Integrated Home Energy & Sludge to Fuel Additional Business Cases and Development Plan Tom Horgan and Noa Simons February 26, 2009

Upload: acton-camacho

Post on 30-Dec-2015

36 views

Category:

Documents


0 download

DESCRIPTION

Integrated Home Energy & Sludge to Fuel. Additional Business Cases and Development Plan Tom Horgan and Noa Simons February 26, 2009. Executive Summary Sludge to Fuel Integrated Home Energy System Wrap Up. Outline. Sludge to Fuel - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Integrated Home Energy & Sludge to Fuel

Integrated Home Energy & Sludge to Fuel

Additional Business Cases and Development Plan

Tom Horgan and Noa Simons

February 26, 2009

Page 2: Integrated Home Energy & Sludge to Fuel

Outline

• Executive Summary

• Sludge to Fuel

• Integrated Home Energy System

• Wrap Up

Page 3: Integrated Home Energy & Sludge to Fuel

Executive Summary• Sludge to Fuel

– Sufficient dewatered, undigested sludge is available in NYS for conversion to energy (~ 15% of total)

– FT based conversion of sludge to diesel is not a realistic path to profitability given excessively high capital and processing costs and low conversion efficiencies for either thermal (17%) or catalytic (24%) gasification

– Biogas Electricity generation via either anaerobic digestion or catalytic gasification is a realistic path to profitability

– At 15% of sludge available in NYS, estimated annual profits $14M/$17M per year

– Catalytic gasification is more efficient than AD in fuel gas synthesis and has more potential for improvement

Page 4: Integrated Home Energy & Sludge to Fuel

Executive Summary• Integrated Home Energy Systems

– NG based Micro-CHP and standalone wood-gas generators are not viable for prime power for various reasons

– The IHES provides efficient prime power and heat with grid support. Grid provides surge protection and IHES can operate independently in a grid outage.

– With high renewable fraction, payback is about 3 years at 5 kW and $5,000 installed cost

– Larger system (>10kW) will generate revenue in grid buyback states (NY, MA, CT, others) however wood demand is excessive

Page 5: Integrated Home Energy & Sludge to Fuel

Sludge to Fuel• Sludge Availability and Tipping Fees

– Per NYS DEC data, approximately 15% of sludge is aerated, dewatered and hauled for secondary processing

– Plant Interviews• Guilderland, Normans Kill (216), 456-2745, Keith Edwards

– Aerates, dewaters to 24/25% solids, hauled away– $85/Wet Ton, 2/4 yr contract

• Herkimer (228), 866-0150, – Aerates, dewaters, 20/30% solids, hauls away – $72.15/wet ton, 2 yr contract

• Hudson (241), 828-1020, Paul Lossi– Aerates, dewaters to 22% solids, hauled away – $84/ wet ton, 2/4 yr contract

– Average Tipping Fee = $0.09/kg

Page 6: Integrated Home Energy & Sludge to Fuel

Sludge to Fuel• Upper bound for FT diesel…

– Use NYS Data. Assume all sludge is available. Ignore efficiency, production, transportation and capital costs.

– Assume a $0.09/kg tipping fee and a diesel price of $0.016/MJ (2/2/09)

Profit: $216M/yr

• Upper bound for Biogas Electricity…– Same assumptions.– Electricity price $0.043/MJ

Profit: $416M/yr

Page 7: Integrated Home Energy & Sludge to Fuel

Sludge to Fuel• Thermal Gasification of Dewatered Sludge

– Using data from http://www.thermogenics.com - manufacturers of gasifier/generator systems designed for dried sewage sludge

– Overall 27% efficient on dry sludge, 4% efficient on dewatered sludge. Assume generator efficiency of 17% on Syngas.

