Page 1 of 71
Request For Proposal
Work Contract for the Commissioning of Instrumentation Systems
For
Integrated Assembly & Testing Facility for Satellite Thrusters (IATF-ST)
ISRO / LPSC
Valiamala, Thiruvananthapuram
Annexure - A
![Page 2: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/2.jpg)
Page 2 of 71
--------------------------------------------------------------------------------------------------------
RFP OF INSTRUMENTATION WORK CONTRACT REVIEW COMMITTEE FOR
INTEGRATED ASSEMBLY & TESTING FACILITY FOR SPACECRAFT THUSTERS
(IATF-ST)
![Page 3: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/3.jpg)
Page 3 of 71
Index
Sl. No. Topic Page no.
I. Introduction 4
Scope of the Contract 4
II. Scope of the Work 6
Details of Instrumentation Work 6
Figures and Wiring Diagrams 38
III. Materials which are under the scope of supply
of the Party
46
List of Items to be supplied by the Party 46
Detailed Specifications of items to be supplied by the
party 49
IV. Materials which are under the scope of supply
of LPSC
58
V. Terms & Conditions 60
VI. Instructions to the Bidder / Party 61
VII. Format for Techno Commercial Compliance
Matrix (Part 1 of 2)
62
VIII. Format for Price / Cost Quotation (Part 2 of 2) 65
Cost format of Instrumentation Work to be done by
the party 65
Price format of Materials to be supplied by the party 68
IX. Conclusion 71
![Page 4: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/4.jpg)
Page 4 of 71
Installation & Commissioning of Instrumentation Systems for
Hot Test Facilities
I. Introduction
The Integrated Assembly & Test Facilities for Spacecraft Thrusters (IATF-ST) is a new
facility complex coming up along with the existing Low Thrust Engine Test Facility (LTET-V) at
LPSC Valiamala, where various activities related to the mass production of Satellite Control
Thrusters are planned. As part of the realization of Control Thrusters, each Thruster has to
undergo different types of Hot Tests by simulating Sea Level Condition and High Altitude
Condition. To conduct these Hot Tests, 4 nos. of High Altitude Test Facilities (HAT) and a Sea
Level Facility are planned in this Test Facility Complex. The layout of IATF-ST & LTET-V
facilities are given in Fig-1.
The 4 nos. of Vacuum chambers are located in HAT building of IATF-ST and the
building size is 25 m x 16 m. The Thruster under test will be mounted inside the Vacuum
Chamber and necessary mechanical system for propulsion and measurement / control
system will be connected to it. The High Altitude condition is simulated in the Vacuum
Chamber by the Vacuum pumping system. Apart from this, the Sea Level Test Bay is located
about 90 m away from the HAT building. The Instrumentation Systems for Sea Level Facility
and HAT facilities are similar.
A Signal Conditioner Room is situated along with the above HAT building where
Instrumentation activities like measurement of test parameters (Flow, Pressure and
Temperature etc.) and its Data Acquisition & Control are planned.
The Control Room from where the remote operations of these Hot Test Facilities are
planned is situated along with the existing LTET-V Control & Data Acquisition building. The
cable distance between the Signal Conditioning Room and Control Room is about 130 m.
It is also planned to renovate the Instrumentation system of existing Low Thrust
Engine Test Facility (LTET-V) along with this contract. LTET-V consists of a HAT facility and a
![Page 5: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/5.jpg)
Page 5 of 71
Sea Level facility. Altogether the party has to carry out Installation & Commissioning of the
Instrumentation systems for 7 hot test facilities.
Scope of the Contract:
a. Installation & Wiring of the Instrumentation Systems
Details of installation & wiring work to be done by the party and corresponding
figures & wiring diagrams are given in the topic II (Scope of the Work). Party has to carry out
the wiring of Instrumentation Racks (ie. Measurement Racks, Command Racks, Data
Acquisition Systems Racks & Safety Systems Rack) & Command Consoles. Cable Tray laying,
Laying of Multi Core Instrumentation cables, Installation of Racks, Command Consoles, Field
Junction Boxes etc. are also to be done by the party. Necessary drawings and wiring diagrams
required for the execution of the work will be provided by LPSC at the time of work. Party
has to quote unit rate for each work. The party has to submit the prices as per the formats
given in topic VI (Price / Cost Format)
b. Supply of Materials for Installation:
Refer topic III (Materials which are under the scope of supply of the Party) for the
list of items and its specification to be supplied by the party. Party has to supply the items as
per the detailed specification given. Party has to quote unit rate for each item and the party
has to submit the prices as per the formats given in topic VI (Price / Cost Format)
c. Evaluation, Checking & Commissioning Activities:
Party has to carry out necessary functional checks like continuity and integrity check
of end to end wiring, voltage simulation tests, calibration of electrical measurement and
command channels etc. as part of the commissioning of the entire system. Party has to
generate and submit the necessary test report of the above tests, for each channel to LPSC.
The detailed wiring diagrams and guidance for the wiring of each Rack & Console will be
given to the party during the contract execution time.
Materials under the scope of supply of LPSC is given in topic IV (Materials which are
under the scope of supply of LPSC)
Expected completion of work shall be 6 months from the date of commencement of
work.
![Page 6: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/6.jpg)
Page 6 of 71
II. Scope of the Work
Details of Instrumentation Work to be carried out are given below. The party has to do the
test & evaluation of the Instrumentation system for Measurement & Command and submit
the test & evaluation report to LPSC.
1. Details of Instrumentation Work
Sl.
No.
Description of the item Qty for 7
facilities
Nature of work
A. Installation & Wiring of Measurement Racks
1.0 Installation of Equipments in the
Measurement Racks:
Rack Size: 42U x 600 mm x 800 mm.
Following items (Sl. no. 1.1 to 1.7) are
to be mounted in a single rack. (Refer
Fig – 2 & 4)
(Scope of supply – LPSC)
7 nos. Install the Rack at Signal
Conditioner Room.
1.1 P+F make, Smart Transmitter Power
Supplies, 3U size
Weight: 250 gm (approx.)
(Scope of supply – LPSC)
112 nos. Mount the item in DIN rail and fix
it in the rack
1.2 MCIH make Temperature Signal
Conditioners, 1U size
Weight: 300 gm (approx.)
(Scope of supply – LPSC)
112 nos. Mount the item in DIN rail and fix
it in the rack
![Page 7: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/7.jpg)
Page 7 of 71
1.3 MCIH make dAMP25X Signal
Conditioners
Size: 100mm(L) X 75mm(B) X 110mm
(H).
Weight: 400 gm (approx.)
(Scope of supply – LPSC)
56 nos. Mount the item in DIN rail and fix
it in the rack
1.4 Rosemount make Mass Flow
Transmitters, 6U size.
Weight: 5 kg (approx.)
(Scope of supply – LPSC)
16 nos.
Mount the item on the
Aluminum fixture and fix it in the
rack
1.5 Fixed Linear Power Supply 28 V DC,
Dual type. Size: 19”, 3U.
Weight: 6 kg (approx.)
(Scope of supply – LPSC)
14 nos. Mount the item on the “L” angle
and aluminum support and fix it
in the rack
1.6 Connector plate size: 500 mm x 400
mm (W x H)
(Material: 4 mm thick, Aluminum
plate)
(Scope of supply – Party)
No. of cutout for Circular Connectors
to be made in the plate
a) 40 mm dia. (approx.) *
b) 25 mm dia. (approx.) *
7 nos.
56 nos.
84 nos.
Fix the connector plate at the
bottom part of the rack.
*Exact cut out size will be
given during the time of
execution of work
1.7 ELMEX make CSTM 2.5 sq.mm,
Terminal Blocks, C Channels and
mounting accessories.
(Scope of supply – Party)
4200 nos. Mount the terminal block on the
ELMEX make “C“Channels.
Channel length: 1.5 m
No. of mounting channels per
rack – 4 nos. Channels are to be
mounted in the rack.
![Page 8: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/8.jpg)
Page 8 of 71
2.0 Wiring of Measurement Racks:
No: of terminations:
(Refer Fig-4)
4200 nos.
a) Carry out the wiring as per the drawing given by LPSC. b) Both ends of the wire are
to be crimped (using flat legs, pin legs, “U” legs, ring legs etc) &
terminated.
c) Necessary identification ferrules/ marks to be provided. d) Wires are to be neatly
harnessed and are to be routed through cable ducts e) Ensure the integrity of the
wiring by conducting continuity check and functional check
2.1 Wiring between mounted
equipments and Terminal Blocks
2.1.1 Wiring from P+F make Smart
Transmitter Power Supply to
Terminal Blocks
2.1.2 Wiring from MCIH make Temperature
Signal Conditioners to Terminal
Blocks
2.1.3 Wiring from MCIH make dAMP25X
Signal Conditioners to Terminal
Blocks
2.1.4 Wiring from Rosemount make Mass
Flow Transmitters to Terminal Blocks
2.1.5 Wiring from Fixed Power Supplies to
Terminal Blocks
2.2 Wiring between Terminal Blocks and
Circular Connectors
- a) Carry out the wiring as
per the drawing given by LPSC
b) Wire termination at
terminal block end to be crimped
using crimping legs and
connector side to be soldered.
Necessary sleeves and labelling
are to be provided.
c) Necessary identification
ferrules/ mark to be provided.
d) Wires are to be neatly
harnessed and are to be routed
through cable ducts.
2.2.1 1. From Terminal blocks to 35 pin
connector (for P+F make Smart
Transmitter Power Supply)
2. Circular connector soldering (male
& female)
No. of 35
pin
connectors:
7 nos. (male
& female)
2.2.2 1. From Terminal blocks to 37 pin
connectors (for P+F make Smart
Transmitter Signal Conditioner – O/P-
1 & 2)
No. of 37
pin
connectors:
14 nos.
