EROSION CONTROL PRODUCTS DOTD Designation: S 613-03 General A. Equipment 1. 2. 3. 4. 5. Plastic bags or other suitable containers for samples. Suitable cutting devices for obtaining samples from rolls. Miscellaneous items such as tape or string in order to secure samples by vvrapping or tying. DOTD lot number stamp vvrth an ink pad. MATT forms and envelopes. B. Safety Precautions It is the responsibility of the user of this sampling method to establish appropriate safety practices including"but not limited to, exposure to flammable and hazardous materials ancj heavy lifting. II. Roll-type Erosion Control Products Note: Sample size is as listed in Sampling Manual. Exercise caution when cutting material. In cases materials is lost in sampling, sample entire roll. In cases where significant amounts of fiber will be lost if the roll is cut, the sample shall consist of the entire roll. A. Sampling at an approved warehouse (Louisiana Warehouse Only) Warehouse Responsibilities: a b. l c d. e. f. Notify the District Laboratory in the district in which the warehouse is located and request ~;ampling and testing for lot approval allowing adequate time for scheduling by the District Laboratory and testing by the Materials and Testing S;ection. Separate the materials to be sampled into individual rolls according to manufacturer's lot number. Each roll in a OCTO lot of 200 rolls shall have the same manufacturer lot number. Provide access to enatlle the District Laboratory personnel to randomly select a representative roll. Randomly select roll for sampling. As directed by the District Laboratory personnel, stamp and mark each roll with the OCTO lot number. After approval of a OCTO lot of rolls. a Certificate of Delivery will accompany each shipment to the job site. If the lot is not approved, void the OCTO lot number by marking through the number. g. District Laboratory Responsibilities: 2. a b. c. d. e. f. Identify each manufacturer's lot number and material to be tested by OOTO lot. Randomly select one roll from each different OOTO lot. Witness the warehouse personnel properly sample the material from the selected roll in accordarlce with OOTO S 601. Place sample into plastic bag or container. Write the OOTO and manufacturer lot numbers on the plastic bag or container. Once the samples are taken, witness the warehouse personnel stamp and mark each roll of that lot with the OOTO lot number (obtain stamps for this purpose from the Materials and Testing Section). Place a properly completed. unsoiled sample identification form in an 9 1II-6:~

Upload: others

Post on 11-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: II. - Louisiana · Write the OOTO and manufacturer lot numbers on the plastic bag or container. Once the samples are taken, witness the warehouse personnel stamp and mark each roll

EROSION CONTROL PRODUCTSDOTD Designation: S 613-03

General

A. Equipment

1.2.3.

4.5.

Plastic bags or other suitable containers for samples.Suitable cutting devices for obtaining samples from rolls.Miscellaneous items such as tape or string in order to secure samples byvvrapping or tying.DOTD lot number stamp vvrth an ink pad.MATT forms and envelopes.

B. Safety Precautions

It is the responsibility of the user of this sampling method to establishappropriate safety practices including"but not limited to, exposure to flammableand hazardous materials ancj heavy lifting.

II. Roll-type Erosion Control ProductsNote: Sample size is as listed in Sampling Manual. Exercise caution whencutting material. In cases materials is lost in sampling, sample entire roll. Incases where significant amounts of fiber will be lost if the roll is cut, the sampleshall consist of the entire roll.

A.

Sampling at an approved warehouse (Louisiana Warehouse Only)

Warehouse Responsibilities:

a

b.l

c

d.e.

f.

Notify the District Laboratory in the district in which the warehouse islocated and request ~;ampling and testing for lot approval allowingadequate time for scheduling by the District Laboratory and testing by theMaterials and Testing S;ection.Separate the materials to be sampled into individual rolls according tomanufacturer's lot number. Each roll in a OCTO lot of 200 rolls shall havethe same manufacturer lot number.Provide access to enatlle the District Laboratory personnel to randomlyselect a representative roll.Randomly select roll for sampling.As directed by the District Laboratory personnel, stamp and mark each rollwith the OCTO lot number.After approval of a OCTO lot of rolls. a Certificate of Delivery willaccompany each shipment to the job site.If the lot is not approved, void the OCTO lot number by marking throughthe number.

g.

