Integrated Management Strategy for Risk Reduction of Groundwater Contamination at Tarnowskie Góry Megasite Janusz Krupanek Institute for Ecology of Industrial Areas Katowice, Poland

Upload: others

Post on 30-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Integrated Management Strategy for Risk Reduction of Groundwater Contamination at Tarnowskie Góry Megasite

Janusz KrupanekInstitute for Ecology of Industrial Areas

Katowice, Poland

Page 2: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

WELCOME ProjectDevelopment of Integrated Management System (IMS) for Prevention and Reduction of Pollution of Waterbodies at

Contaminated Industrial Megasites. Programme: EESD/RTD 5FP

Coordinator: Huub Rijnaards, TNO, Apeldoorn, The Netherlands

Jerzy Szdzuj, Daniel Słowikowski, Ryszard Janikowski,Marek Korcz

(Institute for Ecology of Industrial Areas, Katowice, Poland)Grzegorz Malina

(Czestochowa University of Technology, Czestochowa, Poland)

Page 3: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Section

Expert support

toolsCheck point

Megasite and RMZ

Risk assessment

Management scenarios

ImplementationMonitoring& Review

1 2 3 4

Contamination data & maps

GIS-data, emission, data & maps, cluster maps, RAS

PRESTO, CARO

1.2 Form a group of stakeholders

1.3 Make overview of boundary conditions

1.1 Problem definition

1.4 Make inventory of megasite information

1.5 Build conceptual model1.6 Decide whether an Integrated Management is needed

2.1 Make megasite description

2.2 Define potential risk clusters

2.3 Carry out fate and transport modeling

2.4 Derive local standards and determine risks

2.5 Finalize risk cluster

3.1 Define feasible management scenarios for each cluster

3.2 Perform cost-efficiency and risk reduction analyses

3.3 Select highest priority management scenarios of the RMZ

4.1 Build implementation plan of selected management sceanrios

4.2 develop and implement monitoring program

4.3 Construct medium-long term IMS review plan

Integrated Management System

Page 4: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Megasite and Risk Management Zone

Tarnowskie Góry Megasite

Page 5: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

The past industrial activity -beside the unquestionable positives - leaves us with unwanted heritage of environmental (e.g. polluted soil and groundwater), economic and social problems

Page 6: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Geography of the Tarnowskie Góry

Megasite

SilesianVoivodeship

TarnowskieGóry County

#S

Tarnowskie GóryCounty

"Tarnowskie Góry"Chemical Plant

Page 7: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Tarnowskie Góry megasite - overview

Various pollution sourcesand environmentalcontamination

Page 8: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

HISTORYXV-XIX c. – silver, lead and zinc

ores extraction

-20 000 shafts-250 km adits and corridors

Page 9: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

HISTORYXIX c. - Steel and paper production

View of the site from SE, 1892

Waste depositsChanged land structure

Page 10: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

HISTORY1922 – 1995 Chemical Plant „Tarnowskie Góry”–

view from SE, 1975

Production of : sodium dichromate, barium chloride, boric acid, borax, barium nitrate, zinc oxygen, zinc sulphate, sodium perborate, aluminium sulphate, copper sulphate, zinc sulphate and potassium aluminium sulphate, barium salts and lithopone, strontium carbonate, active soot

Page 11: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Chemical Plant– main pollution source

1.5 x 106 m3 (2.7x106 Mg) waste materials deposited on uncontrolled dumps (26 ha) – total area 34 ha

The annual leachate load from landfills:

B – 6.63 Mg

Ba – 80.4 Mg

Sr – 5.8 Mg

Zn – 1.4 Mg

SO4 – 274.5 Mg

Page 12: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Triassic aquifers - sourcesof water for 0.3 mlnpeople

Page 13: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Group of stakeholders

Acceptance of integrated managament approach with thefocus on groundwater resources as the priority of environmental policy at a local, regional and national scale

Tarnowskie Gory Megasite round table

stakeholdres meeting

Input informationMegasite manager

Owners/users of wells(Triassic aquifer)

Local government(Town Tarnowskie Gory,County Tarnowskie Gory)

National governmentRegulator(Environmental&sanitary inspections)

National governmentOwner of the site(Liquidator of Chemical Plant"Tarnowskie Gory")

National governmentFinancial resources(National budget, National&regionalenvironmental and water economy funds)

Page 14: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Boundary conditionsEconomical aspects

lack of available funding, slow development, local government budget constrains, infrastructure, administration attitude; lack of revitalization drivers (low prices for land, low investment attractiveness, relative abundant water resources, low level of local consumption)

Social issueshigh cost of water, unemployment, rising cost of media for average consumer and the low income families