(male &
female)
![Page 9: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/9.jpg)
Page 9 of 71
2. Circular connector soldering (male
& female)
e) Connect 230V AC power
connection to equipments.
f) Ensure Instrumentation
earth connection to the rack
g) Connect shield/screen
connection wherever needed
and ensure its resistance to
Instrumentation earth is less
than 1Ω
h) Ensure the integrity of the
wiring by conducting continuity
check and functional check.
i) After the completion of above
work, inject known voltage at
the field terminal & measure /
acquire the data at signal
conditioning room and present
the report to LPSC for each
channel.
2.2.3 1. From Terminal blocks to 37 pin
connectors (for MCIH make
Temperature Signal Conditioner O/P-
1 & 2)
2. Circular connector soldering (male
& female)
No. of 37
pin
connectors:
14 nos.
(male &
female)
2.2.4 1. From Terminal blocks to 37 pin
connectors (for MCIH make dAMP25X
Signal Conditioner O/P-1 & 2)
2. Circular connector soldering (male
& female)
No. of 37
pin
connectors:
14 nos.
(male &
female)
2.2.5 1. From Terminal blocks to 7 pin
connectors (MCIH make dAMP25X
Signal Conditioner I/P)
2. Circular connector soldering (male
& female)
No. of 7 pin
connectors:
56 nos.
(male &
female)
2.2.6 1. From Terminals Block to 7 pin
connectors (Rosemount make, Mass
Flow Transmitters O/P)
2. Circular connector soldering (male
& female)
No. of 7 pin
connectors:
14 nos.
(male &
female)
B. Installation & Wiring of Command Racks
1.0 Installation of Equipments in the
Command Racks:
Rack Size: 42U x 600 mm x 800 mm.
Following items (sl. no. 1.1 to 1.7) are
to be mounted in a single rack. (Refer
Fig-3 and 4)
(Scope of supply – LPSC)
7 nos. Install the Rack at Signal
conditioner Room
![Page 10: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/10.jpg)
Page 10 of 71
1.1
OEN make 51 R Series Relays
(Scope of supply – LPSC)
392 nos. Mount the item on DIN rail and
fix the rail in the rack
1.2 Push Button (EAO make) switches 8 nos. Mount the item on 2U size face
plate. Cut out size 21 x 15 mm
1.3 Fix the linear Power Supply, 28 V DC,
Dual type. Size: 19”, 3U
Weight: 6 kg (approx.)
(Scope of supply – LPSC)
7 nos. Mount the item in the rack using
“L” angle and Aluminum support
plate
1.4 Fix the linear Power Supply, 12 V DC,
Dual type,19”, 3U size, weight: 2 kg
(approx.)
(Scope of supply – LPSC)
7 nos. Mount the item in the rack using
“L” angle and Aluminum support
plate
1.5 Programmable Power Supply (0-120
V DC). Size: 19”, 1U
Weight: 2 kg (approx.)
(Scope of supply – LPSC)
7 nos. Mount the item in the rack using
“L” angle and Aluminum support
plate
1.6 Connector plate Size: 500 mm x 400
mm (W x H)
(Material: 4 mm thick, Aluminum
plate)
(Scope of supply – Party)
Cutout for Circular Connectors to be
made in the plate
a) 40 mm (approx.) dia. *
b) 25 mm (approx.) dia. *
7 nos.
84 nos.
42 nos.
Fix the connector plate at the
bottom part of rack.
*Exact cut out size will be given
during the time of execution of
work
1.7 ELMEX make CSTM 2.5 sq.mm,
Terminal Blocks, C Channels and
mounting accessories.
5600 nos. Mount the item on the ELMEX
make “C“Channels. Channel
length: 1.5m
![Page 11: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/11.jpg)
Page 11 of 71
(Scope of supply – Party) No. of mounting channels per
rack – 4 nos. Channels are to be
mounted in the rack.
2.0 Wiring of Command Racks:
No. of terminations
(Refer Fig. 4)
5600 nos.
(a) Carry out the wiring as per the drawing given by LPSC
(b) Both ends of the wire are to be crimped (using flat leg, pin leg, “U” leg or ring leg) & terminated.
(c) Necessary identification ferrules/ mark to be provided.
(d) Wires are to be neatly harnessed and are to be routed through cable ducts
(e) Ensure the integrity of the wiring by conducting continuity check and functional check
2.1 Wire connection between mounted
equipments and terminal Blocks
2.1.1 From Relays to Terminal Blocks
2.1.2 Push Button Switches to Terminal
Blocks
2.1.3 From fixed Power Supply 28 V DC,
Dual type to Terminal Blocks
2.1.4 From fixed Power Supply 12 V DC,
Dual type to Terminal Blocks
2.1.5 From Programmable power supply (0-
12 VDC) to Terminal Blocks
2.2 Wiring between Terminal Blocks and
Circular connectors
-
2.2.1 1. From Terminal block to 35 pin
connector (Relay O/P to E/P Valve at
Test bay
2. Circular connector soldering (male
& female)
No. of 35
pin
connectors:
28 nos.
(male &
female)
a) Carry out the wiring as
per the drawing given by LPSC.
b) Wire termination at
Terminal block end to be
crimped using crimping legs and
connector side to be soldered.
Necessary sleeves and labelling
are to be provided.
c) Necessary identification
ferrules/ mark to be provided.
2.2.2 1. From Terminal block to 37 pin
connector (Relay I/P from Control
Room)
2. Circular connector soldering (male
& female)
No. of 37
pin
connectors:
28 nos.
(male &
female)
![Page 12: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/12.jpg)
Page 12 of 71
2.2.3 1. From Terminal block to 26 pin
connector
1. Status from Relay to DAS
2. Latch valve commands to
Vacuum Chamber
2. Circular connector soldering (male
& female)
No. of 26
pin
connectors:
14 nos.
(male &
female)
d) Wires are to be neatly
harnessed and are to be routed
through cable ducts.
e) Connect 230V AC power
connection to equipments.
f) Ensure Instrumentation
earth connection to the rack.
g) Ensure the integrity of
the wiring by conducting
continuity check and functional
check.
h) Connect shield/screen
connection wherever needed
and ensure its resistance to
Instrumentation earth is less
than 1Ω.
C. Installation & Wiring of Data Acquisition Racks
1.0 Installation of Equipments in the
Data Acquisition Racks:
Rack Size: 42U x 600 mm x 800 mm.
Following items (sl. no. 1.1 to 1.7) are
to be mounted in a single rack. (Refer
Fig – 4 & 5)
(Scope of supply – LPSC)
7 nos.
Install the Rack at Signal
conditioner Room
![Page 13: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/13.jpg)
Page 13 of 71
1.1 NI PXIe system, size: 4U,19”
Weight: 6 Kg
(Scope of supply – LPSC)
7 nos. Mount the item in the rack using
“L” angle & Aluminum mounting
frame
1.2 PC Monitor, size: 18.5”
Weight: 2 kg
(Scope of supply – Party)
7 nos. Mount the item in the rack using
“L” angle and Aluminum
mounting frame.
1.3 NI Connector board
(Scope of supply – LPSC)
21 nos. Mount the item in the rack on
sliding drawer (Scope of supply –
LPSC) using Aluminum mounting
frame.
1.4 Driver circuit box for solenoid valves.
Size: 150 mm x 150 mm x 50 mm
(Scope of supply – LPSC)
7 nos. Mount the item in the rack on
sliding drawer (Scope of supply –
LPSC) using Aluminum mounting
frame.
1.5 Programmable Power Supply 0-120 V
DC
(Scope of supply – LPSC)
1 no. Mount the item in the rack using
“L” angle and Aluminum
mounting frame.
1.6 Connector plate Size: 500 mm x 400
mm
(Material: 4 mm thick, Aluminum
plate)
(Scope of supply – Party)
Cutout for Circular Connectors to be
made in the plate
a) 40 mm dia. (approx.) *
b) 25 mm dia. (approx.) *
7 nos.
56 nos.
84 nos.
Fix the connector plate at the
bottom part of rack.
*Exact cut out size will be given
during the time of execution of
work
1.7 ELMEX make CSTM 2.5 sq.mm,
Terminal Blocks, C Channels and
mounting accessories.
2800 nos. Mount the item on the ELMEX
make “C“Channels.
Channel length: 1.5m
![Page 14: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/14.jpg)
Page 14 of 71
(Scope of supply – Party) No. of mounting channels per
rack – 4 nos. Channels are to be
mounted in the rack.
2.0 Wiring of Data Acquisition Racks:
No. of terminations
(Refer Fig. 4)
2800 nos.
a) Carry out the wiring as
per the drawing given by LPSC
b) Wire termination at
Terminal block end to be
crimped using crimping legs and
connector side to be soldered.
Necessary sleeves and labelling
are to be provided.
c) Necessary identification
ferrules/ mark to be provided.
d) Wires are to be neatly
harnessed and are to be routed
through cable ducts
e) Connect 230V AC power
connection to equipments
f) Ensure Instrumentation
earth connection to the rack
g) Connect shield / screen
connection wherever needed
and ensure its resistance to
Instrumentation earth is less
than 1Ω
h) Ensure the integrity of
the wiring by conducting
continuity check and functional
check
2.1 Wiring between mounted
equipments and Terminal Blocks
-
2.1.1 1. From 80 channel NI connector
boards (3 nos.) to Terminal Blocks
No. of NI
connector
boards: 21
nos.
2.1.2 From Driver circuit box to Terminal
blocks
Driver
circuit box:
1 no.
2.1.3 From programmable power supply to
terminal block
2.2 Wiring between Terminal Blocks and
Circular connectors
-
2.2.1 1. From Terminal Blocks to 37 pin
connector (Data from Measurement
Rack)
2. Circular connector soldering (male
& female)
No. of 37
pin
connectors:
21 nos.
2.2.2 1. From Terminal Blocks to 26 pin
connector (Status from relay rack)
2. Circular connector soldering (male
& female)
No. of 26
pin
connectors:
7 nos.
