iec 61850 certificate level b1 - ucaiug...schneider_val_micom_p746_c1_ed2 the test has been carried...

2
IEC Issued to: Schneider Electric 35 rue Joseph Monier 92500 Rueil Malmaison France Issued by: Schneider Electric IEC61850 Laboratory - China The server produ IEC 61850 Editi Communication n The conformance test has been perform Server Test Procedures version 1.0 wit conformance statements: “MiCOM P (P746/EN PM/D42)”, “MiCOM P74x MC/D42)”, “MiCOM P74x Numerical extra information for testing: “MiCOM (P746/EN PX/D42)”. The following IEC 61850 conformance / total number of test cases): 1 Basic Exchange (23/26) 2 Data Sets (4/7) 4 Setting Group Selection (4/4) 5 Unbuffered Reports (18/20) 6 Buffered Reports (27/29) 9a GOOSE Publish (12/13) 9b GOOSE Subscribe (13/14) This Certificate includes a summary UniCASim 61850 client simulator 4.28 for information purposes only, and Schneider_VAL_MiCOM_P746_C1_E The test has been carried out on one IEC61850 lab by Schneider Electric. T imply that Schneider Electric IEC61850 Shanghai, 2014-12-01 Baohua WANG IED Validation Manager 1 Level B – Test lab with certified ISO 2 Test Procedure Change List Copyright k Schneider Electric All right r Schneider’s customer for convenience pur Schneider Electric 5th Floor, Building #9, No. 3000, Lo Tel: +86(0)21 6159 9812 Fax: +86(0 1/2 C 61850 Certificate Level B 1 No. Schneider_VAL_MiCOM_P746 For the server product: MiCOM P746 Software version: C1 Hardware version: M uct has not been shown to be non-conform ion 2 Parts 6, 7-1, 7-2, 7-3, 7- networks and systems for power utility auto med according to IEC 61850-10 Edition 2, the UCA International th TPCL 2 version 1.0 with product’s protocol, model and technica P74x Numerical Protection Relay Protocol Implementation Co Numerical Protection Relay Model Implementation Conformanc l Protection Relay Technical Issues Conformance Statement (P746 M P74x Numerical Protection Relay Protocol Implementation eXtra I e blocks have been tested with a positive result (number of relevant 12a Direct Control (6/20) 12b SBO Control (12/28) 12c Enhanced Direct Control (6/20) 12d Enhanced SBO Control (12/28) 13 Time Synchronization (6/7) 14 File Transfer (7/8) of the test results as carried out at Schneider Electric IEC618 8.04 with test suite v3.27.12 and UniCA Analyzer 5.28.03. This doc d the original paper copy of the Schneider Electric IEC61 Ed2_RPT_01 will prevail. single specimen of the product as referred above and submitted The manufacturer’s production process has not been assessed. Th 0 lab has certified or approved any product other than the specimen Gang LI IEC61850 Test Engine O 9001 Quality System reserved. Please note that any electronic version of this Schneider Certif rpose only. It is prohibited to update or change it in any manner whatsoe ongDong Avenue, Pudong, 201203 Shanghai, P.R.China 0)21 6159 8888 www.schneider-electric.com 6_C1_Ed2 ming to: -4 and 8-1 omation Users Group Edition 2 al issue implementation onformance Statement ce Statement (P746/EN 6/EN TC/D42)” and the Information for Testing and executed test cases 850 lab in China with cument has been issued 1850 lab report: No. d to Schneider Electric his certificate does not tested. eer ficate is provided to ever, including but not

Upload: others

Post on 13-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IEC 61850 Certificate Level B1 - UCAIug...Schneider_VAL_MiCOM_P746_C1_Ed2 The test has been carried out on one single specime n of the product as referred above and submitted to Schneider

IEC 61850 Certificate Level B

Issued to: Schneider Electric 35 rue Joseph Monier 92500 Rueil Malmaison France Issued by: Schneider Electric IEC61850 Laboratory - China

The server product has not

IEC 61850 Edition Communication networks and systems

The conformance test has been performed according to IEC 61850Server Test Procedures version 1.0 with TPCLconformance statements: “MiCOM P(P746/EN PM/D42)”, “MiCOM P74x MC/D42)”, “MiCOM P74x Numericalextra information for testing: “MiCOM P(P746/EN PX/D42)”.

