installation resource management 2 jun 16 - pdi 2016 · 3 of 23 installation resource management...

23
1 of 23 IMCOM integrates and delivers base support to enable readiness for a self-reliant and globally-responsive All Volunteer Army WE ARE THE ARMY’S HOME Installation Resource Management 2 Jun 16

Upload: lythu

Post on 21-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

1 of 23

IMCOM integrates and delivers base support to enable readiness

for a self-reliant and globally-responsive

All Volunteer Army

WE ARE THE ARMYrsquoS HOME

Installation Resource Management

2 Jun 16

2 of 23

Installation Resource Management

What is the Installation Management Enterprise

Why was it established

How do we resource requirements

3 of 23

Installation Resource Management

Installation Management Enterprise

Installation Management Command (IMCOM)

manages Army installations to support

readiness and mission execution provides

equitable services and facilities optimizes

resources sustains the environment and

enhances the wellndashbeing of the military

community

4 of 23

Installation Resource Management

5 of 23

Installation Resource Management

Installation Management Command was

established in 2003 as the Installation

Management Agency Mission was to ensure

ldquouniform base ops servicesrdquo were being

provided at each installation Common Levels

of Support (CLS) were established Common

Output Level Standards (COLS) (Air Force)

6 of 23

FY16 Installation Services

Garrison Services Garrison Services (Continued) MEDCOM Health Services

Garrison Commander Office

100 Installation Management 425 Geospatial Information and Services (GIampS) 950 Patient Care

Installation Support Offices 200 Unaccompanied Housing Management 951 Health Support for Readiness amp Mobilization

102 Administrative and Civil Law 400 Facilities Engineering Services Mgmt 952Dental Support for Readiness and Mobilization

103 Criminal Law and Discipline 402 Custodial Services 953 Preventive Medicine Services124

104 Client Services 403 Solid Waste Management

105 Claims 404 Maintenance ndash Grounds NETCOM Information Technology Services

106 Religious Support 405 Master Planning 701 Communication Systems and System Support

107 Public Affairs 406 Real EstateReal Property Administration 703 Information Assurance

109 Equal Employment Opportunity (EEO) 407 Leases 700 Automation

111 Internal Review 408 Snow Ice and Sand Removal AMC Logistics Services

112 Installation Safety and Occupational Health 500 Electrical Services 300 Clothing and Equipment

Resource Management Office (RMO) 501 HeatingCooling Services 301 Retail Supply

124 Resource Management (Old 115116)502 Water Services 302 Asset Management

503 Waste Water Services 304 Laundry and Dry Cleaning Services

118 Installation TDA Management (Cost Only) 504 Other Utility Services 305 Food Services

Plans Analysis and Integration Office (PAIO) 505 Environmental Compliance 306 Materiel Support Maintenance

121 Management Analysis 510 Pest Management 307 Transportation Services -NTVs

Human Resources (DHR) 512 Utilities Privatization 308 Transportation Services -Other

113 Administrative Management 421 Maintenance ndash Railroad 309 Ammunition Supply Services

250 Substance Abuse 424 Army Cemeteries Installation (Mission) Services

800 Military Personnel Services Emergency Services (DES) 101 Protocol Services

803 Continuing Education Services 401 Fire and Emergency Response Services 110 EO (Equal Opportunity)

Morale Welfare and Recreation (DMWR) 600 Physical Security 117 Management Accounting

202 Army Lodging Management 601 Law Enforcement Services 122 Contracting (ACC)

251 Army Community Services Plans Training Mobilization amp Security (DPTMS) 123 Banking

252 Child Youth and School Services 602 Anti-Terrorism Services 422 Real Property Demolition

253 Sports Recreation and Libraries 603 Installation Security Program Mgnt Support 605 Correctional Services (OPMG)

254 Business Operations 604 Emergency Management 802 Civilian Personnel Services

Public Works (DPW) AFH 702 MultimediaVisual Information Processes 909 Deployment Planning

201 Family Housing Management 900 Airfield Operations 910 Deployment Training

414 Facilities Maintenance - Army Family Housing 901 Mobilization and Deployment Support 911 Staging Area Operations

Public Works (DPW) SRM 902 Operations 912 Hazardous Material Preparation

409 Minor Construction 903 Training Land Sustainment 913 Container and Pallet Operations

411 Facilities Maintenance ndash Vertical 904 Range Management 914 ArrivalDeparture Airfield Control Group

420 Facilities Maintenance ndash Horizontal 905 Training Support Centers 915 Port Support Activity

906Mission Command Training Support Program 916 Commercial Truck Operations

917 Convoy Support Operations

CLS Totals Color Key 918 Rail Loading Operations

Total CLS services = 54 Garrison services included in CLS 919 In-transit Visibility

Total Service Support Programs (SSPs) = 275 Garrison services not included in CLS 920 Personnel Deployment Processing

Garrison directorates and offices 921 Military Ocean Terminal Deployment Spt Ops

Installation services provided by other than IMCOM 922 AMC Ammunition DepotActivity Deployment

7 of 23

ISR - CLS Relationship

Common Levels of Support (CLS)

CL1 ndash Customer serviced

within 30 minutes 95 of

time

CL2 ndash Customer serviced

w 30 min 89 of time

CL3 ndash Customer serviced

win 30 min 79 of time

A ndash Provide Casualty Operations

Services

B ndash Provide Personnel Processing

Services ndash InOut Processing

C ndash Provide Soldier Readiness

Processing

D ndash Provide CACID

Card Services

Service 800

Military

Personnel

Services

QPSG

Management

Decision

Package

(MDEP)

