INDEX TO
SOURCE PROTECTION COMMITTEE MEETING #1/08
Tuesday, January 29, 2008
MINUTESMinutes of Meeting #1/07, held on December 10, 2007 1
PRESENTATIONSMoore, Larry Project Coordinator, OCWA
re: Lake Ontario Collaborative Study 2Post, Ryan, Project Coordinator for the Dufferin Headwaters Pilot Study 2
CORRESPONDENCESmith, Ian, Director Source Water Protection Branch, MOE
re: Other Legislative Safety Measures in place that protect Ontario's Drinking Water" with attachment which identifies Drinking Water Systems under the Safe Drinking Water Act, 2002 2
re: Inclusion of a Drinking Water System under the Source Protection Planning Process through Municipal Council Resolution 2
re: Clarifying and Using Proxies in accordance to the Source Protection Committee Regulation. 2
Schiller, Mark, Chair, Collaborative Study to Protect Lake Ontario Drinking Water, Region of Peel
re: Scope Change - Collaborative Study to Protect Lake Ontario Drinking Water 2
TERMS OF REFERENCE FOR ASSESSMENT REPORTS AND SOURCE PROTECTION PLANSUpdate and Approval of Next Steps 17
INFORMATION TOPICS FOR FUTURE MEETINGS AND TRAINING NEEDS 27
MUNICIPAL TECHNICAL ADVISORY WORKING GROUP MINUTES 28
MEETING OF THE SOURCE PROTECTION COMMITTEE #1/08January 29, 2008
The Source Protection Committee Meeting #1/08, was held in the North Theatre, Black Creek Pioneer Village, on Tuesday, January 29, 2008. The Chair Susan Self, called the meeting to order at 10:05 a.m..
PRESENTJuli Abouchar MemberJessica Annis MemberAndrea Bourrie MemberWendy Burgess MemberBob Burnside MemberMichael D'Andrea MemberJessica Ginsburg MemberRobert Goodings MemberIrv Harrell MemberRobert Hester MemberDavid Kentner MemberHeather Laidlaw MemberPeter Miasek MemberLynn Moore MemberPeter Orphanos MemberJohn Presta MemberFred Ruf MemberMark Schiller MemberSusan Self ChairHoward Shapiro Member
ABSENTMichael Garrett Member
NON-VOTING INTERIM MEMBERWendy Kemp York Region Representative
1
2
RES.#A1/08 - MINUTES
Moved by: David KentnerSeconded by: Lynn Moore
THAT the Minutes of Meeting #1/07, held on December 10, 2007, be approved. CARRIED
_________________________________________
PRESENTATIONS
(a) A presentation by Larry Moore, Project Coordinator, OCWA in regard to the Lake Ontario Collaborative Study.
(b) A presentation by Ryan Post, Project Coordinator for the Dufferin Headwaters Pilot Study.
RES.#A2/08 - PRESENTATIONS
Moved by: David KentnerSeconded by: Heather Laidlaw
THAT above-noted presentations (a) and (b) be heard and received.CARRIED
_________________________________________
CORRESPONDENCE
(a) A letter dated January 18, 2008 from Ian Smith, Director Source Water Protection Branch, Ministry of the Environment (MOE), in regard to Other Legislative Safety Measures in place that protect Ontario's Drinking Water" with attachment which identifies Drinking Water Systems under the Safe Drinking Water Act, 2002.
(b) A letter dated January 18, 2008 from Ian Smith, Director Source Water Protection Branch, MOE, in regard to Inclusion of a Drinking Water System under the Source Protection Planning Process through Municipal Council Resolution.
(c) A letter dated January 18, 2008 from Ian Smith, Director Source Water Protection Branch, MOE, in regard to Clarifying and Using Proxies in accordance to the Source Protection Committee Regulation.
(d) A letter dated January 28, 2008 from Mark Schiller, Chair, Collaborative Study to Protect Lake Ontario Drinking Water, Region of Peel, in regard to Scope Change - Collaborative Study to Protect Lake Ontario Drinking Water.