![Page 15: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/15.jpg)
Page 15 of 71
2.2.3 1. From Terminal Blocks to 35 pin
connector (From Driver circuit to
TFCV Command at Vacuum chamber)
2. Circular connector soldering (male
& female)
No. of 35
pin
connectors:
7 nos.
i) After the completion of above
work, inject known voltage at
the field terminal & measure /
acquire the data at signal
conditioning room for each
channel
D. Installation & Wiring of Safety Systems Monitoring Rack
1.0 Installation of Equipments in the
Safety Systems Monitoring Rack (1
no.)
Rack Size: 42U x 600 mm x 800 mm.
Following items (sl. no. 1.1 to 1.8) are
to be mounted in a single rack. (Refer
Fig – 4 & 6)
(Scope of supply – LPSC)
1 no. Install the Rack at Signal
conditioner Room
1.1 LAN switch. Size: 1U, 19”
Weight: 1 kg
(Scope of supply – Party)
1 no. Mount the item in the rack using
“L” angle
1.2 OFC LIU / Patch panel. Size: 1U, 19”
Weight: 1 kg
(Scope of supply – Party)
1 no. Mount the item in the rack using
“L” angle
1.3 Push Button (EAO make) switches for
traffic signal and hooter
(Scope of supply – LPSC)
8 nos. Mount the item on 2U size face
plate. Cut out size 21 x 15 mm
1.4 NI, PXIe system. Size: 4U, 19”
Weight: 6 Kg
(Scope of supply – LPSC)
1 no. Mount the item in the rack using
“L” angle and Aluminum
mounting frame
![Page 16: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/16.jpg)
Page 16 of 71
1.5 PC Monitor. Size: 18.5”
Weight: 1 kg
(Scope of supply – Party)
1 no. Mount the item in the rack using
“L” angle and Aluminum
mounting frame
1.6 NI Connector board
(Scope of supply – LPSC)
4 nos. Mount the item in the rack on
sliding drawer (Scope of supply –
LPSC) using Aluminum mounting
frame.
1.7 Connector plate Size: 500 mm x 400
mm
(Material: 4 mm thick, Aluminum
plate)
(Scope of supply – Party)
Cutout for Circular Connectors to be
made in the plate
a) 40 mm dia. (approx.) *
b) 25 mm dia. (approx.) *
1 no.
12 nos.
6 nos.
Fix the connector plate at the
bottom part of rack.
*Exact cut out size will be given
during the time of execution of
work
1.8 ELMEX make CSTM 2.5 sq.mm,
Terminal Blocks, C Channels and
mounting accessories.
(Scope of supply – Party)
400 nos. Mount the item on the ELMEX
make “C“Channels.
Channel length: 1.5m
No. of mounting channels per
rack – 4 nos. Channels are to be
mounted in the rack.
2.0 Wiring of Safety Systems Monitoring
Rack:
No. of terminations
(Refer Fig. 4)
400 nos.
a) Carry out the wiring as
per the drawing given by LPSC
b) Wire termination at
Terminal block end to be
crimped using crimping legs and
connector side to be soldered.
Necessary sleeves and labelling
are to be provided.
2.1 Wiring between mounted equipments and Terminal Blocks
-
2.1.1 From NI Connector board to the Terminal Blocks
![Page 17: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/17.jpg)
Page 17 of 71
2.1.2 Push Button (EAO make) switches for traffic signal and hooter to terminal blocks
c) Necessary identification
ferrules/ mark to be provided.
d) Wires are to be neatly
harnessed and are to be routed
through cable ducts
e) Connect 230V AC power
connection to equipments
f) Ensure Instrumentation
earth connection to the rack
g) Connect shield / screen
connection wherever needed
and ensure its resistance to
Instrumentation earth is less
than 1Ω
h) Ensure the integrity of
the wiring by conducting
continuity check and functional
check
2.2 Wiring between Terminal Blocks and
Circular connectors
-
2.2.1 1. From Terminal Blocks to 35 pin connector 2. Circular connector soldering (male & female)
No. of 35
pin
connectors:
8 nos. (male
& female)
2.2.2 1. From Terminal Blocks to 7 connectors for traffic signal and hooter 2. Circular connector soldering (male & female)
No. of 7 pin
connectors:
6 nos. (male
& female)
E. Installation & Wiring of Command Consoles
1.0 Installation of Equipments in the
Command Consoles
Size: 600 mm x 1550 mm x 1120 mm.
(Refer Fig. 7)
Following items (sl. no. 1.1 to 1.8) are
to be mounted in the console.
(Scope of supply – LPSC)
Note: 3 nos. of Command Console is
jointly known as a Command Control
Desk (CCD). Total 6 nos. of CCDs are
there.
18 nos.
Install the CCDs at the Control
Room
![Page 18: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/18.jpg)
Page 18 of 71
1.1 EAO make ON / OFF switches
(Mounting cutout size: 15 x 21 mm)
(Scope of supply – LPSC)
144 nos. To be mounted on mosaic panel
(configurable) provided in the
console
1.2 Industrial Computer. Size: 19”, 3U
Weight: 12 Kg (approx.)
(Scope of supply – LPSC)
36 nos. Mount the CPUs in the rear side
of the console on sliding drawer
(Scope of supply – LPSC)
1.3 Standard Computer Keyboard &
Mouse
(Scope of supply – LPSC)
36 set Fix the item in the area, at the
front side of the console
1.4 LAN switch. Size: 1U, 19”
Weight: 1 kg (approx.)
(Scope of supply – Party)
7 nos. Mount the item in the rear side
of the console using “L” angle
1.5 OFC LIU / Patch panel. Size: 1U, 19”
Weight: 1 kg (approx.)
(Scope of supply – Party)
1 no. Mount the item in the rear side
of the console using “L” angle
1.6 Fixed Linear Power Supply 12 V DC,
Dual type. Size: 3U, 19”
Weight: 6 kg (approx.)
(Scope of supply – LPSC)
6 nos. Mount the item in the rear side
of the console using “L” angle &
Aluminum support.
1.7 Connector plate size: 500 mm x 400
mm (Material: 6mm thick, Aluminum
plate)
(Scope of supply – Party)
Cutout for Circular Connectors to
be made in the plate
a) 40 mm dia.
b) 25 mm dia.
6 nos.
48 nos.
72 nos.
Fix the connector plate at the
middle part of the middle
console
![Page 19: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/19.jpg)
Page 19 of 71
1.8 ELMEX make CSTM 2.5 sq.mm,
Terminal Blocks, C Channels and
mounting accessories.
(Scope of supply – Party)
2400 nos. Mount the item on the ELMEX
make “C“Channels. Channel
length: 0.6 m
No. of mounting channels per
CCD – 4 nos.
2.0 Wiring of Command Consoles:
No. of terminations
(Refer Fig. 4)
2400 nos.
a) Carry out wiring as per
the drawing given by LPSC
b) Wire termination at
Terminal block end is to be
crimped using crimping legs and
at EAO make witch side is to be
soldered.
c) Necessary identification
ferrules / mark to be provided.
d) Wires are to be neatly
harnessed and are to be routed
through cable ducts
e) Ensure the integrity of
the wiring by conducting
continuity checks and functional
checks
2.1 Wiring between mounted
equipments and Terminal Blocks
-
2.1.1
From EAO make ON/OFF switches to
Terminal Blocks
-
2.1.2 From Fixed linear Power Supply 12 V
DC to Terminal Blocks
-
2.2 Wiring between Terminal Blocks and
Circular Connectors
- a) Carry out wiring as per
the drawing given by LPSC
b) Wire termination at
Terminal block end is to be
crimped using crimping legs and
at connector side it is to be
soldered. Necessary sleeves and
labelling are to be provided.
c) Necessary identification
ferrules/ mark to be provided.
2.2.1 1. From Terminal Blocks to 37 pin
Circular Connectors
2. Circular connector soldering (male
& female)
No. of 37
pin
connectors:
30 nos.
(male &
female)
![Page 20: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/20.jpg)
Page 20 of 71
2.2.2 1. From Terminal Blocks to 7 pin
Circular Connectors
2. Circular connector soldering (male
& female)
No. of 7 pin
connectors:
10 nos.
(male &
female)
d) Wires are to be neatly
harnessed and are to be routed
through cable ducts
e) Ensure integrity of the
wiring by conducting continuity
check and functional check 2.2.3 1. From Terminal Blocks to 2 pin
Circular Connectors
2. Circular connector soldering (male
& female)
No. of 2 pin
connectors:
2 nos. (male
& female)
F. Laying of GI Cable Trays
1.0 Laying of GI Cable Trays a) Cable Trays are to be
neatly laid and joints are
to be welded. These trays
are to be supported with
25 mm/40 mm “L” angles
and cable trays are to be
fixed with the supporting
angles by using “U”
clamp with washer &
nuts (Material SS). The
supporting angles are to
be welded and grouted.
Work like welding,
chipping, grouting &
painting are to carried
out. Ensure that 50 mm
of the supporting angle is
to be inserted into the
side wall wherever it is
needed. All supporting
angles are to be painted
with metal primer (2
coat) and then paint it
with metal paint of grey
color (2 coat).
b) Necessary wall cut outs
for cable tray entry are to
1.1 Perforated, 200 mm GI cable Tray,
Standard Size: 2500 mm x 200 mm x
2mm (Qty-160 Nos)
(Scope of supply – Party)
400 m
1.2 Perforated, 100 GI mm cable Tray,
Standard Size: 2500 mm x 100mm x
2mm (Qty-80 Nos)
(Scope of supply – Party)
200 m
1.3 Perforated, 50 mm GI cable Tray,
Standard Size: 2500 mm x 50mm x
2mm (Qty-40 Nos)
(Scope of supply – Party)
100 m
![Page 21: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/21.jpg)
Page 21 of 71
be provided. The cut outs
for cable entry are to
neatly plastered with
cement mortar.
c) Cables are to neatly tied
by using cable ties at
every 1 m distance.
