Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 1
Image Acquisition Campaign 2008
Pär Johan Åstrand, Maria Erlandsson JRC, CIDMihaela Fotin, Cherith Aspinall JRC, CID
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 2
PAC
CID
Roadmap to Image Acquisition Campaign 2008• Selection of Control Zones and Risk Analysis
responsibility PAC (JRC reference FMP 8218) - guidelines• MS Satellite Image Requirements for the 2008 Campaign
responsibility PAC (JRC reference FMP 8433) – letter plus Annex• Delivery of generalised shapefiles, and further details
responsibility CID 31/12template will be sent out as soon as requirements/budget is defined
• Technical and Competitive Feasibilityresponsibility CID January-Februarycommunication and acceptance by MS Administration March 2008
• LIODOTNET training at CwRS KO Meetingresponsibility CID, also contractors to be invited, March 2008including updates, image return etc.
• Image Acquisition Campaign start…indeed already started, 64 autumn sites already open…
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 3
HR Imagery; sites/windows• All sites to be defined by shape file • Autumn window
autumn sites opened 64 windows (DE, FR), autumn sites acquired 39
• Winter windowopen/close date to be decided by MS
• Spring, Summer windowsnew naming convention proposed: HR-1, HRVHR , HR+1, HR+2 etc.window length HR to be decided by MS (normal case 3(-4) weeks)1st open date to be decided by MS Admin. If no extraordinary decision (*), JRC will
open all further windows automatically after a 2(-3) week dead period after acquisition
• Radar tripletsto be reduced to a minimum in 2008 Campaignfuture VHR Radar (e.g. TerraSAR-X, COSMO-SkyMed) ?
(*) extraordinary condition see VHR Image Specifications for the CwRS Programme [http://mars.jrc.it/] - notice of 2 weeks required.
OKOK
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 4
HR Imagery; 1st come 1st served menuHR Sensor Products GSD [m]
Swath width (at nadir)
Approx Capacity [scenes or km2] in a 1st come 1st served scenario; mean "winners" plus uploaded "loosers"
Proposed role Comments / Constraints
SPOT 2 MSP 3 bands (no SWIR)
20 60 160 ; plus approx 70 ; sum 230
autumn, winter, HR-1, HR+1, HR+2
Old - launched on jan. 22, 1990; SPOT promised 2008 campaign !
SPOT 4 MSP 4 bands (incl. SWIR)
20 60 210 ; plus approx 80 ; sum 290
autumn, winter, HR-1, HR+1, HR+2
SPOT 5 MSP 4 bands (incl. SWIR)
10 60 200 ; plus approx. 50 ; sum 250
autumn, winter, HR-1, HR VHR, HR+1, HR VHR, HR+2
acquisition of SPS PAN and SPOT 5 MSP is possible in same pass
IRS P6 MSP 4 bands (incl SWIR)
23,5 127 - 141 40 ; plus approx. 50 ; sum 90
autumn, winter, HR-1, HR+1, HR+2
Landsat 5 MSP 7 bands 30 183 40 ; plus approx. 60 ; sum 100
autumn, winter, HR-1, HR+1, HR+2
presently suffering low battery problems and is “temporarily” shut down
F2 MSP 4 bands (incl. BLUE)
8 24 10000 km2 ; approx 15 scenes on one window => 45
autumn, winter, HR-1, HR VHR, HR+1, HR VHR, HR+2
capacity depends on off-nadir angle ; fixed orbits means that some areas are never covered ; capacity should be seen together with VHR backup sum 15.000
DMC MSP 3 bands (Landsat 2,3,4 like)
32 325 5 ; plus approx. 5 ; sum 10
autumn, winter, HR-1, HR+1, HR+2
upon request by MS
ALOS - AVNIR2 MSP 4 bands 10 70 unknown HR - archive searches will not be programmedSUM 1015
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 5
HR Imagery; 1st come 1st served menuHR Sensor Products
Approx Capacity [scenes or km2] in a 1st come 1st served scenario; mean "winners" plus uploaded
Proposed role Comments / Constraints
SPOT 2 MSP 3 bands (no SWIR)
160 ; plus approx 70 ; sum 230
autumn, winter, HR-1, HR+1, HR+2
Old - launched on jan. 22, 1990; SPOT promised 2008 campaign !
SPOT 4 MSP 4 bands (incl. SWIR)
210 ; plus approx 80 ; sum 290
autumn, winter, HR-1, HR+1, HR+2
SPOT 5 MSP 4 bands (incl. SWIR)
200 ; plus approx. 50 ; sum 250
autumn, winter, HR-1, HR VHR, HR+1, HR VHR, HR+2
acquisition of SPS PAN and SPOT 5 MSP is possible in same pass
IRS P6 MSP 4 bands (incl SWIR)
40 ; plus approx. 50 ; sum 90
autumn, winter, HR-1, HR+1, HR+2
Landsat 5 MSP 7 bands 40 ; plus approx. 60 ; sum 100
autumn, winter, HR-1, HR+1, HR+2
presently suffering low battery problems and is “temporarily” shut down
F2 MSP 4 bands (incl. BLUE)
10000 km2 ; approx 15 scenes on one window => 45
autumn, winter, HR-1, HR VHR, HR+1, HR VHR, HR+2
capacity depends on off-nadir angle ; fixed orbits means that some areas are never covered ; capacity should be seen together with VHR backup sum
DMC MSP 3 bands (Landsat 2,3,4 like)
5 ; plus approx. 5 ; sum 10
autumn, winter, HR-1, HR+1, HR+2
upon request by MS
ALOS - AVNIR2 MSP 4 bands unknown HR - archive will not be programmedSUM 1015
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 6
HR Imagery; semi-automated orthorectification•
ortho node
1
ortho node
2
ortho node
x
Keystone server
raw image rectification process final ortho image
Digital Elevation Model
Reference
Imagery
SRS dataprocessing
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 7
• Possibility to test the service on 1 site/ contractor in 2008 in an “operational” configuration for interested users (please contact Pär). Then we will request your feedback!