Service Service Support

Programs (SSPs)

Primary Service

Category (PSCs)

Performance Measures

(CLs)

Performance Measures

(Quality Rating)

(Metric Result)

Service

Human

Resources

Standard

GarrisonOrganization

(SGO)

SGO

Installation Status Report ndash Services (ISR-S)

Management

Decision

Package

(MDEP)

Major

Service

Area

(MSA)

Management Decision Package(MDEP)

Management Decision Package(MDEP)

G8 Manpower Models (SSP Process Sequence Model)

G

A

R

B

8 of 23

Installation Resource Management

Resourcing the Installation Management

Enterprise

Start with traditional plan program budget execution

(PPBE) process

Ensure pay is covered for all on board personnel

Implement funding letter adjustments

Evolving issues Storm damage stationing emerging

requirementsArmy leadership initiatives

AF Installation amp Mission Support Center

AFIMSC Update to PDI

Jun 16

AF Installation amp Mission Support Center

AFIMSC Defined The Air Force Installation and Mission

Support Center serves as the single intermediate-level

headquarters staff supporting AF-wide installation and

expeditionary support activities

AFIMSC Organization

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

2 of 23

Installation Resource Management

What is the Installation Management Enterprise

Why was it established

How do we resource requirements

3 of 23

Installation Resource Management

Installation Management Enterprise

Installation Management Command (IMCOM)

manages Army installations to support

readiness and mission execution provides

equitable services and facilities optimizes

resources sustains the environment and

enhances the wellndashbeing of the military

community

4 of 23

Installation Resource Management

5 of 23

Installation Resource Management

Installation Management Command was

established in 2003 as the Installation

Management Agency Mission was to ensure

ldquouniform base ops servicesrdquo were being

provided at each installation Common Levels

of Support (CLS) were established Common

Output Level Standards (COLS) (Air Force)

6 of 23

FY16 Installation Services

Garrison Services Garrison Services (Continued) MEDCOM Health Services

Garrison Commander Office

100 Installation Management 425 Geospatial Information and Services (GIampS) 950 Patient Care

Installation Support Offices 200 Unaccompanied Housing Management 951 Health Support for Readiness amp Mobilization

102 Administrative and Civil Law 400 Facilities Engineering Services Mgmt 952Dental Support for Readiness and Mobilization

103 Criminal Law and Discipline 402 Custodial Services 953 Preventive Medicine Services124

104 Client Services 403 Solid Waste Management

105 Claims 404 Maintenance ndash Grounds NETCOM Information Technology Services

106 Religious Support 405 Master Planning 701 Communication Systems and System Support

107 Public Affairs 406 Real EstateReal Property Administration 703 Information Assurance

109 Equal Employment Opportunity (EEO) 407 Leases 700 Automation

111 Internal Review 408 Snow Ice and Sand Removal AMC Logistics Services

112 Installation Safety and Occupational Health 500 Electrical Services 300 Clothing and Equipment

Resource Management Office (RMO) 501 HeatingCooling Services 301 Retail Supply

124 Resource Management (Old 115116)502 Water Services 302 Asset Management

503 Waste Water Services 304 Laundry and Dry Cleaning Services

118 Installation TDA Management (Cost Only) 504 Other Utility Services 305 Food Services

Plans Analysis and Integration Office (PAIO) 505 Environmental Compliance 306 Materiel Support Maintenance

121 Management Analysis 510 Pest Management 307 Transportation Services -NTVs

Human Resources (DHR) 512 Utilities Privatization 308 Transportation Services -Other

113 Administrative Management 421 Maintenance ndash Railroad 309 Ammunition Supply Services

250 Substance Abuse 424 Army Cemeteries Installation (Mission) Services

800 Military Personnel Services Emergency Services (DES) 101 Protocol Services

803 Continuing Education Services 401 Fire and Emergency Response Services 110 EO (Equal Opportunity)

Morale Welfare and Recreation (DMWR) 600 Physical Security 117 Management Accounting

202 Army Lodging Management 601 Law Enforcement Services 122 Contracting (ACC)

251 Army Community Services Plans Training Mobilization amp Security (DPTMS) 123 Banking

252 Child Youth and School Services 602 Anti-Terrorism Services 422 Real Property Demolition

253 Sports Recreation and Libraries 603 Installation Security Program Mgnt Support 605 Correctional Services (OPMG)

254 Business Operations 604 Emergency Management 802 Civilian Personnel Services

Public Works (DPW) AFH 702 MultimediaVisual Information Processes 909 Deployment Planning

201 Family Housing Management 900 Airfield Operations 910 Deployment Training

414 Facilities Maintenance - Army Family Housing 901 Mobilization and Deployment Support 911 Staging Area Operations

Public Works (DPW) SRM 902 Operations 912 Hazardous Material Preparation

409 Minor Construction 903 Training Land Sustainment 913 Container and Pallet Operations

411 Facilities Maintenance ndash Vertical 904 Range Management 914 ArrivalDeparture Airfield Control Group

420 Facilities Maintenance ndash Horizontal 905 Training Support Centers 915 Port Support Activity

906Mission Command Training Support Program 916 Commercial Truck Operations

917 Convoy Support Operations

CLS Totals Color Key 918 Rail Loading Operations

Total CLS services = 54 Garrison services included in CLS 919 In-transit Visibility

Total Service Support Programs (SSPs) = 275 Garrison services not included in CLS 920 Personnel Deployment Processing

