ibm team race

20

Upload: izzy-immune

Post on 16-Apr-2017

2.348 views

Category:

Business


2 download

TRANSCRIPT

Page 1: Ibm team race
Page 2: Ibm team race

Once upon a time there was a I BM rowing team.

Page 3: Ibm team race

This I BM team agreed to hold an annual rowing race with a Green team. Each team would contain 8 men.

Page 4: Ibm team race

Both teams worked really hard to get in the best shape. On the day of the fi rst race, both teams were ready to win.

Page 5: Ibm team race

FINISHFINISH

The Green team won by 1 mile!

Page 6: Ibm team race

The I BM team was crushed in their def eat, but they were determined to win the race next year. So they established a panel of auditors to observe the situation and ascertain if there were any diff erences

between the teams.

Page 7: Ibm team race

Af ter several weeks of detailed intelligence gathering, the auditors could fi nd only one diff erence; the Green team had 7 rowers and 1

captain...

Page 8: Ibm team race
Page 9: Ibm team race

… and the I BM team had 7 captains and 1 rower!

Page 10: Ibm team race

I BM

Page 11: Ibm team race

Un-perplexed by the raw data, upper management showed unexpected wisdom: they hired a consulting company to analyze the data and suggest a

solution that would enable the I BM team to win next year.

Page 12: Ibm team race
Page 13: Ibm team race

Af ter several months the consultants came to the conclusion that the ratio of captains to rowers was the problem in the I BM team.

Based on this analysis a solution was proposed: the structure of the I BM team has to be

changed!

Page 14: Ibm team race

Like sharks getting the scent of reorganization blood, upper management wasted no time in restructuring the I BM team into

4 Captains, led by 2 Managers, reporting to 1 Senior Director with a dotted line to the rower. Besides that, in a blaze of unrestricted inspiration, they suggested they might be inclined to improve the

rower’s working environment by a non-monetary reward and recognition scheme if there was improved performance by the

rower.

Page 15: Ibm team race

I BM

Page 16: Ibm team race

FINISH

The next year, the Green team won by 2 miles.......

Page 17: Ibm team race

The I BM team upper management immediately fi red the rower based on his unsatisf actory perf ormance.

Page 18: Ibm team race

A bonus was paid to the Captains, Directors, and Managers f or the strong leadership and motivation they showed during the preparation

phase and as an incentive f or them to find a better rower f or the next race.

Page 19: Ibm team race

The consulting company prepared a new analysis of the restructuring activity, which showed that the strategy was good, the motivation was great, the restructuring

was executed correctly, but the tool used (which was not included in the original data) was sub-standard and had to

be improved.

Page 20: Ibm team race

Currently the IBM team management is having a new boat designed;

and to demostrate fiscal and HR dexterity for stockholders they also contracted a placement agency to advertise in other

countries for a new (temporary, non-direct employee) rower.