Infrastructure Due Diligence Report
11 Gibbons Street, Redfern 11 Gibbons Street, Redfern NSW 2016
PREPARED FOR PREPARED BY
St. George Community Housing Northrop Consulting Engineers
Level 5, 38 Humphreys Lane, Level 11, 345 George Street
Hurstville NSW 2220 Sydney NSW 2000
Tel: 02 9001 2220 Tel: 02 9241 4188
Ref: SY180648-MDR01
Rev: 3
Date: 26.04.2018
REPORT
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 1
INFRASTRUCTURE DUE DILIGENCE REPORT
Activity Schedule
Date Revision Issue Prepared By Approved By
22.03.2018 1 Draft for Review S.Murray & R.Nair G.Lukic & S.Parajuli
03.04.2018 2 For Review S.Murray & R.Nair G.Lukic & S.Parajuli
26.04.2018 3 For Review Murray & R.Nair & S.Parajuli
Northrop Consulting Engineers Pty Ltd
ACN 064 775 088 | ABN 81 094 433 100
Level 11, 345 George Street, Sydney NSW 2000
02 9241 4188 | [email protected] | www.northrop.com.au
© 2018 Northrop Consulting Engineers Pty Ltd. All rights reserved.
This document has been prepared on behalf of and for the exclusive use of St. George Community Housing, and is subject to and issued in
accordance with the agreement between St. George Community Housing and Northrop Consulting Engineers. Northrop Consulting Engineers
accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this document by any third party. Copying this
document without the permission of St. George Community Housing or Northrop Consulting Engineers is not permitted.
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 2
TABLE OF CONTENTS
1. Introduction ......................................................................................................................................................... 4
1.1 General ....................................................................................................................................................... 4
1.2 Limitations and Exclusions ......................................................................................................................... 4
2. Hydraulic Infrastructure ....................................................................................................................................... 6
2.1 Sydney Water Sewer Infrastructure ........................................................................................................... 6
2.2 Sydney Water Potable Water Infrastructure .............................................................................................. 7
2.3 Jemena Natural Gas Infrastructure ............................................................................................................ 9
2.4 High Voltage Infrastructure ........................................................................................................................ 9
2.5 Low Voltage & Street Light Infrastructure ................................................................................................ 10
2.6 Communications ....................................................................................................................................... 12
3. Budget Estimate ................................................................................................................................................ 13
3.1 High-Level Budget Estimate ..................................................................................................................... 13
4. Appendix A – Sydney Water Infrastructure ....................................................................................................... 16
5. Appendix B – Jemena Natural Gas Infrastructure ............................................................................................ 17
6. Appendix C – Maximum Demand Calculation .................................................................................................. 18
7. Appendix D – Statement of Availbale Pressure and Flow ................................................................................ 19
FIGURES
Figure 1 – Site Location Plan ..................................................................................................................................... 4
Figure 2 – Existing Electrical Infrastructure ............................................................................................................. 10
Figure 3 – View from the Front of the Property ........................................................................................................ 11
1. Introduction ......................................................................................................................................................... 4
1.1 General ....................................................................................................................................................... 4
1.2 Limitations and Exclusions ......................................................................................................................... 4
2. Hydraulic Infrastructure ....................................................................................................................................... 6
2.1 Sydney Water Sewer Infrastructure ........................................................................................................... 6
2.2 Sydney Water Potable Water Infrastructure .............................................................................................. 7
2.3 Jemena Natural Gas Infrastructure ............................................................................................................ 9
2.4 High Voltage Infrastructure ........................................................................................................................ 9
2.5 Low Voltage & Street Light Infrastructure ................................................................................................ 10
2.6 Communications ....................................................................................................................................... 12
3. Budget Estimate ................................................................................................................................................ 13
3.1 High-Level Budget Estimate ..................................................................................................................... 13
4. Appendix A – Sydney Water Infrastructure ....................................................................................................... 16
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 3
5. Appendix B – Jemena Natural Gas Infrastructure ............................................................................................ 17
6. Appendix C – Maximum Demand Calculation .................................................................................................. 18
7. Appendix D – Statement of Availbale Pressure and Flow ................................................................................ 19
TABLES
Table 1 – Sewerage Generation Estimate ................................................................................................................. 6
Table 2 – EP Capacity Limitations for Reticulation Sewers ....................................................................................... 6
Table 3 – Potable Water Demand Estimate ............................................................................................................... 7
Table 4 – Fire Hydrant Service Demand .................................................................................................................... 7
Table 5 – Fire Services Water Storage Tank Sizing .................................................................................................. 9
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 4
1. INTRODUCTION
1.1 General
Northrop Consulting Engineers (Northrop) have been engaged to provide high level due diligence reporting
services for the proposed new community housing development at the site of 11 Gibbons St, Redfern NSW 2016.
