i ii....o plan originator: tina heath, ehs corporate director o email: [email protected] o...

38
GENERAL NPDES PERMIT FOR DISCHARGES FROM UTILITY VAULTS AND UNDERGROUND STRUCTURES ATTACHMENT E - NOTICE OF INTENT ORDER WQ 2014-017 4-DWQ GENERAL PERMIT NO. CAG990002 ORDER WQ 2014-0174-DWQ NPDES NO. CAG990002 RECEIVED JUN 3 0 2015 DIVISION OF WATER QUAlJT)- STATEWIDE GENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FOR DISCHARGES FROM UTILITY VAULTS AND UNDERGROUND STRUCTURES TO WATERS OF THE UNITED STATES I. NOTICE OF INTENT STATUS (See Instructions) MARK ONLY ONE ITEM 1.0 New Discharger 2.[j] Exi sting Discharger t(DODt!J([)e:JlD/O ( 3.0 Change of Information: WOlD#.., .... ,.,..------=---- 4.0 Change of ownership or responsibility: WDID# II. OWNER/OPERATOR (If additional owners/operators are involved, provide the information in a supplemental page.) A. Name Owner/Operator Type (Check One) Veolia Energy Los Ange l es , Inc 1.0 City 2.0 County 3.0 State 4.0 Gov. Combo 5. [j] Private B. Mail ing Address 2052 Century Park East C. City D. County I E. State I F. Zip Code L os Angel es Los Angeles CA 90067 G. Contact Person H. Title II. Phone Ti na Heath EHS Corporate Director 909-614-2701 J. Email Address [email protected] D Additional Owners-- -------- -------------- ----- Ill. BILLING ADDRESS (Enter information onty if different from II. above) Send to: A. Name I B. Ti tle 0 Owner/Operator Veoli a No rth America Accounts Payable [j] Other C. Mailing Address 125 S 84th, Suite 175 D. City I E. County I F. State I G. Zip Code Milwaukee Milwaukee WI 53214 IV. RECEIVING WATER INFORMATION A. Attach a project map(s) that shows (1) the service area wi thin the a specific Regional Water Board boundary and maps of(2) the corresponding major surface water(s) bodies and watersheds to which utility vault or underground structure water may be discharged . Map features must also include ASBS boundaries, MS4 discharge points to the ASBS , and major roadways. B. Regional Water Quality Control Board(s) where discharge sites are l ocated List the Water Board Regions where discharge of wastewater is proposed, i.e. Region(s) 1, 2, 3, 4, 5, 6, 7, 8, or 9: Four ATTACHMENT E- NOTICE OF INTENT OCTOBER 21 , 2014 PAGE E-1

Upload: others

Post on 14-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

GENERAL NPDES PERMIT FOR DISCHARGES FROM UTILITY VAULTS AND UNDERGROUND STRUCTURES

ATTACHMENT E - NOTICE OF INTENT

ORDER WQ 2014-017 4-DWQ GENERAL PERMIT NO. CAG990002

ORDER WQ 2014-0174-DWQ NPDES NO. CAG990002

RECEIVED JUN 3 0 2015

DIVISION OF WATER QUAlJT)-

STATEWIDE GENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FOR DISCHARGES FROM UTILITY VAULTS AND UNDERGROUND

STRUCTURES TO WATERS OF THE UNITED STATES

I. NOTICE OF INTENT STATUS (See Instructions)

MARK ONLY ONE ITEM 1.0 New Discharger 2.[j] Existing Discharger ._v~-:f: t(DODt!J([)e:JlD/O( 3.0 Change of Information: WOlD#..,....,.,..------=----4.0 Change of ownership or responsibility: WDID#

II. OWNER/OPERATOR (If additional owners/operators are involved, provide the information in a supplemental page.)

A. Name Owner/Operator Type (Check One)

Veolia Energy Los Angeles, Inc 1.0 City 2.0 County 3.0 State 4.0 Gov. Combo 5.[j] Private

B. Mailing Address 2052 Century Park East

C. City D. County I E. State I F. Zip Code Los Angeles Los Angeles CA 90067

G. Contact Person H. Title II. Phone Tina Heath EHS Corporate Director 909-614-2701

J. Email Address [email protected]

D Additional Owners-----------------------------

Ill. BILLING ADDRESS (Enter information onty if different from II. above) Send to: A. Name I B. Title 0 Owner/Operator Veolia North America Accounts Payable

[j] Other C. Mailing Address 125 S 84th, Suite 175

D. City I E. County I F. State I G. Zip Code Milwaukee Milwaukee WI 53214

IV. RECEIVING WATER INFORMATION A. Attach a project map(s) that shows (1) the service area within the a specific Regional Water Board boundary and maps of(2) the corresponding major surface water(s) bodies and watersheds to which utility vault or underground structure water may be discharged. Map features must also include ASBS boundaries, MS4 discharge points to the ASBS, and major roadways.