3
RES.#A3/08 - CORRESPONDENCE
Moved by: David KentnerSeconded by: Heather Laidlaw
THAT above-noted correspondence (a) - (c) be received.CARRIED
RES.#A4/08 - CORRESPONDENCE
Moved by: Mark SchillerSeconded by: Michael D'Andrea
THAT above-noted correspondence (d) be added to the agenda and received.CARRIED
4
CORRESPONDENCE (A)
5
6
7
8
CORRESPONDENCE (B)
9
10
CORRESPONDENCE (C)
11
12
CORRESPONDENCE (D)
13
14
15
16
_________________________________________
17
SECTION I - ITEMS FOR COMMITTEE ACTION
RES.#A5/08 - TERMS OF REFERENCE FOR ASSESSMENT REPORTS AND SOURCE PROTECTION PLANSUpdate and Approval of Next Steps. Report back seeking approval of CTC Source Protection Committee for proposed approach and timelines to complete Terms of Reference for each source protection area within the CTC Region and submit the Terms of Reference to the respective source protection authority no later than August 19, 2008.
Moved by: Irv HarrellSeconded by: Lynn Moore
THAT the CTC Source Protection Committee (SPC) concurs with the amended proposed approach and timelines outlined in Attachment 1 for the CTC SPC Municipal Technical Advisory Working Group to prepare the Terms of Reference for each of the three source protection areas for the approval of the CTC SPC;
THAT the composition of the sub-committee of the CTC Municipal Technical Advisory Working Group (the “Municipal Terms of Reference Liaison Working Group”) be endorsed, with additional membership to be explored;
THAT the draft Table of Contents for the Terms of Reference be provided to members of the Municipal Terms of Reference Liaison Working Group as a discussion starter;
AND FURTHER THAT staff be requested to take the necessary action to support and ensure the development of the milestone products and report back at the February 11, 2008 meeting of the CTC SPC on progress to date and seek approval of any further directions required at that time.
CARRIEDBACKGROUND At CTC SPC Meeting #1/07, held on December 10, 2007, a staff report was received for information outlining the requirements for the development of Terms of Reference by the CTC SPC as required pursuant to Ontario Regulation 287/07 under the Clean Water Act, 2006. Also, the CTC SPC received a presentation on these requirements and authorized by Resolution #C5/07 that a Municipal Technical Advisory Working Group under the chairmanship of SPC member Michael Garrett be charged with preparing the Terms of Reference on behalf of the SPC.
18
Current StatusAt the request of Michael Garrett and CTC SPC Chair Susan Self, the seven municipal members of the CTC SPC have been requested to be part of the Municipal Technical Advisory Working Group responsible for developing the Terms of Reference. The inaugural meeting was held January 8, 2008, which was attended by five of seven municipal SPC members, plus municipal staff from a number of the upper and lower tier municipalities’ works, planning and health departments. Included as Attachment 1 are the agenda and the notes from that meeting.