Garrison directorates and offices 921 Military Ocean Terminal Deployment Spt Ops

Installation services provided by other than IMCOM 922 AMC Ammunition DepotActivity Deployment

7 of 23

ISR - CLS Relationship

Common Levels of Support (CLS)

CL1 ndash Customer serviced

within 30 minutes 95 of

time

CL2 ndash Customer serviced

w 30 min 89 of time

CL3 ndash Customer serviced

win 30 min 79 of time

A ndash Provide Casualty Operations

Services

B ndash Provide Personnel Processing

Services ndash InOut Processing

C ndash Provide Soldier Readiness

Processing

D ndash Provide CACID

Card Services

Service 800

Military

Personnel

Services

QPSG

Management

Decision

Package

(MDEP)

Service Service Support

Programs (SSPs)

Primary Service

Category (PSCs)

Performance Measures

(CLs)

Performance Measures

(Quality Rating)

(Metric Result)

Service

Human

Resources

Standard

GarrisonOrganization

(SGO)

SGO

Installation Status Report ndash Services (ISR-S)

Management

Decision

Package

(MDEP)

Major

Service

Area

(MSA)

Management Decision Package(MDEP)

Management Decision Package(MDEP)

G8 Manpower Models (SSP Process Sequence Model)

G

A

R

B

8 of 23

Installation Resource Management

Resourcing the Installation Management

Enterprise

Start with traditional plan program budget execution

(PPBE) process

Ensure pay is covered for all on board personnel

Implement funding letter adjustments

Evolving issues Storm damage stationing emerging

requirementsArmy leadership initiatives

AF Installation amp Mission Support Center

AFIMSC Update to PDI

Jun 16

AF Installation amp Mission Support Center

AFIMSC Defined The Air Force Installation and Mission

Support Center serves as the single intermediate-level

headquarters staff supporting AF-wide installation and

expeditionary support activities

AFIMSC Organization

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

3 of 23

Installation Resource Management

Installation Management Enterprise

Installation Management Command (IMCOM)

manages Army installations to support

readiness and mission execution provides

equitable services and facilities optimizes

resources sustains the environment and

enhances the wellndashbeing of the military

community

4 of 23

Installation Resource Management

5 of 23

Installation Resource Management

Installation Management Command was

established in 2003 as the Installation

Management Agency Mission was to ensure

ldquouniform base ops servicesrdquo were being

provided at each installation Common Levels

of Support (CLS) were established Common

Output Level Standards (COLS) (Air Force)

6 of 23

FY16 Installation Services

Garrison Services Garrison Services (Continued) MEDCOM Health Services

Garrison Commander Office

100 Installation Management 425 Geospatial Information and Services (GIampS) 950 Patient Care

Installation Support Offices 200 Unaccompanied Housing Management 951 Health Support for Readiness amp Mobilization

102 Administrative and Civil Law 400 Facilities Engineering Services Mgmt 952Dental Support for Readiness and Mobilization

103 Criminal Law and Discipline 402 Custodial Services 953 Preventive Medicine Services124

104 Client Services 403 Solid Waste Management

105 Claims 404 Maintenance ndash Grounds NETCOM Information Technology Services

106 Religious Support 405 Master Planning 701 Communication Systems and System Support

107 Public Affairs 406 Real EstateReal Property Administration 703 Information Assurance

109 Equal Employment Opportunity (EEO) 407 Leases 700 Automation

111 Internal Review 408 Snow Ice and Sand Removal AMC Logistics Services

112 Installation Safety and Occupational Health 500 Electrical Services 300 Clothing and Equipment

Resource Management Office (RMO) 501 HeatingCooling Services 301 Retail Supply

124 Resource Management (Old 115116)502 Water Services 302 Asset Management

503 Waste Water Services 304 Laundry and Dry Cleaning Services

118 Installation TDA Management (Cost Only) 504 Other Utility Services 305 Food Services

Plans Analysis and Integration Office (PAIO) 505 Environmental Compliance 306 Materiel Support Maintenance

121 Management Analysis 510 Pest Management 307 Transportation Services -NTVs

Human Resources (DHR) 512 Utilities Privatization 308 Transportation Services -Other

113 Administrative Management 421 Maintenance ndash Railroad 309 Ammunition Supply Services

250 Substance Abuse 424 Army Cemeteries Installation (Mission) Services

800 Military Personnel Services Emergency Services (DES) 101 Protocol Services

803 Continuing Education Services 401 Fire and Emergency Response Services 110 EO (Equal Opportunity)

Morale Welfare and Recreation (DMWR) 600 Physical Security 117 Management Accounting

202 Army Lodging Management 601 Law Enforcement Services 122 Contracting (ACC)

251 Army Community Services Plans Training Mobilization amp Security (DPTMS) 123 Banking

252 Child Youth and School Services 602 Anti-Terrorism Services 422 Real Property Demolition

253 Sports Recreation and Libraries 603 Installation Security Program Mgnt Support 605 Correctional Services (OPMG)

254 Business Operations 604 Emergency Management 802 Civilian Personnel Services

Public Works (DPW) AFH 702 MultimediaVisual Information Processes 909 Deployment Planning