B. Regional Water Quality Control Board(s) where discharge sites are located List the Water Board Regions where discharge of wastewater is proposed, i.e. Region(s) 1, 2, 3, 4, 5, 6, 7, 8, or 9:

Four

ATTACHMENT E- NOTICE OF INTENT OCTOBER 21 , 2014

PAGE E-1

Page 2: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

GENERAL NPDES PERMIT FOR DISCHARGES FROM UTILITY VAULTS AND UNDERGROUND STRUCTURES

ORDER WQ 2014-0174-DWQ NPDES NO. CAG990002

V. LAND DISPOSAL/RECLAMATION The State Water Resources Control Board's water rights authority encourages the disposal of wastewater on land or re-use of wastewater where practical. You must evaluate and rule out this alternative prior to any discharge to surface water under this O~r ·

Is land disposal/reclamation feasible for all sites? DYes II No

Is land disposal/reclamation applicable to a portion of the total number of sites? D Yes II No

If Yes to one or both questions, you should contact the Regional Water Board. This Order does not apply if there is no discharge to surface waters. If No to either or both questions, explain:

VI. VERIFICATION

Have you contacted the appropriate Regional Water Board or verified in accordance with the appropriate Basin Plan that the proposed discharge will not violate prohibitions or orders of that Regional Water Board? II Yes D No

VII. TYPE OF UTILITY VAULT OR UNDERGROUND STRUCTURE (Check All That A

D Electric D Natural Gas D Telecommunications II] Other: District Heating and Cooling

VIII POLLUTION PREVENTION PLAN CONTACT INFORMATION Each Discharger is required to provide a copy of their PLAN with their completed NO I. The PLAN requirements are provided in Section VII.C.3 of the Order. In the space below, provide the contact information for the person responsible for the development of the PLAN.

A. Company Name

Veolia Energy Los Angeles, Inc C. Street Address Where PLAN is Located

715 West Third Street E. City

Los Angeles I. Phone

213-617-2509

ATTACHMENT E- NOTICE OF INTENT OCTOBER 21, 2014

B. Contact Person

Carlos Dei-Cid D. Title of Contact Person

Director of Operations F. County G. State H. Zip Code

Los Angeles CA 90071 J. Email Address

[email protected]

E-2

Page 3: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

GENERAL NPDES PERMIT FOR DISCHARGES FROM UTILITY VAULTS AND UNDERGROUND STRUCTURES

IX. DESCRIPTION OF DISCHARGE(S)

ORDER WQ 2014-0174-DWQ NPDES NO. CAG990002

Describe the discharge(s) proposed. List any potential pollutants in the discharge. Attach additional sheets if needed.

Water from rainfall, landscape runoff, and distribution pipeline leaks. Under normal operations, the materials in the vaults are not likely to contaminate the water. In most cases, this water is clean, but may contain traces of petroleum products (residue left on the roads: oil, grease, gasoline, etc.), organic matter, mud and pesticides and other pollutants.

X. REMINDERS

A. Have you included service territory/watershed map(s) with this submittal? ij] Yes D No Separate maps must be submitted for each Regional Water Board where a proposed discharge will occur.

B. Have you included payment of the filing fee (for first-time enrollees only) with this submittal? DYes D No ij] N/A C. Have you included your PLAN? ij] Yes D No

ATTACHMENT E- NOTICE OF INTENT E-3 OCTOBER 21, 2014

Page 4: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

GENERAL NPDES PERMIT FOR DISCHARGES FROM UTILITY VAULTS AND UNDERGROUND STRUCTURES

XI. CERTIFICATION

ORDER WQ 2014-0174-DWQ NPDES NO. CAG990002

"I certify under penalty of law that this document and all attachments were prepared under my direction and supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment."

C. Date: & · 01- 9 - I 5': D. Title: Direc or of Opera

PLEASE SUBMIT THE NOI, FIRST ANNUAL FEE, PLAN, AND MAP TO THE FOLLOWING ADDRESS:

STATE USE ONLY WOlD:

Case Handler's Initial:

UTILITY VAULTS NOI NPDES UNIT

DIVISION OF WATER QUALITY STATE WATER RESOURCES CONTROL BOARD

P.O. BOX 100 SACRAMENTO, CA 95812-0100

Regional Board Office Date NOI Received:

Fee Amount Received: Check#: $

ATTACHMENT E- NOTICE OF INTENT OCTOBER 21, 2014

I Date NOI Processed:

E-4

Page 5: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

Statewide General National Pollutant

Discharge Elimination System Permit of

Discharges by Utilities & Companies to Surface

Waters

2015 Pollution Prevention Plan

For

Veolia Energy Los Angeles, Century City

(i)VEOLIA ENERGY

June 29, 2015

Page 6: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

Table of Contents

I. PLAN Administration ... ........... ... ....... .. ..... .......... ........ ..... ..... .. ... .... ....................... .. ..... ........ ..... ... .... ....... 4

a) Company Introduction .......... ..... ...... ................. ...... ....... ............. ... ........... ... ... ..... ... ............ ........... ... 4

b) Overview and Purpose ... ...... ...... ....... .... .. ......... ..... ....... ..... ........... .. .................... ............. ... .... ....... .... 4

c) Pollution Prevention Team ... ....... .. ..... ..... ... ....... ....... ...... ... ... ......... ........... ....... .... ... ...... ....... .... ....... ... 4

d) Employee Training ......................... ..... ..... .... ............................... : ............................... ........ ..... ... .... .. . S

e) Annua l PLAN Revision, Evaluation, and Report ....... .................................................... .. ..... ...... ..... .... S

II. Potential Pollutant Sources ................................. ..................... .... .... ..... ...... ...... ... ... .. .. .. .... .. ... .. .. .... ... .. .. 6

a) Vicinity and Drainage Maps ...... ......... ... ........ ...... ....... ...... ...... ...... ... ... ...... ............. ... ..... ......... ............ 6

b) Inventory of Exposed Materials ......... ... ........ .. ....... .. ..... ..... .. .......... ........ ...... ........ ......... .................... 6

c) Spills and Leaks ... ...... ...... .. .. ........ .......... ...... .. ... ... ...... ........... ..... .. .... .. .. .......... .. ... ... .. .... .... ......... ...... .... 6

Ill. Discharge Provisions and Procedures .... ..... .. .... .. ... .. .. .... .. ....... .. .. .. ......... .. ... ..... ... .... .... ... .... ... ... ...... ... 6

a) Pumpout Procedures ............. .. .... ..... .. .. ........ ...... .. ..... .. .......... ..... .. .... ..... .. .... .. .... .... ..... ............ ....... .... 6

b) Scheduled Discharges ..... .. ...... ... .. ........ .... ............ ..... .. ... ... ..... .... .... ... .... ...... ........... ... ...... ... ......... ....... 7

c) Unscheduled Discharges ... .. .......... ... ... ..... ..... ... .... ....... .. ... ... .... .... ... .... ...... ... ... .... ..... ........... ...... .. ....... 7

d) Emergency Discharges ..... ... ... .. ................. ..... .......... .. ............ .. .... ...... .... ......... ..... ... ... ... .. ... ..... ....... .... 7

e) Reservoir Discharges/ Automatic Discharges .. ....... .. .... ..... ... ... ............ ...... .............. ...... ...... .. ..... ..... .. 7

IV. Risk Identification and Pollution Assessment ...... ........................ ..... ... ...... ................ ............. .. .... .... 7

a) Past Sampling Data and Pollution Assessment ..... ... ... ... ... .. ..... .... .. ... ............. ..... .. ....... ...... ... ... ... ... ... 8

b) Vector Control .... ... .. .. ........ ... .. .... .... ....... ..... ......... ..... .. .... ...... .... .. ... ... ..... .. .... .. .... ......... ..... .... ... ...... .... . 8

c) Future Pollution Assessment and Sampling .... .. ..... ............ .. .... .................................. ..... ..... .......... ... 8

V. Pollution Control Measures and Prevention Practices ......................... .......... .. .. .... .... .. .... ...... .. .... ........ 8

a) Good Housekeeping and Preventive Maintenance ..... ... ..... .... ..... ...... .... ...... .. .. .... .. .... ..... .... ... ... ... ... .. 8

b) Pollution Control, Spill Prevention and Response Procedures .......... .... .. .... .. .... ...... ........ .. .... .. ........ . 8

c) Sediment and Erosion Control ...... .... ... ... ... ... ...... ... ....... ........ .. .... ... .. .... ...... ...... .............. ..... .. ... ... ... ... 9

G)veOLIA ENERGY Page 2

Page 7: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

d) Management Runoff ... .. ............................ ............................... ............................................... ..... ..... 9

e) Inspections ...... ... ..................... ......... ..... .... ...... .......... ...... .................................................................. 9

f) Waste Disposal .............. ............................................. .................................................. .. ................... 9

VI. Record Keeping and Internal Reporting Procedures ......................................................................... 9

VII. Certification and Signature ............................................. .......................................... ....... ................ ll

APPENDIX A- Vicinity and Drainage Maps .......... .. ...................................................................................... l2

APPENDIX B- Vau lt Pumping Procedure: BMS-03-EP-0100-CA and Exhibit A: Pump out Checklist.. ......... 13

G)VEOLIA ENERGY Page 3

Page 8: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

I. PLAN Administration

a) Company Introduction

Veolia Energy Los Angeles, Inc ("Veolia" ) is a company that specia lizes in reliable, low cost thermal

energy via district energy. District energy is the production and distribution of thermal energy,

produced at a central plant and distributed to the community through an underground piping network.