At the post-meeting discussions with SPC members and chair, CTC project manager and CTC executive lead a number of decisions were made:
The members of the Municipal Terms of Reference Liaison Working Group chaired by Mike 1.Garrett will be the seven municipal SPC representatives, Susan Self, selected municipal staff (see item 2 below for details and actions required), Adele Freeman and the CTC Technical Committee (Don Ford, Gayle Soo-Chan, John Kinkead, Kerry Mulchansingh, Karen Hortopan and Beverley Thorpe). Additional municipal staff members were proposed by the SPC members: Ralph Stanley – 2.(Health, Peel), Mark Head (Planning, Peel), James Stiver, (Director of Planning, Orangeville), to be determined (planning, Town of Halton Hills), Barb Jefferies (Planning, York Region). The appointment of these persons is the responsibility of the SPC member representing that municipal group. If the selected individual is not available, then the SPC member is responsible to find an alternate. The selected individuals were chosen to represent the perspectives of upper & lower tier municipalities across the CTC Region with a bias towards the areas in the CTC Region where there are existing water issues. As the SPC members represent the works areas, no additional municipal staff with works expertise is required. Mark Schiller and Beverley Thorpe will engage the Lake Ontario Collaborative (Larry Moore) 3.in helping with identifying in the Terms of Reference (TOR), work required beyond the currently funded Phase 2 studies. Rick Gerber will be requested to advise on what would be required (both technical and 4.budget wise recognizing the current funding model limitations) for the York-Peel-Durham-Toronto Groundwater Study to address the Halton, Wellington, Orangeville and Mono groundwater information. Beverley Thorpe will develop a proposed meeting schedule for the Municipal Terms of 5.Reference Liaison Working Group through completion, to precede the dates of the SPC meetings to ensure work is completed in time to have a draft TOR for municipalities by late April/early May, and will consider when meetings of the larger Municipal Technical Advisory Working Group are required (all municipalities – works, planning and health). A meeting will be scheduled with the commissioners of planning and works for all CTC 6.Region municipalities in mid-March to engage senior municipal staff in the development of the TOR and seek their support. At the meeting to be chaired by Mike Garrett , the commissioners will be briefed on the work to date at that time, the approach, and a proposed generic presentation which could be given to municipal councils. The commissioners will be asked for their advice/recommendations on best approach for the respective councils. Beverley Thorpe is to prepare a draft generic presentation deck on source protection for 7.use by the SPC members in briefing their constituents as soon as possible.
19
The project manager and project leads from the three conservation authorities were 8.directed to prepare a draft Table of Contents for the TOR and a proposed meeting schedule to be reviewed by the CTC SPC and sent to the Municipal Terms of Reference Liaison Working Group members.
RATIONALEAttachment 1 is the proposed meeting schedule and timetable for the development of the Terms of Reference for endorsement by the CTC SPC. Included in the schedule are the proposed milestone deliverables and or decisions required at each meeting. Newly appointed municipal staff on the Municipal Terms of Reference Liaison Working Group have been advised of the proposed meeting on January 30, 2008.
Attachment 2 is the draft Table of Contents prepared by project staff which will be used to begin development of the TOR starting with the January 30, 2008 meeting of the Municipal Terms of Reference Liaison Working Group.
Report prepared by: Beverley Thorpe, 416-661-6600 extension 5577Emails: [email protected] Information contact: Beverley Thorpe, 416-661-6600, extension 5577Emails: [email protected]: January 17, 2008Attachments: 2
20
Attachment 1CTC Source Protection Region Proposed Meeting Schedule, Milestone Deliverables &
Decision Points for Terms of Reference
Month CTC SPC Meetings
Municipal Terms of Reference Liaison
Working Group Meetings
CTC Technical Committee Meetings
Other Meetings/Consultations