Figure 1 – Site Location Plan
This document provides the maximum demand (see Appendix A) calculation based on AS/NZS: 3000 Table C3
which is based on the information given in emails sent and phone correspondence.
The purpose of this report is to;
• Provide high level advice regarding the Electrical Services infrastructure to the site;
• Report on Northrop’s site investigation to confirm site constraints and existing services for the proposed site
including:
Water Supply Infrastructure;
Sewerage Infrastructure;
Natural Gas Infrastructure;
Electrical Power Infrastructure.
• Provide a preliminary high level budget estimate for the Residential Apartment Complex.
1.2 Limitations and Exclusions
The limitations and exclusions of this report are as follows:
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 5
• The following assessment is based upon Dial Before You Dig documentation, as well as correspondence with
Authorities, and all Request for Tender information provided by the Client;
• Underground routes have not been documented as accurate as possible with the use of a subcontractor with
Ground-Penetrating Radar (GPR) technology. If excavation works are to be undertaken in this area,
contractors are to undertake their own Dial Before You Dig submission and services searches and not rely on
the provided documentation.
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 6
2. HYDRAULIC INFRASTRUCTURE
2.1 Sydney Water Sewer Infrastructure
The development has access to the following Sydney Water sewer mains:
• DN 225 Vitrified Clay sewer main located within Gibbons Street;
• DN 225 Vitrified Clay sewer main located within William Lane.
2.1.1 Sewage Generation
Preliminary sewage generation rates have been estimated in accordance with the Sewerage Code of Australia -
Sydney Water Edition, WSA-02-2002 (2009). A number of assumptions have been made in estimating sewer
generation rates:
• 154 unit yield for the proposed development;
• Building height exceeds 25m effective height;
• On grade carparking only, with no below ground basement carpark proposed;
• 3.0 Equivalent Persons (EP) / dwelling has been adopted;
• Demands from other building classifications i.e. commercial, back of house, are currently unknown and have
being excluded from the calculations.
Table 1 – Sewerage Generation Estimate
Yield (Units) EP1 ADWF (kL/d)2 ADWF (L/s)3 PDWF ‘d’ Factor4 PDWF (L/s)5
154 462 83.16 0.97 2 1.94
Notes:
1. Based on 3.0 EP / ET.
2. Average Dry Weather Flow (ADWF) based on 180 L/EP/day.
3. Based on 0.0021 L/s / EP.
4. Peak Dry Weather Flow (PDWF) from Figure B.1 of SW ed. WSA 02-2002-2.2.
5. ADWF x d Factor.
2.1.2 EP Capacity Limitations for Reticulation Sewers
Per the below table from the Sewerage Code of Australia - Sydney Water Edition, WSA-02-2002 (2009), the
existing sewer mains in close proximity to the site meet the minimum size limitations to cater for the site.
However, the existing catchment area and current EP loading on these sewer mains is currently unknown. It is
possible that these mains are currently at peak capacity and are unable to cater for additional loading without an
increase in pipe size. Final determination of any upgrade works required will be subject to Sydney Water
assessment and approval under a Section 73 Application.
