initiating equipment prs using erp process & common mistakes dr. khaled al-athel director, lab...
DESCRIPTION
LTSO Objectives LTSO should provide a wide range of services to university laboratories that includes, but not limited to: Survey of vendors Help in writing technical specifications Technical analysis of bids Maintenance, Repairs and calibrations Training on equipment Chemicals and materials procurement etc…TRANSCRIPT
Initiating Equipment PRs using ERP
Process & Common MistakesDr. Khaled Al-Athel
Director, Lab Technical Support Office
Overview • LTSO Overview• LTSO Services• Equipment PRs using ERP• Process for PRs through Bids
LTSO Objectives• LTSO should provide a wide range of services
to university laboratories that includes, but not limited to:• Survey of vendors• Help in writing technical specifications• Technical analysis of bids• Maintenance, Repairs and calibrations• Training on equipment• Chemicals and materials procurement• etc…
Stakeholders
Lab Technical Support Office
Academic Departments
Vendors
Environment, Health & Safety
Research Institutes
Deanship of Research
Purchasing
Storehouse
LTSO Structure
Lab Technical Support Office- Director - Assistant Director
Chemicals & Gas Cylinders
Equipment (Purchasing)
Lab Structures & Equipment
Purchasing
Tracking
POs Review
Waste Handling
Maintenance & Repairs
Equipment Training
Bids Analysis
Latest Tech.
Lab Refurbishing & Establishment
Equipment PRs using ERP• Choose correct stock number that fits your requirement
• If no stock number matches your item
• Request storehouse to generate a new stock number
• Make a separate line for each service required with the equipment (Installation, Training, Calibration, etc.)
• Create separate lines for each additional taggable accessories, kits, etc.
Equipment PRs using ERP• For services, use “Technical Data1 & Data2” with your service requirements
(Ex: On-site training, training at manufacturer, etc.)
Equipment PRs using ERP• If the four fields are not enough to cover all specifications
prepare detailed specifications in word format
• DO NOT include any internal information (internal approvals, signatures, memes, prices, web links, or catalogs)
• Any internal information like MEMO, planning committee approval etc. should be attached to internal category only. (Not to supplier)
• Specifications should be attached to supplier category (not to buyer)
• Specifications should be prepared by the end user/originator, any quotation attached as specs will lead to cancellation of the PR.
Equipment PRs using ERP• Providing 1-3 suppliers to the Buyer could expedite your process
• Buyer might contact other companies & get different quotations
Equipment PRs using ERP• Need-by date should be minimum 3 months after initiation of PR
• Department name should be changed from “Dhahran” to proponents department/center
Equipment PRs using ERP• Department cost center must be added in the charge account• For RI & DSR projects, fill the charge account & other information
Equipment PRs using ERP• Justification should be clear why proponent wants to buy this equipment, not
on the use of it• It is important to understand the difference between the notes
Equipment PRs using ERP• Equipment is for teaching or research?• If research, mention the project number• Is this a new equipment, replacement of an existing equipment, or an
integration with an existing equipment
Equipment PRs using ERP• Notes to Buyer, Receiver, & Supplier should not include any technical
specification• If you need to give site information & other environmental information, use
Note To Supplier
Request for Quotations (RFQ)• Once RFQ is created and published for suppliers to quote
• Proponent can use “online discussion” message to provide any clarifications to supplier or buyer
• Online discussion should no be used to add new requirements or change the specifications
• It is the proponent’s responsibility to check online discussion messages regularly and provide the feedback
Recommendation of Supplier (Award)• Once RFQ is closed, purchasing department will send you a notification to
proponent make the recommendation of supplier within two weeks
• Recommendation is done through i-Procurement Sourcing Home Page• Recommended supplier should be the lowest bidder that matches the PR
requirements/specifications (government regulations)
• Note to approver: provide justification of recommended supplier and reason for rejecting others
• If the lowest bidder is rejected, proponent must clarify the reason for rejection
• Once recommendation is submitted for approval, proponent can track the status from “View Award Approval History”
Delivery of PO• Supplier should deliver the PO to storehouse
• Storehouse will receive the material/equipment in the system and forward it to end user
• Note: Any PO directly received by the proponent or the department/center from supplier is not acceptable and illegal
• Proponent has to accept the material/equipment of the issued PO once delivered
• Any changes with new or additional requirements are not acceptable and illegal
Example 1• Certificate must be in the original requirements
• Supplier with lowest quotation should be requested to clarify if the calibration certificate is included
Example 2• No justification was written in this case
Example 3• Proponent requested 32 items with estimated cost of SAR 6,000/each
• Total estimated cost = SAR 192,000
• Proponent awarded a supplier with a quotation of SAR 300,000
• Any equipment/item > SAR 300,000 must be directed to Contracts department to acquire through tenders
Steps to Announce a Tender• Equipment coast > SAR 300,000
• A PO must be created and approved in ERP
• A sealed envelope with the estimated cost must be sent to Chairman, Bids & Tenders Committee with• PO number• Tenders name• Department name
• Specifications must be written and information according to a checklist form
• Specifications must be translated into Arabic (in addition to the English specs)
• Email checklist and specs to contracts department to prepare the tender
Summary• Review/feedback on purchase orders
• Review/feedback on bids analysis
• Contact vendors for faculty members & researchers• Equipment specification• Quotations
• Any technical support for laboratories and equipment
• www.kfupm.edu.sa/sites/LTSO
• Email: [email protected]
• Phone (Directors): 8831 (Director), 8833 (Assist.)
• Phone (Scientists & Eng.): 7838, 8384, 8759
Thank you