200 mm cable Tray:
To be laid between Signal
Conditioner Room and
Control room through
cable trench
To be laid between Signal
Conditioner Room and
HAT bay junction box
through cable trench
To be laid between Signal
Conditioner Room and
Sea Level Test bay
through cable trench
100 mm & 50 mm cable Trays:
To be laid in the Test
Facility Area.
To be laid between traffic
signal post and signal
conditioning room.
G. Laying of 32 Core PTFE Armored Data Cable
1.0 Laying of 32 Core PTFE Armored
Data Cable
(Scope of supply – LPSC)
5000 m
(approx.)
Party has to open up the
concrete slabs on the cable
trench, lay the new cables and
close the trench with existing
concrete slabs.
![Page 22: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/22.jpg)
Page 22 of 71
1.1 32 core PTFE armored cable, over all
dia 25 mm.
Average length: 150 m (approx.)
No of cables
Total length: 150 x 25 = 3750 m
25 nos.
a) Cables are to be neatly
routed on 200 mm cable
tray between: Control
Room & Command Racks
in Signal Conditioner
Room.
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
1.2 32 core PTFE armored cable, over all
dia 25 mm.
Average length: 100 m (approx.)
Total length: 100 x 8 = 800m
No of cables (Total nos. = 8)
8 nos.
Cables are to be neatly routed on
200 mm cable tray between:
a) Command rack at Signal
Conditioner Room & Sea
Level Test Facility
Command Junction Box
(Refer Fig. 8)
No. of cables – 4
b) Data Acquisition Rack at
Signal Conditioner Room
& Sea Level Engine Test
Bed for control voltage
No. of cables – 1
c) Safety Rack in Signal
Conditioner Room & Sea
Level Hazardous
Monitoring Junction Box
No. of cables – 1
![Page 23: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/23.jpg)
Page 23 of 71
d) Measurement rack at
Signal Conditioner Room
& Sea Level
Measurement Junction
Box (Refer Fig. 9)
No. of cables – 2
Wire termination at connector
side is to soldered. Necessary
sleeves and labelling are to be
provided.
1.3 32 core PTFE armored cable, over all
dia 25 mm.
Average length: 400 m (approx.)
No of cables
Total length: 400 x 1 = 400m
1 no.
Cable from propellant storage
yard to safety systems
monitoring rack at signal
conditioning room at IATF-ST to
be laid as specified below.
a) From propellant yard to IATF-
ST control room cable entry
point through underground PVC
cable conduit at a depth of 50
cm. PVC cable conduit size 1.5”
and length 250 m. Cable length is
250 m (approx.). (Refer Fig-1)
b) From IATF-ST control room
cable entry point to signal
conditioning room at IATF-ST
through cable trench. Cable
length is 150 m (approx.).
c) Wire termination at connector
side is to be soldered. Necessary
sleeves and labelling are to be
provided.
![Page 24: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/24.jpg)
Page 24 of 71
1.4 32 core PTFE armored cable, over all
dia 25 mm.
Average length: 60 m (approx.)
No of cables
Total length: 60 x 10 = 600 m
10 nos.
a) Cables are to be neatly
routed on cable trays
provided between LTET-
V Control Room & LTET-V
Blockhouse.
b) Party has to open up the
concrete slabs on the
cable trench, remove the
old cables, lay the new
cables and close the
trench with existing
concrete slabs.
c) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
H. Laying of 32 Core PTFE Data Cable
1.0 Laying of 32 Core PTFE Data Cable
(Scope of supply – LPSC)
5000 m
(approx.)
Cables are to be neatly routed on
cable trays provided between:
Control Room & Signal
Conditioner Room.
Signal Conditioner Room
& Test Facility.
Inside the Test Facility.
![Page 25: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/25.jpg)
Page 25 of 71
1.1 32 core PTFE Data cable.
Over all dia. 16 mm
Average length: 150 m (approx.)
No of cables
Total length : 150 x 10 = 1500 m
10 nos.
Cables are to be neatly routed on
cable tray between:
a) Signal Conditioner Room
& Control Room (2 nos.
each for 5 facilities).
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
1.2 32 core PTFE Data cable. Over all dia.
16 mm
Average Length: 45m (approx.)
No of cables
Total length : 45 x 10 = 450 m
10 nos.
Cables are to be neatly routed on
cable tray between
a) Measurement rack at
Signal Conditioner Room
& HAT Test Facility
Measurement Junction
Box (2 nos. each for 5
facilities) (Refer Fig-9)
b) Wire termination at
connector side is to
soldered. Necessary
sleeves and labelling are
to be provided.
1.3 32 core PTFE Data cable. Over all dia.
16 mm
Average Length: 45m (approx.)
No of cables
Total Length : 45 x 20 =900 m
20 nos.
Cables are to be neatly routed on
cable tray between
a) Command rack at Signal
Conditioner Room & HAT
Test Facility (Command
Junction Box) (Refer Fig.
8). 4 nos. each for 5
facilities.
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
![Page 26: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/26.jpg)
Page 26 of 71
1.4 32 core PTFE Data cable. Over all dia.
16 mm
Average Length: 45m (approx.)
No of cables
Total length: 45 x 8 =360m
8 nos.
a) Lay the cable between
Signal Conditioner room
(1 cable each from
Command rack & Data
Acquisition rack) and
Vacuum Chamber. (2
nos. each for 4 facilities.)
b) Cable into vacuum
chamber is to be laid in
air tight manner (feed
thru) sealed with proper
sealant such as Araldite.
Work has to be carried
out under the
supervision of LPSC
Engineers.
c) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
1.5 32 core PTFE Data cable. Over all dia.
16 mm
Length : 260 m
- a) Interconnection of Racks at
Signal Conditioner Room,
Command Consoles, LTET-V
blockhouse & Control room.
b) Wire termination at connector
side is to be soldered. Necessary
sleeves and labelling are to be
provided.
![Page 27: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/27.jpg)
Page 27 of 71
1.6 32 core PTFE data cable, over all dia
16 mm.
Average length: 45m (approx.)
No of cables
Total length : 45 x 8 = 360 m
8 nos.
a) Cables are to be neatly
routed on cable trays
between Safety Systems
Monitoring Rack in Signal
Conditioner Room & HAT
facility Hazardous
Monitoring Junction Box
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
1.7 32 core PTFE data cable, over all dia
16 mm.
Average length: 50 m (approx.)
No of cables
Total length : 50 x 8 = 400 m
8 nos.
a) Cables are to be neatly
routed on cable trays
provided between LTET-
V Blockhouse &
Command Junction Box
at test facility. (4 nos.
each for 2 facilities)
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
1.8 32 core PTFE data cable, over all dia
16 mm.
Average length: 50 m (approx.)
No of cables
Total length : 50 x 4 = 200 m
4 nos.
a) Cables are to be neatly
routed on cable trays
provided between LTET-
V Blockhouse &
Measurement Junction
Box at sea level test
facility and HAT facility.
(2 nos. of cables each per
facility).
b) Wire termination at
connector side is to
soldered. Necessary
sleeves and labelling are
to be provided.
![Page 28: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/28.jpg)
Page 28 of 71
1.9 32 core PTFE data cable, over all dia
16 mm.
Average length: 60 m (approx.)
No of cables
Total length : 60 x 2 = 120 m
2 nos.
a) Cables are to be neatly
routed on cable trays
provided between LTET-
V control room & LTET-V
blockhouse.
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
1.10 32 core PTFE data cable, over all dia
16 mm.
Average length: 50 m (approx.)
No of cables
Total length : 50 x 4 = 200 m
4 nos.
a) Cables are to be neatly
routed on cable trays
provided between:
LTET-V blockhouse &
Vacuum chamber
LTET-V blockhouse & Sea
Level test bed
2 nos. each for 2 facilities.
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
c) Cable into vacuum
chamber is to be laid in
air tight manner (feed
thru) sealed with proper
sealant such as Araldite.
Work has to be carried
out under the
supervision of LPSC
Engineers.
I. Laying of 6 Core PTFE Data Cable
1.0 Laying of 6 Core PTFE Data Cable
(Scope of supply – LPSC)
7500m
(approx.)
![Page 29: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/29.jpg)
Page 29 of 71
1.1 6 core PTFE Data cable. Over all dia. 8
mm
Average Length: 150m (approx.)
No of cables
Total length : 150 x 10 =1500 m
10 nos.
a) Lay the cable between
Signal Conditioner room
and Control Room. 2
each for 5 facilities (IATF-
ST). 1 cable from data
acquisition rack and
other one from
command rack.
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
1.2 6 core PTFE Data cable. Over all dia. 8
mm
Average Length: 20m (approx.)
No of cables
Total length: 20 x 120 = 2400 m
120 nos.
Lay the cable between EP Valves
& Test Facility (Command
Junction Box). 24 nos. each for 5
facilities.
Refer fig. 8
1.3 6 core PTFE Data cable. Over all dia. 8
mm
Average Length: 45m (approx.)
No of cables
Total length: 45 x 24 =1080m
24 nos.
a) Lay the cable between
Signal Conditioner Room
and Vacuum chamber.
Cable into vacuum
chamber is to be laid in
air tight manner (feed
thru) sealed with proper
sealant such as Araldite
under the supervision of
LPSC Engineers. (2 nos.
each for Command rack,
Measurement rack and
DAS rack per facility)
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
![Page 30: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/30.jpg)
Page 30 of 71
1.4 6 core PTFE Data cable. Over all dia. 8
mm
Length: 400 m
-
a) Lay the Cable between Signal
Conditioner Room and Auxiliary
System (Hooter, Traffic Lamp, PA
System etc)
b) Wire termination at connector
side is to be soldered. Necessary
sleeves and labelling are to be
provided.
