imax xtra el - ideal boilers ie · 2018. 10. 3. · j. installation instructions - 1 off this...

4
BOILER PUMP KIT INSTRUCTIONS IMAX XTRA EL When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Ideal. October 2016 UIN 213987 A02

Upload: others

Post on 22-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IMAX XTRA EL - Ideal Boilers IE · 2018. 10. 3. · J. Installation Instructions - 1 off This Boiler Pump Kit is suitable for the following boilers listed: IMAX XTRA EL RANGE The

BOILER PUMP KITINSTRUCTIONS

IMAX XTRA EL

When replacing any part on this appliance, use only spare parts that you can beassured conform to the safety and performance specification that we require.Do not use reconditioned or copy parts that have not been clearly authorised by Ideal.

October 2016UIN 213987 A02

Page 2: IMAX XTRA EL - Ideal Boilers IE · 2018. 10. 3. · J. Installation Instructions - 1 off This Boiler Pump Kit is suitable for the following boilers listed: IMAX XTRA EL RANGE The

2 BOILER PUMP KIT - INSTRUCTIONS

A B

C DG H

E

F

KIT CONTENTS

A. Stratos 80 Pump - 1 off (c/wflangegaskets&insulation)B. IFModule-1offC. M16x65Bolts-8offD. M16 Nuts - 8 offE. PumpControlLeadSet-1offF. 230VRelay-1offG. M3 Nuts - 2 offH. M3Washer-2offJ. InstallationInstructions-1off

ThisBoilerPumpKitissuitableforthefollowingboilerslisted:

IMAX XTRA EL RANGE

TheBoilerPumpKitshouldbefittedontothereturnflangeoftheboiler.Ideallyitwouldbefittedinconjunctionwithalowlossheaderorheatexchanger,toprovidehydronicseparationoftheboilertothesystem.

These instructions must be read in conjunction with the Installation & Servicing Instructions supplied with the boiler.

ThehydraulicresistanceandnominalflowsfortheboilerrangearegivenintheInstallationManualandshouldbelookedatwhenspecifyingapump.Atableshowingtheavailableheadatnominalflowareshownbelowforeachboilerintherange

Themanufacturer'sinstructionsareprovidedandshouldbereadfullytounderstandtheoperationofthepump.Thepumpshouldbefittedtothereturnmanifoldusingtheflangegaskets,boltsandnutsprovided.

Boiler Size320 395 470 545 620

AvailableHead(m) 1.2 1.6 2.1 3.1 4NominalFlow(m3/h) 13.8 17.0 20.2 23.5 26.7

Page 3: IMAX XTRA EL - Ideal Boilers IE · 2018. 10. 3. · J. Installation Instructions - 1 off This Boiler Pump Kit is suitable for the following boilers listed: IMAX XTRA EL RANGE The

3BOILER PUMP KIT - INSTRUCTIONS

These instructions must be read in conjunction with the Installation & Servicing Instructions supplied with the boiler.

INSTALLING THE IF MODULE

L N

S

SM

AA tthc

tung

IFO-pMo

tiodnul

ANe

chttzsp

unagn

Attentionnung

Mains Voltage

netio

n - 123

0V!

IF-Modulntpiao

nn

nung

tage

AM

tatiens Vol

3

2

1

4a 4b 4c

4d

4e

~15 mm

~15 mm

INSTALLINGToensureimmunityinindustrialenvironments(EN61000-6-2)thedataandcontrolcablesmustbeshieldedcablesandmustbeusedwithanEMCcompliantcablegland(includedwiththemodule).

WARNING!Dangerofelectricshock!

Thepumpshouldbeelectricallyisolatedandsecuredagainstunauthorisedswitch-onbeforebeginninginstallationoftheIF-Module.

InstallationstepsinaccordancewithDiagramabove:• Removethelidofthepump'sterminalbox• Removethecover(1)• InstalltheIF-Moduleinthepump'sterminalbox(2)• Pushtheconnectionpluginalltheway(3)• RemovetheexistingPG9screwedconnections(4a)• InstalltheaccompanyingmetalEMCcableglands(4b)• Stripandpreparetheshieldandthecorewires(4c)• Insertthecable(4d)• Screwthecableglandintoplace(4e)

ELECTRICAL CONNECTIONWARNING!Dangerofelectricshock!

Electrical connection must be carried out by an electrician authorised by the local electricity supply company and in accordance with the applicable Wiring Regulations, BS7671.