District Laboratory Responsibilities:2.

a

b.c.

d.e.

f.

Identify each manufacturer's lot number and material to be tested by OOTOlot.Randomly select one roll from each different OOTO lot.Witness the warehouse personnel properly sample the material from theselected roll in accordarlce with OOTO S 601.Place sample into plastic bag or container.Write the OOTO and manufacturer lot numbers on the plastic bag orcontainer.Once the samples are taken, witness the warehouse personnel stamp andmark each roll of that lot with the OOTO lot number (obtain stamps for thispurpose from the Materials and Testing Section).Place a properly completed. unsoiled sample identification form in an9

1II-6:~

Page 2: II. - Louisiana · Write the OOTO and manufacturer lot numbers on the plastic bag or container. Once the samples are taken, witness the warehouse personnel stamp and mark each roll

h.

envelope and securel~1 attach the envelope to the sample container.Forward the samples to the Materials and Testing Section for testing. Thedisposition of results will be reported by the Materials and Testing Sectionto the District Laborato,ry.For any lot of materia! not conforming to specifications and receiving afailing report, return to "the storage facility to ensure that the supplier of thematerial has voided thEI OCTO lot number.

3. Certificate of Delivery from the Warehouse:

Upon receiving approval ancj a passing laboratory number from the Materialsand Testing Section, submit with each OCTO lot of approved material aCertificate of Delivery to the !:)roject engineer along with a copy to the Materialsand Testing Section.

B. Sampling at Project Site

1. Contractor Responsibilities:

8.

b.

c.

Notify the project personnel and request sampling and testing for approval,allowing adequate time for sample transportation and testing by theMaterials and Testing ~jection.Separate the materials to be sampled into individual rolls by manufacturer' slot number. Samples should not represent more than 200 rolls of the sameManufacturer's lot.Provide access to enable the project personnel to randomly select arepresentative roll.

2. Project Engineer Responsibilities:

a.b.c.d.e.f.

Identify each manufacturer's lot number and material to be tested.Randomly select one roll from each different manufacturer's lot.Properly Sample the material from the selected roll.Place the sample in a plastic bag or suitable container.Write the manufacturer's lot numbers on the sample bag or container.Place a properly completed, unsoiled sample identification form n anenvelope and securely attach the envelope to the sample container.Forward the samples to the Materials and Testing Section for testing. Thedisposition of results will be reported by the Materials and Testing Sectionto the project personnel.

III. Bagged Products

A. Sampling at an approved walrehouse (Louisiana Warehouse Only)

1 Warehouse Responsibilities:

A.

B.

c.

D.

E.

F.

Notify the District Laboratory in the district in which the warehouseis located and requlest sampling and testing for lot approval allowingadequate time for scheduling by the District Laboratory and testing bythe Materials and -resting SectionSeparate the materials to be sampled into individual bags accordingto manufacturer's lot number. Each bag in a OCTO lot of 200 bagsshall have the same Manufacturer's lot number.Provide access to enable the District Laboratory personnel torandomly select a representative bag.As directed by thE~ District Laboratory personnel, stamp and markeach bag or sealed pallet with a OCTO lot number.After approval of a OCTO lot, a certificate of Delivery will accompanyeach shipment to 1:he job site.If the lot is not approved, void the OCTO lot number by marking

111-6:3 12/03

Page 3: II. - Louisiana · Write the OOTO and manufacturer lot numbers on the plastic bag or container. Once the samples are taken, witness the warehouse personnel stamp and mark each roll

through the numb,er

2.