District heating and cooling allows buildings to forego the installation of on-site boilers and chillers, so

our customers receive consistent heating and cooling within their property line, the benefit of

redundancy within both chilled water and hot water capacity, and the economy of sca le. In addition,

our district energy plants and networks are designed to stringent environmental standards.

b) Overview and Purpose

Veolia has vaults throughout the closed loop distribution system. Veolia may occasionally remove water

from the vaults as a result of stormwater drainage, subterranean seepage, irrigation runoff, and/or

distribution line leakage. Thus, due to the normal course of maintenance and vault care, the vault must

be dewatered. This results in short term and intermittent discharges to surface waters of the State of

California.

The California State Water Resources Control Board has the authority under the Federal Clean Water Act

of 1972, to issue statewide General National Pollutant Discharge Elimination System ("NPDES") Permits

to regulate the discharge of pollutants into the United States water.

In order to regulate surface waters discharges associated with the de-watering of utility vaults and

underground structures, the California State Water Resources Control Board issues General NPDES

Permits for Discharges from Utility Vaults and Underground Structures to Surface Waters, Order No.

2014-0174-DWQ, NPDES CAG990002, ("PERMIT" ). The State Board allows utilities and other companies

to app ly for coverage under the Genera l Permit within their region.

The PERMIT requires utilities and other companies to develop and implement a Pollution Prevention

Plan ("PLAN" ), which include Pollution Prevention Practices ("PPP"), designed to prevent or contro l the

discharge of pollutants. In addition, the PERMIT requires the utilities and other companies to develop

and implement a monitoring and reporting program.

The purpose of this PLAN is to assist the Veolia staff in complying with the water quality standards, PPP,

and the provisions ofthe general permit when discharging water from the vaults.

c) Pollution Prevention Team

o Team Head: Carlos Del Cid, Director of Operations

o Email : [email protected]

o Phone: 909-612-2743

G)veOLIA ENERGY Page4

Page 9: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

o Team assistant: Graham Rowe, Operator

o Email : [email protected]

o Phone: 323-879-0110

o PLAN Originator: Tina Heath, EHS Corporate Director

o Email: tina [email protected]

o Phone: 909-614-2701

The Veolia Team also includes all of the Veolia personnel working on the dewatering of the vaults.

Members of the team are responsible for developing, maintaining, revising, and implementing this

PLAN.

d) Employee Training

Veolia's personnel are fully trained before performing work in vaults. Their training includes, but not

limited to:

o Vault pumpout procedures and logs, BMS-03-EP-0100-CA

o Basic operating procedures

o Safety procedures and issues

o Proper traffic safety procedures

o Good housekeeping practices

o Spill management procedures

o Confined space entry and confined space non-entry rescue

These training courses are conducted via various means: PowerPoint, webinar, in-person face-to-face,

and videos and is coordinated/overseen by head of the Pollution Prevention Team. The employees are

trained on the specifics of the PLAN including the procedure to fill out the pumpout logs. Records of

the employee training will be maintained at the Veolia Los Angeles Office.

e) Annual PLAN Revision, Evaluation, and Report

Veolia shall amend the PLAN whenever there is a change in construction, operation, or maintenance, when such amendment is necessary to ensure compliance with the California State Water Resources Control Board issues General NPDES Permits for Discharges from Utility Vaults and Underground Structures to Surface Waters, Order No. 2014-0174-DWQ, NPDES CAG990002 and receiving water limits. The PLAN shall also be amended if it is in violation of any conditions of this General Permit or has not achieved the general objective of controlling pollutants in discharges to surface waters. The Discharger shall submit the amended PLAN to the Regional Water Board .

Veolia shall conduct an overall evaluation of the effectiveness the PLAN in controlling the discharge of pollutants during a discharge event and revise or replace the PLAN as necessary to address procedures and PPP. During this evaluation period, Veolia will analyze the yearly representative vault water discharge for the parameters listed within PERMIT, Attachment C, Table C-1.

G)VEOLIA ENERGY Page 5

Page 10: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

Veolia shall submit an Annual Report (for the period from May 1 through April 30) no later than June 151

of each year during the term of this PERMIT.

II. Potential Pollutant Sources

a) Vicinity and Drainage Maps

The vaults covered within this PLAN are located in the Downtown Los Angeles Area. Vicinity and

Drainage maps and an example vault diagram can be found within Appendix A. The corresponding City

of Los Angeles stormwater drain runoffs travel to the ocean.

Under normal operations, the materials in the vaults are not likely to contaminate the water. However,

because the vaults are not watertight, they can co llect from ra infall and landscape runoff. In most

cases, this water is clean, but may contain traces of petroleum products (residue left on the roads: oil,

grease, gasoline, etc.), organic matter, mud and pesticides and other pollutants.

b) Inventory of Exposed Materials

Most vau lt water is found to be free of substantial pollutants and is not treated prior to discharge. If

significant or haza rdous contaminants are detected during the on-site water testing as described in

Veo lia Procedure Vault Pumping Procedure, BMS-03-EP-0100-CA, prior to dewatering, licensed

contractors wi ll transport and properly dispose of the contaminated water.

c) Spills and Leaks

Veolia has had rare treated process water leaks in association with the dewatering of the vau lts within

the past t hree years. However, the discharged water testing has been performed by third party

laboratories and no hazardous pollutants were found. The PLAN w il l include a record of any spills or

leaks of hazardous pollutants on t he appropriate logs.

