ici final report

49
Proposal for the Construction of Food Grocer Prepared by: 1. Teo Vi Vien (0321645) 2. Wong De-Vin (0319814) Tutor: Miss Ann See Peng 1

Upload: devin-wong

Post on 12-Aug-2015

106 views

Category:

Art & Photos


0 download

TRANSCRIPT

Page 1: Ici final report

Proposal for the Construction of

Food Grocer

Prepared by: 1. Teo Vi Vien (0321645)2. Wong De-Vin (0319814)

Tutor: Miss Ann See Peng

Content 1

Page 2: Ici final report

INTRODUCTION

2

Topic Page

Cover 1

Content 2

Introduction 3

Our Site 4

Site Analysis and Observation 5-8

Rationales and Client Evaluation 9-10

Concept Proposal 11-12

Plans and Elevations 13-21

Drainage System 22

Fire Safety 23

Attributes of Supermarket Construction24

Operational Energy Used 25

Task Of Professions Involved 26-27

Local Authorities Approval 28-35

Page 3: Ici final report

This is our final project for the module introduction to construction industry (ICI), for this assignment, we are required to find a partner and produce a minimum 20 pages report. Our task is to find a 30m x 30m (900 meters square) to 30m x 40m (1200 meters square) empty land and come up with a proposal to consult a potential client to construct a building in the site chosen.

The proposing construct building is required to serve one of the purposes as mentioned below: Recreation area, Commercial area, Industrial area, Agricultural area, Tourism area and Residential area.

The objective of this assignment is not only to enable students to develop an understanding of the building team, its organization, duties and inter-relations within which they will seek employment, career progression or further study but also To develop an awareness of their professional responsibilities and to appreciate their profession in the construction industry.

To make this assignment successful for us, we are encouraged to explain the need to coordinate and develop an understanding of coherent working relations among various industry players and to improve the communication channels. We are also to show our ability to document our observations and understanding from our visit to our site and also research towards our site.

OUR SITE

3

Page 4: Ici final report

Our site is located at 3.061732, 101.610481 on Google Maps. The area is 67m x 67m (4489 meter squares) . The reason why we chose this site is because it is an open space which lacks buildings and design. It is a big waste to this empty land as it is a very strategic area because it is located near residential areas and also a university.

SITE ANALYSIS AND OBSERVATION

4

Page 5: Ici final report

Our site is located 1.5 km away from Taylor’s University Lakeside Campus. Our site can be reached by car, which is 5 minutes, or by walk, which is 22 minutes from Taylor’s University. Our site is 30m x 35m (1050 meter square). It is an empty land next to a High-Raised Apartment. The only entrance that vehicle can enter to this empty land is from an entrance which shares the same road to enter the apartment. Therefore that entrance will also be our proposed entrance for our commercial building. There is a slope at the East end of our site and that will be our main drainage and waste system for our commercial building. The traffic rate at our site is slightly jam during peak hours and traffic rate is low during normal hours.

Pictures from our site:

View from the main road to our site

5

Page 6: Ici final report

View from the entrance of the apartment to the main road

View from entrance of condominium to the Highway connecting road

View from the main road to the apartment

6

Page 7: Ici final report

View from main road to the entrance of apartment

View from apartment to our site

Advantages

7

Page 8: Ici final report

Our site is located just outside of Taylor’s Lakeside with a distance of 1.5km. This is one of the main advantages of building our site as the core purpose of this project is to create convenience for university students who stay in Bandar Sunway to access the building without the hassle of traffic congestion.Most high-rise apartments are located around the area to create convenience for the residents to access the building, especially for those who do not own a vehicle as the walking distance is at an average of 5 minutes from the proposed building to the apartments.There is a wide expanse of open space to create a potential space for future development. It also has an existing flat ground to ease the process of construction.

Disadvantages

Despite the good potential of our site for our proposed plan, it also has its down side that might be the reason of its lack of usage and abandoned open area.It only has one access point where vehicles have to turn in from the apartment located next to our site before entering. Therefore, the flow of traffic is a difficult procedure as it only has one entry and exit point.Our site is located at a low area where it holds water after a heavy rainfall. Standing water creates a potential spot for mosquitos to breed which will cause a huge disadvantage for our proposed plan. A storm water catch basins (system) have to be installed to solve this problem.Our site does not have a good view. It overlooks a low-end apartment and it is located next to a cross junction. The view is not pleasing to the eyes.

Rationale and Client Evaluation

8

Page 9: Ici final report

After thorough discussion and research on our site, also emphasizing on the advantages and disadvantages of the existing nature of the area, we have decided to propose a commercial area with a mid-end hypermarket, food court and fast food joint with drive-thru service.For this construction project, we look upon the weakness of the nearby places of the same facilities and functions to compare and improve on their weaknesses to propose a plan to better suit the clients of our project.We have distinguished a few issues that are not suitable for our proposed plan and came up with a list of improved suggestions according to the areas.