District Laboratory Responsibilities:

a.

bc.d

e.

to

Identify each manlJfacturer's lot number and material to be tested byOCTO lot.Randomly select one bag form each different OCTO lot.Write the OCTO and manufacturer lot numbers on the bag.Witness the warehouse personnel stamp and mark each bag of thatlot with the OCTO lot number (obtain stamps for this purpose fromthe Materials and Testing Section.)Place a properly completed, unsoiled sample identification form in anenvelope and seclJrely attach the envelope to the selected bag.Forward the sample to the Materials and Testing Section for testing.The disposition of results will be reported by the Materials andTesting Section to the istrict Laboratory.For any lot of material not conforming to specifications and receivinga failing report, retu rn to the storage facility to ensure that the supplierof the material has voided the OCTO lot number.

3" Certificate of Delivery form the Warehouse:

Upon receiving approval and a passing laboratory number from theMaterials and Testing Section, submit with OCTO lot of approved materiala Certificate of Delivery to the project engineer along with a copy to theMaterials and Testing SI~ction.

Sample at Project Site (Wht~n not accompanied with a properly completedOCTO Certificate of Delivery indicating material was previously sampled at anin state warehouse and approved by the Materials and Testing Section or isdeemed questionable by the Project Engineer.)

B

Contractor Responsibilities:

a

b.

Notify the project ipersonnel and request sampling and testing forapproval, allowing adequate time for sample transportation andtesting by the Materials and Testing Section.Separate the ma1:erials to be sampled into individual bags bymanufacturer's lot number. Samples shall not represent more than200 rolls of the sarrle manufacturer's lot.Provide access to enable the project personnel to randomly select arepresentative bag.

c

Project Engineer Responsibilities2

Identify each manu1:acturer's lot number and material to be tested.Randomly select on bag from each different manufacturer's lot.Write the OCTO and manufacturer's lot number on the selected bag.Place a properly completed, unsoiled sample identification form in anenvelope and securl~ly attach the envelope to the bag. Forward thesample to the Materials and Testing Section for testing. Thedisposition of results vvill be reported by the Materials and TestingSection to the projec:t personnel.

a.bc.d

12/03111-64

Page 4: II. - Louisiana · Write the OOTO and manufacturer lot numbers on the plastic bag or container. Once the samples are taken, witness the warehouse personnel stamp and mark each roll

OCTO 03-22-0032Rev. 03/03

STA-rE OF LOUISIANADEPARTMENT OF TRA/lISPORTATlON AND DEVELOPMENT

MATERIAL:S & TESTING SECTION5080 FLORIDA BL\'D., BATON ROUGE, LA 70806

CERTIFIC)\ TE OF DELIVERYFOR

GROUND GRANULATED BLAST -FURNACE SLAG

PROJECT NAME P. O. NUMBER

PROJECT NUMBER CONTRACTOR

CONCRETE PLANT PLANT LOCATION

PRODUCTSOURCE

CODE

MFG.LOCATION

SUPPLIERLOCATIONMANUFACTURER SUPPLIER

INTENDEDUSE

MODE OFSHIPPING

VEHICLENO.

SEALNO.

DATESHIPPED

QUANTITY

Mg (tons)GRADE

l:!.9k LA OOTO specifications require an alkali content of 0.60% or less

The undersigned certifies that the ground granulated blast-furnace slag in this shipment has been manufactured under strictquality control and complies with the Louisiana Department of Transportation and Development specifications for the intendeduse and grade of gr.ound granulated blast furnace slag in(jicated above. This certificate is invalid unless signed by anauthorized representative of the company.

COMPANY

BY

(Authorized Company Representative Signature)

Copies: .One copy shall accompany all shipments (rail, truck, or barge) of the above listed materials for each project.

.One copy shall be mailed to the Materials Enginel~r Administrator, LA DOTD, 5080 Florida Blvd., Baton Rouge, LA 70806

For OCTO Use:

DateApproved

Remarks

Shipments will be accepted only when accompanied by this official DOTD certificate form.

111-65 12/03 '