
possibleLikely Moderate
Prescribed Waste EP 06 REFER IMS Enviro. Awareness
TrainingLikely Moderate Medium REFER EMP Likely Moderate Medium Likely Moderate
Visual EP 06 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium
Unsuitable material to be cleared from site
ASAPLikely Minor
Damage to sites of indigenous / native
vegetationEP 12 REFER IMS
Enviro. Awareness
TrainingLikely Major High REFER EMP Likely Major High
Pre construction measures & adequate
protectionUnlikely Major
Land & Biodiversity Disturbance EP 14 REFER IMSEnviro. Awareness
TrainingLikely Major High REFER EMP Possible Major High
Pre construction measures & adequate
protectionUnlikely Major
Location & Management of Stockpiles EP 06 REFER IMSEnviro. Awareness
TrainingPossible Moderate Medium REFER EMP Possible Moderate Medium
Pre construction planning & adequate
protectionUnlikely Moderate
Noise
F:\Project\Other\S
rini
K\EPA\Tg30292N
oiseControl.pdf
EP-13 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium
Silencer on exhausts & designated working
hours
Works limited to hours specified in
Noise Control Guideline 1254/2008Rare Moderate
Generation of Waste - Landfill
F:\Project\Other\S
rini
K\EPA\448.3Wast
eClassification.pdf
EP 18 REFER IMSEnviro. Awareness
TrainingAlmost Certain Minor Medium REFER EMP Almost Certain Minor Medium
Recyclable materials to be separated and
reused if possible
Trees mulched to be reused during
landscaping worksUnlikely Minor
Erosion & Sedimentation EPA 480, 4.4 EP 05 REFER IMSEnviro. Awareness
TrainingPossible Major Medium REFER EMP Possible Moderate Medium
Sensitive locations to be protected prior any
works, Silt fencing &/or straw bales to be
setup
clear water diversions created with
catch drains. Monitor water to turbidity
levels as required.
Rare Moderate
Destruction of Archaeological &
Heritage SiteEP 12 REFER IMS
Enviro. Awareness
TrainingLikely Major Medium REFER EMP Likely Major Medium
Pre construction measures & adequate
protectionMonitors present while topsoil stripped Rare Catastrophic
Dust
F:\Project\Other\S
rini
K\EPA\AirQuality4
40.1.pdf
EP 13 REFER IMSEnviro. Awareness
TrainingAlmost Certain Moderate High REFER EMP
Dust Complaint
ResolutionAlmost Certain Moderate High
Implementation of Water cart if required. Air
Quality monitored
Works stopped when dust is generated
near sensitive areas Unlikely Moderate
Location & Management of Stockpiles EP 06 REFER IMSEnviro. Awareness
TrainingLikely Major High REFER EMP Likely Major High
Pre construction planning & adequate
protectionRare Moderate
Erosion & Sedimentation EPA 480, 4.4 EP 05 REFER IMSEnviro. Awareness
TrainingLikely Major High REFER EMP Likely Major High
Sensitive locations to be protected prior any
works, Silt fencing &/or straw bales to be
setup
Unlikely Major
Spillage of Hazardous Substances EP 3 & EP 16 REFER IMSEnviro. Awareness
TrainingUnlikely Catastrophic Medium REFER EMP Unlikely Catastrophic Medium Restrained storage of all chemicals
No weed spraying chemicals are to be
kept onsite Rare Catastrophic
Land & Biodiversity Disturbance EP 14 REFER IMSEnviro. Awareness
TrainingLikely Major High REFER EMP Likely Major High
Pre construction measures & adequate
protectionRare Major
Weed Infestation Fungal infection. EP 8 REFER IMSEnviro. Awareness
TrainingUnlikely Major Medium REFER EMP Unlikely Major Medium
All machinery to be cleaned and delivered to
site free of any contaminants.Rare Major
Site
Pre
par
atio
n
Topsoil Stripping -
Stockpile Sites, Weed
Management
WIN-S-05-A ENVIRONMENTAL RISK REGISTER
Demolition - Structures,
Fences, Culverts,
Storm water Drainage
Pits, Concrete Edgings
& Paving, Recycling
Clearing & Grubbing -
Trees, Vegetation,
Mulching,
DECEMBER 2013PAGE No. 2REVISION No. 1
.
Reviewed By Richard BrownProject Risk Assessment
ActivityAspect (red =
significant)Impact (green = beneficial)
EPA, Legal &
Other Reqs.
Operating
Condition
IMS Procedures &
Instructions
IMS
Objectives &
Targets
Competency
RequirementsLikelihood Consequence Risk
Project
Objectives
& Targets
Project
Operating
Conditions
Likelihood ConsequenceProject
RiskPRIMARY CONTROLS Additional Project Specific Controls Likelihood Consequence
Secondary Assessment, taking into account
all project specific controls
ENVIRONMENTAL ASPECTS REGISTER DECEMBER 2013
Generic Risk Assessment
Approved By Srini Krishnamurti
Noise & Vibration
F:\Project\Other\S
rini
K\EPA\Tg30292N
oiseControl.pdf
EP-13 REFER IMSEnviro. Awareness
TrainingLikely Moderate Medium REFER EMP Likely Moderate Medium
Silencer on exhausts & designated working
hours
Works limited to hours specified in
Noise Control Guideline 1254/2008Unlikely Moderate
Dust
F:\Project\Other\S
rini
K\EPA\AirQuality4
40.1.pdf
EP 13 REFER IMSEnviro. Awareness
TrainingLikely Moderate Medium REFER EMP
Dust Complaint
ResolutionLikely Moderate Medium
Implementation of Water cart if required. Air
quality monitored Works stopped when dust is generated
near sensitive areas Rare Moderate
Emissions - Ground, Water & AirF:\Project\Other\S
rini
REFER EMP, Weekly
Environmental InspectionREFER IMS
Enviro. Awareness
TrainingLikely Moderate Medium REFER EMP Likely Moderate Medium Air & water monitored throughout the job
Plant emissions checked during weekly
inspectionUnlikely Moderate
Resource Use EP 18 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Medium Likely
Destruction of Archaeological &
Heritage SiteEP 12 REFER IMS
Enviro. Awareness
TrainingLikely Major High REFER EMP Likely Major High
Pre construction measures & adequate
protectionMonitors present while topsoil stripped Rare Major
Noise & Vibration
F:\Project\Other\S
rini
K\EPA\Tg30292N
oiseControl.pdf
REFER EMP, EP-13 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium
Silencer on exhausts & designated working
hours
Works limited to hours specified in
Noise Control Guideline 1254/2008Unlikely Minor
Erosion & Sedimentation resulting in
an impact on water course
F:\Project\Other\S
rini
K\EPA\SoilConser
vationManual.pdf
EP 05 REFER IMSEnviro. Awareness
TrainingLikely Major High REFER EMP Likely Major High
High risk areas identified where water may
cross major earthworks and where
uncontained run off from our site will enter
the creek system and appropriate control
measures implemented
minimize contamination of water
flowing across and offsite, clear water
diversions are to be established where
possible.
Unlikely Major
Emissions - Ground, Water & AirF:\Project\Other\S
rini EP 10, EP 18 REFER IMS
Enviro. Awareness
TrainingLikely Moderate Medium REFER EMP Likely Moderate Medium Air & water monitored throughout the job
Plant emissions checked during weekly
inspectionUnlikely Minor
Location & Management of Stockpiles EP 06 REFER IMSEnviro. Awareness
TrainingLikely Moderate Medium REFER EMP Likely Moderate Medium
Pre construction planning & adequate
protectionUnlikely Moderate
Dust
F:\Project\Other\S
rini
K\EPA\AirQuality4
40.1.pdf
EP 10 REFER IMSEnviro. Awareness
TrainingLikely Moderate Medium REFER EMP
Dust Complaint
ResolutionLikely Moderate Medium Implementation of Water cart if required
Works stopped when dust was
generated near sensitive areas or were
dust generation is leaving site
impacting on the surrounding
communities dust to be prevented with
the use of water carts and dust
suppressant agents
Unlikely Moderate
Resource Use EP 18 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium Likely Minor
Generation of Waste - Landfill,
Prescribed Waste
F:\Project\Other\S
rini
K\EPA\448.3Wast
eClassification.pdf
EP 06 REFER IMSEnviro. Awareness
TrainingAlmost Certain Minor Medium REFER EMP Almost Certain Minor Medium
Recyclable materials to be separated and
reused if possibleUnlikely Minor
Weed Contamination from Imported
Fill MaterialsEP 08 REFER IMS
Enviro. Awareness
TrainingUnlikely Major Medium REFER EMP Unlikely Major Medium
When fill is imported from external sources a
clean fill certificate must be sighted prior to
any importation of fill.