• Further analysis and testing to be done on VHR data during 2008.
SRS dataprocessing
Ancillary dataSensor
SRTM or local DEMLPIS ortho coverage (WMS or local access)
SPOT 5
SRTMLandsat coverage
SPOT 2,4Landsat
HR Imagery; semi-automated orthorectification
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 8
VHR Imagery; sites/windows• Efficient sizes (*) • Ratio 1:3 QB:IK (*) • Window length VHR to be decided by MS (normal case 6(-8)
weeks)• Window will be adapted to fit satellite pass• Backup window closes after dedicated prime has acquired
(*)• Backup window opens 20 days after dedicated prime• All windows can have MSP component (VHR or HR)
(*) see VHR Image Specifications for the CwRS Programme [http://mars.jrc.it/]
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 9
VHR Imagery; Dedicated sensors menuVHR Sensor Products GSD [m] Swath (at
nadir)
Approx Capacity [km2] in a Dedicated scenario
Proposed role Comments / Constraints
IKONOS PAN, MSP (4 bands), PANMERGE
0.83.2
11,3 120.000 PRIME efficient site 30x30, but may be larger up to 40x60km ; max. off-nadir angle 37 deg
QUICKBIRD PAN, MSP (4 bands), PANMERGE
0,62,4
16,5 30-40.000 PRIME to be within 1 fragment 14 km max width, efficient size 12x30km ; max. off-nadir angle 37 deg
EROS A PAN 1,8 14 10.000 BACKUP (*) efficient site 13x25km (or longer) ; max. off-nadir angle set to 18,5 deg
EROS B PAN 0,7 7 30.000 BACKUP (*) efficient site 26x28km ; max. off-nadir angle set to 30 deg ; geom acc test ongoing
SPOT5 SPS PAN supermode
2,5 60,0 25.000 BACKUP (*) acquisition of SPS PAN and SPOT 5 MSP is possible in same pass
F2 PAN, MSP (4 bands), PANMERGE
2 24 5.000 BACKUP (*) resolution at off-nadir angle 30deg approx 3m ; will be restricted to reach geom acc. threshold; capacity should be seen together with HR backup sum 15.000WorldView1 PAN 0,5 17,6 10.000 BACKUP (*) preferrably on QB site for efficiency ; needs to be tested for geometric accuracy
SUM PRIME 150.000SUM BACKUP 80.000(*) - can be programmed in conjunction with HR (SPOT 5, F2) to obtain MSP component
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 10
VHR/HR Imagery; how to increase capacity, reduce costs?• VHR Prime capacity approx. 150.000 km2• VHR Backup capacity 80.000 km (plus EROS B)• HR capacity approx 1000 scenes / campaign
• How to increase capacity?increase VHR window lengthslide VHR windowsmore extensive use of backup; allowing a lower planned dedicated success rateHR capacity sufficient?
• How to reduce costs?develop control method using PAN only as VHR primeless HR windowsflexibility of backup?
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 11
Some information• JRC will download source HR/VHR directly from Image Providers in Campaign 2008• F2 orthocorrection modules;
– ERDAS Imagine 9.1 (fix 32472 that adds a geometric modelling for F2)– PCI Geomatica 10 (with patch 10031 which includes critical enhancements for the F2 modelling)– SIPOrtho, Prodigeo, Socet set
• EROS B orthocorrection modules;PCI Geomatica 10.1.1 , ERDAS LPS, Socet Set
• ALOS; AVNIR-2 orthocorrection module; PCI Geomatica v 9.1 onwards
• Wv1 orthocorrection… PCI, ERDAS ? (waiting confirm by Eurimage, and test by CID)
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 12
• thank you !
Madrid, 12-14 November, 2007 – Geomatics in Support of the CAP 13
VHR Type window
PRIM
E
DEDICATED SENSOR IKONOS or QUICKBIRD IKONOS QUICKBIRD
BACKUP N Y Y
DEDICATED BACKUP SENSOR n/a
F2 (BUNDLE or PANMERGE); EROS A,B (PAN); SPS (PAN)
F2 (BUNDLE or PANMERGE); EROS A,B (PAN); WORLDVIEW1 (PAN); SPS (PAN)
DEDICATED BACKUP HR SENSOR IN VHR WINDOW i.e. HRVHR window
n/a SPOT5 MSP (if dedicated backup sensor is ≠ F2)
SPOT5 MSP (if dedicated backup sensor is ≠ F2)
EXTENSION possible if no prime only possible if no prime, no backup
only possible if no prime, no backup
BA
CK
UP
VHR type of window - CwRS Campaign 2008