III. Discharge Provisions and Procedures Veolia must dewater the subsurface vaults to protect equipment or for safety reasons prior to

performing repair and maintenance of the equipment located within the various vau lts. The water is

manually pumped from the vau lt. The volume of discharge from each vault varies and may range from a

few hundred ga llons to a few thousand ga llons depending on the size of the vau lt, the weather and/or

the maintenance activity.

a) Pumpout Procedures

Veo lia uses the company's Procedure Vault Pumping Procedure, BMS-03-EP-0100-CA, attached in

Appendix B of the PLAN, to pumpout the vaults. Prior to discharging waters, Veolia personne l will use

G)veOLIA ENERGY Page 6

Page 11: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

the Veolia Pump Out Checklist, to determine if the water can be discharged in compliance with the

NPDES PERMIT and this PLAN. Only waters which pass this test will be discharged.

b) Scheduled Discharges

Veolia does not regularly schedule discharges from the underground vaults. If a scheduled discharge

were to occur, the practices as outlined within unscheduled discharges would be implemented.

c) Unscheduled Discharges

The majority of the discharges from the underground vaults are unscheduled. Water accumulates in

these structures overtime and is dewatered as necessary for maintenance or repair. The frequency of

discharge is dependent on the rate and frequency that the water is entering the vault. These vaults

need to be dewatered before field work can occur.

Unscheduled discharges would be contro lled utilizing the practices described in this PLAN and Veolia

Procedure Vault Pumping Procedure, BMS-03-EP-0100-CA

d) Emergency Discharges

In emergency situations involving an immediate threat to human life, serious property damage and/or

catastrophic events, Veolia's Management shall take the required action to enter the vault and

discharge the untested water. If an emergency discharge were to occur, the practices as outlined within

unscheduled discharges would be implemented and the event documented.

e) Reservoir Discharges/ Automatic Discharges

Veolia does not discharge into reservoirs. Veolia only has one vault that is fitted with automatic sump

pumps. This vault, #9, is located in the basement of a building and does co llect landscape runoff on

occasion. Even though the vault is controlled by the building property owners, Veolia regularly inspects

the vault, coordinates any maintenance, and discuss pumping activity with the owners.

IV. Risk Identification and Pollution Assessment Since the vaults are not air-tight, contaminants can enter from outside sources. External contaminants

can include traces of petroleum products (oil, gasoline), oil and grease, organic matter, mud, silt,

pesticides, and other pollutants. These contaminants are from residue matter left on the streets and

within ground/landscaping. Typically, discharge waters are free from significant contaminants.

Accidenta l spills or leaks by outside parties (illegal dumping, traffic accidents) are possible, though

unlikely and their risk is low since the vault lids are secured.

The distribution piping contained within vaults contains insulation material around the pipe and may

contribute very small amounts of particulates matter to the discharged water. As the piping is routinely

maintained and monitored, the risk of contaminating the discharge water is small.

G)VEOLIA ENERGY Page 7

Page 12: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

a) Past Sampling Data and Pollution Assessment

The discharged waters have been tested by third party laboratories. The past data water testing results

confi rm that the pollution concern is extremely low.

b) Vector Control

Vector control is required for stagnant, room temperature standing water to discourage the breeding of

insects, such as mosquitoes. Since Veolia operates a district heating plant, the high temperature water

loops piping heats the vaults in excess of 100• F. This temperature is too hot for insect breeding. Thus,

Veo lia does not need to administer chemical pesticides in the vaults.

c) Future Pollution Assessment and Sampling

Veolia personnel will sample the vault discharge water in accordance to Attachment G of the PERMIT,

Discharge Characterization Study 1. In addition, Veolia will sample the discharge water for the

constituents listed within PERMIT, Table 3 to help gauge the effectiveness ofthe existing PLAN annually.

V. Pollution Control Measures and Prevention Practices

a) Good Housekeeping and Preventive Maintenance

Veolia has policies in place which address housekeeping, inspections and preventative maintenance. The vaults and other sub-surface structures are kept clean and free from known contaminants. The sites are ·periodically checked during maintenance for any defects {deposits, leaks, cracks, etc.).

The Veo lia personnel is required to prepare the site in accordance with standard Veolia policy and practices, including work zone safety. Prior to discharging, the personnel is required to set up all safety equipment and don all necessary personal protective equipment including, but not limited to, safety glasses, safety shoes, gloves, high visibility traffic warning vest, etc. These procedures are covered within Veolia Internal Procedure regarding work zone safety, BMS-01-SP-023.

