ie3100m systems design project ay2017/18 | department of ... · build a demand forecasting model...

1
Problem Overview OBJECTIVES Proposed Solutions Evaluation & Results Automation of time consuming steps Reduce time needed for scheduling Standardisation of documentation Improves communication Group Technology Product Layout I. Model equipment utilisation behaviour II. Calculated the average walking distance per patient per therapy session Simulation Approach Project Methodology & Key Findings Total time spent/week Statistical Analysis Analyse data and propose solutions Data Collection Gather information to serve as base case Problem Investigation Identify key problems faced by the team Develop Solutions Evaluate outcomes of proposed solutions User Feedback Improve solutions based on user feedback 1. Integrated Scheduling System using Google Sheets 2. Optimal Facility Layout using Simulation Process Layout METHODOLOGY 1. Improvement in Scheduling Tasks Singapore’s ageing population brings about higher demand for rehabilitation services. This project aims to help SACH DRC by revamping their scheduling process and proposing better facility layouts. Reducing inefficiency in scheduling tasks Enhancing patient therapy experience To improve quality of outpatient rehabilitative services by: Data Analytics Dashboard Provides manager with insights on operations and workload distribution From 120 mins to Machines with common functions are grouped Machines are arranged in clusters according to patients’ need Dissimilar machines are grouped for patients with common needs KEY SKILLSETS Project management concepts are applied to management of time and resources. Software development skills and human factors engineering concepts used in the proposed scheduling system. Knowledge in facility layout contributed to the designs of facility arrangements. KEY FINDINGS Problem 1: Repetitive and time consuming scheduling process Inconsistency in scheduling methods Difficulty in balancing the team’s workload Problem 2: Uneven utilisation of gym equipment due to suboptimal facility layout Opening new slots (From 6s) Sorting Therapist schedules (From 60s) Swapping alternating patients (From 10s) Allocating new patients (From 80s) 37 mins 54s 59s 9s 4s 2. Forecasted Improvement in Various Facility Layouts 1. Build a demand forecasting model when more data on patient referral case is available 2. Expand simulation model to consider more patient types Future Directions Current walking distance per patient per session : 64.2m Process Layout : 61.8m (↓4%) Product Layout : 35.3m (↓45%) Group Technology: 45.1m (↓30%) ↓45 % Overall decrease in walking distance IE3100M Systems Design Project (Group2) AY2017/18 | Department of Industrial Systems Engineering and Management OPTIMISATION OF PATIENT SCHEDULING AND FACILITY LAYOUT IN A DAY REHABILITATION CENTRE Project Supervisor: Prof Tang Loon Ching Industrial Supervisor: Mdm Loh Wei Chin Group Members: Li Chenxi, Pei Chang Hong, Sylvester Chin Si Wei, Vo Hoang Khai, Wong Si Ying

Upload: others

Post on 24-Mar-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IE3100M Systems Design Project AY2017/18 | Department of ... · Build a demand forecasting model when more data on ... Expand simulation model to consider more patient types ... in

Problem Overview ❏ OBJECTIVES

Proposed Solutions

Evaluation & Results

Automation of time consuming steps Reduce time needed

for scheduling

Standardisation of documentation Improves

communication

Group Technology

ProductLayout

I. Model equipmentutilisation behaviour

II. Calculated the averagewalking distance perpatient per therapy session

Simulation Approach

Project Methodology & Key Findings

Total time spent/week

Statistical AnalysisAnalyse data and propose solutions

Data CollectionGather information to serve as base case

Problem InvestigationIdentify key problems faced by the team

Develop SolutionsEvaluate outcomesof proposed solutions

User FeedbackImprove solutions based on user feedback

1. Integrated SchedulingSystem using Google Sheets

2. Optimal Facility Layoutusing Simulation

ProcessLayout

METHODOLOGY

1. Improvement in Scheduling Tasks

Singapore’s ageing population brings about higher demand for

rehabilitation services.

This project aims to help SACH DRC by revamping their

scheduling process and proposing better facility layouts.

Reducing inefficiency in scheduling tasks

Enhancing patient therapy experience

To improve quality of outpatient rehabilitative services by:

Data Analytics Dashboard

Provides manager withinsights on operationsand workload distribution

From 120 mins to

Machines with common functions are grouped

Machines are arranged in clusters according to patients’ need

Dissimilar machines are grouped for patients with common needs

❏ KEY SKILLSETS

Project management concepts are appliedto management of time and resources.

Software development skills and humanfactors engineering concepts used in theproposed scheduling system.

Knowledge in facility layout contributedto the designs of facility arrangements.

❏ KEY FINDINGS

Problem 1: Repetitive and time consuming scheduling process

Inconsistency in scheduling methods

Difficulty in balancing the team’s workload

Problem 2:

Uneven utilisation of gym equipment due to suboptimal facility layout

Openingnew slots (From 6s)

Sorting Therapist schedules

(From 60s)

Swappingalternating

patients(From 10s)

Allocatingnew

patients(From 80s)

37mins

↓54s↓59s ↓9s ↓4s

2. Forecasted Improvementin Various Facility Layouts

1. Build a demand forecasting model when more data onpatient referral case is available

2. Expand simulation model to consider more patient types

Future Directions

Current walking distance per patient per session : 64.2m

Process Layout : 61.8m (↓4%)Product Layout : 35.3m (↓45%) Group Technology: 45.1m (↓30%)

↓45%

Overall decrease in walking distance

IE3100M Systems Design Project (Group2) AY2017/18 | Department of Industrial Systems Engineering and Management

OPTIMISATION OF PATIENT SCHEDULING AND FACILITY LAYOUT

IN A DAY REHABILITATION CENTRE Project Supervisor: Prof Tang Loon Ching

Industrial Supervisor: Mdm Loh Wei Chin

Group Members: Li Chenxi, Pei Chang Hong, Sylvester Chin Si Wei, Vo Hoang Khai, Wong Si Ying