January
Jan. 8 Kick-off meeting of the CTC Municipal Technical Advisory Working Group
Jan. 15 Prepare for draft Table of Contents
Prepare proposed meeting schedule
Jan. 16 Formal Notice to municipalities re commencement of TOR work
Jan. 29 Progress on TOR
Jan. 30 Update on TOR from Technical Committee meeting Jan. 15
Set the stage for Feb. 22 meeting
Joint meeting with Municipal Liaison Group
February
Feb. 11 Progress on TOR
Feb. 21 Prepare for workshop with project management consultant to develop deliverable breakdown structure and estimated effort and responsibility for each of major Terms of Reference tasks
21
Month CTC SPC Meetings
Municipal Terms of Reference Liaison
Working Group Meetings
CTC Technical Committee Meetings
Other Meetings/Consultations
Feb. 22 Workshop with project management consultant to develop deliverable breakdown structure and estimated effort and responsibility for each of major Terms of Reference tasks
Joint meeting with Municipal Liaison Working Group
March
Mar. 19 Dinner meeting with SPC municipal members, commissioners of planning and works and CA CAOs to present work in-progress and seek advice on how to work with councils
Mar. 17 Progress on TOR
Mar. 19 Timelines
Resource estimates
Who does what
Mar. 26 Draft TOR
Mar. 28 Draft TOR circulated to members
April
Apr. 14 Progress on TOR
Apr. 16 Draft TOR
Meet with Technical Committee in morning
Joint meeting with Municipal Liaison group in morning
Meeting of the Municipal Technical Advisory Working Group with the Municipal Terms of Reference Liaison Working Group to discuss draft TOR in afternoon
Apr. 30 Final Draft TORMeet with Technical Committee
Joint meeting with Municipal Liaison Working Group
22
Month CTC SPC Meetings
Municipal Terms of Reference Liaison
Working Group Meetings
CTC Technical Committee Meetings
Other Meetings/Consultations
May
May 13 Approve Draft TOR
May 14 Post TOR for public comment. Written comments accepted until June 18
June
June 4
Review Dates
Public consultation meeting, Credit Valley SPA
Will require some SPC members in attendance
June 5
Review Dates
Public consultation meeting, Toronto and Region SPA
Will require some SPC members in attendance
June 6
Review Dates
Public consultation meeting, Central Lake Ontario SPA
Will require some SPC members in attendance
June 9 Review initial comments on TOR
June 10-23 Other meetings with stakeholder groups to be determined
June 24 Review written comments on TOR
Revise TOR as required
Meet with Technical Committee in morning
Joint meeting with working groups
Meeting of the Municipal Technical Advisory Working Group with the Municipal Liaison Working Group to discuss draft TOR in afternoon
23
Month CTC SPC Meetings
Municipal Terms of Reference Liaison
Working Group Meetings
CTC Technical Committee Meetings
Other Meetings/Consultations
July
July 8 Review written comments on TOR
Review revised TOR from working group
July 10 Final meeting re TOR
Meet with Technical Committee
Joint meeting with Municipal Liaison Working Group
July 20 TOR circulated to members
August
Aug. 11 Final meeting re approval of TOR
Aug. 22 Submission of TOR to each SPA no later than August 22.
Notice for public to comment on TOR to each authority.
CTC source protection staff will be responsible for preparing draft documents for review by the various committees, organizing meeting arrangements, locations etc, agenda and meeting notes, notices and newspaper ads and completing the terms of Reference in the Access database (Wizard) as mandated by the Ministry of the Environment.
24
Attachment 2
Draft Table of Contents for Terms of Reference
Terms of Referencefor
CTC Source Protection Planning
Version 1.0
January 15, 2008
25
Table of Contents
Page
1. Assessment Report Preparation (Clean Water Act, s.15)a. Assessment Report Components
i. Watershed Characterization (Module 1)ii. Municipal Water Supply Strategies (Module 2)iii. Groundwater Vulnerability (Module 3)iv. Surface Water Vulnerability (Module 4)v. (Module 5)vi. (Module 6)vii. Water Quantity Risk Assessment (Module 7)
b. Report Compilationc. Project Managementd. Budget Administration
2. Assessment Report Consultation
3. Publication of Approved Assessment Report (Clean Water Act, s.20)
4. Interim Progress Reports (Clean Water Act, s.21)
5. Source Protection Plan Preparation (Clean Water Act, s.22)a. Source Protection Plan Components