– Gasification Efficiency on dewatered sludge ~ 22%– Assume FT Efficiency on clean syngas ~ 80%– Overall Thermal Efficiency to FT Diesel ~ 17%

• Catalytic Gasification of Dewatered Sludge – Using data from “Catalytic Wet Gasification of Municipal and

Animal Waste”, Elliot, et al, 2006– Low quality fuel gas (half CH4, half CO2) with 90% recovery of

high energy input. Conversion Efficiency to Fuel Gas ~36%. – Fuel gas to Syngas by Steam reforming ~ 83%– Overall Thermal Efficiency to FT Diesel ~ 24%

Page 8: Integrated Home Energy & Sludge to Fuel

Sludge to Fuel• Issues w/ Fischer Tropsch

– Excessively high capital and production costs particularly on biomass due to gas purity requirements

– Added contamination issues associated with sludge – Exxon Mobil, Shell, Choren, Sasol, Syntroleum all researching

heavily in FT with few improvements demonstrated

• Biogas Electricity Generation– Using data from

http://www.epa.gov/chp/documents/biomass_chp_catalog_part6.pdf

– Biogas from Sludge via Anerobic Digestion ~ 35%– Biogas from Sludge via Catalytic Gasification Catalytic Gasification ~ 36%– Large scale biogas generator efficiency ~ 22%/45%

– Overall Thermal Efficiency to Electricity ~ 12%

Page 9: Integrated Home Energy & Sludge to Fuel

Sludge to Fuel• Financial Analysis Ignoring Capital & Production Costs

• Though conversion efficiency is lower, fuel value is Though conversion efficiency is lower, fuel value is higher resulting in higher profit potentialhigher resulting in higher profit potential

Page 10: Integrated Home Energy & Sludge to Fuel

• Financial Analysis with Capital & Production Costs– * Prod and Cap costs for FT estimated at 10% of Syntroleum to indicate economies of scale

• Capital costs 50x lower for AD. Assume 25x for CG.Capital costs 50x lower for AD. Assume 25x for CG.

Sludge to Fuel

Page 11: Integrated Home Energy & Sludge to Fuel

• Profitability indicated with minimal sludge availability

Sludge to Fuel

Page 12: Integrated Home Energy & Sludge to Fuel

Sludge to Fuel• Catalytic Gasifiaction Process *

* Elliot, et al, , “Catalytic Wet Gasification of Municipal and Animal Waste”, American Chemical Society, 2006

Sludge

Page 13: Integrated Home Energy & Sludge to Fuel

Sludge to Fuel• IP Opportunities in Catalytic Gasification

– Catalyst Cleaning/Regeneration: Doug Elliot listed this as the primary downside of the process. Research would focus on cleaning methods and alternative disposable) catalyst types

– Efficiency Improvement: Continued research in processing conditions and pretreatment methods to increase CH4 synthesis (minimize CO2)

– Desulphurization: Development of economical means of desulphurizing feed to minimize catalyst damage

– Reactor Component Lifetime: Severe operating conditions accelerate both catalyst and equipment degradation. Research into new materials and methods is warranted.

Page 14: Integrated Home Energy & Sludge to Fuel

Sludge to Fuel• Next Steps

– Conduct phone interviews/plant visits with engineers & scientists working in catalytic gasification

– Plan and cost out pilot facility for catalytic gasification– Investigate potential IP opportunities in anaerobic

digestion and biogas efficiency improvement– Investigate higher efficiency generators and

applicability of non-PEM based fuel cells– Research and quantify sludge availability,

transportation costs, etc in other states & countries– Contact/interview sludge handlers (New England

Organic) for assessment of actual handling costs, regulatory requirements etc

Page 15: Integrated Home Energy & Sludge to Fuel

• Net metering by State– States that offer NEG Reimbursement (up to full amount)

• Massachusetts, Minnesota, Nebraska, New Mexico, North Dakota, Pennsylvania, Connecticut, Colorado, New Jersey, New York, Ohio, Wyoming, Washington, Illinois

– States that offer Net Metering for Biomass, CHP & MSW• Maine, Massachusetts, Minnesota, Nebraska, New Mexico, North Dakota,

Oklahoma, Pennsylvania, Wisconsin

– States that offer Net Metering for Biomass & CHP• District of Columbia, Vermont

– States that offer Net Metering for Biomass & MSW• Connecticut, Iowa, Michigan, Texas, Virginia

– States that offer Net Metering for Biomass• Colorado, Delaware, Hawaii, Idaho, Louisiana, Maryland, Nevada, New

Jersey, New York, North Carolina, Ohio Oregon, South Carolina, West Virginia, Wyoming

• 6 States offer net metering and grid buyback for IHES product. 5 more probable.