• Carryoutinstallationasdescribedintheprevioussection.• Carryoutelectricalinstallationofthepumpasspecifiedin

therelevantinstallationandoperatinginstructions.• Theelectricalconnectionmustbeestablishedviaafixed

powercable(3x1.5mm2minimalcross-section),equippedwithaplugandsocketconnectororanall-poleswitchwithaminimumcontactopeningwidthof3mm.

• Thefollowingminimumrequirementsaretobemetifshutdowntakesplacebymeansofanonsitenetworkrelay:nominalcurrent≥10A,nominalvoltage250VAC.

• Fuseprotection:10/16A,slow-bloworautomaticfusewithCcharacteristic.

• CheckthetechnicalspecificationsoftheelectriccircuitsbeingconnectedtoensuretheyarecompatiblewiththeelectricalspecificationsoftheIF-ModuleTerminalnumberingasshowninPos.(3)frombottomtotop.

IF-MODULE Stratos Ext. Off

TerminalNo. Terminal*1 Ext.Off*2 Ext.Off3 0-10V4 GND(for0-10V5 DP6 DP

*Removelinkandconnectcontrolcablewireshere.• CheckthattheExt.Offwiresarefreeofinterferencevoltage.

FINAL WORK - ALL MODULES• Checktheterminalboxsealforanyvisibledamage.• Closetheterminalboxlidwiththescrewsprovidedsothat

thesealistightallaround.• Carryoutcommissioning/functionaltestinaccordancewith

thefollowingsection.

COMMISSIONINGThefollowingsectiondescribestestingthefunctioningoftheinputs/outputs.Itisrecommendedtotesttogetherwiththeconnectedsystem.Thepump'sinstallationandoperatinginstructionsareneededforsomesettings.

EXT. OFF INPUT• ContactviaExt.Offterminalsisclosed.• Switchonthepumpviathemenu:symbolfor“On”appears.• ContactviaExt.Offterminalsisopened:pumpswitchesoff,

symboldisappears.

Page 4: IMAX XTRA EL - Ideal Boilers IE · 2018. 10. 3. · J. Installation Instructions - 1 off This Boiler Pump Kit is suitable for the following boilers listed: IMAX XTRA EL RANGE The

Ideal Boilers Ltd., P.O.Box103,NationalAve,KingstonuponHull,HU54JN.Telephone:01482492251Fax:01482448858.RegistrationNo.London322137.

Technical Training

Ideal Boilers Ltd.pursuesapolicyofcontinuingimprovementinthedesignandperformanceofitsproducts.Therightisthereforereservedtovaryspecificationwithoutnotice.

TheIdealBoilersTechnicalTrainingCentreoffersaseriesoffirstclasstrainingcoursesfordomestic,commercialandindustrialheatinginstallers,engineersandsystemspecifiers.Fordetailsofcoursespleasering:................................ 01482498432

Ideal Installer/Technical Helpline: 01482 498 376www.idealcommercialboilers.com

PUMP KIT INSTALLATIONOncompletionofinstallingtheIFmoduleontothepump,takethePumpControlLeadandinstallintothecontrolboxontheRH,frontuppersideoftheboiler.

1. ToaccesscontrolsboxonRHside,removeboilerpanels.RefertoInstallationInstructions

2. MounttherelayontotheleftmostM3studsandsecureusingthetwowashersandnutsprovided.

3. RemovethepumpconnectionfromtheburnercontrolPCBandreplacewiththeconnectoronthepumpcontrollead.

4. RemovethepluglocatedinthePWMinstallerconnection.Placethistoonesideasitwillbeusedlater.UnclipthePWMinstallerconnectorfromthefrontpanelinstallerconnectionarea

5. Replacewiththeconnectoronthepumpcontrollead.

6. Usingasuitable2corecable,asspecifiedfortheIFmodule,connectthepumpcontrolcablebetweentheIFmoduleandthepumpcontrolplug,routingthecableconnectorthroughtheSELVconduitfromthebackoftheboilerandsecuringattheboilerwiththecableclamps.

7. Powerupthepumpandfollowthecommissioninginstructions.

8. Finallypluginthepumpcontrolplugintotheinstallerpumpcontrolconnection,labelled"PumpPWM".

9. Checkthatthepumpstartswhentheboilerpumpsignalison.

10.Replaceandsecureallboilerpanelsinreverseorder.