Table 2 – EP Capacity Limitations for Reticulation Sewers
Pipe Size (DN) Maximum Allowable EP
150 600
225 1,600
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 7
300 3,200
2.2 Sydney Water Potable Water Infrastructure
The development has access to the following Sydney Water potable water mains:
• DN 150 DICL water main located within Gibbons Street;
• DN 150 CICL water main located within Marian Street.
2.2.1 Potable Water Demand
Preliminary water supply demand rates have been estimated in accordance with AS/NZS 3500.1. A number of
assumptions have been made in estimating the water supply demand rates:
• 154 unit yield for the proposed development;
• Building height exceeds 25m effective height;
• On grade carparking only, with no below ground basement carpark proposed;
• Demands from other building classifications i.e. commercial, back of house, are currently unknown and have
being excluded from the calculations.
Table 3 – Potable Water Demand Estimate
Table 2.2 Potable Water Demand Estimate
Yield (Units) Approx. Demand per Unit Total Demand Supply Size Required (DN)
154 0.066L/sec 10.27 L/sec 100
Per the above table the existing water mains in close proximity to the site meet the minimum size limitations to
cater for the site. However, the existing flow rates and pressure available from these water mains is currently
unknown. It is possible that these mains are currently at peak capacity and are unable to cater for additional
loading without an increase in pipe size or the introduction of on-site pressure booster pumpsets and/or water
storage tanks. Final determination of any upgrade works required will be subject to Sydney Water assessment
and approval under a Section 73 Application and submission of a water main pressure and flow test application to
assess the capacity of the existing infrastructure.
2.2.2 Flow Demand Calculations
2.2.2.1 Fire Hydrant Service
Assessing the development against AS 2419.1 Table 2.1 has determined that 2 fire hydrants will be required to
flow simultaneously which constitutes a system flow rate of 20 L/sec. This is based on the development
comprising three or more stories with fire compartment floors area <5,000 m2.
Table 4 – Fire Hydrant Service Demand
Number of Fire Hydrant Outlets Required to Discharge
Simultaneously According to Building
Classification and Area
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 8
Building Classification
(see BCA)
Fire Compartment
Floor Area m2
No. of Fire Hydrant Outlets
Required to Flow
Simultaneously
2, 3, 5 and 9
(1 or 2 stories contained)
≤1,000 1
2, 3, 5 and 9
(1 or 2 stories contained)
>1,000
≤5,000
2
2, 3, 5 and 9
(3 or more stories contained)
≤500 1
2, 3, 5 and 9
(3 or more stories contained)
>500
≤5,000
2
6, 7, and 8
≤500 1
6, 7, and 8 >500
≤5,000
2
All Classes Sprinklered >5,000
≤10,000
2
All Classes Sprinklered >10,000 2
All Classes Unsprinklered >5,000
≤10,000
3
All Classes Unsprinklered >10,000 3 plus one additional fire hydrant
for each additional 5,000m2 or part
thereof
2.2.2.2 Fire Sprinkler Service
Assessing the development against AS 2118.1 has determined that the highest hazard classification will be
contributed by the on-grade carparking which will constitute an Ordinary Hazard 2 classification, with a system
flow rate of 12L/sec.
2.2.3 Fire Services Water Storage
Based on the pressure and flow test results received from Sydney Water, the existing infrastructure will be
inadequate to cater for the site’s fire services demands. As such, on-site water storage and pressure booster
pumpsets will be required to make up for the shortfall. Further, as the proposed building will be in excess of 25m
effective height, additional water storage will be required to meet the Grade 1 fire sprinkler water supply
classification in accordance with AS2118.1.
The volume of on-site storage suggested in this document is to meet the hydrant and sprinkler demands in
accordance with the relevant Australian Standards (AS 2419.1and AS 2118.1) and the BCA Volume 1. Due to the
early nature of this feasibility assessment, it is currently unknown if window drenchers would be required to
protect openings within close proximity to building boundaries, and as such window drencher service demands
have being excluded from the below calculations.