All external plant used within the works are
thoroughly cleaned for noxious weeds.
all external plant or shields used on site
to be cleaned thoroughly for all noxious
weeds.
Rare Major
Noise & Vibration
F:\Project\Other\S
rini
K\EPA\AirQuality4
40.1.pdf
EP-13 REFER IMSEnviro. Awareness
TrainingAlmost Certain Moderate High REFER EMP Almost Certain Moderate High Community consultation if required
Works limited to hours specified in
Noise Control Guideline 1254/2008
Damage due to vibrations shall be
rectified after all works have been
completed onsite.
Possible Moderate
Community Discomfort REFER EMP REFER IMSEnviro. Awareness
TrainingLikely Moderate Medium REFER EMP Likely Moderate Medium Community consultation if required
Neighbours notified five days prior to
blastingUnlikely Moderate
Dust
F:\Project\Other\S
rini
K\EPA\AirQuality4
40.1.pdf
EP 10 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP
Dust Complaint
ResolutionLikely Minor Medium Implementation of Water cart if required
Works stopped when dust is generated
near sensitive areasRare Minor
Excavations / Cuttings /
Trenches
Blasting
Eart
hw
ork
s &
Dra
inag
e
Fill Foundations
DEC 2013PAGE No. 3REVISION No. 1WIN-S-05-A ENVIRONMENTAL RISK REGISTER
.
Reviewed By Richard BrownProject Risk Assessment
ActivityAspect (red =
significant)Impact (green = beneficial)
EPA, Legal &
Other Reqs.
Operating
Condition
IMS Procedures &
Instructions
IMS
Objectives &
Targets
Competency
RequirementsLikelihood Consequence Risk
Project
Objectives
& Targets
Project
Operating
Conditions
Likelihood ConsequenceProject
RiskPRIMARY CONTROLS Additional Project Specific Controls Likelihood Consequence
Secondary Assessment, taking into account
all project specific controls
ENVIRONMENTAL ASPECTS REGISTER DECEMBER 2013
Generic Risk Assessment
Approved By Srini Krishnamurti
Noise & Vibration
F:\Project\Other\S
rini
K\EPA\AirQuality4
40.1.pdf
EP-13 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium
Silencer on exhausts & designated working
hours
Works limited to hours specified in
Noise Control Guideline 1254/2008Unlikely Minor
Dust
F:\Project\Other\S
rini
K\EPA\AirQuality4
40.1.pdf
EP 10 REFER IMSEnviro. Awareness
TrainingUnlikely Minor Low REFER EMP
Dust Complaint
ResolutionUnlikely Minor Low
Implementation of Water cart if required all
pavement materials delivered as wet mix
Works stopped when dust is generated
near sensitive areas Rare Minor
Resource Use EP 18 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium Likely Minor
Noise & Vibration
F:\Project\Other\S
rini
K\EPA\Tg30292N
oiseControl.pdf
REFER EMP, EP-13 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium
Silencer on exhausts & designated working
hours
Works limited to hours specified in
Noise Control Guideline 1254/2008Unlikely Minor
Dust
F:\Project\Other\S
rini
K\EPA\AirQuality4
40.1.pdf
EP 10 REFER IMSEnviro. Awareness
TrainingUnlikely Minor Low REFER EMP
Dust Complaint
ResolutionUnlikely Minor Low
Implementation of Water cart if required all
pavement materials delivered as wet mix
Works stopped when dust is generated
near sensitive areas.Rare Minor
Resource Use REFER EMP REFER IMSEnviro. Awareness
TrainingLikely Moderate High REFER EMP Unlikely Minor Low Unlikely Minor
Noise & Vibration
F:\Project\Other\S
rini
K\EPA\Tg30292N
oiseControl.pdf
REFER EMP, EP-13 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium
Silencer on exhausts & designated working
hours
Works limited to hours specified in
Noise Control Guideline 1254/2008Rare Minor
Dust
F:\Project\Other\S
rini
K\EPA\AirQuality4
40.1.pdf
EP 10 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP
Dust Complaint
ResolutionLikely Minor Medium
Implementation of Water cart if required all
pavement materials delivered as wet mix
Works stopped when dust is generated
near sensitive areasUnlikely Minor
Spillage of Hazardous Substances EP 03, EP 16 REFER IMSEnviro. Awareness
TrainingPossible Catastrophic High REFER EMP Possible Catastrophic High Restrained storage of all chemicals
No surfacing chemicals are to be kept
onsite Unlikely Catastrophic
Emissions - Ground, Water & AirF:\Project\Other\S
rini
K\EPA\840Ground
EP 10, EP 18 REFER IMSEnviro. Awareness
TrainingUnlikely Moderate Medium REFER EMP Unlikely Moderate Medium Air & water monitored throughout the job
Plant emissions checked during weekly
inspectionRare Moderate
Generation of WasteF:\Project\Other\S
rini
K\EPA\448.3Wast
EP 06 REFER IMSEnviro. Awareness
TrainingPossible Minor Medium REFER EMP Possible Minor Medium
Unsuitable material to be cleared from site
ASAPUnlikely Minor
Rain fall within 24 hours of prime and
sealingEP 11 REFER IMS
Enviro. Awareness
TrainingPossible Major Medium REFER EMP Possible Major Medium
Trap all water runoff in drainage lines and
ensure the water is clean prior to discharge.
The long range and weekly forecasts
will be checked in the weeks prior to
asphalting works being programmed
and completed. No works shall start if
the forecast is unfavourable.
Unlikely Major
Resource Use EP 18 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium Likely Minor
Unbound - Supply of
Materials, Mixing,
Spreading & Compaction
of Material, Surface
Trimming
Pav
em
en
t C
on
stru
ctio
n Bound - Supply of
Materials, Mixing,
Spreading & Compaction
of Material, Surface
Trimming
Surfacing Works -
Surface Preparation,
Bituminous Surfacing,
Asphalt, Pavement
Markings
REVISION No. 1WIN-S-05-A ENVIRONMENTAL RISK REGISTER DECEMBER 2013PAGE No. 4
.
Reviewed By Richard BrownProject Risk Assessment
ActivityAspect (red =
significant)Impact (green = beneficial)
EPA, Legal &
Other Reqs.
Operating
Condition
IMS Procedures &
Instructions
IMS
Objectives &
Targets
Competency
RequirementsLikelihood Consequence Risk
Project
Objectives
& Targets
Project
Operating
Conditions
Likelihood ConsequenceProject
RiskPRIMARY CONTROLS Additional Project Specific Controls Likelihood Consequence
Secondary Assessment, taking into account
all project specific controls
ENVIRONMENTAL ASPECTS REGISTER DECEMBER 2013
Generic Risk Assessment
Approved By Srini Krishnamurti
Noise
F:\Project\Other\S
rini
K\EPA\Tg30292N
oiseControl.pdf
REFER EMP, EP-13 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium
Silencer on exhausts & designated working
hours
Works limited to hours specified in
Noise Control Guideline 1254/2008Unlikely Minor
Dust
F:\Project\Other\S
rini
K\EPA\AirQuality4
40.1.pdf
EP 10 REFER IMSEnviro. Awareness
TrainingLikely Moderate Medium REFER EMP
Dust Complaint
ResolutionLikely Moderate Medium Implementation of Water cart if required
Works stopped when dust is generated
near sensitive areas Rare Moderate
Weed Infestation - Degradation to
Indigenous Flora.EP 08 REFER IMS
Enviro. Awareness
TrainingUnlikely Major Medium REFER EMP Unlikely Major Medium
On site materials to be used where possible.
When topsoil is imported from external
sources a clean fill certificate must be sighted
prior to any importation of fill.
All external plant used within the works are
thoroughly cleaned for noxious weeds.
Landscape subcontractor to ensure fill
material used is sourced within the
works.
