ijb team structure

22
JB Goals

Upload: jesswanless

Post on 30-Jun-2015

280 views

Category:

Education


0 download

TRANSCRIPT

Page 1: Ijb team structure

JB Goals

Page 2: Ijb team structure

Building an inclusive community

JB aims to build an inclusive community in which members feel ownership and participate in decision making

Page 3: Ijb team structure

Developing our organisation

JB aims to build capacity among its members to take an active role within CISV at various levels including programmes and administration

Page 4: Ijb team structure

Advancing leadership

JB aims to develop leadership skills which empower individuals to become contributing members of a peaceful society

Page 5: Ijb team structure

Educating by experience

JB aims to educate by organising activities which stimulate knowledge, teach skills and foster positive attitudes towards a more peaceful society

Page 6: Ijb team structure

Empowering to reflect and act

JB aims to be a creative force by empowering its members to think critically and take action to create positive change

Page 7: Ijb team structure
Page 8: Ijb team structure

IJB Team Structure

Page 9: Ijb team structure

Once upon a time the IJB team was a big mess.

There was no structure, just a lot of motivated juniors, and so often the goals weren’t reached

Page 10: Ijb team structure

In 2007 the International Junior Representatives decided that things had to change. With such a lot of motivated people it was time to take some real actions.

In order to take these actions a structure was needed!

Page 11: Ijb team structure

In 2008 a structured IJB Team was born. After reflecting for some time the IJRs concluded IJBs work was covered by three main areas.

These three areas then became the three sections of the IJB Team.

Page 12: Ijb team structure

These were:

Connect

Page 13: Ijb team structure

Connect

Growth and Development

These were:

Page 14: Ijb team structure

These were:

Connect

Growth and Development

Quality Lab

Page 15: Ijb team structure

However after a few successful years working in this structure it was once again time for a change.

The team had become too big and was no longer productive.

Page 16: Ijb team structure

Last summer before IJBC the IJB Team met to evaluate the structure.

They began with the goals of the IJB Team and built up to the structure from there.

Page 17: Ijb team structure

After many long nights and early morning they came up with a new structure:

Made up of 4 areas

Page 18: Ijb team structure

These areas then divide into groups, with different tasks.

Page 19: Ijb team structure

However, there is no such thing as a perfect structure and we already have a group working on evaluating the new one.

Maybe in a couple of years we will have a whole new structure again!

Page 20: Ijb team structure

So what can we learn from this?

Page 21: Ijb team structure

Even though we have a whole new structure, you can see that we still have 3 main sections, that work with the same themes as in the previous structure.

Page 22: Ijb team structure

From this we learnt that regardless of the structure we still have the same three main areas that we work on.