integrated green infrastructure...integrated green infrastructure landscape urbanism design strategy...

45
INTEGRATED GREEN INFRASTRUCTURE

Upload: others

Post on 09-Jun-2020

37 views

Category:

Documents


4 download

TRANSCRIPT

INTEGRATED GREEN INFRASTRUCTURE

Landscape Urbanism Design Strategy

INTEGRATED GREEN INFRASTRUCTURE

Landscape Urbanism Design Strategy

WHY?

Landscape Urbanism Design Strategy

THE WORLD IS MADE UP OF

INTERCONNECTED SYSTEMS

Landscape Urbanism Design Strategy

Landscape Urbanism Design StrategyRO

ADS

/ TRA

NSPO

RT

HABI

TAT

NETW

ORK

S

ACCE

SS N

ETW

ORK

S

BUILT

DEV

ELO

PMEN

T

WAT

ER M

ANAG

EMEN

T

GRE

EN /

OPE

N SP

ACE

Landscape Urbanism Design StrategyRO

ADS

/ TRA

NSP

ORT

HABI

TAT

NETW

ORK

S

ACCE

SS N

ETW

ORK

S

BUIL

T D

EVEL

OPM

ENT

WAT

ER M

ANAG

EMEN

T

GRE

EN /

OPE

N SP

ACE

Existing Woodland

Proposed woodland creation

proposed meadow creation

proposed / consolodated developed public open space

existing green belt

Dams to Darnley Country Park

Integrated Green Infrastructure Strategy

Access Networks

barriers to movement: crossing points

subdivision of urban area

Stewardship over Time

undefined amenity space landscape management plan

neutral grassland fen marsh swamp

Habitat NetworksWater Management

hydrology - flooding hydrology - catchments & former John’s Burn

existing green network: south-west Glasgow

Green and Open Spaces

Landscape Urbanism Design Strategy

INTEGRATED GREEN INFRASTRUCTURE

Landscape Urbanism Design Strategy

POLICY

DELIVERY

INTEGRATED GREEN INFRASTRUCTURE

Landscape Urbanism Design Strategy

STRATEGYNITSHILL / SW GLASGOW IGIGREATER EASTERHOUSE IGI

MASTERPLAN / DELIVERYFORESTERHILL HEALTH CAMPUS IGI

HALFWAY PARK IGIGLASGOW 2014 MGP: BARROWFIELD PARK

INTEGRATED GREEN INFRASTRUCTURE

Landscape Urbanism Design Strategy

STRATEGYNITSHILL / SW GLASGOW IGIGREATER EASTERHOUSE IGI

MASTERPLAN / DELIVERYFORESTERHILL HEALTH CAMPUS IGI

HALFWAY PARK IGIGLASGOW 2014 MGP: BARROWFIELD PARK

Existing Woodland

Proposed woodland creation

proposed meadow creation

proposed / consolodated developed public open space

existing green belt

Dams to Darnley Country Park

Integrated Green Infrastructure Strategy

Access Networks

barriers to movement: crossing points

subdivision of urban area

Stewardship over Time

undefined amenity space landscape management plan

neutral grassland fen marsh swamp

Habitat NetworksWater Management

hydrology - flooding hydrology - catchments & former John’s Burn

existing green network: south-west Glasgow

Green and Open Spaces

Landscape Urbanism Design Strategy

SOUTH-WEST GLASGOW / NITSHILL IGI

client: Glasgow & Clyde Valley Green Network Partnership / GCC

team: ERZ & Enviro-centre (ecology / hydrology)

Landscape Urbanism Design Strategy

HYDROLOGY: CATCHMENTS

Levern WaterBrock Burn

White Cart Water

River Clyde

Landscape Urbanism Design Strategy

HYDROLOGY: FLOODING

200 year pluvial flood

30 year pluvial flood

1984 flood event

Landscape Urbanism Design Strategy

URBAN STRUCTURE: BARRIERS

Landscape Urbanism Design Strategy

URBAN STRUCTURE: BARRIERS

Landscape Urbanism Design Strategy

URBAN STRUCTURE: DESTINATIONS800m = 10 min walk

400m = 5 min walk

Landscape Urbanism Design Strategy

URBAN STRUCTURE: DENSITY

Landscape Urbanism Design Strategy

WIDER GREEN NETWORK: GAPS

Pollok Country Park

Dams to Darnley Country Park Rouken Glen Park

Landscape Urbanism Design Strategy

STRATEGY: GREEN NETWORK

green network that functions on both a local and citywide level

centre of Nitshill becomes a hub of the green network & a key point of arrival to Dams to Darnley Country Park and wider network

make the green network accessible & visible & redefine the character / identity of the area

Landscape Urbanism Design Strategy

STRATEGY: WATER

Peat Road corridor redesigned to manage surface water thro’ SUDs features such as: swales, linear wetland, tree planting etc.