Rare Major
Spillage of Hazardous Substances -
Toxicity to Flora & FaunaEP 03, EP 16 REFER IMS
Enviro. Awareness
TrainingUnlikely Moderate Medium REFER EMP Unlikely Moderate Medium Restrained storage of all chemicals
No landscaping chemicals are to be
kept onsite Rare Moderate
Emissions - Ground, Water & AirF:\Project\Other\S
rini EP 10, EP 18 REFER IMS
Enviro. Awareness
TrainingLikely Moderate Medium REFER EMP Likely Moderate Medium Air & water monitored throughout the job
Plant emissions checked weekly during
weekly inspectionUnlikely Minor
Resource Use EP 18 REFER IMS Enviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium Likely Minor
Loss of Indigenous Vegetation REFER EMP REFER IMSEnviro. Awareness
TrainingLikely Catastrophic Very High REFER EMP Likely Major High
Pre construction measures & adequate
protection
Use of indigenous plants and grass in
landscaping designRare Moderate
Habitat Alteration / Disturbance REFER EMP REFER IMSEnviro. Awareness
TrainingLikely Major Very High REFER EMP Likely Moderate Medium
Pre construction measures & adequate
protection
Sensitive areas protected with bunting,
hollowed out tree stumps retained for
habitat
Unlikely Minor
Noise
F:\Project\Other\S
rini
K\EPA\Tg30292N
oiseControl.pdf
REFER EMP, EP-13 REFER IMSEnviro. Awareness
TrainingLikely Moderate Very High REFER EMP Unlikely Minor Low
Silencer on exhausts & designated working
hours
Works limited to hours specified in
Noise Control Guideline 1254/2008Unlikely Minor
Generation of Waste
F:\Project\Other\S
rini
K\EPA\448.3Wast
eClassification.pdf
EP 06 REFER IMSEnviro. Awareness
TrainingUnlikely Minor Low REFER EMP Unlikely Minor Low
Recyclable materials to be separated and
reused if possible
Trees mulched to be reused during
landscaping worksRare Minor
Spillage of Hazardous Substances -
Toxicity to Flora & FaunaEP 03, EP 12, EP 16 REFER IMS
Enviro. Awareness
TrainingUnlikely Moderate Medium REFER EMP Unlikely Moderate Medium Restrained storage of all chemicals
No landscaping chemicals are to be
kept onsite Rare Moderate
Resource Use EP 18 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium Likely Minor
Loss of Indigenous Vegetation EP 04 REFER IMSEnviro. Awareness
TrainingUnlikely Moderate Medium REFER EMP Unlikely Moderate Medium
Pre construction measures & adequate
protectionRare Moderate
Dust
F:\Project\Other\S
rini
K\EPA\AirQuality4
40.1.pdf
EWP 10 REFER IMSEnviro. Awareness
TrainingPossible Minor Medium REFER EMP Possible Minor Medium Implementation of Water cart if required
Works stopped when dust is generated
near sensitive areas Unlikely Minor
Erosion & Sedimentation EPA 480, 4.4 EP 05 REFER IMSEnviro. Awareness
TrainingPossible Moderate Medium REFER EMP Possible Moderate Medium
Sensitive locations to be protected prior any
works, Silt fencing &/or straw bales to be
setup
Unlikely Moderate
Noise
F:\Project\Other\S
rini
K\EPA\Tg30292N
oiseControl.pdf
REFER EMP, EP-13 REFER IMSEnviro. Awareness
TrainingUnlikely Minor Low REFER EMP Unlikely Minor Low
Silencer on exhausts & designated working
hours
Works limited to hours specified in
Noise Control Guideline 1254/2008Rare Minor
Generation of Waste
F:\Project\Other\S
rini
K\EPA\448.3Wast
eClassification.pdf
EP 06 REFER IMSEnviro. Awareness
TrainingPossible Minor Medium REFER EMP Possible Minor Medium
Recyclable materials to be separated and
reused if possible
Trees mulched to be reused during
landscaping worksRare Minor
Spillage of Hazardous Substances -
Toxicity to Flora & FaunaEP 03, EP 12, EP 16 REFER IMS
Enviro. Awareness
TrainingUnlikely Minor Low REFER EMP Unlikely Minor Low Restrained storage of all chemicals
No landscaping chemicals are to be
kept onsite Rare Minor
Resource Use EP 18 REFER IMSEnviro. Awareness
TrainingLikely Minor Medium REFER EMP Likely Minor Medium Rare Minor
Maintenance -
Replanting, Weed
Control, Watering,
Mowing, Pruning,
Reseeding, Re-mulching,
Removal of Tree Guards
& Stakes
Planting - Shrubs, Trees,
Mulching, Fertilizing &
Watering
Top soiling & Grassing -
Supply of Materials,
Fertilizing, Spreading.
Lan
dsc
apin
g
DECEMBER 2013PAGE No. 5REVISION No. 1WIN-S-05-A ENVIRONMENTAL RISK REGISTER
.
Secondary
Risk
Low
Medium
Medium
Medium
Low
Low
Low
Low
Low
Secondary Assessment, taking into account
all project specific controls
DECEMBER 2013
.
Secondary
Risk
Secondary Assessment, taking into account
all project specific controls
Medium
Low
Medium
Low
Low
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Low
Low
Low
Low
Medium
Low
Medium
Low
Low
Low
DECEMBER 2013
.
Secondary
Risk
Secondary Assessment, taking into account
all project specific controls
Medium
Low
Medium
Medium
Low
Low
Medium
Low
Medium
Medium
Medium
Low
Low
Medium
Medium
Low
DEC 2013
.
Secondary
Risk
Secondary Assessment, taking into account
all project specific controls
Low
Low
Medium
Low
Low
Low
Low
Low
Medium
Low
Low
Medium
Medium
DECEMBER 2013
.
Secondary
Risk
Secondary Assessment, taking into account
all project specific controls
Low
Low
Low
Low
Low
Medium
Low
Low
Low
Low
Low
Medium
Low
Low
Medium
Low
Low
Low
Low
DECEMBER 2013
.
1 of 1 184 E1 VERSION: 2
Environment
ProtectionENVIRONMENTAL MANAGEMENT PLAN
Health & Safety
Protection
E1Dust, Noise, Odour
& LitterH1 Signage
Shown on Plan: Y ES Shown on Plan: Y / N
See Attachment See Attachment
E2 Stockpiling of Soil H2 O, H & S
Shown on Plan: Y ES Shown on Plan: Y / N
See Attachment See Attachment
E3Erosion & Sediment
ControlH3
Shown on Plan: Y ES Shown on Plan: Y / N
See Attachment See Attachment
E4Temporary Outfall
ChannelH4
Shown on Plan: N/A Shown on Plan: Y / N
See Attachment See Attachment
E5Vehicle Refuelling &
MainH5
Shown on Plan: Y ES Shown on Plan: Y / N
See Attachment See Attachment
E6 Flora & Fauna H6
Shown on Plan: Y ES Shown on Plan: Y / N
See Attachment See Attachment
E7 Remnant Grassland H7
Shown on Plan: N/A Shown on Plan: Y / N
See Attachment See Attachment
E8Aboriginal &
Heritage ArtefactsH8
SITE MANAGEMENT PLAN PROJECT NAME: Plenty River Stage 13
Shown on Plan: N/A Shown on Plan: Y / N
See Attachment See Attachment
JOB No: 5611H9
MUNICIPALITY: City of Whittlesea PROJECT MANAGER: Clinton Holland DATE: 23/05/13Shown on Plan: Y / N Shown on Plan: Y / N
See Attachment CONTAMINANT STATUS: Clean SHEET NUMBER: MELWAY REF: See Attachment
E9
H2
Out Fall Channel
SITE COMPOUND
H1 H2
TRUCK ENTRY/EXIT
E2
E2
E6 E4
E6
E4
H1
STOCKPILE
E1 E5
WINSLOW Contract No:
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan 1 1 MAY 2013
APPENDIX F:
PROJECT SPECIFIC LEGAL & OTHER REQUIREMENTS
Winslow
50 Barry Road CAMPBELLFIELD VIC 3061
Telephone: +61 3 9358 7700 Facsimile: +61 3 9358 7701
Internet: www.Winslow.com.au
RRReeegggiiisssttteeerrr ooofff LLLeeegggaaalll aaannnddd OOOttthhheeerrr
RRReeeqqquuuiiirrreeemmmeeennntttsss fffooorrr OOOccccccuuupppaaatttiiiooonnnaaalll
HHHeeeaaalllttthhh &&& SSSaaafffeeetttyyy MMMaaannnaaagggeeemmmeeennnttt
December 2013
Register of Legal and Other Requirements for Occupational,
Health & Safety Management.