Integrated Home Energy

Page 16: Integrated Home Energy & Sludge to Fuel

• Net metering by State

Integrated Home Energy

Page 17: Integrated Home Energy & Sludge to Fuel

• Net metering interview with Rex Bradford– Installed Solar Panels in Ipswitch, Ma– Had issues with LOCAL utility who can claim exemption from state

law. Ultimate got local laws changed to allow for net metering.– Solar covers half of electricity on annual basis– Installed cost, $26,000 less $2,000 in incentives

• Grid connection for net metering and buyback is codified by states and implemented by utilities, who are disincentivized to facilitate distributed generation

• Massachusetts - National Grid Website - 220 CMR 11.04c) Net Metering. A Customer of a Distribution Company with an on-site Generation Facility of 60 kilowatts or less in

size has the option to run the meter backward and may choose to receive a credit from the Distribution Company equal to the average monthly market price of generation per kilowatthour, as determined by the Department, in any month during which there was a positive net difference between kilowatthours generated and consumed. Such credit shall appear on the following month's bill. Distribution Companies shall be prohibited from imposing special fees on net metering Customers, such as backup charges and demand charges, or additional controls, or liability insurance, as long as the Generation Facility meets the Interconnection Standards and all relevant safety and power quality standards.

Integrated Home Energy

Page 18: Integrated Home Energy & Sludge to Fuel

Integrated Home Energy • Incentives are available for biomass alternative energy

projects to offset installation costs for homeowner

– Federal Incentives (available for Biomass)• Tax Credit: 30% up to $1500• Various loan programs

– State Incentives (available for Biomass)• Massachusetts

– 100% Tax Deduction. – Grant money available from Renewable Energy Trust Fund and LORI.

• New York– Property Tax Exemption. – Grant money available from NYSERDA (Micro CHP)

• Connecticut– Property Tax Exemption. – Grant money available from Connecticut Clean Energy Fund

Page 19: Integrated Home Energy & Sludge to Fuel

• IHES Model– Conversion efficiencies, electricity/NG prices and usage conditions

interact counter intuitively at times to effect economics of IHES– Spreadsheet model built to evaluate economics of microCHP,

wood gas generators and IHES– Includes state by state electricity and NG prices (www.eia.gov)– Includes state by state net metering policies and utility

reimbursement for states offering it (www.newenergychoices.org)– Total energy usage determined by home size. Distribution

between NG and Electricity determined by location

• Note: Used commercial price for NG calcs in previous IHES analysis discussion. This made residential stand alone Micro CHP seem more viable than it actually is.

Integrated Home Energy

Page 20: Integrated Home Energy & Sludge to Fuel

• Competitive Products– Standalone Micro CHP (Freewatt, Marathon Engine)

• Installation costs range from $14K to $35K with 30 year payback under best case conditions.

• Long or no payback in many states due to high NG prices and low efficiency.

• Requires efficiencies of 40% for reasonable payback

– Standalone Woodgas Generator (ECO -5, 5kW )• Wood pellets. System Cost - $9,495• Sufficient for backup and supplemental power but not for

prime power (reliability, fuel handling)• Not CHP. Overall Electrical Efficiency ~ 10%• Long payback though not as long as Micro CHP.

Integrated Home Energy

Page 21: Integrated Home Energy & Sludge to Fuel

In Door NG In Door NG Micro CHP UnitMicro CHP Unit

OutdoorOutdoorGasifierGasifier

- Under 3 yr payback w/out net metering in LF mode

- Faster payback with grid buyback on systems over 10 kW (very high wood requirement)

- NG can be used to fire gasifier and or dry feed

- User controls renewables use- Wood chips ($0.05/kg) or wood

pellets ($0.06/kg)- Pellets available by the ton at

Home Depot

• Integrated Home Energy System– 5/25 kW Grid Parallel/Grid Backup System, $5,000– Fuel: NG/LPG and Renewables– Benefits….