Prior to entrance into the vault by the workers, the atmosphere must be tested, the vault must be purged, continuous ventilation must be provided, and the atmosphere must be continuously monitored as long as the workers remains in the vault. These procedures are covered in the Veolia Interna l Procedure Permit required Confined Space, BMS-01-SP-002.

b) Pollution Control, Spill Prevention and Response Procedures

Veolia's management has established a strict environmental policy that promotes increase awareness, motivation and involvement of the people in the organization. To aid in the pollution contro l, hazardous materials are not stored within Veolia's vaults and the lids to all vaults are secured into place and the vaults are not accessible to the general public.

Prior to any manual discharge, the waters are inspected prior to discharge to determine if they contain contaminants. Contaminated water will not be discharged. If an unexpected spill were to enter into a

G)veOLIA ENERGY Page 8

Page 13: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

vault or structure, the appropriate agencies would be immediately notified and the release would be addressed either by a qualified contractor or Veolia personnel according to the Veolia Internal Environmental Reporting Procedure, BMS-01-EP-014.

Any hazardous materials and/or waste would be contained and transported to an appropriate disposal facility by qualified personnel. Spill response equipment and supplies are available at Veolia Energy Bunker Hill Facility.

c) Sediment and Erosion Control

The vaults that Veolia manages under this PLAN are not in high risk areas for significant soil erosion. ·The personnel will follow the Veolia Vault Pump out Procedure No. BMS-03-EP-0100: Sections 7.2 to minimize the risk of sediment entering discharge water.

d) Management Runoff

Not applicable. No water runs off. It is trapped in the substructure which serves as a containment.

e) Inspections

Veolia personnel must inspect the integrity of vaults and structures to ensure they are in good working order and functioning properly. Any damage is documented and repaired as soon as possible. Prior to manually pumping out a vault or subsurface structure, t he personnel, or subcontractor, will conduct a visual inspection of the water in the vault to determine the presence of any obvious signs of contaminat ion (e.g., a sheen on top of the water, cloudiness, presence of physical objects, etc.). These procedures and required records are noted in Veolia Procedure No. BMS-03-EP-0100-CA: Section 7.0 and Procedure's Pump out Checklist-Exhibit A. Copies of these documents ca n be found within Appendix B of the PLAN.

Veolia personnel are instructed to contact their supervisor if the water fails preliminary screening. Only water that has passed the screening process will be discharged. If the water fails screen ing, prearranged licensed contractors are availab le to pump out, transport, and properly dispose of the contaminated water. It is the operation's and maintenance's responsibility to strictly adhere to the approved inspection procedures for dewatering of vaults and structures.

fl Waste Disposal

Veolia has interna l policies in place which addresses t he proper handling of the hazardous waste management, BMS-01-EP-009. Although Veolia does not store any haza rdous materials nor expect the need to dispose of hazardous waste during the pumpouts of the vau lts, the personnel will inspect the water prior to discharge to determine if they conta in contaminants.

VI. Record Keeping and Internal Reporting Procedures

Federal regulation requires that any oil spi ll into a water body be reported to the National Response Center at 1-800-424-8802 (24 hours). In add ition, Veo lia sha ll report sp ills to the appropriate local agency, such as the fire department at phone number 911 and the California Office of Emergency

G)VEOLIA ENERGY Page 9

Page 14: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

Services located at phone number 1-800-852-7550. These actions are outline within the Veolia spill notification guidelines template and Veolia Interna l Environmenta l Reporting Procedure, BMS-01-EP-014.

During such an incident, Veolia will provide a description of incidents (such as spills or other discharges), along with other information describing the quality and quantity of discharges. The Company will then document the date and time of incident, weather conditions, duration and cause of spill/leak/discharge, response procedures, resulting environmental problems and persons notified.

Veolia will mainta in the PLAN records for five years at the facility and at the Los Angeles Office.

G)VEOLIA ENERGY Page 10

Page 15: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

VII. Certification and Signature

I certify under penalty of law that this document and all attachments were prepared under my direction

or supervision in accordance with a system designed to assure that qualified personnel properly gather

and evaluate the information submitted. Based on my inquiry of the person or persons who manage the

system or those persons directly responsible for the gathering the information, the information

submitted is, to the best of my knowledge and belief, true, accurate, and complete . I am aware that

there are significant penalties for submitting false information, inclu ing the possibi lity of fine and

imprisonment for knowing violations.

Carlo

Director of Operations

Date: June 29, 2015

G)veOLIA ENERGY Page 11

Page 16: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

APPENDIX A - Vicinity and Drainage Maps

G)veOLIA ENERGY Page 12

Page 17: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

Table 1 Century City Vault Locations (Updated June 2015)

Vault# Vault Address Vault Size (ft)

1 Located behind 2052 10x12x12 (6 ft below

Century Park E grade to top of vault)

2 Located 1 00 feet west of 16x18x18 (6 ft below

2052 Century Park E grade to top of vault) Located about 500 feet east

3 of intersection of W. 8x10x12 (5 ft below grade

Olympic Blvd and Century to top of vault) Park E.