The following IEC 61850 conformance blocks have been tested with a positive result (number of relevant and executed test cases / total number of test cases):

1 Basic Exchange (23/26) 2 Data Sets (4/7) 4 Setting Group Selection (4/4) 5 Unbuffered Reports (18/20) 6 Buffered Reports (27/29) 9a GOOSE Publish (12/13) 9b GOOSE Subscribe (13/14)

This Certificate includes a summary of the test results as carried out at Schneider Electric IEC61850 lab in China with UniCASim 61850 client simulator 4.28.04 with test suite for information purposes only, and the original paper copy of the Schneider Electric IEC61850 Schneider_VAL_MiCOM_P746_C1_Ed2

The test has been carried out on one single specimen of the product as referred above and submitted to Schneider Electric IEC61850 lab by Schneider Electric. The manufacturer’s production process has not been assessed. This certificate does not imply that Schneider Electric IEC61850 lab has

Shanghai, 2014-12-01

Baohua WANG IED Validation Manager 1 Level B – Test lab with certified ISO 9001 2 Test Procedure Change List

Copyright k Schneider Electric All right reserved. Please note that any electronic version of this Schneider Certificate is provided to Schneider’s customer for convenience purpose only. It is prohibited to update or change it in any manner whatsoever, includin

Schneider Electric 5th Floor, Building #9, No. 3000, LongDong Avenue, Pudong,Tel: +86(0)21 6159 9812 Fax: +86(0)21

1/2

IEC 61850 Certificate Level B1 No. Schneider_VAL_MiCOM_P746_

For the server product: Schneider Electric MiCOM P746

Software version: C1 Hardware version: M

product has not been shown to be non-conforming to:

Edition 2 Parts 6, 7-1, 7-2, 7-3, 7-Communication networks and systems for power utility automation

has been performed according to IEC 61850-10 Edition 2, the UCA International Users Group with TPCL2 version 1.0 with product’s protocol, model and technical issue implementation

MiCOM P74x Numerical Protection Relay Protocol Implementation Conformance Statement 4x Numerical Protection Relay Model Implementation Conformance Statement (

Numerical Protection Relay Technical Issues Conformance Statement (P746/EN TC/D42extra information for testing: “MiCOM P74x Numerical Protection Relay Protocol Implementation eXtra Information for Testing

mance blocks have been tested with a positive result (number of relevant and executed test cases

12a Direct Control (6/20) 12b SBO Control (12/28) 12c Enhanced Direct Control (6/20) 12d Enhanced SBO Control (12/28) 13 Time Synchronization (6/7) 14 File Transfer (7/8)

This Certificate includes a summary of the test results as carried out at Schneider Electric IEC61850 lab in China with 4.28.04 with test suite v3.27.12 and UniCA Analyzer 5.28.03. This document has been issued

for information purposes only, and the original paper copy of the Schneider Electric IEC61850 _C1_Ed2_RPT_01 will prevail.

The test has been carried out on one single specimen of the product as referred above and submitted to Schneider Electric IEC61850 lab by Schneider Electric. The manufacturer’s production process has not been assessed. This certificate does not

Schneider Electric IEC61850 lab has certified or approved any product other than the specimen tested.

Gang LI IEC61850 Test Engineer

ISO 9001 Quality System

Schneider Electric All right reserved. Please note that any electronic version of this Schneider Certificate is provided to Schneider’s customer for convenience purpose only. It is prohibited to update or change it in any manner whatsoever, includin

5th Floor, Building #9, No. 3000, LongDong Avenue, Pudong, 201203 Shanghai, P.R.China Tel: +86(0)21 6159 9812 Fax: +86(0)21 6159 8888 www.schneider-electric.com

P746_C1_Ed2

conforming to:

-4 and 8-1 for power utility automation

, the UCA International Users Group Edition 2 product’s protocol, model and technical issue implementation

Protection Relay Protocol Implementation Conformance Statement Implementation Conformance Statement (P746/EN

P746/EN TC/D42)” and the tra Information for Testing

mance blocks have been tested with a positive result (number of relevant and executed test cases

This Certificate includes a summary of the test results as carried out at Schneider Electric IEC61850 lab in China with ocument has been issued

for information purposes only, and the original paper copy of the Schneider Electric IEC61850 lab report: No.