Integrated Home Energy

Page 22: Integrated Home Energy & Sludge to Fuel

• Case 1: Heating System replacement/upgrade, 2400 sq ft house, 25%/17% Electrical, 63% Thermal, 80% Renewables, $5,000 Installed Cost

• 10 kW system shows annual revenue in MA however wood demand is excessive – 9 fifty pound bags of pellets /day

• Note: 3% improvement in Syngas Electric Efficiency triples revenue and decreases wood demand by 12%

Integrated Home Energy

5 kW5 kW

10 kW10 kW

Page 23: Integrated Home Energy & Sludge to Fuel

• Analysis:– Heating System for 2400 sq ft house, $5K (no deferred cost)

• Diminishing returns from Max Generation as Renewable fraction increased above 70%.

Integrated Home Energy

Page 24: Integrated Home Energy & Sludge to Fuel

• Analysis:– Heating System for 2400 sq ft house, $5K (no deferred cost)

• Improved Syngas Electrical Efficiency results in heat deficit (NG must be purchased from utility)

Integrated Home Energy

Page 25: Integrated Home Energy & Sludge to Fuel

Summary• Sludge to Electricity via either anaerobic digestion or

catalytic gasification has high profit potential

• Additional research and IP opportunities in catalyst formulations, regeneration techniques and pretreatments

• IHES System can payback in two to three years in some states and generate revenue after that through grid buy back

• Larger systems are required and wood requirements are excessive due to low efficiency

• Small improvement in Syngas Electrical Efficiency mitigates problem and increases revenue

Page 26: Integrated Home Energy & Sludge to Fuel

Backup Slides

Page 27: Integrated Home Energy & Sludge to Fuel

Integrated Home Energy• Development Plan

– Proof of Concept (6 months). Assemble prototype from retrofit commercial NG generator, gasifier and CHP• Downselect and purchase gasifier, gas generator, chipper, etc

• Research/validate wood gasification (mc, wood type, etc).

• Assemble/test and develop heat rejection, gas cleaning

• Research/development/test CHP functionality

– Cost Estimates• Hardware: 2 gasifiers, 2 NG generators (~ $20 to 305K)

– Misc tools/test equipment ($1 to $3K)– One Computer - ($1K)– Additional Hardware for BOP ($3 to 5K)

• Contract Services: $20/$25K• Salaries: 2 x $90K * 0.5 = $90K• Rental: $1 to $1.5K /per month = $6 to $9K• Total: ~ $150,000

Page 28: Integrated Home Energy & Sludge to Fuel

Integrated Home Energy• Development Plan

– Prototype Demonstration (6 months). Integrate advanced gasification, generator and CHP loop into homogeneous unit• Validate CHP functionality/software & controls• Develop detail drawings, design system layout & enclosure• Assemble and test prototypes

– Cost Estimate• Hardware:

– Custom designed gasifier & system components ($100 to $150K)– NG Generator ($3K)– Shift reactor, software & controls ($15K)

• Contract Services: $20/25K• Software: Solid Works ($10K)• Salaries: 2 x $90K * 0.5 = $90K• Rental: $1 to $1.5K /per month = $6 to $9K• Total: ~ $250/300K

Page 29: Integrated Home Energy & Sludge to Fuel

Integrated Home Energy • Lessons learned from model analysis…

– Under two year payback possible with high renewables usage but wood requirement excessive

– Small improvement in syngas electrical efficiency result in large payback improvements (research area)

– MSW does not impact payback appreciably (later add-on)– Straight NG Micro CHP does not really pay for itself even at low

cost. Efficiency too low/NG cost too high– Improving electrical efficiency on syngas is good to a point in LF

mode (NY/Ma)• More electricity means less heat and more NG that must be purchased

from grid.• Always good in MG mode. More efficiency means more money and

your making excess heat anyway

– Renewables are cheap but overall electrical efficiency is about 10%. Still a very good deal.