WIN-SP-07-A OHS & Other Legal Requirements Revision No. 15 Page No. 2 December 2013
Revision
Number
Revision
Date
Description of
Revision
Approved
By
Date Revision
Effected
12 April 2012 Amended to include the WHS Act SK April 2012
13 September
2012
Amended to change Commonwealth Acts SK Sep 2012
14 December
2012
Amended to include new Regulations SK Dec 2012
15 March 2013 Amended to include SWA Acts & Regs SK March 2013
Register of Legal and Other Requirements for Occupational,
Health & Safety Management.
WIN-SP-07-A OHS & Other Legal Requirements Revision No. 15 Page No. 3 December 2013
1. INTRODUCTION
The Occupational Health and Safety Policy of the Winslow Group (Winslow) commits to compliance with
relevant OH&S legislation, and with other requirements placed on the Company, or to which the Winslow
Group subscribes. To facilitate the achievement of this policy commitment Winslow operate an Integrated
Management System (IMS) incorporating OH&S, environmental and quality management according to the
requirements of AS/NZS 4801:2001, AS/NZS ISO 14001: 2004 and AS/NZS ISO 9001: 2008. Conformance with
the OH&S Standard (AS/NZS 4801: 2001) requires Winslow to identify and have access to all legal and other
requirements that are directly applicable to the OH&S issues involving the activities, products and services
of the Company, including all relevant relationships with contractors and suppliers.
Accordingly, the purpose of this Register is to identify all applicable OH&S legislation, and other
requirements to which Winslow subscribe, and to provide direction for ongoing access to ensure its
currency. In addition, procedural requirements of Winslow Integrated Management System include
determination of how legal and other requirements apply to identified health and safety hazards in order
to undertake hazard/risk assessment, and apply appropriate controls. Therefore, this Register includes
relevant specific details of legislation and associated regulations, policies, guidelines, codes of practice and
standards that apply to identified health and safety hazards associated with the operation of the Winslow
Group. Such information is required to populate Winslow’s OH&S Hazards Register which effectively links
hazards with legal and other requirements and undertakes risk assessment. The required content and
maintenance of this Register is described in the IMS Legal and Other Requirements Procedure (WIN-SP 07).
The Register is not to be considered legal advice, but rather should be used as a guidance document
identifying and understanding legal requirements, and ensuring current access. The Register may also be
used as a base reference for evaluation of compliance with legal and other requirements (i.e. due diligence
audits).
Professional legal advice may be necessary to assist with the identification and interpretation of legal responsibility.
The register is current for operations of as of March 2013. Information regarding the interpretation of, and
changes to, legal and other requirements identified in this Register may be found on the following
websites.
Register of Legal and Other Requirements for Occupational,
Health & Safety Management.
WIN-SP-07-A OHS & Other Legal Requirements Revision No. 15 Page No. 4 December 2013
Victorian WorkCover Authority http://www.workcover.vic.gov.au
Australian Safety and Compensation Council
Full copies of up-to-date legislation are available on the following websites:
Victorian Law Today http://www.dms.dpc.vic.gov.au
Australian Legal Information Institute http://www.austlii.edu.au
Appendix 1 lists all Commonwealth and Victorian legislation, regulations, codes of practices, guidance
notes and standards that may be applicable to the operations of the Winslow Group.
APPENDIX 1: List of Commonwealth and Victorian legislation, regulations, codes of practices, guidance
notes and standards.
Commonwealth Consolidated Acts & Regulations
Title Year
Commonwealth Work Health & Safety Act 2011
Commonwealth Work Health & Safety Regulations 2011
Commonwealth Work Health and Safety Approved Codes of Practice 2011
Occupational Health & Safety (Commonwealth Employment) Act 1991
Fair Work Act 2009
Fair Work Amendment Act 2012
Fair Work Regulations 2009
Workplace Relations Act 1996
Workplace Relations Regulations 2006
Register of Legal and Other Requirements for Occupational,
Health & Safety Management.
WIN-SP-07-A OHS & Other Legal Requirements Revision No. 15 Page No. 5 December 2013
Victorian Consolidated Acts
Title Year
Accident Compensation Act 1985
Accident Compensation Regulations 2001
Accident Compensation Act 1985 Amended 2010
Accident Compensation (Occupational Health and Safety) Act 1996 1996
Accident Compensation (WorkCover Insurance) Act 1993
Workers Compensation Act 1958
Occupational Health and Safety Act 2004
Dangerous Goods Act 1985
Electricity Safety Act 1998
Road Transport (Dangerous Goods) Act 1995
Equipment (Public Safety) Act 1994
Emergency Management Act 1986
Health Act 1958
Local Government Act 1989
Road Management Act 2004
Road Management Act (As Amended) 2009
Victorian Regulations
Title Year
Accident Compensation Regulations 2001
Dangerous Goods (Storage and Handling) Regulations 2012
Electrical Safety (Installations) Regulations 1999
Electrical Safety (Management) Regulations 1999
Environmental Protection (Prescribed Waste) Regulations 1998
Register of Legal and Other Requirements for Occupational,
Health & Safety Management.
WIN-SP-07-A OHS & Other Legal Requirements Revision No. 15 Page No. 6 December 2013
Equipment (Public Safety) (General) Regulations 1995
Equipment (Public Safety) (Incident Notification) Regulations 1997
Workers Compensation Regulations 1995
Occupational Health & Safety Regulations 2007
Code of Practices
Title Year
Code of Practice for Hazardous Substances (No.24) 2000
Code of Practice for Manual Handling (No.25) 2000
Code of Practice for Noise (No.17) 1992
Code of Practice for the Storage and Handling of Dangerous Goods 2000
Code of Practice for Safety Precautions in Trenching Operations (No.8) 1988
National Code of Practice for the Safe Use of Synthetic Mineral Fibres
(NOHSC:2006)
1990
Code of Practice for the Safe Removal of Asbestos (NOHSC:2002) 1988
Code of Practice for Worksite Traffic Management 2010
Work Safe Victoria Guidance Notes
Title Year
Hazard Identification, Risk Assessment and Risk Control in the Workplace 2000
Hazards of Working in Heat 2001
Sun Protection for Construction and other Workers
“Office wise – A Guide to Health and Safety in the Office”
Standard Specification for Asbestos Removal from Buildings, Structures, Ships,
Plant and Workplaces – Victorian Asbestos Removal Industry Consultative
Committee
Register of Legal and Other Requirements for Occupational,
Health & Safety Management.
WIN-SP-07-A OHS & Other Legal Requirements Revision No. 15 Page No. 7 December 2013
WORKSAFE VICTORIA YEAR
COMPLIANCE CODES
Asbestos Removal Sep 2008
Communicating across Languages Sep 2008
Confined Spaces Sep 2008
First Aid Sep 2008
Managing Asbestos Sep 2008
Prevention of Falls Sep 2008
Workplace Amenities Sep 2008
Foundries Sep 2008
National Occupational Health and Safety Council Guidance Notes
Title Year
Exposure Standards for Atmospheric Contaminants in the Occupational Health
Environment (NOHSC:1003)
Guidance Note for the Protection of Workers from the Ultra Violet Radiation in
Sunlight (NOHSC:3012)
Standards
Title Year
AS 1216 – Class Labels for Dangerous Goods + Amendment s 1995
AS 1269.3 – Occupational Noise Management – Hearing Protection Programme 1998
AS 1318 – SAA Industrial Safety Colour Code 1985
AS 1319 – Safety Signs for the Occupational Environment 1994
AS/NZS 1336 – Recommended Practices for Occupational Eye Protection +
Amendment
1997
Register of Legal and Other Requirements for Occupational,
Health & Safety Management.