Located on the Southwest 16x16x20 (18ft below

4 corner of Olympic Blvd and Century Park E.

grade to top of vault)

6 Located in front of 2052 8x1 Ox1 0 (6 ft below grade

Century Park E. to top of vault) Located on the Southwest

18x18x20 (6 ft below 7 corner of Century Park E.

and Constellation Blvd. grade to top of vault)

Located on the Southwest 8x10x10 (4ft below grade

7A corner of Century Park E: and Constellation Blvd.

to top of vault)

Located East side of 1 Ox15x1 0 (2 ft below

7B Centu ry Park East, South of Santa Monica Blvd.

grade to top of vault)

Located on the West side of Constellation Blvd 460 ft

8x1 Ox1 0 (6 ft below grade 8 south of Century Pak E.

and 420 ft north of Avenue to top of vault)

of the Stars Located on the Northwest

8A corner of Avenue of the 10x10x12 (0 ft below Stars and Constellation grade to top of vault)

Blvd. Located on the Northwest

8B corner of Avenue of the 10x10x12 (0 ft below Stars and Constellation grade to top of vault)

Blvd.

Located on the Southwest corner of Avenue of the

10x14x10 (6 ft below 9 Stars and Constellation

Blvd. (1999 Ave of the Stars grade to top of vault)

Buidling Property owners)

Located on the Southeast

10 corner of Avenue of the 8x8x1 0 (6 ft below grade Stars and Constellation to top of vault)

Blvd.

Page 18: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

<\,.,...,.l;lr.··· I

~ ... .lt14\ ~,"ll.,:!s.

N .~

®

@)

··~' G)

~

lf.dlvi

-·'C.t\9

Sailii:Q ~

IIV'Ialllt"11

t. '"II" 1- ll'l

Glendale ~ Gnff.1it ".ari! •

los An1geles ·~ r};:;." e:-..·~ ...,

.:.~·

® I Posodo.na

EuiL .p,~~

Af(

fog till~. Soutfl &n Ma:itrn:.l

~\ -.::.!!:'.~ p;laiH'Jr:fena Tam.pl[

.~

,A1J1ambm Stm G3Df1~1

Mon1er!Qv -~ Prn~

Soutti San Gilbncl

Rooomaad

'lol ml!'!

j:i~"r;afjtj

So M

I ,11lnlcu r1 Ui.J' CutV-m Ci1y S.UM~~

"JI\:TCI'Kon

~ Montebollo

·2·llll

5km

Figure 1.1

L.b.-.. .. """~ ®

'CI,Jnid

l O$. :._n,~~je~ ;~ "T].1Lc.mn( ..,_

IIIJ•Jlorl•

BSegundD

Century City

Vault Locat.ion~s

~ Helgl)l~

l~n Pm

~'JIP.ir'l-;

VJf;fN

~,0~.'11/.ind&Df

• - Inglewood

·~

LunJtOx 'Ncsllfi'1Clol'lt

, \~no;~ c~erc.e

Hun~in9ton f~~~·~.OQd Part

!>DUll\

M~h:;o

Plc'O''RI'Iffira

• F loron~· Gr.o.'ham ~

South Gate ev~~h;- Gam~!> .. f i 'IWI

' ocowney .,.,J

.... i ' ...

WiJ1oG ~4IHiJIIIo Lyn~'Ood

Dt!!IAira H.aM\Ithlcme '!l1/ilbw'Diook En 1

~1 GQC9t.l · - - dlll:tl ~fJi~1 ~Oftu:Sifi'~-A.I.1. EM n ~-

Veolia Energy

Sitte Vicinity Map

G ~

Page 19: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

v,~~~e u ~ ~J'<-r£ll..all'~ ~ ~

'

~\:,

..., .... , .. - · -- · lfl

J Cri!'o'i .m ~ ~f~J~•l':hth

~-

~ ... Gl ~ (01

6..-~·~tul

-~ [ ~'>'J N ~-

~

rl G6ut)0!5 i<()

lOJ_• L[l

q;

~/ ~..,

J_j

S•.rv"o~r<:t~ c~

(lot

~.:Al'J..~·

c<~''/ (;.t.•

r. fl '\

~1111' ~ G~r·l A. (: nr

• v(:j

EJ

n c~ •• ,tt

1200 :ti c..v-* 1 t::{•'rs:ieC.titM•

1 QQ.ffl' A I ~t:fj

~'J. ~

--

----- - --

Figure 1.2

Century City Vault Locations

O~l.!!!:i

":"J;) ~-

El ,.- • r-~" ·--. \1\ ('l'f'll.·, ~~

~ r- . - ·~ .. ~ - --::l r .. nt .;.r::r .~ . - .,

_,/ - ¢'f'

.., ., ,. I _,F' •t;

$ ' ·c~,. -.: ,

Plaza l<Ittl'ISO / ~~

" " .. B r'' ,.