i. Assessment Reportii. Policies on Significant Drinking Water Threatsiii. Policies for Targets (Clean Water Act, s.85)iv. Policies for Monitoring Significant Drinking Water Threatsv. Policies for Monitoring Drinking Water Threats in Vulnerable Areasvi. Policies for Monitoring Effectiveness of Policiesvii. Policies for Monitoring Drinking Water Issues (limited circumstances)viii. Prohibited Activities (Clean Water Act, s.57)ix. Regulated Activities (Clean Water Act, s.58)x. Restricted Activities (Clean Water Act, s.59)xi. Other Prohibited/Regulated/Restricted Activitiesxii. Policies Governing Content of Risk Management Plans (s.58)xiii. Policies for Lake Ontario Drinking Water Supplies/Great Lakes Policiesxiv. Policy Designating Public Body for implementing policyxv. Policies re Monitoring Past Conditionsxvi. Education and Outreachxvii. Additional Policies on Prohibiting/Restricting Activities
b. Plan Compilationc. Proposed Source Protection Plan Consultationd. Proposed Source Protection Plan Publicatione. Project Managementf. Budget Administration
26
6. Notification (Clean Water Act, s.23)a. Notice to Clerks of Proposed Source Protection Planb. Notice to Persons of Proposed Source Protection Planc. Notice to Public of Proposed Source Protection Pland. Publish Source Protection Plan
7. Amending the Terms of Reference
8. Municipal Resolutions (Clean Water Act, s.24)
9. Submission to Minister of the Environment (Clean Water Act, s.25)a. Submission of Source Protection Plan to Minister of the Environmentb. Submission of Comments on Source Protection Plan to Minister of the
Environment
_________________________________________
27
RES.#A6/08 - INFORMATION TOPICS FOR FUTURE MEETINGS AND TRAINING NEEDSDiscussion regarding priority/scheduling of presentations at upcoming SPC meetings and the future information and training needs for SPC members.
Moved by: Irv HarrellSeconded by: Lynn Moore
THAT the list of Information Topics for Future Meetings and Training Needs be updated as outlined below.
CARRIED
Suggested Topic Priority/MeetingMunicipal and conservation authority technical studiesDiscussions with First Nations Understanding of water quantity
Water budgets, climate, and impacts to permits to take water
Feb. 11 from each SPA
Future re how municipalities will be expected to report on monitoring of performanceInformation from Province on public health issues and connection to drinking water source protectionEstablishing a Great Lakes working groupWater Characterization Reports Feb. 11 from each SPAGroundwater vulnerability Mar. 17Why CVC is able to go directly to Tier 2Risk AssessmentResults of jurisdictional scan by MOEWhere is this all going ie. what will be in a SPP and what are we working toward. From MOE, what restrictions, policies, etc. will be established
Mar. 17
Tier 3 study in OrangevilleContext of how assessment reports go together. Table explaining into which module each report fits
Feb. 11
Gap analysis and how will we know progress
_________________________________________
28
SECTION II - ITEMS FOR COMMITTEE INFORMATION
RES.#A7/08 - MUNICIPAL TECHNICAL ADVISORY WORKING GROUP MINUTES
Moved by: Fred RufSeconded by: Heather Laidlaw
THAT the Minutes from Municipal Technical Advisory Working Group Meeting #1/08, held on January 8, 2008, be received.
CARRIED _________________________________________
RES.#A8/08 - SCHEDULE OF MEETINGS
Moved by: Fred RufSeconded by: Heather Laidlaw
THAT the Schedule of Meetings outlined in Attachment 1 be received.CARRIED
For Information contact: Karen Hortopan, extension 5392Email: [email protected]: January 17, 2008Attachments: 1
29
Attachment 1
CTC Source Protection Committee Meetings ScheduleDecember 2007 - August 2008
Meeting #1/07 Monday, December 10, 2007 10am - 3pm
Meeting #1/08 Tuesday, January 29, 2008 10am - 3pm
Meeting #2/08 Monday, February 11, 2008 10am - 3pm
Meeting #3/08 Monday, March 17, 2008 10am - 3pm
Meeting #4/08 Monday, April 14, 2008 10am - 3pm
Meeting #5/08 Tuesday, May 13, 2008 10am - 3pm
Meeting #6/08 Monday, June 9, 2008 10am - 3pm
Meeting #7/08 Tuesday, July 8, 2008 10am - 3pm
Meeting #8/08 Monday, August 11, 2008 10am - 3pm
_________________________________________
30
TERMINATION
ON MOTION, the meeting terminated at 2:45 p.m., on January 29, 2008.
Susan SelfChair
/ks