WIN-SP-07-A OHS & Other Legal Requirements Revision No. 15 Page No. 8 December 2013
Standards
Title Year
AS 1337 – Eye Protectors for Industrial Applications 1994
AS/NZS 1337.4 – Personal Eye Protection – Filters and Eye Protection against Laser
Radiation+ Amendments
AS 1345 – Identification of the Contents of Piping, Conduits and Ducts 1995
AS 1418.1- Cranes, hoists and winches – General requirements+ Amendment 2002
AS 1418.10 – Elevating work platforms 1996
AS 1418.11 – Vehicle Loading Cranes 2004
AS 1418.13 – Cranes (including hoists and winches) – Building Maintenance Units 1996
AS/NZS 1576.1 – Scaffolding – General Requirements 1995
AS/NZS 1577 – Scaffold Planks 1993
AS 1614 – Design and Use of Reflectorised Signs for Mines and Tunnels 1985
AS/NZS 1715 – Selection, Use and Maintenance of Respiratory Protective Devices 1994
AS/NZS 1716 – Respiratory Protective Devices 2003
AS 1735.1 – Lifts, Escalators and Moving Walkways – General Requirements 2003
AS 1735.10 (int) - Tests 2002
AS/NZS 1800 – Occupational Protective Helmets – Selection, Care and Use 1998
AS/NZS 1891.1 – Industrial Fall-Arrest Systems and Devices – Safety Belts and
Harnesses
1995
AS/NZS 1891.2 – Industrial Fall-Arrest Systems and Devices – Horizontal Lifeline and
Rail Systems
2001
AS/NZS 1891.3 – Industrial Fall-Arrest Systems and Devices – Fall Arrest Devices 1997
AS 1892.5 – Portable Ladders – Selection, Safe Use and Care 2000
AS 1943 – Industrial Gas Cylinder Identification
AS 1944 – Medical Gas Cylinder Identification
AS 2161.1 – Occupational Protective Gloves – Selection, Use and Maintenance 2000
Register of Legal and Other Requirements for Occupational,
Health & Safety Management.
WIN-SP-07-A OHS & Other Legal Requirements Revision No. 15 Page No. 9 December 2013
Standards
Title Year
AS/NZS 2161.2 Occupational Protective Gloves – General Requirements 1998
AS/NZS 2161.4 – Occupational Protective Gloves – Protection against Heat 1999
AS/NZS 2161.5 – Occupational Protective Gloves – Protection against Mechanical
Risks
1998
AS/NZS 2161.10 – Occupational Protective Gloves – Protection against Chemicals and
Micro Organisms
2002
AS/NZS 2210.1 – Occupational Protective Footwear – Guide to Selection, Use and
Care
2000
AS/NZS 2211.1 – Safety of Laser Products – Equipment Classification Requirements
and User’s Guide
2004
AS 2416 – Design and Application of Water Safety Signs 2002
AS 2865 – Safe Working in a Confined Space 2001
AS 2899.2 – Public Information Symbol Signs-Water Safety Signs 1986
AS 3544 – Industrial Vacuum Cleaners for Particulates Hazardous to Health 1988
AS 3760 - In-service Inspection and Testing of Electrical Equipment 2003
AS 31000 – Risk Management 2009
AS 4801 Occupational Health and Safety Management Systems 2001
HB 9 – Occupational Personal Protection 1994
OTHER STATE ACTS AND REGULATIONS
Occupational Health Safety and Welfare Act (South Australia) 1986
Occupational Health Safety and Welfare Regulations (South Australia) 1995
Work Health and Safety Act (Tasmania) 2011
Work Health and Safety Regulations (Tasmania) 2011
Register of Legal and Other Requirements for Occupational,
Health & Safety Management.
WIN-SP-07-A OHS & Other Legal Requirements Revision No. 15 Page No. 10 December 2013
Work Health Act (Northern Territory) 1986
Work Health (Occupational Health and Safety) Regulations (Northern Territory) 1996
Occupational Health and Safety Act (Australian Capital Territory) 1989
Occupational Health and Safety Regulation (Australian Capital Territory) 1991
Occupational Health and Safety (Manual Handling) Regulation (ACT) 1997
Occupational Health and Safety ( Plant Users and Operators) Regulation (ACT) 1991
Occupational Safety and Health Regulations (Western Australia) 1996
The Work Health & Safety Act ( Queensland) 2011
The Work Health & Safety Regulations 2011
The Electrical Safety Act ( Queensland) 2002
Workers Compensation and Rehabilitation Act ( Queensland) 2003
Workers Compensation and Other Amendments Bill ( Queensland) 2007
Dangerous Goods Act ( Queensland) 2001
Aboriginal Cultural Heritage Act ( Queensland) 2003
Coastal Protection and Management Act ( Queensland) 1995
Fisheries Act 1994 ( Queensland) 1994
Integrated Planning Act 1997 ( Queensland) 1997
Local Government Act 1993 ( Queensland) 1993
The Electrical Safety Regulation ( Queensland) 1997
Dangerous Goods Regulations ( Queensland) 2001
Workers Compensation and Rehabilitation Regulation ( Queensland) 2003
Register of Legal and Other Requirements for Occupational,
Health & Safety Management.
WIN-SP-07-A OHS & Other Legal Requirements Revision No. 15 Page No. 11 December 2013
SAFE WORK AUSTRALIA
ACTS & REGULATIONS
Model Work Health & Safety Act 2011
Model Work Health & Safety Regulation 2011
SAFE WORK AUSTRALIA
MODEL CODES OF PRACTICE
How to safely remove Asbestos
How to manage and control Asbestos in the workplace
Abrasive Blasting
Confined Spaces
Construction Work
Work Health & Safety –Consultation, Cooperation & Coordination
Demolition Work
Managing the risk of fall at workplaces
Managing work environment and Facilities
First Aid in the Workplace
Labeling of workplace hazardous chemicals
Preparation of safety data sheets for hazardous chemicals
Managing risks of hazardous chemicals in the workplace
Hazardous Manual tasks
Managing noise and preventing hearing loss at work
Managing risks of plant in the workplace
How to manage work health & safety risk
Safe design of structures
Spray Painting & Powder Coating
Welding processes
WIN-SP-07-B Environmental Legal Register Revision No. 1 Page No. 1 December 2013
W i n s l o w G r o u p
RRReeegggiiisssttteeerrr ooofff LLLeeegggaaalll aaannnddd OOOttthhheeerrr
RRReeeqqquuuiiirrreeemmmeeennntttsss fffooorrr EEEnnnvvviiirrrooonnnmmmeeennntttaaalll
MMMaaannnaaagggeeemmmeeennnttt
December 2013
WIN-SP-07-B Environmental Legal Register Revision No. 1 Page No. 2 December 2013
REVISION LIST
Revision Number
Revision Date
Description of Revision
Approved By
Date Revision Effected
11 March 2013 Amended to include further references
SK March 2013
WIN-SP-07-B Environmental Legal Register Revision No. 1 Page No. 3 December 2013
CONTENTS
1. INTRODUCTION
2. ENVIRONMENTAL MANAGEMENT AND THE LAW
3. INTERNATIONAL TREATIES
4. COMMONWEALTH GOVERNMENT ENVIRONMENTAL LEGISLATION
5. VICTORIAN GOVERNMENT ENVIRONMENTAL LEGISLATION
WIN-SP-07-B Environmental Legal Register Revision No. 1 Page No. 4 December 2013
1. Introduction
The Environmental Policy of Winslow Group commits to compliance with relevant environmental, and with other requirements placed on the companies, or to which the Winslow Group subscribes. To facilitate the achievement of this policy commitment Winslow Group operate an Integrated Management System (IMS) incorporating environmental management with OH&S, and quality management according to the requirements of AS/NZS ISO 14001: 2004, AS/NZS 4801:2001, and AS/NZS ISO 9001:2008. Conformance with the Environmental Standard (AS/NZS ISO 14001; 2004) requires Winslow to identify and have access to all legal and other requirements that are related to its environmental aspects, and to determine how these requirements apply to its environmental aspects..
Accordingly, the purpose of this Register is to identify all applicable environmental legislation, and other requirements to which Winslow subscribe, and to provide direction for ongoing access to ensure its currency. In addition, procedural requirements of Winslow Group’s Integrated Management System include determination of how legal and other requirements apply to environmental aspects in order to undertake impact/risk assessment, and apply appropriate controls. Therefore, this Register includes relevant specific details of legislation and associated regulations, policies, guidelines, codes of practice and standards that apply to identify environmental aspects associated with the operation of the Winslow Group. Such information is required to populate Winslow’s Environmental Aspects Register which effectively links environmental aspects and impacts hazards with legal and other requirements and undertakes risk assessment. The required content and maintenance of this Register is described in the IMS Legal and Other Requirements Procedure (WIN-SP 07).
The Register is not to be considered legal advice, but rather should be used as a guidance document identifying and understanding legal requirements, and ensuring current access. The Register may also be used as a base reference for evaluation of compliance with legal and other requirements (i.e. due diligence audits).