1.5 6 core PTFE Data cable. Over all dia 8
mm
Length : 350 m
-
a) Interconnection of Racks at
Signal Conditioner Room and
Command Console at Control
Room
b) Wire termination at connector
side is to be soldered. Necessary
sleeves and labelling are to be
provided.
1.6 6 core PTFE Data cable. Over all dia. 8
mm
Average Length: 20 m (approx.)
No of cables
Total length: 20 x 48 = 960 m
48 nos.
Lay the cable between EP Valves
& LTET-V Test Facility (Command
Junction Box). 24 nos. each for 2
facilities.
Refer fig. 8
![Page 31: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/31.jpg)
Page 31 of 71
1.7 6 core PTFE Data cable. Over all dia. 8
mm
Average Length: 50 m (approx.)
No of cables
Total length: 50 x 2 = 100m
12 nos.
a) Lay the cable between
LTET-V Blockhouse and
Vacuum chamber. Cable
into vacuum chamber is
to be laid in air tight
manner (feed thru)
sealed with proper
sealant such as Araldite
under the supervision of
LPSC Engineers. (2 nos.
each for Command rack,
Measurement rack and
DAS rack per facility)
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
1.8 6 core PTFE Data cable. Over all dia. 8
mm
Length: 250 m
-
a) Lay the Cable between LTET-V
Blockhouse and Auxiliary
Systems (Hooter, Traffic Lamp,
PA System etc.)
b) Wire termination at connector
side is to be soldered. Necessary
sleeves and labelling are to be
provided.
J. Laying of 2 Core PTFE Data Cable
1.0 Laying of 2 Core PTFE Data Cable
Over all dia. 4 mm
(Scope of supply - LPSC)
2500 m
![Page 32: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/32.jpg)
Page 32 of 71
1.1 2 core PTFE Data cable. Over all dia. 4
mm
Average Length: 150m(approx.) No of
cables
Total length : 150 x 10=1500m
10 nos.
a) Lay the cable between
signal Conditioner room
and Control Room. (1
each for Command rack
and Data Acquisition
rack.) 2 nos. each for 5
facilities (IATF-ST).
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
1.2 2 core PTFE Data cable. Over all
dia. 4 mm
Average Length: 20m(approx.)
No of cables
Total length : 20 x 80=1600m
80 nos.
Lay the cable between
Measurement Junction Box and
Field Measurement Sensors
(Refer Fig. 9). (16 nos. each for 5
facilities)
1.3 2 core PTFE Data cable. Over all dia. 4
mm
No of cables
Length: 15m (approx.) x 20 = 300m
20 nos.
a) Lay the cable for
Auxiliary System (PA System etc.) at Signal Conditioner Room
Auxiliary System (PA System etc.) at Control Room
Auxiliary System (PA System etc.) at Test Bays
b) Wire termination at
connector side is to be
soldered. Necessary
sleeves and labelling are
to be provided.
K. Laying of 3 Core Armored Cable
1.0 Laying of 3 Core Armored Cable
Length: 20m (approx.) x 25 = 500 m
500 m
From Hazardous Monitoring
System Junction Box to
![Page 33: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/33.jpg)
Page 33 of 71
(Scope of supply – LPSC)
No. of Hazardous monitoring
sensors.
25 nos.
Hazardous monitoring system /
flame detector system.
L. Laying of OFC Cable
1.0 Laying of OFC cable 320 m
1.1
Laying of 12 core Armored OFC
cable, Over all dia 25 mm
(Scope of supply - Party)
Average length: 160 m
No of Cables
2 nos.
a) Lay OFCs in cable trench
between Control room
and Safety Systems
Monitoring rack in Signal
Condition room.
b) 2 nos. of OFCs need to be
spliced & terminated in
the LIU.
M. Laying of CAT-6 Cable
1.0 Laying of CAT-6 Cable
1.1 Laying of CAT-6 cable
(Scope of Supply-Party)
500 m
1.2 No. of RJ-45 Connectors
(Scope of Supply-Party)
180 nos. Connectors should be crimped to
CAT-6 Cable
1.3 Average length: 10 m
No. of Cables
Total length: 10 x 50 = 500 m
50 nos.
Lay the cable between
Data Acquisition Systems
& Network Switches
Signal Conditioning
Room and Sea Level Test
Bay
IATF-ST Control Room &
LTET-V Control Room
![Page 34: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/34.jpg)
Page 34 of 71
N. Installation of Field Junction Boxes
1.0 Installation of Field Junction
Boxes
1.1 Type-A Junction Boxes
(Material: Stainless steel)
Size: 600mm x 500mm x 200mm
Weight - 25 Kg
(Scope of Supply – LPSC)
No of Cable Terminations
6 nos.
1200 nos.
Refer the Fig. 8, 9 & 10A, 10B, 10C
Fabricate the mounting structure as per the drawing given in fig-10.
Mount the Junction Boxes on the mounting structure in the Test Facility.
Carry out Multi core cable termination. All terminations are to be neatly harnessed, routed and crimped using flat leg, pin leg, “U” leg or ring leg & terminated
Necessary identification ferrules/tags are to be provided
Cable entry cut out is to be provided wherever needed
1.2 Type-B Junction Boxes
(Material: Stainless steel)
Size: 400mm x 300mm x 200mm
Weight - 20 Kg
(Scope of Supply – LPSC)
No of Cable Terminations
10 nos.
700 nos.
1.3 Type-C Explosion Proof Junction
Boxes
Size: 350mm x 350mm x 250mm
Weight - 30 Kg
(Scope of Supply – LPSC)
No of Cable Terminations
7 nos.
250 nos.
O. Installation of Field Sensors / Indicators
1.0 Installation of Field Sensors /
Indicators
1.1 Smart Pressure Transmitter (2 wire
type)
40 nos. The party has to install the item
as per the guidelines of LPSC
![Page 35: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/35.jpg)
Page 35 of 71
Make: M/s Rosemount
Model: 3051S series.
Weight – 3.5 kg
(Scope of Supply – LPSC)
Engineers. Necessary cable
terminations are to be provided
with proper tagging. Cable have
to be routed through the cable
tray neatly. Necessary
mechanical supports are to be
provided wherever needed.
1.2 Mass Flow Meters
Make: M/s Micro Motion
Model: CMF010 sensor
Weight – 7 kg
(Scope of Supply – LPSC)
12 nos.
1.3 Pyrometer
Weight – 4 kg
(Scope of Supply – LPSC)
5 nos.
1.4 Propellant vapor / Flame
detectors
(Scope of supply – LPSC)
24 nos. Sensors are to be
mounted in the
instructed locations and
3 core armored cable
are to be routed
through ¾ inch PVC
conduit (Scope of supply
– Party) to Type–C
junction box.
Necessary clamping
should be provided for
conduit wherever
needed.
Necessary mechanical
mounting support is to
be provided.
1.5 a) Traffic signaling and hooter
system
3 nos. Erection of traffic post
using concrete of size
2x2x2 (feet). Concrete
![Page 36: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/36.jpg)
Page 36 of 71
(Scope of supply – LPSC)
b) Laying of 3 core armored
cable – Av: length 50 m
Total length 50 x 3 = 150 m
c) Laying of 220 V AC power
cable from signal conditioning
room to traffic signaling and
hooter system
material under scope of
supply of party.
3 core and power cable to be laid from safety system monitoring rack in Signal Conditioning room to Traffic Post through
underground ¾ inch PVC
conduit (Scope of supply – Party) at a depth 50 cm underground.
P. Finishing & mounting work of Structural Materials
1.0 Finishing & mounting work of
Structural Materials
1.1 Aluminum plate (thickness – 4
mm)
(Scope of Supply – Party)
10 m2 Structural material for connector
plate and equipment support
etc. Work like cutting, making
circular connector cutouts,
drilling, filing, fitting, nut & bolt
fixing etc.
1.2 Aluminum angle (25mm x 25mm x
2mm)
(Scope of Supply – Party)
50 m Structural material for mounting
equipments in the rack /
console. Work like cutting,
drilling, filing, fitting, nut & bolt
fixing etc.
1.3 Aluminum angle (40mm x 40mm x
2mm)
(Scope of Supply – Party)
50 m Structural material for mounting
equipments in the rack /
console. Work like cutting,
drilling, filing, fitting, nut & bolt
fixing etc.
![Page 37: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/37.jpg)
Page 37 of 71
1.4 SS Channels (50mm x 25 mm x 5
mm)
(Scope of Supply – Party)
100 m Structural material for mounting
junction boxes and other field
sensors etc. Work like cutting,
drilling, filing, fitting, nut & bolt
fixing etc.
1.5 MS angle (25mm x 25mm x 6mm)
(Scope of Supply – Party)
100 m Structural material for mounting
cable trays and other field
sensors etc. Work like cutting,
drilling, filing, fitting, nut & bolt
fixing, painting etc. 1.6 40 mm MS angle (40mm x 40mm
x 6mm)
(Scope of Supply – Party)
100 m
1.7 50 mm MS angle (50mm x 50mm
x 6mm)
(Scope of Supply – Party)
100 m
1.8 MS flat (25mm x 2mm)
(Scope of Supply – Party)
50 m
1.9 2 inch MS pipe
(Scope of Supply – Party)
30 m
1.10 Painting Area
(Scope of Supply of paint- Party)
30 m2 Party has to carry out painting
work as per the instruction of
LPSC Engineers. Painting has to
done with 2 coats of metal
primer and then 2 coats of grey
color paint.