201 Family Housing Management 900 Airfield Operations 910 Deployment Training

414 Facilities Maintenance - Army Family Housing 901 Mobilization and Deployment Support 911 Staging Area Operations

Public Works (DPW) SRM 902 Operations 912 Hazardous Material Preparation

409 Minor Construction 903 Training Land Sustainment 913 Container and Pallet Operations

411 Facilities Maintenance ndash Vertical 904 Range Management 914 ArrivalDeparture Airfield Control Group

420 Facilities Maintenance ndash Horizontal 905 Training Support Centers 915 Port Support Activity

906Mission Command Training Support Program 916 Commercial Truck Operations

917 Convoy Support Operations

CLS Totals Color Key 918 Rail Loading Operations

Total CLS services = 54 Garrison services included in CLS 919 In-transit Visibility

Total Service Support Programs (SSPs) = 275 Garrison services not included in CLS 920 Personnel Deployment Processing

Garrison directorates and offices 921 Military Ocean Terminal Deployment Spt Ops

Installation services provided by other than IMCOM 922 AMC Ammunition DepotActivity Deployment

7 of 23

ISR - CLS Relationship

Common Levels of Support (CLS)

CL1 ndash Customer serviced

within 30 minutes 95 of

time

CL2 ndash Customer serviced

w 30 min 89 of time

CL3 ndash Customer serviced

win 30 min 79 of time

A ndash Provide Casualty Operations

Services

B ndash Provide Personnel Processing

Services ndash InOut Processing

C ndash Provide Soldier Readiness

Processing

D ndash Provide CACID

Card Services

Service 800

Military

Personnel

Services

QPSG

Management

Decision

Package

(MDEP)

Service Service Support

Programs (SSPs)

Primary Service

Category (PSCs)

Performance Measures

(CLs)

Performance Measures

(Quality Rating)

(Metric Result)

Service

Human

Resources

Standard

GarrisonOrganization

(SGO)

SGO

Installation Status Report ndash Services (ISR-S)

Management

Decision

Package

(MDEP)

Major

Service

Area

(MSA)

Management Decision Package(MDEP)

Management Decision Package(MDEP)

G8 Manpower Models (SSP Process Sequence Model)

G

A

R

B

8 of 23

Installation Resource Management

Resourcing the Installation Management

Enterprise

Start with traditional plan program budget execution

(PPBE) process

Ensure pay is covered for all on board personnel

Implement funding letter adjustments

Evolving issues Storm damage stationing emerging

requirementsArmy leadership initiatives

AF Installation amp Mission Support Center

AFIMSC Update to PDI

Jun 16

AF Installation amp Mission Support Center

AFIMSC Defined The Air Force Installation and Mission

Support Center serves as the single intermediate-level

headquarters staff supporting AF-wide installation and

expeditionary support activities

AFIMSC Organization

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

4 of 23

Installation Resource Management

5 of 23

Installation Resource Management

Installation Management Command was

established in 2003 as the Installation

Management Agency Mission was to ensure

ldquouniform base ops servicesrdquo were being

provided at each installation Common Levels

of Support (CLS) were established Common

Output Level Standards (COLS) (Air Force)

6 of 23

FY16 Installation Services

Garrison Services Garrison Services (Continued) MEDCOM Health Services

Garrison Commander Office

100 Installation Management 425 Geospatial Information and Services (GIampS) 950 Patient Care

Installation Support Offices 200 Unaccompanied Housing Management 951 Health Support for Readiness amp Mobilization

102 Administrative and Civil Law 400 Facilities Engineering Services Mgmt 952Dental Support for Readiness and Mobilization

103 Criminal Law and Discipline 402 Custodial Services 953 Preventive Medicine Services124

104 Client Services 403 Solid Waste Management

105 Claims 404 Maintenance ndash Grounds NETCOM Information Technology Services

106 Religious Support 405 Master Planning 701 Communication Systems and System Support

107 Public Affairs 406 Real EstateReal Property Administration 703 Information Assurance

109 Equal Employment Opportunity (EEO) 407 Leases 700 Automation

111 Internal Review 408 Snow Ice and Sand Removal AMC Logistics Services

112 Installation Safety and Occupational Health 500 Electrical Services 300 Clothing and Equipment

Resource Management Office (RMO) 501 HeatingCooling Services 301 Retail Supply

124 Resource Management (Old 115116)502 Water Services 302 Asset Management

503 Waste Water Services 304 Laundry and Dry Cleaning Services

118 Installation TDA Management (Cost Only) 504 Other Utility Services 305 Food Services

Plans Analysis and Integration Office (PAIO) 505 Environmental Compliance 306 Materiel Support Maintenance

121 Management Analysis 510 Pest Management 307 Transportation Services -NTVs

Human Resources (DHR) 512 Utilities Privatization 308 Transportation Services -Other

113 Administrative Management 421 Maintenance ndash Railroad 309 Ammunition Supply Services

250 Substance Abuse 424 Army Cemeteries Installation (Mission) Services

800 Military Personnel Services Emergency Services (DES) 101 Protocol Services

803 Continuing Education Services 401 Fire and Emergency Response Services 110 EO (Equal Opportunity)

Morale Welfare and Recreation (DMWR) 600 Physical Security 117 Management Accounting

202 Army Lodging Management 601 Law Enforcement Services 122 Contracting (ACC)

251 Army Community Services Plans Training Mobilization amp Security (DPTMS) 123 Banking

252 Child Youth and School Services 602 Anti-Terrorism Services 422 Real Property Demolition

253 Sports Recreation and Libraries 603 Installation Security Program Mgnt Support 605 Correctional Services (OPMG)

254 Business Operations 604 Emergency Management 802 Civilian Personnel Services

Public Works (DPW) AFH 702 MultimediaVisual Information Processes 909 Deployment Planning