Page 30: Integrated Home Energy & Sludge to Fuel

• Standalone Micro CHP Players– Climate Energy “Freewatt” – $14K

• Heat following 1.2kW system using • Honda MCHP generator w/ integrated furnace/boiler• 20% electric, 85% overall• System produces about 50% of electricity needs• Not grid independent.• Annual savings - ~$1K

– Marathon Engine Systems – up to $35K• Electric load following 2 to 4.7kW, supplemental heat required• Up to 27% electric, 92% overall• 2000 systems in Europe• Can be Grid Independent• Uses heat from generator

Integrated Home Energy

Page 31: Integrated Home Energy & Sludge to Fuel

• Climate Energy “Freewatt” – $14K

At $2500 At $2500 installed installed

cost, cost, payback is payback is still 6 yrsstill 6 yrs

Integrated Home Energy

Page 32: Integrated Home Energy & Sludge to Fuel

• Marathon Engine Systems – ~$35K

Payback WORSE with Payback WORSE with Maximum Electricity Maximum Electricity

Generation – Need %40 Generation – Need %40 Efficiency for grid buybackEfficiency for grid buyback

Integrated Home Energy

Page 33: Integrated Home Energy & Sludge to Fuel

• ECO -5, 5kW Wood Pellet gasifier/generator - $9,495

Max Gen w/ Grid Max Gen w/ Grid Reimbursement Reimbursement up to four fold up to four fold improvmentimprovment

Integrated Home Energy

Page 34: Integrated Home Energy & Sludge to Fuel

Sludge to Fuel• Sludge Analysis Source data

– FT Synthesis• Capital Costs Data

– http://www.syntroleum.com/Presentations/SyntroleumMerrimanConferenceSeptember2008FINAL.pdf

– Capital cost of $50M for a 9,000 kg/d plant

• Production Cost Data– Processing costs back calculated from Choren data, overall efficiency of 60%,

given input biomass and output diesel fuel, adjusted for water removal in sludge at 1.6 MJ/kg. All input energy assumed from NG.

– Maint & OP Costs – estimated from Biopetrol data (low) and includes tarsnportation cost estimate

– Anerobic Digestion• All data from the document ‘Anerobic Digestion’ published, 2007 by

www.residua.com. Contains, economic and processing data/costs

– Catalytic Gasification• All data from the paper “Catalytic Wet Gasification of Municipal and Sewage

Sludge”, American Chemical Society, 12/2006• Capital cost estimate from Elliot compilation paper

Page 35: Integrated Home Energy & Sludge to Fuel

IHES Model

• Model assumptions– All electricity and heat not provided by IHES purchased from grid – Unit has separate peak heater so heat demands always met.– No recovered heat from gasifier – MSW = 4.6 lbs/person/day (EPA Website) – All heating is NG. For heat following mode fraction renewable is on

thermal – For maximum gen/electric load following mode fraction renewable

is on electricity – Electricity measured at meter - no efficiency loss. – Use average heating unit efficiency of 83% to calculate actual

energy needs from purchased NG.

Page 36: Integrated Home Energy & Sludge to Fuel

Energy Demographics• Warmer states use more electrical energy, colder states

use more thermal energy

• Total Energy use somewhat correlated to region

• Total Energy use highly correlated to house size

• Number of occupants less correlated to house size

• Ideal State: Low Average Electrical Demand with NEG Reimbursement

Page 37: Integrated Home Energy & Sludge to Fuel

State of NG & LPG• NG Demand

Page 38: Integrated Home Energy & Sludge to Fuel

State of NG & LPG• Available Reserves

Page 39: Integrated Home Energy & Sludge to Fuel

State of NG & LPG• Grants

Page 40: Integrated Home Energy & Sludge to Fuel

State of NG & LPG• Microturbines

– DOE has program for microturbine development (> 100kW)• http://www.eere.energy.gov/de/microturbines/

– Program Goals:• High efficiency — Fuel-to-electricity conversion efficiency of at least 40% • Environment — NOx <7 ppm (natural gas) • Durability — 11,000 hours of reliable operations between major overhauls and a

service life of at least 45,000 hours • Cost of power — System costs <$500/kW, costs of electricity that are competitive with

alternatives (including grid) for market applications • Fuel flexibility — Options for using multiple fuels including diesel, ethanol, landfill gas,

and biofuels.

– Program Partners• Capstone (PDF 61 KB) • GE (PDF 57 KB) • Ingersoll-Rand (PDF 82 KB) • Solar Turbines (PDF 52 KB) • UTC (PDF 71 KB).

Page 41: Integrated Home Energy & Sludge to Fuel

Conclusions

Page 42: Integrated Home Energy & Sludge to Fuel

• Case 1: Same conditions, except….

Integrated Home Energy

5 kW

10 kW

15 kW

5 kW

10 kW

15 kW