![Page 38: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/38.jpg)
Page 38 of 71
2. Figures and Wiring Diagrams
(Fig-1) Layout of IATF-ST & LTET- V Facilities
![Page 39: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/39.jpg)
Page 39 of 71
Schematic layout of Measurement Rack & Command Rack
(Fig-2) Measurement Rack (Fig-3) Command Rack
![Page 40: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/40.jpg)
Page 40 of 71
(Fig - 4) General Internal Wiring Details of Instrumentation Racks & Console
![Page 41: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/41.jpg)
Page 41 of 71
Schematic layout of Data Acquisistion Rack & Safety Rack
(Fig-5) Data Acquisition Rack (Fig-6) Safety Rack
![Page 42: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/42.jpg)
Page 42 of 71
(Fig-7) Command Control Desk
![Page 43: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/43.jpg)
Page 43 of 71
Instrumentation Wiring Scheme for Facility Junction Boxes
(Fig-8) Command System (E/P Valves)
(Fig-9) Measurement System (Smart Transmitter / Sensor)
![Page 44: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/44.jpg)
Page 44 of 71
(Fig-10) Structure of Mounting for Junction Boxes
![Page 45: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/45.jpg)
Page 45 of 71
![Page 46: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/46.jpg)
Page 46 of 71
III. Materials which are under the scope of supply of the Party
i. List of Items to be supplied by the Party
Sl. No. Description of Item Quantity
1. Ethernet Switches (Make: HP/ D-Link/ Cisco, 16 port, 2 SFP, L2
Managed, 19” rack mountable, Warranty – 1 year)
9 nos.
2. SFP Transceiver Modules 3 nos.
3. Optical Fiber Cable (OFC) (12 core outdoor armored cable –
Single Mode, Direct Burial Type)
320 m
4. LC Pigtail Patch Chord 4 nos.
5. CAT-6 Ethernet Cable 500m
6. RJ-45 male connectors 180 nos.
7. OFC LIU Fiber Management System 2 nos.
8. Computer Monitor 18.5” 6 nos.
9. Computer Mouse 6 nos.
10. Computer Keyboard 6 nos.
11. Connector Terminals Blocks & Accessories:
a. ELMEX make C series 32 mm DIN rail mounted terminal
with Melamine Housing and suitable for conductor size:
2.5 sq.mm
Code: CSTM 2.5 (Khaki)
25,000 nos.
b. ELMEX make 32 mm mounting channel suitable for
mounting Terminal Type CSTM 2.5 & Length 2000mm
Code: CHS 20
50 nos.
c. ELMEX make end plate suitable for Terminal Type CSTM
2.5; code: KPNS (Khaki)
300 nos.
d. ELMEX make metallic Slide Clamp with fixing screws
suitable for 32mm channel; Code SCS (metallic)
300 nos.
e. Standard DIN rail size: 35 x 7.5 mm; length : 2000mm 50 nos.
![Page 47: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/47.jpg)
Page 47 of 71
12. Crimping legs (wire size: 2.5 mm2 ) suitable for Industrial type
wiring (Compatible with item no. 11):
a. Flat type (“I”) 20,000 nos.
b. U type 5000 nos.
c. Pin type 5000 nos.
d. Ring Type 2000 nos.
13. Wiring Harnessing & Labelling Materials (Alpha-numeric
Ferrules, Printed Labels, Lacing Threads, Cable ties, Sleeves,
Heat shrinkable sleeves etc.)
1 lot (which is
required for the
completion of the
work)
14. Fastening Materials – Different type of stainless steel nuts,
bolts, washers, screws, clamp etc. which is required for the
completion of the work
1 Lot (which is
required for the
completion of the
work)
15. PVC Cable duct :
a. Size: 2” x 2” 100 m
b. Size: 2” x 1” 100 m
c. Size: 1” x 1” 100 m
16. GI Cable Trays with Required Clamping materials:
a. Perforated, 200 mm cable Tray
Standard Size: 2500 mm x 200mm x 2mm
160 Nos.
b. Perforated, 100 mm cable Tray
Standard Size: 2500 mm x 100mm x 2mm
80 Nos.
c. Perforated, 50 mm cable Tray
Standard Size: 2500 mm x 50mm x 2mm
40 Nos.
17. Aluminium Structural Materials:
a. Aluminium plate (Thickness – 4 mm) 10 m2
b. Aluminium angle (25mm x 25mm x 2mm) 50 m
![Page 48: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/48.jpg)
Page 48 of 71
c. Aluminium angle (40mm x 40mm x 2mm) 50 m
18. Stainless Steel Structural Materials:
SS “C”Channels (50mm x 25 mm x 5 mm)
100 m
19. Mild Steel Structural Materials:
a. MS angle (25 mm x 25 mm x 6 mm) 100 m
b. MS angle (40 mm x 40 mm x 6 mm) 100 m
c. MS angle (50 mm x 50 mm x 6 mm) 100 m
d. MS flat (25 mm x 2 mm) 50 m
e. MS pipe (2 inch dia, 2 mm thick) 30 m
20. PVC Cable Conduit:
a.
inch size PVC 600 m
b. 1
inch size PVC 400 m
21. Paint 30 L
22. Metal Primer 30 L
Remark: Any other items other than those mentioned above required for the successful
commissioning of the facility shall be supplied by the party.
![Page 49: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/49.jpg)
Page 49 of 71
ii. Detailed Specifications of items to be supplied by the party
1. Ethernet switch
Sl. No. Description Specification
1. Quantity 9 nos.
2. Make / Manufacturer Cisco, HP
3.
Ports Minimum 16 nos. of Ethernet ports
(Autosensing 10/100/1000 Gigabit, RJ-45) &
minimum 2 nos. of SFP ports
4. Form Factor 19” rack mountable
5. Switching Type Layer 2 Manageable Switch
6. Switching Capacity 20 Gbps or higher
7. Features Auto sensing 10/100/1000 Gigabit ports,
QoS
8. Warranty 1 year
2. SFP Modules
Sl. No. Description Specification
1. Quantity 3 nos.
2. Make / Manufacturer Cisco, HP
3. Type Single mode, 1000 base LX
4. Connector Type LC
5. Receive Sensitivity -20dBm
6. Standards Class 1 Laser, FDA 21
7. Warranty 1 year
![Page 50: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/50.jpg)
Page 50 of 71
3. Optical Fiber Cable
Sl. No. Description Specification
1. Quantity 600 m
2.
No. of cores 12
3. Type Outdoor Armored Direct Burial Type
4. Armoring Corrugated Steel Tape Armor with Loose-
Tube Gel Filled
5. No. of Modes Single Mode
6. Construction Multi-tube construction
7. Attenuation @ 1310 nm < =0.4dB/km, @ 1500 nm < =
0.3dB/km
8. Tensile rating 1200 N
9. Maximum Crush resistance 3000 N
10. Operating Temperature - 40 deg C to + 60 deg C
11. Warranty 1 year
4. LC Pigtail Patch Chord
Sl. No. Description Specification
1. Quantity 4 nos.
2. Type Single mode
3. Features 250 µm coated fiber in protective 900 µm
tubing
4. Length 1 m
![Page 51: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/51.jpg)
Page 51 of 71
5. Compatibility Compatible with item no. 2 & 7
6. Warranty 1 year
5. Ethernet Cable
Sl. No. Description Specification
1. Quantity 500 m
2. Performance Category CAT-6
3. Type Unshielded Twisted Pair
4. Insulation Jacket PVC
5. Warranty 1 year
6. RJ-45 Male Connectors
Sl. No. Description Specification
7. Quantity 180 nos.
8. Performance Category CAT-6
9. Housing Material Polycarbonate UL 94V-2
10. Contacts Gold Plated Contacts
11. Warranty 1 year
7. OFC LIU Fiber Management System
Sl. No. Description Specification
1. Quantity 2 nos.
2. Capacity (No. of Cores) 24 minimum
3. Form Factor 19” rack mountable, 1U height
4. No. of Splicing Trays 1 minimum
![Page 52: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/52.jpg)
Page 52 of 71
5. Special Feature Sliding provision for easy splicing and
termination & Loaded with LC single mode
couplers.
6. Body Powder coated Steel or Aluminium
7. Warranty 1 year
8. Computer Monitor (18.5 inch)
Sl. No. Description Specification
1. Quantity 6 nos.
2. Display Size 18.5 inch
3. Display Technology LED
4. Computer Interface VGA
5. Warranty 1 year
9. Computer Mouse
Sl. No. Description Specification
1. Quantity 6 nos.
2. Type Optical
3. Computer Interface USB
4. Warranty 1 year
10. Computer Keyboard
Sl. No. Description Specification
2 Quantity 6 nos.
3 Computer Interface USB
4 Warranty 1 year
![Page 53: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/53.jpg)
Page 53 of 71
11. Connector Terminal Blocks & Accessories
Sl. No. Description, Make / Model Specification
1. ELMEX make C series 32 mm DIN rail mounted
terminal with Melamine housing suitable for
conductor size 2.5 sq.mm. Product Code - CSTM 2.5
(Khaki)
Quantity – 25,000 nos.
2. ELMEX make 32 mm mounting channel suitable for
mounting Terminal Type CSTM 2.5 & Length 2000
mm.
Product Code - CHS 20
Quantity – 50 nos.
3. ELMEX make end plate suitable for Terminal Type
CSTM 2.5. Product Code - KPNS (Khaki)
Quantity – 300 nos.
4. ELMEX make metallic Slide Clamp with fixing screws
suitable for 32mm channel. Product Code - SCS
(metallic)
Quantity – 300 nos.
5. Standard DIN rail size: 35 x 7.5 mm; length :
2000mm. Product
Quantity – 50 nos.
6. Warranty 1 year
12. Crimping Legs
Sl. No. Description Specification
1. Quantity Flat Type (“I”) – 20,000 nos.
U Type – 5,000 nos.
Pin Type – 5,000 nos.
Ring Type – 2,000 nos.
2. Compatibility Suitable for wire size: 2.5 sq.mm, suitable for Industrial
type wiring. Compatible with item no. 11
3. Warranty 1 year
![Page 54: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/54.jpg)
Page 54 of 71
13. Wiring Harnessing & Labelling Materials
Sl. No. Description Specification
1. Quantity 1 lot (which is required for the completion of whole
work)
2. Items required Alpha-numeric Ferrules, Printed Labels, Lacing
Threads, Cable ties, Sleeves, Heat shrinkable sleeves
etc.