High-end hypermarket at Sunway Pyramid

1. Price of groceries and items are more expensive – Price of goods sold at the high-end hypermarket are placed at a higher price due to the expensive rental and emphasize on the interior design.

2. High cost of imported goods – High-end hypermarkets usually import quality goods that are priced too high and are not affordable for students who live near the area.

3. Area too small – High-end hypermarket are smaller compared to mid-end hypermarkets, hence there are lesser varieties for customers to choose from.

Restaurants in Syopz Mall

1. Limited choices of restaurants – The students of Taylor’s University face dilemmas of what to eat for lunch everyday as there are not much variety in campus.

2. Price of food is not affordable for students - The price starts from RM15 and above with no

3. Closing time too early – Most restaurants in campus are closed at 9pm. Only the “mamak” and convenient stores are open 24/7. Most students who overnight at campus do not have a complete meal to eat.

Fast Food Joint next to Sunway Toll

9

Page 10: Ici final report

1. No direct access to campus from the restaurant – Students who drive have to make a huge round around Subang at a proximate duration of 15 minutes before going back to campus.

2. Isolated location – The fast food joint is located beside the toll in a non-strategic area and customers have to pay the toll after they finished dining.

3. No drive-thru service – Drive-thru service is not available, customers who are in a rush will not enjoy the convenience of taking away efficiently.

Through studying the weaknesses of these areas, we have decided to improve on our construction project. The proposal is required to fulfill the following criteria.

1. The whole project will be finished within the estimated time.2. The space is utilized sufficiently.3. Benefit the society and improve on the weakness of the high-

end hypermarket, restaurants in syopz and fast food joint next to the Sunway Toll.

CONCEPT

10

Page 11: Ici final report

Rationale of our concept:

The concept of our site is to provide a convenient and affordable hypermarket including an efficient food court on the ground floor. We also aim to build this building with the cheapest yet sustainable materials with an attractive exterior design of the building. The interior of our building is also very organized for the customers to have a comfortable and organized grocery shopping experience.

Organized shelves for easier access to find products

Attractive and sustainable design

11

Page 12: Ici final report

Advantages of our concept:

It is located at a site where it is easy to be accessed. It also very convenient for the residents nearby. Our concept is also very organized and it is easy for customers to find the products they need. There is also a food court and a fast food joint located at the ground floor of the building for the convenience of the customers in rush. The purpose of the food court is to provide more varieties for the customers as there are limited choices of restaurant nearby.

Food Court with varieties

Drive Thru services at fast food joints

12

Page 13: Ici final report

Location Plan

13

Page 14: Ici final report

Existing Plan

Floor Plan

14

Page 15: Ici final report

Ground Floor

15

Page 16: Ici final report

First Floor

16

Page 17: Ici final report

Second Floor

17

Page 18: Ici final report

Front Elevation

18

Page 19: Ici final report

Side Elevation

Cross Section

19

Page 20: Ici final report

20

Page 21: Ici final report

Car park and traffic flow

Car parks are often associated with large retail complexes and steel framed car parks are a common solution. Column spacing of 5.2m and 7.5m align with 2 or 3 car park spaces and spans are often 4.5m, 7m and 4.5m so that a central aisle is created. Long-span steel framed car parks are also popular and 16.5m is the common span in these cases.

21

Page 22: Ici final report

Drainage System

Catch Basins

A catch basin is an inlet to a storm drain system that typically includes a grate where storm water enters, and a sump to capture sediment, debris and associated pollutants.Catch basins are designed specifically for capturing and conveying storm water. Typically, on private commercial or industrial sites, there is no standard for the placement of catch basins. Storm water drain systems are often installed based on the best professional judgment and experience of the design engineer.The estimated peak storm water flow rate dictates the number of catch basins needed on a site. The percent impervious surface, slope, average rainfall and rainfall intensity are all factors in calculating the peak flow rate.

Vacuum Drainage System

The condensation wastewater can be lifted vertically up from the freezer and transported through piping in the ceiling to a drain elsewhere in the building. Special greater tanks called interceptors are used to ensure the water transport's efficiency. The piping for condensation water can be moved easily when floor plans change.

22

Page 23: Ici final report

Fire Safety

Fire safe design is important in retail buildings, both for provision of effective means of escape in a fire and also to protect the asset value of the building and its contents.The fire resistance is generally 120 minutes and a life safety sprinkler system is also required.

Intumescent coatings are paint like materials which are inert at low temperatures but which provide insulation as a result of a complex chemical reaction at temperatures typically of about 200-250°C. At these temperatures the properties of steel will not be affected.

Boards are used as structural fire protection. They offer the specified a clean, boxed appearance and have the additional advantages that application is a dry trade and may not have significant impacts on other activities. Also, boards are factory manufactured and thicknesses can be guaranteed. Furthermore, boards can be applied on unpainted steelwork.