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 9
2.2.3.1 Tank Sizing Calculations
Table 5 – Fire Services Water Storage Tank Sizing
Fire Service Storage Required
Fire Hydrant Service 25,000L
Fire Sprinkler Service (2L/sec water main shortfall
make-up x 1.2 (hydraulic gain) x 60 minutes)
8,640L
Fire Sprinkler Service Grade 1 Supply (12L/sec
system demand) x 1.2 (hydraulic gain) x 60 minutes)
51,840
Total Water Storage Required 85,480L
2.3 Jemena Natural Gas Infrastructure
The development has access to the following Jemena natural gas mains:
• DN 100, 1,050kPa gas main located within Gibbons Street;
• Capped DN 32, 210kPa gas main located at the corner of Marian Street and Gibbons Street;
• DN 100, 1,050kPa gas main located within Marian Street;
• Capped DN 32, 210kPa gas main located at the corner of Marian and Regent Street.
The existing natural gas mains in close proximity to the site appear to be of an adequate size and pressure to
service the proposed development, however, it is possible that these mains are currently at peak capacity and are
unable to cater for additional loading without an increase in pipe size.
Northrop is aware that St. George Community Housing provide individual instantaneous water heaters to each
unit as part of their strata metering strategy. This will result in an increase in the overall site demand against a
typical residential development which would provide a centralised water heating plant. Final determination of any
upgrade works required will be subject to Jemena assessment through a connection application process through
their online portal once site demands have being finalised.
2.4 High Voltage Infrastructure
The Energy Authority serving the site is Ausgrid.
The site appears to be well serviced with high voltage (HV) infrastructure with a HV feeders on Gibbons Road
(the red line indicates the underground HV feeder). The site is currently fed by two service mains from poles SY-
6244 & SY-6242 on the existing low voltage network located along Gibbons Road.
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 10
Figure 2 – Existing Electrical Infrastructure
Based on the preliminary Maximum Demand calculation in Section 3.1 of this report, it is likely that a development
of this magnitude is required to be serviced by on-site by a 1000 kVA Kiosk Substation. Please note that this
advice is based on the assumption that the existing gas supply will be used to power cooking appliance and water
heaters. Should the building footprint not allow for an outdoor substation, a chamber substation is an alternative
solution.
It is likely that a new HV cable will be need to be installed directly through a straight through junction located
along Gibbons Rd. This will provide a ring feed from the newly installed substation, which means two feeds will be
coming into the substation. The new feed will require approx. 20m-25m of trenching and cabling as there are no
existing spare ducts.
The section of cable in front of the property may have to be undergrounded should the development application
state so – past projects indicate that such a scenario is likely to play out for the proposed site as well.
2.5 Low Voltage & Street Light Infrastructure
The front of the property contains Low Voltage (LV) “110 AAC” style cabling (please see figure below). Depending
on the DA conditions, there may be a requirement to underground the cables in the front of the property should
the development application state so.
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 11
Figure 3 – View from the Front of the Property
The existing overhead street light cable can also be moved underground as part of the development consent
conditions.
The removal of all the overhead conductors will also result in the removal of two poles in front of the property. A
new street light column might be required to ensure lighting compliance.
Poles to be
removed
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 12
2.6 Communications
Currently, nbn™ has not installed infrastructure in the area. However, as the premises will have more than 100
units then nbn™ will provide services to the property. NBN rollout expected in 2019.
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 13
3. BUDGET ESTIMATE
3.1 High-Level Budget Estimate
This indicative budget estimate is based on a high-level review of the proposed development along with previous
experience with similar projects.
We have allowed for the maximum 154 residential units as determined in the correspondence by St. George
Community Housing.