Environmental issueslegal conditions, groundwater hydrological conditions

Page 15: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Conceptual model

E1

E1

E2

Q

TI

Sa

E6

E1 - health and ecological impacts

Q - Quaternary aquiferT - Trriasic aquifer

E2- surface waters impact E5 - migration-Quaternary Sx - contamination sources

E3

E6

RMZ RMZ

RMZ - Risk Management Zone

Sb

E0

E0

E4

E5

E5

E6, - water wells impacts

E0 - deposition in soil, Quaternary E3 - vertical migration - Trriasic

E4

E2E2

E4, - migration Quaternary -Trriasic

ScE0

TII

E7

Receptors

Page 16: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Risk modeling

Page 17: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Management Zones in Tarnowskie Góry megasite

Page 18: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Group of stakeholdersAcceptance of risk based

managament approach within the risk management zone and determined boundary conditions

Tarnowskie Gory Megasite round table

stakeholdres meeting

Health risk (surface contamination)

Health risk (groundwater contamination)

Ecological risk (soil, sediments, plant contamination)

Risk related to water erosion

Risk related to contaminated sediments

Page 19: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Risk assessment

Tarnowskie Góry Megasite

Page 20: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Risk clusters

Q

TI

Sa

Q - Quaternary aquifer

T -Triassic aquifer (first & second layer)

Sb

Sc

TII

Sa - waste deposits of the Chemical Plant Tarnowskie GórySb - contaminated quaternary shallow layer

Sc - contaminanted soil in the vicinity of the chemical plant

Qi

Qi -Quaternary -isolation layer

CLUSTER I

CLUSTER III

CLUSTER II

Risk Management Zone

Page 21: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Risk evaluationCluster I

Health risk (surface) Medium

Ecological risk (soil, sediments, plants) Low

Risk related to water erosion Medium

Risk related to sediments Low

Cluster II

Cluster III

Health risk (groundwater wells) High

Health risk (groundwater wells) Medium

Page 22: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Priority contaminants

Based on: the interpretation of modelling results and riskassessment and conclusions of the expert meeting,

boron was selected as the priority contaminant at the

Tarnowskie Góry Megasite

Contaminant Frequency of occurrence

Natural attenuation potential

Toxicity Mobility potential

Data availability

Arsenic Moderate High High Low Moderate Barium High High Moderate Low Moderate Boron High Low Moderate High Moderate Cadmium Moderate Moderate High Low Moderate Strontium High Low Low High Moderate Zinc High Moderate Moderate Low Moderate

Page 23: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Groundwater contamination with BORON, 2002

Page 24: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Risks and stakeholders interests

Receptors(water wells)

Receptors(water wells)

Medium risk

Low risk

High risk

Page 25: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Group of stakeholders

Acceptance of risk assumptions and determined local standards at planes of compliance

Tarnowskie Gory Megasite round table

stakeholdres meeting

Boron migration in Triassic aquifer threatening water extraction in the area is a priority

Page 26: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Management scenarios

Tarnowskie Góry Megasite

Page 27: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Management goals for Tarnowskie Góry priorities

stabilisation of the contaminants plume – worst case at least no further spread outside the area of risk management zone

stabilisation of the contaminants plume at the actual state (year 2003) trend reversal

clean up of the Triassic aquifer time- frame 2030

Page 28: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Support different situations

by specific tools

Page 29: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Basic scenariosSource-oriented measures:

primary sources capping or removalcontaminants immobilization in soils and Quaternary deposits (secondary source)

Pathway oriented: internal hydrological barrier external hydrological barrier

Receptor oriented: monitoring,water extraction regime at receptors (wells) development as a hydraulic barrier

Page 30: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Feasibility studyModelling

Modflow 96 PMPathMT3D

Technical aspects of implementation

Land use requirements

Legal and policy issues

Page 31: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Chemical Plant liquidation plan, 2003

The chemical plant demolition is completed

New Central landfillBuilding within the site•Area – 16 ha•Cubature – 1.7 x 106 m3

Page 32: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Group of stakeholdersRefining of management goals and

acceptance of management options, establishement of local standards and planes of compliance

Tarnowskie Gory Megasite round table

stakeholdres meeting

• The boron concentration of 0.3 mg/l is accepted as final steering parameter at planes of compliance established for Triassic groundwater wells

• Concentration 1 mg of boron /l is reqiured in I level of Triassic aquifer at risk management zones

Page 33: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Preferred scenariosS 1 – controlled natural attenuation (NA), i.e. source removal + monitoring and control of the hydrological regime

S 2 – active groundwater remediation (AGWR), i.e. source removal + groundwater clean-up + monitoring

S 3 – engineered natural attenuation (NA), i.e. source removal + increased extraction of groundwater (specific and low-risk oriented) within the Risk Management Zone (RMZ) + monitoring

Page 34: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Scenario S1

Landfill construction is the main activityGroudnwater ,onitoring is essentially improved Relative high risk for selected stakeholders remains – boron plume spread in the Triassic aquifer

Page 35: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Scenario S2Two technical variants of groundwater clean up

Internal barrier External barrier

• Decontamination issue and water utylization issue(700-1200 m3 of contaminated water/day) - high cost