14. Fastening Materials
Sl. No. Description Specification
1. Quantity 1 lot (which is required for the completion of whole
work)
2. Items required Different type of stainless steel nuts, bolts, washers,
screws, clamp etc. which is required for the completion
of the work.
15. PVC Cable Duct
Sl. No. Description Specification
1. Quantity Size: 2” x 2” – 100 m (with cover)
Size: 2” x 1” – 100 m (with cover)
Size: 1” x 1” – 100 m (with cover)
2. Material PVC
3. Features Industrial Standard
![Page 55: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/55.jpg)
Page 55 of 71
16. GI Cable Trays
Sl. No. Description Specification
1. Perforated 200 mm Cable Tray
Standard Size: 2500 mm x 200 mm x 2mm
Quantity – 160 nos.
2. Perforated 100 mm Cable Tray
Standard Size: 2500 mm x 100mm x
2mm
Quantity – 80 Nos.
3. Perforated 50 mm Cable Tray
Standard Size: 2500 mm x 50mm x
2mm
Quantity – 40 Nos.
4. Material Galvanized Iron
5. Accessories required Required SS Clamping Materials
17. Aluminium Structural Materials
Sl. No. Description Specification
1. Aluminium plate (Thickness – 4 mm) Quantity - 10 m2
2. Aluminuim angle (Size: 25mm x 25mm x
2mm)
Quantity – 50 m
3. Aluminuim angle (Size: 40mm x 40mm x
2mm)
Quantity – 50 m
18. Stainless Steel Structural Materials
Sl. No. Description Specification
1. SS “C”Channels (Size: 50mm x 25 mm x 5 mm) Quantity - 100 m
![Page 56: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/56.jpg)
Page 56 of 71
19. Mild Steel Structural Materials
Sl. No. Description Specification
2. MS angle (Size: 25mm x 25mm x 6mm) Quantity - 100 m
3. MS angle (Size: 40mm x 40mm x 6mm) Quantity - 100 m
4. MS angle (Size: 50mm x 50mm x 6mm) Quantity - 100 m
5. MS flat (Size: 25 mm x 2 mm) Quantity - 50 m
6. MS pipe (2 inch dia, 2 mm thick) Quantity - 30 m
20. PVC Cable Conduit
Sl. No. Description Specification
1.
inch size PVC Quantity - 600 m
2. 1
inch size PVC Quantity - 400 m
3. Approval ISI mark
21. Paint
Sl. No. Description Specification
1. Quantity 30 Liters
2. Paint Color Smoke Grey
3. Paint Type Rubberized Enamel
![Page 57: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/57.jpg)
Page 57 of 71
22. Metal Primer
Sl. No. Description Specification
1. Quantity 30 L
2. Primer Type Zinchromate Metal Primer
![Page 58: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/58.jpg)
Page 58 of 71
IV. Materials which are under the scope of supply of LPSC
Sl. No. Item Quantity
1. Instrumentation Racks (for Measurement, Command, Data
Acquisition & Safety Systems Monitoring)
22 nos.
2. P+F make, Smart Transmitter Power Supplies 112 nos.
3. MCIH make, Temperature Signal Conditioners 112 nos.
4. MCIH make, dAMP25X Signal Conditioners 56 nos.
5. Rosemount make, Mass Flow Transmitters 12 nos.
6. Fixed Linear Power Supply (28 V DC, Dual type) 21 nos.
7. Fixed Linear Power Supply (12 V DC, Dual type) 15 nos.
8. Programmable Power Supply (0-120 V DC) 7 nos.
9. OEN make 51 R Series Relays 392 nos.
10. NI make, PXIe system 6 nos.
11. NI make Connector board (80 channels) 19 nos.
12. Driver circuit box for solenoid valves. 7 nos.
13. EAO make, ON/OFF switches 208 nos.
14. Industrial Computers with 21” monitors, keyboard & mouse 36 nos.
15. 32 Core PTFE Armored Data Cable 5000 m
16. 32 Core PTFE Data Cable 5000 m
17. 6 Core PTFE Data Cable 7500 m
18. 2 Core PTFE Data Cable 2500 m
19. 3 Core Armored Cable 500 m
20. Field Junction Boxes 23 nos.
21. Traffic signaling & Hooter system 3 nos.
22. Rosemount Make, Smart Pressure Transmitter 40 nos.
![Page 59: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/59.jpg)
Page 59 of 71
23. MicroMotion make, Mass Flow Meters 12 nos.
24. Pyrometer 5 nos.
25. 37 pin Circular Connectors 175 nos.
26. 35 pin Circular Connectors 50 nos.
27. 26 pin Circular Connectors 25 nos.
28. 7 pin Circular Connectors 200 nos.
29. 2 pin Circular Connectors 50 nos.
![Page 60: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/60.jpg)
Page 60 of 71
V. Terms & Conditions:
i. General Terms
1. Refer topic II for Details of instrumentation work to be carried out by the party,
figures & wiring diagrams.
2. Refer topic III for the materials which are under the scope of supply of the party
and their specifications.
3. Refer topic IV for the materials which are under the scope of supply of LPSC.
4. Refer topic V for Terms & Conditions.
5. Refer topic VI for Instructions to the Bidder / Party
6. Refer topic VII for Format for Techno Commercial Compliance Matrix (Part 1 of 2)
7. Refer topic VIII for Format for Price / Cost Quotation (Part 2 of 2)
8. Party has to execute the work as per the instruction of LPSC Engineers.
9. 1-year warranty should be there for all the items that are supplied by the party.
10. Necessary drawings and wiring diagrams required for the execution of the work
will be provided by LPSC at the time of work.
11. Party has to carry out necessary functional check like continuity and integrity
check of end to end wiring, voltage simulation tests, calibration of channels etc.
as part of the commission of the entire system. Party has to provide necessary
validation certificate / report for each channel.
12. Party shall be present in the facility at LPSC for 15 working days after the
completion / commissioning of the work to ensure the integrity and smooth
functioning of the instrumentation system.
13. In addition to the above work, party shall execute minor works and supply
materials required for the completion of the work.
14. Party has to complete the whole work within 6 months from the date of
commencement of work.
ii. Competence of the Party
1. Party should have previous experience in similar field in any establishments of
ISRO. Details regarding the proof of experience of the party shall be provided
along with the quotation.
2. The technicians who are doing the wiring and installation work should have at
least 2 years of experience.
3. Minimum 1 Engineer with at least 2 years of experience in the field of
instrumentation, erection & commissioning work should be posted by party for
the supervision and execution of the work.
iii. Safety & Logistics Terms
1. LPSC will not provide any amenities like transportation / conveyance, meals etc.
to workers / staffs of the party.
2. LPSC will not provide any tools like multimeters, crimping tools, screw drivers,
spanners, label printers, welding set, painting brush etc. for the completion of the
work.
![Page 61: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/61.jpg)
Page 61 of 71
3. Test equipments like Oscilloscope, Electrical Calibrators, Dead Weight Tester,
Insulation Tester etc. will be provided by LPSC for carrying out the functional
check.
4. The staff of the party shall take all safety precautions as per the safety standards
while doing the wiring, installation and commissioning activities.
5. Party will be responsible for the damage (if happened) of the items and
equipment during the installation and commissioning phase of instrumentation
systems.
iv. Payment Terms
1. Party has to quote the unit rate of both work and material supply as per the
Price / Cost Format given in topic VI.
2. Payments will be settled as per the actual work done and material supply done
by the party.
3. If required, part payment (3 times only) is acceptable.
4. If required 50 % payment will be provided prior to the purchase of materials and
items against Bank Guarantee.
5. Party has to pay the electricity charges required for the work. Electricity meter
and main switch to be brought by the party.
VI. Instructions to the Bidder / Party:
The bidder / party shall submit their bid on 2-part basis.
Part-1: Techno Commercial (other than price) quotation.
Part-2: Sealed Price quotation
The price quotation submitted by those parties who satisfy the techno commercial
requirement only shall be opened subsequently. The party shall submit the Techno
Commercial quotation / compliance statement as per the format given in topic VII. Format
for Techno Commercial Compliance Matrix
![Page 62: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/62.jpg)
Page 62 of 71
VII. Format for Techno Commercial Compliance Matrix (Part 1 of 2)
Sl.
No.
Descriptions / Specifications
(Techno Commercial Terms &
Conditions)
Compliance
(Yes / No)
If ‘No’ specify
deviations
explicitly
Remarks
1. Party shall do all the work as given
in topic II. Scope of the Work (page
no. 6 to 45)
2. Party should supply all the items
mentioned in topic III. Materials
which are under the scope of
supply of the Party (page no. 46 to
48) with specifications mentioned
in page no. 49 to 57.
3. Party should comply all the Terms &
Conditions as given in topic V (page
no. 60 to 61)
4. 1 year warranty should be there for
all the items that are supplied by
the party.
5. Party has to carry out necessary
functional check like continuity and
integrity check of end to end wiring,
voltage simulation tests, calibration
of channels etc. as part of the
commissioning of the entire system.
Party has to provide necessary
validation certificate / report for
each channel.
6. Party shall be present in the facility
at LPSC for 15 working days after
the completion / commissioning of
the work to ensure the integrity and
smooth functioning of the
instrumentation system.
7. In addition to the work mentioned
in topic II, party shall execute minor
works and supply materials
![Page 63: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/63.jpg)
Page 63 of 71
required for the completion of the
work, if needed.
8. Party has to complete the whole
work within 6 months from the date
of commencement of work.
9. Party should have previous
experience in similar field in any
establishments of ISRO. Details
regarding the proof of experience of
the party shall be provided along
with the quotation.
10. The technicians who are doing the
wiring and installation work should
have at least 2 years of experience.
11. Minimum 1 Engineer with at least 2
years of experience in the field of
instrumentation, erection &
commissioning work shall be posted
by party for the supervision and
execution of the work.