SUDs features associated with adjacent residential development site incorporated into linear park

SUDs feature created as terminus to boulevard on cleared site: addressing water management requirements of surrounding development sites

linear swale/wetland SUDs features incorporated into design of green link: management of surface water in upper portion of catchment (south of rail line)

Landscape Urbanism Design Strategy

STRATEGY: OVERVIEW

Landscape Urbanism Design Strategy

DETAIL AREAS:

Landscape Urbanism Design Strategy

GREATER EASTERHOUSE IGI

client: Glasgow City Council / GCVGNPteam: ERZ & Enviro-centre (ecology / hydrology)

Landscape Urbanism Design Strategy

HYDROLOGY: CATCHMENTS

Landscape Urbanism Design Strategy

GREEN NETWORK: BREAKS

Glasgow

NCR 75

NCR 75

Strathkelvin Railway Path

Glasgow to

Cumbernauld

1km

Glasgow Coatbridge

0km 24km

Glasgow Coatbridge0km 16km

NCR 75

7 Lochs Cycle LinkCoatbridge

to Kirkintilloch

Gartcosh

Glenboig

Bargeddie

Rutherglen

Bishopbriggs

AirdireBlairtummock

Cranhill

Ruchazie

Landscape Urbanism Design Strategy

WIDER GREEN NETWORK:

Landscape Urbanism Design Strategy

STRATEGY:

Landscape Urbanism Design Strategy

DETAIL AREAS:

INTEGRATED GREEN INFRASTRUCTURE

Landscape Urbanism Design Strategy

STRATEGYNITSHILL / SW GLASGOW IGIGREATER EASTERHOUSE IGI

IN AREAS OF ANTICIPATED CHANGE

PLANNING / DESIGN GUIDANCE

CREATES COMMON PLATFORM OF UNDERSTANDING FOR ALL PARTIES

NEED TO EMBED IN STATUTORY PROCESSES

INTEGRATED GREEN INFRASTRUCTURE

Landscape Urbanism Design Strategy

MASTERPLAN / DELIVERYFORESTERHILL HEALTH CAMPUS IGI

HALFWAY PARK IGIGLASGOW 2014 MGP: BARROWFIELD PARK

Landscape Urbanism Design Strategy

FORESTERHILL CAMPUS

client: NHS Grampian / Green Exercise Partnershipteam: ERZ & Enviro-centre (ecology / hydrology)

Landscape Urbanism Design Strategy

FORESTERHILL: 1944

Landscape Urbanism Design Strategy

EXISTING: ROADS / PARKING

Landscape Urbanism Design Strategy

FORESTERHILL GI MASTER PLAN

Landscape Urbanism Design Strategy

FORESTERHILL CAMPUS

Landscape Urbanism Design Strategy

FORESTERHILL CAMPUS

Landscape Urbanism Design Strategy

HALFWAY PARK

client: Southside Housing Association

erz

Limite

d 21

Jam

es M

orris

on S

treet

Glas

gow

G1

5PE

T/F:

014

1 55

2 08

88

E: in

fo@

erzs

tudi

o.co

.uk

W: w

ww

.erz

stud

io.c

o.uk

Project Title:

Drawing Title:

Client:

Notes:

Scale:

Drawing Number:

Revision Number:

Moss Heights 'Halfway Park'

Date:

erz/13/13/

13.07.2015

Planning

Southside Housing Association

All dimensions are to be verified on site. Do not scale from this drawing. The contractor is to bring to the attention of the Landscape Architect any discrepancies contained in this drawing prior to work commencing.

Site Section 2

NTS

P 09

Landscape Urbanism Design Strategy

HALFWAY PARK

Landscape Urbanism Design Strategy

MGP 2014: CAMLACHIE

client: West of Scotland Housing Association / Glasgow City Council / CSGN

Landscape Urbanism Design Strategy

MGP 2014: CAMLACHIE

Landscape Urbanism Design Strategy

MGP 2014: CAMLACHIE

Landscape Urbanism Design Strategy

MGP 2014: CAMLACHIE

Landscape Urbanism Design Strategy

MGP 2014: CAMLACHIE

INTEGRATED GREEN INFRASTRUCTURE

Landscape Urbanism Design Strategy

MASTERPLAN / DELIVERYFORESTERHILL HEALTH CAMPUS IGI

HALFWAY PARK IGIGLASGOW 2014 MGP: BARROWFIELD PARK

PROBLEM SOLVING INTERVENTIONS

DRIVEN BY NEED FOR CHANGE

SEEK BETTER BALANCE OF ‘SYSTEMS’ IN BUILT ENVIRONMENT

Landscape Urbanism Design StrategyRO

ADS

/ TRA

NSPO

RT

HABI

TAT

NETW

ORK

S

ACCE

SS N

ETW

ORK

S

BUILT

DEV

ELO

PMEN

T

WAT

ER M

ANAG

EMEN

T

GRE

EN /

OPE

N SP

ACE