23

Page 24: Ici final report

Attributes of Supermarket Construction

1. Speed of construction is increased by pre-fabrication. Supermarket construction is fast, with contract durations for

new build stores of 6000–7000m2 typically ranging from 22 to 26 weeks. Rationalized design and standard products are necessary to achieve such compressed programs.

2. Economy in terms of structure cost As for all construction clients, supermarket chains are

concerned about reducing initial build cost, but as owner occupiers, they also take into account the long-term impact of investment decisions. They use payback and life cycle costing assessments to determine additional investment in flexibility, reduced running costs or sustainability.

3. Sustainable design and lightweight construction A store's target market will also influence the architectural

design of the exterior of the building, and the materials that are used, glazing systems, floor finishes etc., that are partially determined by location, target market and projected turnover.

4. Long spans for flexible use of space Supermarkets also have extensive back-of-store facilities for

staff, offices and storage. Target figures for total back-of-house space have fallen from 50% of gross internal floor area to 25-40%, depending upon the size and target market of the store.

5. Convenience of traffic flow Parking, access and distribution are also key aspects of the

design solution. The space for car parking is also extensive and in some locations, double level car parks are required. Most supermarkets are serviced at night which requires suitable access, turning and off-loading space.

24

Page 25: Ici final report

Operational energy used in supermarkets

Lighting was found to be the most significant energy demand, accounting for around a half of the total operational carbon emissions. Consequently efficient lighting systems coupled with optimum roof light design are important in

delivering operational carbon reductions. The complexity of the interaction between building orientation, roof light design, lighting systems and daylight dimming lighting controls in supermarket buildings requires detailed dynamic thermal modelling in conjunction with good lighting design to develop an optimum lighting solution.

Efficient lighting of supermarkets are highly dependent on the presence and configuration of the shelving and racking systems used. Where obstructions such as high bay racking are installed, the building is effectively split into a number of narrow, corridor type ‐spaces which require many more fittings, and hence more energy, to achieve the same level and uniformity of lighting.Special greater tanks called interceptors are used to ensure the water transport's efficiency. The piping for condensation water can be moved easily when floor plans change.

25

Page 26: Ici final report

Task of professions involved in building constructions

1. ArchitectThe architects provide various designs, then prepares drawings and a report presenting ideas to the client based on his needs. After discussing and agreeing on the initial proposal, architects develop final construction plans that show the building's appearance and details for its construction. The plan is then passed to the Structural Engineer for his own design.

2. Structure EngineerAfter the architectural design is completed, SE are the next professionals to work on the design.

The job scope of the Structural Engineer includes- Designing the structural members (slabs, beams, columns and foundations) with the Geotechnical Engineer. - Determine the sizes (thickness span and depth) of structural members and the quality, size, type and quantity of reinforcements. - Decide on the quality and type of materials used for structural members and the required concrete strength-Designs the roof trusses to sustain all expected loads and forces -Produces the structural drawings which is required for building construction approval.

3. Quantity SurveyorThe QS estimates the project budget, analysis the effect of design changes on the budget and the most noticeable role preparation of Bill of Quantities that assist in the tender process, produce tender document and manage the tender process, clarify and evaluate tenders, variations control, contract administration and assessment of claims, negotiate and settlement of accounts, Valuing completed work and arranging for payments, expert witness report in case of dispute.

26

Page 27: Ici final report

4. BuilderThe Builder study the production information that is the drawings, schedules and specifications they analyze the build ability and maintainability of buildings. He writes on the construction method and program, assess the workmanship skill of artisan and suggest solution to technical problems.

5. ConsultantThe consultant represents the owner and to lend practical expertise to the job. Working on behalf of the owner, the consultant can identify and address potential construction problems in the design stages and, as an independent party, may be in the best position to suggest cost saving or time saving alternatives and to evaluate suggestions made by the other parties.

6. Mechanical and Electrical Engineer

The M&E Engineers design layouts and requirements for building services for which is one of the requirements for building approval. Design and development of electrical systems required based on envisaged power consumption for safety and energy sustaining operation of buildings, construction and operation of Heating, ventilation and air conditioning (HVAC) systems.

7. The building contractorThe BC is responsible for hiring, supervising, firing and payment of workers alongside obtaining materials for the project to precise specifications, mostly using the services of suppliers. The BC works based on agreed contract sum with building owners so, he controls Budget issues, follow that budget as closely as possible though there might be slight variation at the end of the project. They ensure that the project is completed within the specified time frame as well as reviewing the progress and implementing any changes along the course of completion.

27

Page 28: Ici final report

Local Authorities Approval

28

Page 29: Ici final report

29

Page 30: Ici final report

30

Page 31: Ici final report

31

Page 32: Ici final report

32

Page 33: Ici final report

33

Page 34: Ici final report

34

Page 35: Ici final report

35