201 Family Housing Management 900 Airfield Operations 910 Deployment Training

414 Facilities Maintenance - Army Family Housing 901 Mobilization and Deployment Support 911 Staging Area Operations

Public Works (DPW) SRM 902 Operations 912 Hazardous Material Preparation

409 Minor Construction 903 Training Land Sustainment 913 Container and Pallet Operations

411 Facilities Maintenance ndash Vertical 904 Range Management 914 ArrivalDeparture Airfield Control Group

420 Facilities Maintenance ndash Horizontal 905 Training Support Centers 915 Port Support Activity

906Mission Command Training Support Program 916 Commercial Truck Operations

917 Convoy Support Operations

CLS Totals Color Key 918 Rail Loading Operations

Total CLS services = 54 Garrison services included in CLS 919 In-transit Visibility

Total Service Support Programs (SSPs) = 275 Garrison services not included in CLS 920 Personnel Deployment Processing

Garrison directorates and offices 921 Military Ocean Terminal Deployment Spt Ops

Installation services provided by other than IMCOM 922 AMC Ammunition DepotActivity Deployment

7 of 23

ISR - CLS Relationship

Common Levels of Support (CLS)

CL1 ndash Customer serviced

within 30 minutes 95 of

time

CL2 ndash Customer serviced

w 30 min 89 of time

CL3 ndash Customer serviced

win 30 min 79 of time

A ndash Provide Casualty Operations

Services

B ndash Provide Personnel Processing

Services ndash InOut Processing

C ndash Provide Soldier Readiness

Processing

D ndash Provide CACID

Card Services

Service 800

Military

Personnel

Services

QPSG

Management

Decision

Package

(MDEP)

Service Service Support

Programs (SSPs)

Primary Service

Category (PSCs)

Performance Measures

(CLs)

Performance Measures

(Quality Rating)

(Metric Result)

Service

Human

Resources

Standard

GarrisonOrganization

(SGO)

SGO

Installation Status Report ndash Services (ISR-S)

Management

Decision

Package

(MDEP)

Major

Service

Area

(MSA)

Management Decision Package(MDEP)

Management Decision Package(MDEP)

G8 Manpower Models (SSP Process Sequence Model)

G

A

R

B

8 of 23

Installation Resource Management

Resourcing the Installation Management

Enterprise

Start with traditional plan program budget execution

(PPBE) process

Ensure pay is covered for all on board personnel

Implement funding letter adjustments

Evolving issues Storm damage stationing emerging

requirementsArmy leadership initiatives

AF Installation amp Mission Support Center

AFIMSC Update to PDI

Jun 16

AF Installation amp Mission Support Center

AFIMSC Defined The Air Force Installation and Mission

Support Center serves as the single intermediate-level

headquarters staff supporting AF-wide installation and

expeditionary support activities

AFIMSC Organization

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

5 of 23

Installation Resource Management

Installation Management Command was

established in 2003 as the Installation

Management Agency Mission was to ensure

ldquouniform base ops servicesrdquo were being

provided at each installation Common Levels

of Support (CLS) were established Common

Output Level Standards (COLS) (Air Force)

6 of 23

FY16 Installation Services

Garrison Services Garrison Services (Continued) MEDCOM Health Services

Garrison Commander Office

100 Installation Management 425 Geospatial Information and Services (GIampS) 950 Patient Care

Installation Support Offices 200 Unaccompanied Housing Management 951 Health Support for Readiness amp Mobilization

102 Administrative and Civil Law 400 Facilities Engineering Services Mgmt 952Dental Support for Readiness and Mobilization

103 Criminal Law and Discipline 402 Custodial Services 953 Preventive Medicine Services124

104 Client Services 403 Solid Waste Management

105 Claims 404 Maintenance ndash Grounds NETCOM Information Technology Services

106 Religious Support 405 Master Planning 701 Communication Systems and System Support

107 Public Affairs 406 Real EstateReal Property Administration 703 Information Assurance

109 Equal Employment Opportunity (EEO) 407 Leases 700 Automation

111 Internal Review 408 Snow Ice and Sand Removal AMC Logistics Services

112 Installation Safety and Occupational Health 500 Electrical Services 300 Clothing and Equipment

Resource Management Office (RMO) 501 HeatingCooling Services 301 Retail Supply

124 Resource Management (Old 115116)502 Water Services 302 Asset Management

503 Waste Water Services 304 Laundry and Dry Cleaning Services

118 Installation TDA Management (Cost Only) 504 Other Utility Services 305 Food Services

Plans Analysis and Integration Office (PAIO) 505 Environmental Compliance 306 Materiel Support Maintenance

121 Management Analysis 510 Pest Management 307 Transportation Services -NTVs

Human Resources (DHR) 512 Utilities Privatization 308 Transportation Services -Other

113 Administrative Management 421 Maintenance ndash Railroad 309 Ammunition Supply Services

250 Substance Abuse 424 Army Cemeteries Installation (Mission) Services

800 Military Personnel Services Emergency Services (DES) 101 Protocol Services

803 Continuing Education Services 401 Fire and Emergency Response Services 110 EO (Equal Opportunity)

Morale Welfare and Recreation (DMWR) 600 Physical Security 117 Management Accounting

202 Army Lodging Management 601 Law Enforcement Services 122 Contracting (ACC)

251 Army Community Services Plans Training Mobilization amp Security (DPTMS) 123 Banking

252 Child Youth and School Services 602 Anti-Terrorism Services 422 Real Property Demolition

253 Sports Recreation and Libraries 603 Installation Security Program Mgnt Support 605 Correctional Services (OPMG)

254 Business Operations 604 Emergency Management 802 Civilian Personnel Services

Public Works (DPW) AFH 702 MultimediaVisual Information Processes 909 Deployment Planning