The test has been carried out on one single specimen of the product as referred above and submitted to Schneider Electric IEC61850 lab by Schneider Electric. The manufacturer’s production process has not been assessed. This certificate does not

any product other than the specimen tested.

Test Engineer

Schneider Electric All right reserved. Please note that any electronic version of this Schneider Certificate is provided to Schneider’s customer for convenience purpose only. It is prohibited to update or change it in any manner whatsoever, including but not

Page 2: IEC 61850 Certificate Level B1 - UCAIug...Schneider_VAL_MiCOM_P746_C1_Ed2 The test has been carried out on one single specime n of the product as referred above and submitted to Schneider

2/2

Copyright k Schneider Electric All right reserved. Please note that any electronic version of this Schneider Certificate is provided to Schneider’s customer for convenience purpose only. It is prohibited to update or change it in any manner

Applicable Test Procedures from the UCA International Users Group Edition 2 Server Test Procedures version 1.0 with TPCL version 1.0. Conformance Block Mandatory Conditional 1: Basic Exchange sAss1, sAss2, sAss3, sAssN2, sAssN3, sAssN4,

sAssN5, sSrv1, sSrv2, sSrv3, sSrv4, sSrv5,

sSrvN1abcd, sSrvN4

sAssN6, sSrv6, sSrv8, sSrv9,

sSrv10, sSrv12, sSrvN1e,

sSrvN1f, sSrvN3

2: Data Sets sDs1, sDs10a, sDs15, sDsN1ae

4: Setting Group

Selection

sSg1, sSg3, sSg11, sSgN1

5: Unbuffered

Reporting

sRp1, sRp2, sRp3, sRp4, sRp9, sRp14, sRpN1,

sRpN2, sRpN3, sRpN4, sRpN8

sRp5, sRp8, sRp10, sRp11,

sRp12, sRp13, sRpN5

6: Buffered Reporting sBr1, sBr2, sBr3, sBr4, sBr9, sBr14, sBr20,

sBr21, sBr22, sBr25, sBr26, sBr27, sBr28,

sBrN1, sBrN2, sBrN3, sBrN4, sBrN5, sBrN8

sBr5, sBr8, sBr10, sBr11,

sBr12, sBr13, sBr23, sBr24

9a: GOOSE publish sGop2a, sGop3, sGop4, sGop7, sGop9,

sGop10, sGop11

sGop1, sGop5, sGop6,

sGopN1, sGopN2

9b: GOOSE subscribe sGos1, sGos2, sGos3, sGos5, sGos6a, sGos7,

sGosN1, sGosN2, sGosN3, sGosN4, sGosN5,

sGosN6

sGos6b

12a: Direct control sCtl5, sCtl10, sCtl14, sDOns1, sDOns2 sCtl13

12b: SBO control sCtl5, sCtl6, sCtl8, sCtl9, sCtl10, sCtl11, sCtl25,

sSBOns1, sSBOns2, sSBOns6

sCtl4, sCtl27

12c: Enhanced Direct

control

sCtl5, sCtl10, sCtl14, sDOes1, sDOes2 sCtl13

12d: Enhanced SBO

control

sCtl5, sCtl6, sCtl8, sCtl9, sCtl10, sCtl11, sCtl25,

sSBOes1, sSBOes2, sSBOes6, sSBOes8

sCtl4

13: Time sync sTm1, sTm2, sTmN1 sTm3, sTm4, sTm5

14: File transfer sFt1, sFt2ab, sFt4, sFt5, sFtN1ab sFt2c, sFtN1c