This a Class 5 estimate as described in AACE International Recommended Practice No. 18R-97: ‘Cost Estimate
Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries’. An
extract from 18R-97 follows:
In providing budgetary advice, Northrop Consulting Engineers has exercised the skill, care and diligence of a
Consulting Engineer experienced in the relevant discipline. The advice given is for a specific project, by a specific
client for a specific purpose. It is a condition of the use of this budgetary advice that it will not be used for any
purpose other than the specified project, client and purpose as shown below:
Project Name: 11 Gibbons St, Redfern Client: St. George Community Housing
End Usage: Due Diligence Estimate Class: 5
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 14
Northrop Consulting Engineers does not provide Class 1 or Class 2 estimates. Where these classes of estimates
are required, we recommend engagement of a specialist Quantity Surveyor with experience in the specific type of
project.
3.1.1 Electrical Services Budget Estimate
Item Description Amount
1. 154 apartments at $17,000.00 $2,618,000.00
2. Substation Option 1: 1,000kVa Substation (excluding trenching)*; $180,000.00
3. Substation Option 2: Chamber Substation(excluding trenching)*; $250,000.00
Total Option 1 + 15% Contingency $3,217,700.00
Total Option 2 + 15% Contingency $3,298,200.00
*Note: Trenching will depend upon the connection points which can only be finalized once an application is made
to Ausgrid.).
3.1.2 Hydraulic Services Budget Estimate
Item Description Amount
1. 154 apartments at $16,000.00 $2,464,000.00
2. Natural Gas Main Extension $35,000.00
Total Option 1 + 15% Contingency $2,873,850.00
3.1.3 Wet Fire Services Budget Estimate
Item Description Amount
1. 154 apartments at $5,000.00 $770,000.00
2. Fire Sprinkler Pressure Booster Pumpset $17,000.00
3. Fire Hydrant Pressure Booster Pumpset $20,000.00
4. Water Storage Tank (above ground, sectional panel type) $25,000.00
Total Option 2 + 15% Contingency $956,800.00
3.1.4 Disclaimer
• The above prices (see Appendix B) are based on industry knowledge, RLB’s Riders Digest 2016, and
Rawlinson’s Australian Construction Handbook 2016, reflecting an objective view of industry prices. It should
be noted that Northrop Consulting Engineers are not quantity surveyors;
• Allowances where otherwise unknown, have been extracted from documentation detailing typical allowances
and requirements based on similar developments;
• Northrop Consulting Engineers reserves the right to adjust the above figures based on further developed
documentation and information for the project;
• This budget estimate has been provided in assistance with the client to offer a broad understanding of the
scope and cost of works at this stage. At no given time shall Northrop Consulting Engineers assume
responsibility of market figures;
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 15
• The above figures shall be treated only as a guideline and is subject to change with further development of
design;
• It is assumed that the above costs will be subject to tenderers and market value. These figures have been
produced as a means of advice and not subject to cost comparison throughout any stage of this development;
• We understand the client and all relevant parties have read through the provided figures and information as
part of this disclaimer and will not object the rights and responsibilities set out by Northrop Consulting
Engineers.
3.1.5 Assumptions
It is assumed all buildings will be constructed in a single stage, no allowances have been made for
staging/phasing of buildings.
3.1.6 Exclusions
• Professional fees other than Level 3 ASP;
• Local authority contributions;
• Escalation of construction prices from date of budget estimate to date of tender;
• Contingency;
• Builders works;
• GST;
• Authority fees and charges other than cost of physical substation;
• Demolition works;
• Reinstatement of surfaces;
• Temporary services and connections;
• Latent conditions, unspecified heritage works and the like;
• Special site conditions;
• Professional fees;
• Rock excavation.
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 16
4. APPENDIX A – SYDNEY WATER INFRASTRUCTURE
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 17
5. APPENDIX B – JEMENA NATURAL GAS
INFRASTRUCTURE
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 18
6. APPENDIX C – MAXIMUM DEMAND CALCULATION
SY180648: 11 Gibbons Street, Redfern Infrastructure Due Diligence Report | Rev 3 | 26.04.2018 Page 19
7. APPENDIX D – STATEMENT OF AVAILBALE
PRESSURE AND FLOW