201 Family Housing Management 900 Airfield Operations 910 Deployment Training

414 Facilities Maintenance - Army Family Housing 901 Mobilization and Deployment Support 911 Staging Area Operations

Public Works (DPW) SRM 902 Operations 912 Hazardous Material Preparation

409 Minor Construction 903 Training Land Sustainment 913 Container and Pallet Operations

411 Facilities Maintenance ndash Vertical 904 Range Management 914 ArrivalDeparture Airfield Control Group

420 Facilities Maintenance ndash Horizontal 905 Training Support Centers 915 Port Support Activity

906Mission Command Training Support Program 916 Commercial Truck Operations

917 Convoy Support Operations

CLS Totals Color Key 918 Rail Loading Operations

Total CLS services = 54 Garrison services included in CLS 919 In-transit Visibility

Total Service Support Programs (SSPs) = 275 Garrison services not included in CLS 920 Personnel Deployment Processing

Garrison directorates and offices 921 Military Ocean Terminal Deployment Spt Ops

Installation services provided by other than IMCOM 922 AMC Ammunition DepotActivity Deployment

7 of 23

ISR - CLS Relationship

Common Levels of Support (CLS)

CL1 ndash Customer serviced

within 30 minutes 95 of

time

CL2 ndash Customer serviced

w 30 min 89 of time

CL3 ndash Customer serviced

win 30 min 79 of time

A ndash Provide Casualty Operations

Services

B ndash Provide Personnel Processing

Services ndash InOut Processing

C ndash Provide Soldier Readiness

Processing

D ndash Provide CACID

Card Services

Service 800

Military

Personnel

Services

QPSG

Management

Decision

Package

(MDEP)

Service Service Support

Programs (SSPs)

Primary Service

Category (PSCs)

Performance Measures

(CLs)

Performance Measures

(Quality Rating)

(Metric Result)

Service

Human

Resources

Standard

GarrisonOrganization

(SGO)

SGO

Installation Status Report ndash Services (ISR-S)

Management

Decision

Package

(MDEP)

Major

Service

Area

(MSA)

Management Decision Package(MDEP)

Management Decision Package(MDEP)

G8 Manpower Models (SSP Process Sequence Model)

G

A

R

B

8 of 23

Installation Resource Management

Resourcing the Installation Management

Enterprise

Start with traditional plan program budget execution

(PPBE) process

Ensure pay is covered for all on board personnel

Implement funding letter adjustments

Evolving issues Storm damage stationing emerging

requirementsArmy leadership initiatives

AF Installation amp Mission Support Center

AFIMSC Update to PDI

Jun 16

AF Installation amp Mission Support Center

AFIMSC Defined The Air Force Installation and Mission

Support Center serves as the single intermediate-level

headquarters staff supporting AF-wide installation and

expeditionary support activities

AFIMSC Organization

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

6 of 23

FY16 Installation Services

Garrison Services Garrison Services (Continued) MEDCOM Health Services

Garrison Commander Office

100 Installation Management 425 Geospatial Information and Services (GIampS) 950 Patient Care

Installation Support Offices 200 Unaccompanied Housing Management 951 Health Support for Readiness amp Mobilization

102 Administrative and Civil Law 400 Facilities Engineering Services Mgmt 952Dental Support for Readiness and Mobilization

103 Criminal Law and Discipline 402 Custodial Services 953 Preventive Medicine Services124

104 Client Services 403 Solid Waste Management

105 Claims 404 Maintenance ndash Grounds NETCOM Information Technology Services

106 Religious Support 405 Master Planning 701 Communication Systems and System Support

107 Public Affairs 406 Real EstateReal Property Administration 703 Information Assurance

109 Equal Employment Opportunity (EEO) 407 Leases 700 Automation

111 Internal Review 408 Snow Ice and Sand Removal AMC Logistics Services

112 Installation Safety and Occupational Health 500 Electrical Services 300 Clothing and Equipment

Resource Management Office (RMO) 501 HeatingCooling Services 301 Retail Supply

124 Resource Management (Old 115116)502 Water Services 302 Asset Management

503 Waste Water Services 304 Laundry and Dry Cleaning Services

118 Installation TDA Management (Cost Only) 504 Other Utility Services 305 Food Services

Plans Analysis and Integration Office (PAIO) 505 Environmental Compliance 306 Materiel Support Maintenance

121 Management Analysis 510 Pest Management 307 Transportation Services -NTVs

Human Resources (DHR) 512 Utilities Privatization 308 Transportation Services -Other

113 Administrative Management 421 Maintenance ndash Railroad 309 Ammunition Supply Services

250 Substance Abuse 424 Army Cemeteries Installation (Mission) Services

800 Military Personnel Services Emergency Services (DES) 101 Protocol Services

803 Continuing Education Services 401 Fire and Emergency Response Services 110 EO (Equal Opportunity)

Morale Welfare and Recreation (DMWR) 600 Physical Security 117 Management Accounting

202 Army Lodging Management 601 Law Enforcement Services 122 Contracting (ACC)

251 Army Community Services Plans Training Mobilization amp Security (DPTMS) 123 Banking

252 Child Youth and School Services 602 Anti-Terrorism Services 422 Real Property Demolition

253 Sports Recreation and Libraries 603 Installation Security Program Mgnt Support 605 Correctional Services (OPMG)

254 Business Operations 604 Emergency Management 802 Civilian Personnel Services

Public Works (DPW) AFH 702 MultimediaVisual Information Processes 909 Deployment Planning