12. Party shall bring tools like
multimeters, crimping tools, screw
drivers, spanners, label printers,
welding set, painting brush etc. for
the completion of the work.
13. The staff of the party shall take all
safety precautions as per the safety
standards while doing the wiring,
installation and commissioning
activities.
14. Party has to pay the electricity
charges required for the work.
Electricity meter and main switch to
be brought by the party.
15. Party will be responsible for the
damage (if happened) of the items
and equipment during the
![Page 64: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/64.jpg)
Page 64 of 71
installation and commissioning
phase of instrumentation systems.
16. Payments will be settled as per the
actual work done and material
supply done by the party.
17. If required 50 % payment will be
provided prior to the purchase of
materials against Bank Guarantee.
Remaining 50 % payment will be
made against the delivery of the
material and its warranty
certificate.
18. If required, part payment (3 times
only) is acceptable. 90 % payment
will be made in 2 times. Remaining
10 % payment will be made only
after the successful test, evaluation
and commissioning of the facility.
![Page 65: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/65.jpg)
Page 65 of 71
VIII. Format for Price / Cost Quotation (Part 2 of 2)
Party has to submit the unit price / cost and total price / cost of each to be Material supplied
and Instrumentation Work to be done in a separate sealed bid as per the formats given
below.
i. Cost format of Instrumentation Work to be done by the party
(Refer topic II. Scope of Work)
Sl. No. Details Quantity Unit Rate
(`)
Total Cost (`)
1. Installation & Wiring of Measurement Racks
(Refer Details of Instrumentation Work, Item
A)
7 nos.
2. Installation & Wiring of Command Racks
(Refer Details of Instrumentation Work,
Item B)
7 nos.
3. Installation & Wiring of Data Acquisition
Racks (Refer Details of Instrumentation
Work, Item C)
7 nos.
4. Installation & Wiring of Safety Systems
Monitoring Rack (Refer Details of
Instrumentation Work, Item D)
1 no.
5. Installation & Wiring of Command Consoles
(Refer Details of Instrumentation Work,
Item E)
18 nos.
6. Laying of GI Cable Trays (Refer Details of
Instrumentation Work, Item F)
6.1 Perforated, 200 mm GI cable tray 400 m
6.2 Perforated, 100 mm GI cable tray 200 m
6.3 Perforated, 50 mm GI cable tray 100 m
7. Laying of 32 Core PTFE Armored Data Cable
(Refer Details of Instrumentation Work,
Item G)
5000 m
![Page 66: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/66.jpg)
Page 66 of 71
8. Laying of 32 Core PTFE Data Cable (Refer
Details of Instrumentation Work, Item H)
5000 m
9. Laying of 6 Core PTFE Data Cable (Refer
Details of Instrumentation Work, Item I)
7500 m
10. Laying of 2 Core PTFE Data Cable (Refer
Details of Instrumentation Work, Item J)
2500 m
11. Laying of 3 Core Armored Cable (Refer
Details of Instrumentation Work, Item K)
500 m
12. Laying of OFC Cable (Refer Details of
Instrumentation Work, Item L)
320 m
13. Laying of CAT-6 Cable (Refer Details of
Instrumentation Work, Item M)
500 m
14. Installation of Field Junction Boxes (Refer
Details of Instrumentation Work, Item N)
14.1 Type A Size: 600mm x 500mm x
200mm
6 nos.
14.2 Type B Size: 400mm x 300mm x
200mm
10 nos.
14.3 Type C Size: 350mm x 350mm x
250mm
7 nos.
15. Installation of Field Sensors / indicators
(Refer Details of Instrumentation Work,
Item O)
15.1 Smart Pressure Transmitter 40 nos.
15.2 Mass Flow Meters 12 nos.
15.3 Pyrometer 5 nos.
15.4 Propellant Vapor / Flame
detectors
24 nos.
15.4 Traffic signaling and hooter
system
3 nos.
![Page 67: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/67.jpg)
Page 67 of 71
16. Finishing & mounting work of Structural
Materials (Refer Details of Instrumentation
Work, Item P)
16.1 Aluminium plate (thickness – 4
mm) (including 80 nos. of circular
connector cut out per m2)
10 m2
16.2 Aluminium angle (25mm x 25mm
x 2mm)
50 m
16.3 Aluminium angle (40mm x 40mm
x 2mm)
50 m
16.4 Aluminum Flat (25mm x 2mm) 50 m
16.5 SS Channels (50mm x 25mm x 5
mm)
100 m
16.6 MS angle (25mm x 25mm x 6mm) 100 m
16.7 MS angle (40mm x 40mm x 6mm) 100 m
16.8 MS angle (50mm x 50mm x 6mm) 100 m
16.9 MS flat (25mm x 2mm) 50 m
16.10 MS pipe (2 inch dia, 2 mm thick) 30 m
16.11 Painting Area 30 m2
Remark: Any other instrumentation work other than those
mentioned above required for the successful commissioning
of the facility shall be done by the party.
Total Cost of the Instrumentation Work done by the party: `
![Page 68: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/68.jpg)
Page 68 of 71
ii. Price format of Materials to be supplied by the party
Sl. No. Items Quantity Unit Price
(`)
Total Price
(`)
1. Ethernet Switches (Make: HP/ D-Link/
Cisco, 16 port, 2 SFP, L2 Managed, 19”
rack mountable, Warranty – 1 year)
9 nos.
2. SFP Transceiver Modules 3 nos.
3. Optical Fiber Cable (OFC) (12 core outdoor
armored cable – Single Mode, Direct
Burial Type)
320 m
4. LC Pigtail Patch Chord 4 nos.
5. CAT-6 Ethernet Cable 500 m
6. RJ-45 male connectors 180 nos.
7. OFC LIU Fiber Management System 2 nos.
8. Computer Monitor 18.5” 6 nos.
9. Computer Mouse 6 nos.
10. Computer Keyboard 6 nos.
11. Connector Terminals Blocks & Accessories:
11.1 ELMEX make C series 32 mm DIN
rail mounted terminal with
Melamine Housing and suitable
for conductor size: 2.5 sq.mm
Code: CSTM 2.5 (Khaki)
25,000 nos.
11.2 ELMEX make 32 mm mounting
channel suitable for mounting
Terminal Type CSTM 2.5 & Length
2000mm Code: CHS 20
50 nos.
![Page 69: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/69.jpg)
Page 69 of 71
11.3 ELMEX make end plate suitable
for Terminal Type CSTM 2.5
Code: KPNS (Khaki)
300 nos.
11.4 ELMEX make metallic Slide Clamp
with fixing screws suitable for
32mm channel; Code: SCS
(metallic)
300 nos.
11.5 Standard DIN rail size: 35 x 7.5
mm; length : 2000mm
50 nos.
12. Crimping legs (wire size: 2.5 mm2 )
suitable for Industrial type wiring
(Compatible with item no. 11):
12.1 Flat type (“I”) 20,000 nos.
12.2 U type 5,000 nos.
12.3 Pin type 5,000 nos.
12.4 Ring Type 2,000 nos.
13. Wiring Harnessing & Labelling Materials
(Alpha-numeric Ferrules, Printed Labels,
Lacing Threads, Cable ties, Sleeves, Heat
shrinkable sleeves etc.)
1 lot (which
is required
for the
completion
of the work)
14. Fastening Materials – Different type of
stainless steel nuts, bolts, washers,
screws, clamp etc. which is required for
the completion of the work
1 Lot (which
is required
for the
completion
of the work)
15. PVC Cable duct :
15.1 Size: 2” x 2” 100 m
15.2 Size: 2” x 1” 100 m
15.3 Size: 1” x 1” 100 m
![Page 70: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/70.jpg)
Page 70 of 71
16. GI Cable Trays with Required Clamping
materials:
16.1 Perforated, 200 mm Cable Tray
Standard Size: 2500 mm x
200mm x 2mm
160 nos.
16.2 Perforated, 100 mm Cable Tray
Standard Size: 2500 mm x
100mm x 2mm
80 nos.
16.3 Perforated, 50 mm Cable Tray
Standard Size: 2500 mm x
50mm x 2mm
40 Nos.
17. Aluminium Structural Materials:
17.1 Aluminum plate (thickness – 4
mm)
10 m2
17.2 Aluminum angle (25mm x 25mm
x 2mm)
50 m
17.3 Aluminum angle (40mm x 40mm
x 2mm)
50 m
18. Stainless Steel Structural Materials:
SS “C”Channels (50mm x 25 mm x 5 mm)
100 m
19. Mild Steel Structural Materials:
19.1 MS angle (25mm x 25mm x 6mm) 100 m
19.2 MS angle (40mm x 40mm x 6mm) 100 m
19.3 MS angle (50mm x 50mm x 6mm) 100 m
19.4 MS flat (25 mm x 2mm) 50 m
19.5 MS pipe (2 inch dia, 2 mm thick) 30 m
20. PVC Cable Conduit:
20.1
inch size PVC 600 m
![Page 71: INTEGRATED ASSEMBLY & TESTING FACILITY FOR … · 2018. 6. 28. · List of Items to be supplied by the Party 46 Detailed Specifications of items to be supplied by the party 49 IV](https://reader035.vdocuments.mx/reader035/viewer/2022071414/610dde3bb88ac102eb4616a3/html5/thumbnails/71.jpg)
Page 71 of 71
20.2 1
inch size PVC 400 m
21. Paint 30 L
22. Metal primer 30 L
Remark: Any other items other than those mentioned above
required for the successful commissioning of the facility should be
supplied by the party. Payment will be settled as per actuals.
Total Price of the Materials supplied by the party: `
Grand Total Cost / Price of the entire work
Final Total Cost of all the Instrumentation Work done & Materials supplied by the party: `
IX. Conclusion
This is a two-part tender. Party has to go through the entire report and quote.
Party can visit the site (IATF-ST / LPSC, Valiamala) for technical discussion
regarding the nature of work to be carried out.