• New infrastructure is required (new and existing wells)

Page 36: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Scenario S3

Relevant for intensive development of the water extraction system in the area with increased groundwater yield >20 000 m3/d (current yield in the area) infrastructure implications (new water wells with high capacity, pipelines should be built)Development of new monitoring regime is essentialProvide safety conditions for existing and potential groundwater well users

Page 37: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

S1 50 mln € S2 >70 mln €

S3 <49 mln €

Cost – efficiency Triassic aquifer contamination – forecast for 2030

Page 38: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Cost – efficiency Triassic aquifer contamination – forecast for 2075

S1 50 mln € S2 >80 mln €

S3 <48 mln €

Page 39: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Cost – efficiency Triassic aquifer contamination – forecast for 2100

S1 50 mln € S2 >80 mln €

S3 <47 mln €

Page 40: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Cost-benefit analysis

Issue S1 S2 S3Water needs (social, industrial) - + ++Organizational aspects + - -Environmental issues - + -Infrastructure implications + - -Local finance + - -Local development - + +Policy and legal aspects + + +

Page 41: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

GOS decision on Final IMSthe group of stakeholders have

not made the decision on the selection of the final risk management scenario (RMS)

Tarnowskie Gory Megasite round table

stakeholdres meeting

Scenario S1 is currently being implemented. The Scenario S1 and S3 are preferred because of their cost-efficiency and benefits. Implementation of the scenario S2 is not excluded.The final decision will depend on the following:

Access to funds;Elimination of knowledge and technological gaps,Stabilization of environmental regulations

Page 42: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Implementation, Monitoring, Review

Tarnowskie Góry Megasite

Page 43: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Management plan

establishment of risk management zone (RMZ) in the watershed management plan by the Regional Water Management Board Implementation of the monitoring programme with continuous revision and modificationFurther research on boron plume dispersal and cost-efficient clean up solutionspermanent assessment, verification and management of the risks within the RMZ Review process - revisions done by the stakeholders

Page 44: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Organizational schemeScenario S1 – controlled NA

existing organizational structure based on the legal obligations of the local and regional administration and the megasite management organization (the liquidator of chemical plant)

Scenario S2 – active groundwater remediationestablishment of a new organization unit within the local and regional administration for implementing this scenario after the chemical plant liquidation program is completed

Scenario S3 – engineered NAEngagement of different stakeholders (administration, industry) New management structure to intensify the processes of the megasiteredevelopment Local and regional administration may have a leading position inimplementation of this scheme

Page 45: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Monitoring Program

A new organization of a monitoring system for the megasite, is proposed

SELECTED PRIORITY SITES

DEFINITION OF OBJECTIVES

COLLECTION OF EXISTING DATA

ESTABLISHMENT OF CONCEPTUALGEOLOGICAL/ HYDROGEOLOGICAL

MODEL AND FLOWNET CONSTRUCTION

NETWORK IMPLEMENTATION

PERIODIC SAMPLING

CHEMICALANALYSES

WATER-LEVELPERIODIC

MEASUREMENT

EVALUATION OFGROUNDWATER FLOW PATTERN

DATABASE MANAGEMENT SYSTEM

IMPLEMENTATION OF PROTECTIVE MEASURES

EXISTING DATA ANALYSIS

DEVELOP WORK PLAN

SAMPLING NETWORKPRELIMINARY DESIGN

SELECTION OF TARGET

MONITORING

LOCATION OF BACKGROUND AND

DOWNGRADIENT WELLS

VERIFIFICATION OF LOCATIONS

SELECTION OF DETERMINANTS

SELECTION OF SAMPLING METHODS

MONITORING WELLS INSTALLATION

TEST SYSTEM

NATURALATTENUATION

REMEDIATION

DATA ANALYSIS

GROUNDWATER QUALITY INFORMATION SYSTEM

GROUNDWATER QUALITY MANAGEMENT SYSTEM

OPTIMISATION OF MONITORING PROGRAM

FIELD INVESTIGATION

CONFIRM/REFINE CONCEPTUAL MODEL AND

FLOWNET

follow-up

Verified sampling protocol, i.e. sampling technique, frequency and parameters to be measured (number and range)

Page 46: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Monitoring ProgramGroundwater quality monitoring of the Triassic aquifers is focused on

tracing migration of potential contaminants from the area of dumping sites and quaternary sediments to the operating groundwater intakes

performance of the controlled landfill and the secondary sources of contamination (i.e. quaternary sediments).

Reduction of the monitoring of the Quaternary water-bearing horizons within the area of former dumping sites is proposed

Page 47: Integrated Management Strategy for Risk Reduction of ... · Boundary conditions Economical aspects zlack of available funding, slow development, local government budget constrains,

Conclusions

Integrated Management Strategy for Tarnowskie Góry megasite is a good example of dynamic, interactive, systemic and risk-based management of complex systemThe management of the megasite is an ongoing process of learning with key stakeholders participation