201 Family Housing Management 900 Airfield Operations 910 Deployment Training

414 Facilities Maintenance - Army Family Housing 901 Mobilization and Deployment Support 911 Staging Area Operations

Public Works (DPW) SRM 902 Operations 912 Hazardous Material Preparation

409 Minor Construction 903 Training Land Sustainment 913 Container and Pallet Operations

411 Facilities Maintenance ndash Vertical 904 Range Management 914 ArrivalDeparture Airfield Control Group

420 Facilities Maintenance ndash Horizontal 905 Training Support Centers 915 Port Support Activity

906Mission Command Training Support Program 916 Commercial Truck Operations

917 Convoy Support Operations

CLS Totals Color Key 918 Rail Loading Operations

Total CLS services = 54 Garrison services included in CLS 919 In-transit Visibility

Total Service Support Programs (SSPs) = 275 Garrison services not included in CLS 920 Personnel Deployment Processing

Garrison directorates and offices 921 Military Ocean Terminal Deployment Spt Ops

Installation services provided by other than IMCOM 922 AMC Ammunition DepotActivity Deployment

7 of 23

ISR - CLS Relationship

Common Levels of Support (CLS)

CL1 ndash Customer serviced

within 30 minutes 95 of

time

CL2 ndash Customer serviced

w 30 min 89 of time

CL3 ndash Customer serviced

win 30 min 79 of time

A ndash Provide Casualty Operations

Services

B ndash Provide Personnel Processing

Services ndash InOut Processing

C ndash Provide Soldier Readiness

Processing

D ndash Provide CACID

Card Services

Service 800

Military

Personnel

Services

QPSG

Management

Decision

Package

(MDEP)

Service Service Support

Programs (SSPs)

Primary Service

Category (PSCs)

Performance Measures

(CLs)

Performance Measures

(Quality Rating)

(Metric Result)

Service

Human

Resources

Standard

GarrisonOrganization

(SGO)

SGO

Installation Status Report ndash Services (ISR-S)

Management

Decision

Package

(MDEP)

Major

Service

Area

(MSA)

Management Decision Package(MDEP)

Management Decision Package(MDEP)

G8 Manpower Models (SSP Process Sequence Model)

G

A

R

B

8 of 23

Installation Resource Management

Resourcing the Installation Management

Enterprise

Start with traditional plan program budget execution

(PPBE) process

Ensure pay is covered for all on board personnel

Implement funding letter adjustments

Evolving issues Storm damage stationing emerging

requirementsArmy leadership initiatives

AF Installation amp Mission Support Center

AFIMSC Update to PDI

Jun 16

AF Installation amp Mission Support Center

AFIMSC Defined The Air Force Installation and Mission

Support Center serves as the single intermediate-level

headquarters staff supporting AF-wide installation and

expeditionary support activities

AFIMSC Organization

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

7 of 23

ISR - CLS Relationship

Common Levels of Support (CLS)

CL1 ndash Customer serviced

within 30 minutes 95 of

time

CL2 ndash Customer serviced

w 30 min 89 of time

CL3 ndash Customer serviced

win 30 min 79 of time

A ndash Provide Casualty Operations

Services

B ndash Provide Personnel Processing

Services ndash InOut Processing

C ndash Provide Soldier Readiness

Processing

D ndash Provide CACID

Card Services

Service 800

Military

Personnel

Services

QPSG

Management

Decision

Package

(MDEP)

Service Service Support

Programs (SSPs)

Primary Service

Category (PSCs)

Performance Measures

(CLs)

Performance Measures

(Quality Rating)

(Metric Result)

Service

Human

Resources

Standard

GarrisonOrganization

(SGO)

SGO

Installation Status Report ndash Services (ISR-S)

Management

Decision

Package

(MDEP)

Major

Service

Area

(MSA)

Management Decision Package(MDEP)

Management Decision Package(MDEP)

G8 Manpower Models (SSP Process Sequence Model)