Professional legal advice may be necessary to assist with the identification and interpretation of legal responsibility.
The register is current for operations of as of March 2013. Information regarding the interpretation of, and changes to, legal and other requirements identified in this Register may be found on the following websites.
Department of Environment and Resource Management (DERM) http://www.derm.qld.gov.au
Department of Environment and Heritage Protection (EHP) http://www.ehp.qld.gov.au
EPA Victoria http://www.epa.vic.gov.au
Department of Sustainability and Environment http://www.dse.vic.gov.au
Department of Environment & Heritage http://www.deh.gov.au
WIN-SP-07-B Environmental Legal Register Revision No. 1 Page No. 5 December 2013
Full copies of up-to-date legislation are available on the following websites:
Victorian Law Today http://www.dms.dpc.vic.gov.au
Australian Legal Information Institute http://www.austlii.edu.au
2. ENVIRONMENTAL MANAGEMENT AND THE LAW
Environmental management of business and industry in Australia is controlled by legislation at
both the federal and state government levels. Local government may also pass by-laws relating
to the environment. Environmental legislation relates to both existing operations and
proposed developments.
Under the Australian Constitution, environmental legislation at the Commonwealth level
generally relates to broad policy issues that have national implications, including the
implementation of agreements made under international treaties. Legislation to protect
biodiversity and world heritage areas, to control the import and export of materials such as
hazardous wastes, and to control the manufacture, export and import of ozone depleting
substances comes under this category. Administration of environmental legislation at
Commonwealth level is generally through the Commonwealth Environment Protection Agency
(CEPA) and the Department of Environment and Heritage.
The Council of Australian Governments (COAG) is the peak intergovernmental forum in
Australia. COAG comprises the Prime Minister, State Premiers, Territory Chief Ministers and
the President of the Australian Local Government Association (ALGA). The role of COAG is to
initiate, develop and monitor the implementation of policy reforms that are of national
significance and which require cooperative action by Australian governments
Control of matters such as flora and fauna protection, pollution, air and water quality, recycling
and waste management is carried out at the state level with some coordination through the
Australian New Zealand Environmental Conservation Council (ANZECC), a council of state and
federal ministers. This has led to wide variation in environmental controls and standards between
states. In late 1992, the State and Commonwealth Governments signed the Inter-Governmental
Agreement on the Environment (IGAE) with the aim of providing a national, coordinated approach
to environmental management. In particular, the IGAE is intended to lead to development of
national standards for air and water quality. It is likely that individual states will retain control over
waste discharges through licensing or other controls.
Local government also plays a role in environmental management, particularly when dealing
with amenity issues and environmental issues that are confined to the local area, or affect the
local community. Many local governments have developed local conservation strategies to
provide for identification and management of local environmental issues. Local governments
WIN-SP-07-B Environmental Legal Register Revision No. 1 Page No. 6 December 2013
are also responsible for providing waste collection and disposal services to domestic and some
industrial premises, and may coordinate recycling within their area.
3. INTERNATIONAL TREATIES
Australia is signatory to a number of international treaties that relate to environmental
matters, including treaties to protect world heritage areas, protect migratory birds, and to
prevent the international spread of pest plants and plant products. The treaties listed in this
section are those most relevant to Winslow’s activities
Commonwealth Government Environmental Legislation
Title Year
Environmental Protection Act 1970
Emergency Management Act 1986
Public Health and Wellbeing Act 2008
Local Government Act 1989
Archaeological and Aboriginal Relics Preservation Act 1972
Catchment and Land Protection Act 1994
Conservation Forests and Lands Act 1987
Dangerous Goods Act 1985
Commonwealth EPBC Act 1999
Environment Effects Act 1978
Environment Protection and Biodiversity Conservation Act 1999
National Environment Protection Measures (Implementation) Act 1998
Ozone Protection and Synthetic Greenhouse Gas Management Act 1989
Victorian Consolidated Acts
Title Year
Environmental Protection Act 1970
WIN-SP-07-B Environmental Legal Register Revision No. 1 Page No. 7 December 2013
Emergency Management Act 1986
Health Act 1958
Local Government Act 1989
Archaeological and Aboriginal Relics Preservation Act 1972
Catchment and Land Protection Act 1994
Conservation Forests and Lands Act 1987
Dangerous Goods Act 1985
Environment Effects Act 1978
Flora and Fauna Guarantee Act 1988
Heritage Act 1995
Planning and Environment Act (Road Safety exemption for native
vegetation Removal) 1989
Victorian Aboriginal Heritage Act (Cultural Heritage Management Plan) 2006
Victorian Aboriginal Heritage Regulations 2007
Queensland Consolidated Acts
Title Year
Aboriginal Cultural Heritage Act 2003
Coastal Protection and Management Act 1995
Environmental Protection Act 1994
Fisheries Act 1994 1994
Local Government Act 1993 1993
Nature Conservation Act 1992 1992
Soil Conservation Act 1986 1986
Vegetation Management Act 1999
WIN-SP-07-B Environmental Legal Register Revision No. 1 Page No. 8 December 2013
Water Act 2000
Queensland Regulations
Environmental Protection Regulation 1998
Environmental Protection ( Waste Management)Regulation 2000
Environmental Protection ( Waste Management)Policy 2000
Environmental Protection (Air) Policy 1997
Environmental Protection (Noise) Policy 1997
Environmental Protection (Water ) Policy 1997
Vegetation Management Regulation 2000
Nature Conversation Regulation 1994
Victorian Regulations
Title Year
Environmental Protection (Prescribed Waste) Regulations 1998
Dangerous Goods (Storage and Handling) Regulations 2012
Equipment (Public Safety) (General) Regulations 1995
Queensland Industry Guidelines, Advisory Standards
Title Year
Asbestos Removal 1999
Aboriginal Cultural Heritage Act – Duty of Care Guidelines 2004
Acid Sulphate Soils – Laboratory Methods Guidelines V2.1
ANZECC Water Quality Guidelines for Fresh and Marine Waters (ANZECC,) 2002
AS/NZ ISO 140001:2004 (Environmental Management Systems –
Specification with Guidance for Use)
2004
WIN-SP-07-B Environmental Legal Register Revision No. 1 Page No. 9 December 2013
Australian Standard 3580.10.1 Determination of particulates - deposited
matter - gravimetric method. USEPA Equivalent Method EQPM-1090-079
Best Practice Guidelines for the Control of Storm water Pollution from
Building Sites (BCC 2000)
2000
Best practice Guidelines for Urban Storm water 1999
Brisbane City Council “Soil Erosion and Sediment Control – Engineering
Guidelines for Queensland” – Institution of Engineers Australia –
Queensland Division.
