I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Pacific Air Forces
As of: 1
EP-3 Recovery
Mr. Ross Higa
HQ PACAF/CECI
As of: 2I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Background
CE Mission: Document pavement degradation from AN-124 traffic US responsible for pavement damage
Chinese tried, but could not “run up the bill”
Airfield designed for fighter aircraft Narrow taxiways, small aprons Limited pavement bearing strength
AN-124 has higher damage potential than C-5 Five AN-124 flights (first and last were heaviest) Cargo weight and fuel strictly controlled to avoid damage
First AN-124 arrived 16 Jun 01 to start recovery operations - completed 3 Jul 01
As of: 3I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Logistics and Security
Lodged at Gloria Resort Hotel in Sanya U.S. manager assisted in logistical support One hour bus ride to/from Lingshui Air Base Left hotel 0630, returned 1830
Operations kept low key Minimal news coverage Photographers and reporters kept away from
hotel and base Police stationed along route to Lingshui Exception: Numerous guests/photographers
on base during fuselage loading
As of: 4I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Lingshui (Naval) Air Base, Hainan Island, People's
Republic of ChinaEP-3
As of: 5I n t e g r i t y - S e r v i c e - E x c e l l e n c e
EP-3 and AN-124
As of: 6I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Crew members guided the AN-124 on narrow taxiways and through tight turns
As of: 7I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Kneeling AN -124 - Load bearing points on the pavement were closely monitored
As of: 8I n t e g r i t y - S e r v i c e - E x c e l l e n c e
The airfield already had existing defects
As of: 9I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Working Conditions
Lockheed Martin was well prepared Chartered Gulfstream IV on standby at Sanya
Airport for evacuation Physician on team - local hospitals inadequate
Temperatures reached 107 deg F with high humidity Heat stress encountered early on Administered medication as needed
Daily safety meetings - no injuries incurred Local contracts for work trailers, water,
transportation, meals, toilets, generator, etc. Cell phones with international capability
As of: 10I n t e g r i t y - S e r v i c e - E x c e l l e n c e
People's Liberation Army
PLA Navy monitored operations closely Continuous photography and video taping of
work and people U.S. workers restricted from crossing rope
barriers Routine review of photos and video taken by U.S. End of day meetings held to recap day's events
and resolve issues Key project officers from Beijing; not Lingshui
Non-threatening, but many "home turf" rules
As of: 11I n t e g r i t y - S e r v i c e - E x c e l l e n c e
As of: 12I n t e g r i t y - S e r v i c e - E x c e l l e n c e
As of: 13I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Three jack stands supported the aircraft during underside disassembly work
As of: 14I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Blowers vented residual fuel before cutting operations could begin
As of: 15I n t e g r i t y - S e r v i c e - E x c e l l e n c e
A safety line was installed for topside work
As of: 16I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Flaps, ailerons and leading edges were salvaged
As of: 17I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Tail section was cut off the fuselage
As of: 18I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Key components were salvaged
As of: 19I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Four engines were removed in one day
As of: 20I n t e g r i t y - S e r v i c e - E x c e l l e n c e
As of: 21I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Gas powered saws were used to cut and remove the wings in sections
As of: 22I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Scrapped parts were also taken to Kadena on the AN-124
As of: 23I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Main and nose gears were removed when rain halted wing cutting operations
As of: 24I n t e g r i t y - S e r v i c e - E x c e l l e n c e
A specially made trailer was jacked up to support the aircraft
As of: 25I n t e g r i t y - S e r v i c e - E x c e l l e n c e
EP-3 rested solely on the raised trailer after the jack stands were removed
As of: 26I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Interior pipes and cables were pre-cut to facilitate removal of wing sections
As of: 27I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Nacelles were salvaged
As of: 28I n t e g r i t y - S e r v i c e - E x c e l l e n c e
The AN-124 was "cubed out" on almost every return flight
As of: 29I n t e g r i t y - S e r v i c e - E x c e l l e n c e
“You Call – We Haul”
Lockheed and Russian crews "busted butts" to load same-day turnaround flights
As of: 30I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Bridge cranes were used to load from the rear
As of: 31I n t e g r i t y - S e r v i c e - E x c e l l e n c e
A centerline marker was laid out to help align the
AN-124 to the EP-3
As of: 32I n t e g r i t y - S e r v i c e - E x c e l l e n c e
The AN-124 hit the mark perfectly
As of: 33I n t e g r i t y - S e r v i c e - E x c e l l e n c e
The AN-124 used portable extension ramps to reduce the incline
As of: 34I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Steel cables from the cargo bay were attached to the trailer
As of: 35I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Winches pulled the fuselage into the cargo bay
As of: 36I n t e g r i t y - S e r v i c e - E x c e l l e n c e
The wide wheels and narrow ramps left no room for error
As of: 37I n t e g r i t y - S e r v i c e - E x c e l l e n c e
The fuselage and trailer cleared by a few inches
As of: 38I n t e g r i t y - S e r v i c e - E x c e l l e n c e
As of: 39I n t e g r i t y - S e r v i c e - E x c e l l e n c e
As of: 40I n t e g r i t y - S e r v i c e - E x c e l l e n c e
The portable ramps were disassembled and loaded onto the AN-124
As of: 41I n t e g r i t y - S e r v i c e - E x c e l l e n c e
The Russian crew
As of: 42I n t e g r i t y - S e r v i c e - E x c e l l e n c e
After a refueling stop in the Philippines and crew rest in Hawaii, the fuselage was welcomed home at Dobbins ARB, GA (home
of Lockheed Martin Aeronautical Systems Co.)
As of: 43I n t e g r i t y - S e r v i c e - E x c e l l e n c e