G

A

R

B

8 of 23

Installation Resource Management

Resourcing the Installation Management

Enterprise

Start with traditional plan program budget execution

(PPBE) process

Ensure pay is covered for all on board personnel

Implement funding letter adjustments

Evolving issues Storm damage stationing emerging

requirementsArmy leadership initiatives

AF Installation amp Mission Support Center

AFIMSC Update to PDI

Jun 16

AF Installation amp Mission Support Center

AFIMSC Defined The Air Force Installation and Mission

Support Center serves as the single intermediate-level

headquarters staff supporting AF-wide installation and

expeditionary support activities

AFIMSC Organization

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

8 of 23

Installation Resource Management

Resourcing the Installation Management

Enterprise

Start with traditional plan program budget execution

(PPBE) process

Ensure pay is covered for all on board personnel

Implement funding letter adjustments

Evolving issues Storm damage stationing emerging

requirementsArmy leadership initiatives

AF Installation amp Mission Support Center

AFIMSC Update to PDI

Jun 16

AF Installation amp Mission Support Center

AFIMSC Defined The Air Force Installation and Mission

Support Center serves as the single intermediate-level

headquarters staff supporting AF-wide installation and

expeditionary support activities

AFIMSC Organization

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

AF Installation amp Mission Support Center

AFIMSC Update to PDI

Jun 16

AF Installation amp Mission Support Center

AFIMSC Defined The Air Force Installation and Mission

Support Center serves as the single intermediate-level

headquarters staff supporting AF-wide installation and

expeditionary support activities

AFIMSC Organization

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

AF Installation amp Mission Support Center

AFIMSC Defined The Air Force Installation and Mission

Support Center serves as the single intermediate-level

headquarters staff supporting AF-wide installation and

expeditionary support activities

AFIMSC Organization

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

AFIMSC Organization

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

Next Stepshellip

PPLAN Signed by 30 Sept 2016

Full Operating Capability (FOC) 1 Oct 2016

Stabilize ndash 1 Oct 16 to 30 Sep 18

BPRs to Evaluate Effectiveness of New Organization amp

Processes and Integrate Common Activities Across PSUs

Realign Funding amp Manpower within the Enterprise to

Maximize Efficiencies amp Deliver Capability at Right Echelon

(HQ Det PSU)

Right size ndash 1 Oct 18 to 30 Sept 21

BPR Efforts Drive Further Efficiencies and Workload

Requirements within Enterprise

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

Whatrsquos Different

Where IampMS fundingbudget policyfinancial services

guidance comes from (ldquoWho you callrdquo)

New OAC (OAC 18) for IampMS Requirements

ndash Changes cash flow dynamics (for better on OAC 18 reqts)

DetachmentHQ relationships

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

Whatrsquos the Same

Cash Flow Principles

ndash Resolve problems at lowest level

ndash Fund mission-criticalcommander priorities first (within the OAC)

Major Budget Drills

8020 Rule Travel Limitation Sustainment Floor

UFR Submissions Through MYREOY Strategy

BA Management

ReimbursementFunds Control Balancing

Corporate Process ReviewPrioritization of

Requirements

Financial Services Support Provided to FSOs

Accounting (via installation amp MAJCOM)

Processes Largely Unchanged Just Different Partner

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

ldquo1st Inningrdquo Takeaways

CPTSCC role in messaging amp Decision Support

ndash ldquoTravel vouchers take 30 days to payrdquo

ndash ldquoIrsquom shorted $18K in this EEIC ndash my IDrsquos a messrdquo

ndash Not everythingrsquos an ERR

AFIMSC standup created no new $

Solve problems at lowest level

AccountingEOM Balancinghellipneed your help

Read Business RulesFiscal Guidance

Improve Cost Accounting Discipline

Enterprise-Wide Execution Focus

ndash Meet Time on Targets for CE projects

Communicate Communicate Communicate

Communication Critical to Change Management

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

Whatrsquos to Come

Effective properly scoped Quality Assurance Program

ndash AFIMSC focus needs to be on quality of analysis amp follow-up not

admin or competition

ndash Heart of successful QA program still at the installation level

Use Continual EvaluationData (MICT Metrics etc) to

InformDevelop Financial Services Training

FY17 Execution Plan Development

ndash SAFFM AFBEAT used for Ex Plan drill

Lots of Long-Term Opportunities for Standardization

ndash BMCs T-MOAs Utility Levels COLS Support Agreements

Strategic SourcingCategory Management Service Contract

Reviews Acqusition ldquosmoothingrdquohellip

ndash Patiencehellipwill take timehellipfirst priority is ldquogetting up amp runningrdquo

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

bull Get the People

bull Get Connected

bull Take Capabilities

bull Establish Business RulesRoles

bull Supportive External Communication

bull Implement Initial Lesson Learned

AF-Wide CPTS

MICT Analysis Virtual

Assessment

Disbursing

SAVs

CSS Tracking

Lessons Learned

Share AF-Wide

FIAR Sampling

QA Program

(Focus Metrics)

Audit

Metrics

Financial Services Oversight

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

18

Historical IampMS Cycle

0

10

20

30

40

50

60

70

80

90

100

Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MYR

Really

Payback

FSRM

FSRM

Payback

TOTs

Huge Acq

Workflow

Large $rsquos

to Execute

EOY

8020

Clear

Withholds

Congressional Action

Large ERA Taxes

Baseline held at Air Staff

Minimal Acq Workload

Receipt of Funds

FSRM - Bill Payer

Multiple Withholds

Decentralized Sustainment

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

0

10

20

30

40

50

60

70

80

90

100

Q1 Q2 Q3 Q4

TOTs

Congressional Action

Smaller ERA Taxes

Air Staff Push gt of $$

Desired IampMS Funding Cycle

AFIMSC Push $$ to

Execute Earlier

Increase CC Flexibility

Reduced Functional

Withholds

Increase

Construction

Projects

in Current Yr

Less Stress

to 8020

Execute Fallout

on IPL amp FillKill

More Acq

Workload

Less Acq Workload

Soft Close

EOY

Execution

Success

Patience and Consistency Required to Change Culture

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

20 of 23

CompareContrast Responsibilities

Contracting agency is part of AFIMSC Contracting is separate command

from IMCOM

AFIMSC organized by function IMCOM organized by geography

Activation of AFIMSC will support meeting DoD mandate of 20

reduction in management staff levels IMCOM taking a 25 reduction in

HQ staff

Both Commands provide Morale Welfare and Recreation service

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

21 of 23

Measure of OutputOutcome

Common Levels of Support (CLS)

Common Output Level Standards (COLS)

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

22 of 23

Future Joint Base Initiatives

Process for handling cross-service funding issues

StandardizingStreamlining Support Agreements

Standardized Levels of Service

Co-advocacy on certain mission support funding

issues to OSD

23 of 23

QUESTIONS

23 of 23

QUESTIONS