Guidelines for the sampling and Analysis of Lowland Acid Sulphate (ASS) in
Queensland
1998
Instructions for the Treatment and Management of Acid Sulphate Soils, 2001
Queensland Acid Sulphate Soils Technical Manual (QASSIT) – Soil
Management Guidelines – Version 3.8
Queensland Acid Sulphate Soils Technical Manual (QASSIT) – Legislation and
Policy Guideline Version 2.2
Queensland Water Quality Guidelines 2006
State Planning Policy 2/02 Guidelines – Acid Sulphate Soils
Water Quality Management Guidelines 2002
Water Quality Sampling Manual Third Edition – Environmental Protection
Agency
1999
National Occupational Health and Safety Council Guidance Notes
Title Year
Exposure Standards for Atmospheric Contaminants in the Occupational
Health Environment (NOHSC:1003)
WIN-SP-07-B Environmental Legal Register Revision No. 1 Page No. 10 December 2013
Further References
Australian Water Quality Guidelines for Fresh and Marine Waters (Australian and New Zealand Environment and Conservation Council)
Environmental Protection Authority Technical Guidelines – Bunding Guidelines, Publication 347
Environment Protection Authority Publication 275 - Construction Techniques for Sediment Pollution Control
Environmental Protection Authority Publication 441 - A Guide to the Sampling and Analysis of Waters, Wastewaters, Soils and Wastes
Environment Protection Authority Publication 448 - Classifications of Wastes
Environment Protection Authority Publication 480 - Environmental Guidelines for Major Construction Sites,
Environment Protection Authority Publication 669 - Groundwater Sampling Guidelines
Environmental Protection Authority Technical Guidelines – Noise Control Guidelines TG302/92
NSW Department of Housing - Managing Urban Stormwater – Soil and Construction
State Environment Protection Policy - Prevention and Management of Contaminated Land
State Environment Protection Policy - Waters of Victoria
State Environment Protection Policy - Ground waters of Victoria
State Environment Protection Policy - Air Quality Management
Victoria, Stormwater Committee - Urban Stormwater : Best Practice Environmental Management Guidelines
Vic Roads - Project Management Guidelines : Environmental Protection
Civil Contractors Federation/Environmental Protection Authority - Environmental Management System
Victoria’s Native Vegetation. A Framework for Action
Vic Roads Biodiversity Guidelines – 2004
Department of Environment and Resource Management, Queensland (DERM)
Department of Environment and Heritage Protection, Queensland (EHP)
WINSLOW Contract No:
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan 1 1 MAY 2013
APPENDIX G:
SUBCONTRACTORS AND SUPPLIERS
Integrated Management System
PROJECT MANAGEMENT PLAN
Stonehill Stage 4A
DOCUMENT ISSUE DATE
WIN-SP-11-A Project Management Plan 2 December 2013
SUBCONTRACTORS AND SUPPLIERS
SUBCONTRACTOR
/ SUPPLIER
ADDRESS PRODUCT ORDER
NUMBER
DATE QUALITY SYSTEMS
WINSLOW SELF
YVE Watermain
Reticulation
Califam Sewer
Reticulation
MVQ Quarry Supply
BARRO GROUP Concrete Supply
RCPA Storm Water
Pipe
WINSLOW Contract No:
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan 1 1 MAY 2013
APPENDIX H:
INSPECTION TEST PLANS AND CHECKLISTS
PROJECT : Stonehill Stage 4A FOREMAN:
Attendee Attendee Attendee
Attendee Attendee Attendee
Attendee Attendee AttendeeTick Yes if item is Compliant // Tick No of item is Not Complaint // Tick N/A if item is Not Applicable
Items to be Checked Compliance Items to be Checked Compliance
Yes No N/A Yes No N/A
1 a Policies & "If You Are Injured" Posters Displayed? 6 a Qualified First Aider onsite and known to employees?
Project b All Personnel & Subcontractors Inducted? First Aid b Kit contents clean, orderly & adequately stocked?
Records c PMP / Health & Safety Coordination Plan Available? c
d Emergency numbers displayed & relevant? d First Aid treatment recorded?
e Task specific SWMS available? 7 a Appropriate Fire extinguishers serviced/tagged?
f SWMS signed by all staff? Fire b Flammable material stored adequately?
g Are works performed as described in SWMS ? c Are naked flames clear of all flammable material?
h Are SWMS effectively keeping staff safe? 8 a Temp Structures constructed as designed?
i Personal Protective Equipment issued? b Temp structure constructed by competent person?
j P P E worn & in good condition? c Only marked scaffold couplers used on scaffolds?
k All incidents & near misses reported? (Scaffold etc) d Are protections in place to stop falling objects?
2 a Winslow & advisory / warning signs in place? e Are all sharp objects capped?
General Site b Barricades installed around hazards? 9 a TMP Available?
Conditions c Tidy, clear of rubbish & free of Trip Hazards? Site Specific b Traffic control checklist completed?
d Site compound clearly defined? c Traffic Signs kept in good condition?
3 a Barricades properly installed / maintained d
Trenching b Trenches correctly battered/benched or shields in place? e Emergency Assembly Area known by all site personnel?
Excavations c Trenching checklist completed? 10 a Appropriate Storage ?
d Chains & Slings tagged and in good condition? b Gas Bottles/Acetylene bottles restrained?
4 a Plant Daily Prestart Inspections completed? c Are Paints/Chemicals stored appropriately?
Plant & b Have identified faults been reported to workshop? d Material Safety Data Sheets present?
Equipment c Subbie Plant Hazard Assessments sighted? 11 a All electrical equipment tagged and in good condition ?
d Operators competency recorded ? Electrical b Are leads clear of ground & not causing trip hazards?
e SAFETY PINS FITTED AT ALL TIMES? Equipment c Leads in good condition?
f Are all flashing warning lights operational ? d All switches / plugs / sockets in good condition?
g Are all reversing alarm operational ? e Switchboard secured; Switches/circuits identified?
h Have all operators signed on to excavation permit? 12 a Fences & Gates in good conditions?
5 a Lunch rooms & toilets clean? After Hours b All paths clear for pedestrians?
Amenities b Fresh drinking water available? Site Security c Appropriate signage in place?
c Rubbish bins available & covered? d Site clear of litter?
NON CONFORMANCE
Item No State Condition of Fault
CORRECTIVE ACTION TAKEN
Item No Details of Corrective Action
Checked By: Date:
Action Taken By
Revision No. 10
All O/head & U/ground services identified & protected?
Date
DECEMBER 2013Page No. 1WIN-SP-15-A Weekly Site Safety Inspection
WEEKLY SAFETY INSPECTION CHECKLIST
Integrated Management System
Date
Are the contents within Exp dates?
Action Taken By
Temp
Structures
Dangerous
Goods /
Hazardous
Substances
FOREMAN:
Compliance ComplianceYes No N/A Yes No
1 Vegetation Management 7
a Is there Barricading around preserved trees? a Are all gates and fences in good condition?
b Are the trees healthy and in good condition? b Are all shared paths clear for pedestrians?
2 Erosion /Sedimentation / Water Quality c
a Is the silt fencing working effectively? 8
b Are the gravel bags working effectively? a
c Are the straw bales working effectively? b
d Are the Cut off and diversion drains in good condition? c
e Are Soil stockpiles an adequate distance from nearest water body? 9
f Are the Side entry pit drains free of sediment and pollutants? a
3 Water Quality b
a Is the water being discharged clear and not discoloured? 10
b Is dewatering being undertaken in a controlled manner? a
c Is all water clear of oil sheen? b
d Are all water bodies clear of contamination? 11
4 Dust Control / Air Quality a
a Is worksite clear of visible airborne dust? b
b Is all plant clear of excessive emissions? c
5 Noise Emissions 12
a Is work being carried out within noise restriction time limits? a
b Is all plant clear of excessive engine noise? b
c Are adjacent buildings/services or structures clear of damage? c
6 Waste Management 13
a Are bins regularly emptied and not overfilled? a
b Are waste materials disposed of per EPA requirements? b
c Are concrete washout areas maintained? c
d Is area clear of litter? you notify authorities?
NON CONFORMANCE
Item
No State Condition of Fault
CORRECTIVE ACTION TAKEN
Item
No Details of Corrective Action
Checked By: Date:
WIN-SP-15-B Weekly Site Environmental Checklist
Are there Plant/vehicle wash down facilities on site?
Is all Fuel stored in bunded area?
Are all containers labelled correctly?
Fuel and Chemical Storage
PROJECT: Stonehill Stage 4A
Plant Wash Down
Is there Plant/vehicle wash down equipment on site?
Integrated Management System
No NoItem to be Checked
ENVIRONMENTAL CHECKLIST
Is appropriate signage installed where required?
Tick Yes if item is Compliant // Tick No of item is Not Complaint // Tick N/A if item is Not Applicable
Flora & Fauna
Is there approval for removal of trees?
Is there protection for trees/fauna/wetlands?
Do you have to relocate any Fauna?
Item to be Checked
Are roads clear of mud and dirt?
Is there sufficient crushed rock at entry and exit where required?
Amenity ( Community)
Road Cleanliness
Are all MSDS available?
Contaminated Soil
Are Procedure for contaminated soil available?
Is the Proper disposal and documentation compiled / available?
Are the Material tracking records up to date?
Archaeological & Heritage Sites
If discovered are significant areas protected?
Have Archaeologists been contacted to investigate?
Did you cease works because artefacts were found and did
December 2013Page No. 1Revision No. 10
Taken By Date
Taken By Date
ComplianceN/A
Integrated Management System
ENVIRONMENTAL CHECKLIST
Tick Yes if item is Compliant // Tick No of item is Not Complaint // Tick N/A if item is Not Applicable
December 2013
Date
Date
WINSLOW Contract No:
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan 1 1 MAY 2013
APPENDIX I:
MONITORING AND MEASUREMENT
Integrated Management System
WIN-SP-03-C Tool Box Meeting Revision No. 9 Page No. 1 December 2013
RECORD OF TOOL BOX MEETING
Project Name:_________________________________________________________
Meeting Conducted By:__________________________________ Date:________________________
Possible Meeting Items Could Include:
- Drug and Alcohol - site signage - Dust control - Bulling and Harassment - traffic safety – (Winslow and Public) - Stormwater management - Incidents & near misses - spill control - Noise control - SWMS - storage of dangerous goods -Barricading of excavations - Trenching safety -tools & equipment -Licences - Manual Handling Issues -Site amenities -Barricading of excavations - First aid & emergencies -PPE & safety helmet -Work safe entry reports - Mobile phone use -site inspections -Fire extinguishers - Site amenities -IMS system improvements -Health & Safety Coordination Plan(HSCP) - Safety Pins (Must be Fitted At All Times)
ITEMS DISCUSSED TODAY:
NAME (Please Print) COMPANY DATE NAME (Please Print) COMPANY DATE
WINSLOW Contract No
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan No. 1 1 May 2013
APPENDIX: J
INTERNAL AUDIT PROGRAM
Integrated Management System
SYSTEM AUDIT SCHEDULE
Department / Project Elements / Procedures year
To Be Audited To Be Audited J F M A M J J A S O N D J F M A M J
NOTE: X = planned audit ; = planned audit performed
Audit
No.
December 2013Page No. 1Revision No. 7WIN-SP-17-A System Audit Schedule
WINSLOW Contract No
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan No. 1 1 May 2013
APPENDIX: K
PRECOMMENCEMENT NOTIFICATIONS
Notification No.
NOTICE OF INTENTION TO COMMENCE EXCAVATION OPERATIONS IN TRENCHES, SHAFTS AND TUNNELS
To: Construction & Utilities Program Local Office, WorkSafe Victoria
To be submitted to WorkSafe at least 3 days
prior to commencing excavations
Date: / /
This form should be completed and returned to WorkSafe Victoria by the employer or self-employed person carrying out the excavation work.
Notice is given that I intend to commence work as described in this form and I submit the name of the person nominated to supervise this work.
Name
……………………………………………………………………………………
Address
……………………………………………………………………………………
Particulars of employer or self-employed person
Postcode
……………. Tel No (W) ……………. A/H ………………
Name
……………………………………………………………………………………
Address
……………………………………………………………………………………
Particulars of nominated supervisor
Postcode
……………. Tel No (W) ……………. A/H ………………
Experience of supervisor (certificates, training courses, experience in relation to trenching/excavation) ……………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………………
Name of Exact Locality of Excavation
Street:………………….......... Suburb/Town:………….………… Building Site/Estate:…….…………… Directory reference:……………………….. Proposed date of commencement: / / Proposed completion date: / /
Type of Excavation Maximum Depth / Length
Trench ……………… Shaft ……………… Tunnel ………………
House connection ……………… Other ………………
Number of persons to be employed in this work: ……………………….
EXPLOSIVES Explosives WILL/WILL NOT be used. Please cross out whichever is NOT applicable.
Shotfirers Name: ....................................... Shotfirers PERMIT NUMBER:…………………………
Permit Type: Black Red Authorised to Use: Electric Safety Fuse Cortex None
Person authorised to sign: ………………………………………………………………………………………………………………
Printed name: …………………………………………………………………………………………………………………………….
PERMIT TO WORK – SERVICES
PROJECT No: ____________ PERMIT No: _____________
This permit is to be issued PRIOR to commencement of ANY excavation works which may impact on Underground or Overhead Services.
Date issued: ___/___/___ Valid to: ___/___/___
Project Name: _____________________________________________________________________________________________
Location: ______________________________________________________ Chainage: _____________________________
Scope of work: _____________________________________________________________________________________________
A task specific Safe Work Method Statement must be developed, clearly understood and signed by all relevant personnel
UNDERGROUND
Are current Dial Before You Dig drawings attached? If ‘NO’ - Excavation work can NOT proceed
Y N
Have all known services been located, proved, identified & PROTECTED? If ‘NO’ - Excavation work can NOT proceed
Y N
Actions to be undertaken (Delineation of Services: O’Head / U’Ground, Sewer pits)
______________________________________________________
______________________________________________________
ASSET PROTECTION PLAN ATTACHED? If ‘NO’ - Excavation work can NOT proceed
Y N
Can the works encroach on the NO-GO-ZONE clearances? Clearances MUST be maintained (See table A)
Y N
If ‘YES’ – An Asset Owner Permit is required (Copy of Permit to be attached)
Person Responsible
Print name: __________________ Signature: ________________ Date: ___/___/___
Works to be carried out as/per requirements of permit
OVERHEAD
Are there overhead services present? Y N
Construction Plant to be used: ____________________________
Does the operational range of movement of the plant (see fig.1) allow it to encroach into the:
i) NO-GO-ZONE? (See table B) Y N
If ‘No’, Proceed to (ii)
If ‘Yes’ – An Asset Owner permit is required (attach copy)
A) Can power be isolated? Y N
– If ‘No’, Proceed to (B)
B) Can plant/process be substituted? Y N
– If ‘No’, Proceed to (C)
C) Can work area be separated from hazard (Flagging/Barricading)? Y N
– If ‘No’, Proceed to (D)
D) Is a qualified spotter available? Y N
- If ‘NO’ – Works can NOT proceed
Does the operational range of movement of the plant (see fig.1) allow it to encroach into the:
ii) SPOTTER ZONE? (See table B) Y N
Is a qualified spotter in place? Y N
- If ‘NO’ – Works can NOT proceed
Are control measures in place as/per Working Within Power lines? Y N
Person Responsible
Print name: ________________________ Signature: ________________________ Date: ____/____/____
Project manager approval to proceed:
Print name: ________________________ Signature: ________________________ Date: ____/____/____
PERMIT ISSUED TO: Name:__________________ Signature:__________________ Date: __________________
Known Services Located Proved
YES NO YES NO
Electricity Orange
Gas Yellow
Comms White
Water main Blue
Sewage Black
Drainage
Other
Employees Signing onto Permit – Acknowledgement of presence and understanding of conditions of permit:
Name Signature Date Name Signature Date
WIN-OP-04-C Permit to Work - Services Revision No. 8 Page No. 1 December 2013
Figure 1
Safety Pins
MUST be fitted at
all times.
PERMIT TO WORK – SERVICES
Table A
Table B
In the event of contact with an overhead power line:
The operator should stay in the vehicle at all times, unless there is a risk of fire or other urgent reason
If the operator has to leave the machine, the following steps should be followed to avoid electrocution:
1. Jump clear without touching both the vehicle and the ground simultaneously. Try to land with both feet together, then shuffle, or jump,
with both feet together until at least 10 meters clear.
2. Do not run.
3. If fallen to the ground, roll clear. Do not try to get up by pushing off the ground with hands, as electricity may pass through arms and
legs in contact with the ground, resulting in the possibility of electric shock.
Warn other people in the area to keep well clear of the site until the power company advises that the power has been turned off. Do not
approach any victim in the vicinity (10m) until power has been officially turned off.
Call for emergency assistance on 000 and ask for the fire brigade and ambulance at the earliest opportunity; advise of the situation and wait for
help.
Contact nominated Power Company.
Wait for confirmation by the power company that the power has been turned off
Offer first aid without placing yourself or others in any danger
WIN-OP-04-C Permit to Work - Services Revision No. 8 Page No. 2 December2013
WINSLOW Contract No
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan No. 1 1 May 2013
APPENDIX: L
INSURANCE
CERTIFICATEOF CURRENCY
Agent for WorkSafe Victoria*
1.The following WorkSafe Insurance policy covers the employer's liability under the AccidentCompensation Act 1985 (and amendments).
This Certificate is valid from: 30/06/2013 to: 30/06/2014
The information provided in this Certificate of Currency is correct at: 18/06/2013
EMPLOYER'S INFORMATION
Employer or Policy Number:
5008078
Legal Name:
WINSLOW CONSTRUCTORS P/L
Trading Name:
ABN:
73 006 581 764
ACN/ARBN:
006 581 764
IMPORTANT INFORMATION
This policy commences and finishes at 4.00pm on the dates specified above.
STATEMENT OF COVERAGE
2.
3.
*WorkSafe Victoria is a trading name of the Victorian WorkCover Authority
WINSLOW Contract No
DOCUMENT ISSUE REVISION DATE
WIN-SP-11-A Project Management Plan No. 1 1 May 2013
APPENDIX: M
TRAFFIC MANAGEMENT PLAN