..:1' e .. \ l •:>.~'JI ~. ..... ( :

-~ • .i' Cl' J.'i"1"' r.·, ........ ~~· .. .-" t;: ,.

:I i-' "' "·~J'n 11 .q. •-..-'

19 ~

n~ Al•'dlb~g .-c (1; ''0 ifl ~:~f!IJ ,J' ~ . ~.,.. Pt~q.,~ ..... '"' ,()

'~· ~ ... .f ~

Jl 'if •

~',IS~ I

'f. i.,-i{/ -t I h :o C't_,. ~-'/0 ' l ~"'"" ·· · ·~ - ·. i'~ .s ~· 19'-n:; -~ ••

l.F '\' £. "'"~- ~ ,___ GQ011 ~ ·II'I~J) .;!ata02011 ~. ~"4'n~ i£-uns .r•r '-'-"~ . E·::l:1.n (g.-;._:,~·=- ~.~;;p !/.:»~ f;:e-pr

Veolia Energy

Site Vicinity Map

Page 20: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

A •. e,~...,c•, iJ ~/-s.tw.: u• s.~r .. 1illl N .

~ =I

I.:J

n.-..o·tttttb. r I

~~ I!O.'lr-,

Ploll·l T(1"1o'tf•

Ct'1•1) ,~., •. .aa. Pl,.lu To.tnwn 1!1

p

Ba:uk o1 S Arei•O<;IJ!

IF'olo1o'i::.t:

~li.JI !.ll' tlf1

• II''

<.:i4>c.d~ ct.tfil storm Drain:

Elora:insto a q;..~~ Pac•1ic Ocean , #f.-

_, ... 0 _­J,._. ....... _

-~.

\ _ ~

e MH #1\

u, "•~~ r .&1. l I<Jtol Dt'1.to: 1m

,,. -~

~ ~~

~ 151'

s ~ ~

• l!•r•t-'" •

t ~ -"9-

~ (il

~ '\ ~

e

~-.

,!j . .. I r l.

i G ~ c ..

~.· ~ ii 5

::0

s ;'JV' i'i ilhflf!J Sp.w· r·:tf .

'1{11.;-JI.;tll)t'>'j

# ~((} .

{;)""'" .... ... !1,\

( •

% \ ~ ~

~ .. ~ .. ~~ .,..,.~

~ ~ ~~ ~m ~1 C:.oogie . hlapd!Q1MO:I1 ~. $ant!Qm • Tet1tr::. o~ r_;:.,:. - Ew1 n ~:.,:~·g~ r-. l~· ~.t:.~W rRe;:...:~

1200 it I 50 m t

Figure 1.3 Veolia Energy Century City

·-·- Vau~t Location Site Vicinity Map

Page 21: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

A _ ~ N

!;;h'HI:<,tdt u

p

('

~1.. ~

1~ ] l!.J .{)

;-

8

f;t-robJJt; ~'1111 H flrr'o'f4 '-

§.,., T~ I,Joi!M"I lll "f f M'l•l

t:: wv. ....a. Fit.J.l~ !.::•mrfi 1::1

Onn).CJr $ M14fiC11

I ,00 f1. I 28 m I

·­-

Figure 1.4

Century City ·v·ault Location

' ~ MH#2 •

Pia!.{(:

SUI fJ •~C£t.

• • ~~·il~:·ll·!•l~~t

0nt-O~(I•J"i

p

Storm Drain: <Jt· . D I t

( .-,~~" (:w.a ra n~ ~

P .a cifi c Ocean

~ \ .. j_ ..() ..,,..,_

'1& EJ

~ ~qj

Q)~~ . (.,

F<(t. .... ~'>; .r..\'\" · _, ,.,.,.

-...r

-J,4 ~~

.,,,:d·

''./o,~~ o"1 -02011 ~ - Map ~a ~ 1 C'~, SarOOn - 1 e~ m:: -o1 tts.e - Eat n•:-!lO!.}i:! 7;1~ ~,~:~!:er Re;

"'

Veolia Energy

Site Vicinity Map

Page 22: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

~

rom

~~

El

. .. fi/}~~ .. if

&'i:-.. :~

T t->1'11 £1Uv•'1ll II C•.!Uv.o

......

eJ ~.:P ·- ·~9J

~. '0~ ...:t~

~!:-4:;11

~tor,m Dlfa in: o· ~ Dr.s in:s: t.o --_--

P a dlic 0 ce an

lf.~~

, .. ~,. ..

"& -~..¢

'~'

Figure 1.5

Century City - Vault L,ocat·ion

, ~ \

eMH#3

\ ~ ~ ·.s

...-

'5.­:Q

% 'Y.

'<;

C'. ~t-.,...1>

~t5"

-..',tt.

~" ~

-f'l', :J- ,

~

' ~ --? ..

' . ··t-

-~:;.:,

"%

"

f ~ 0 ....

~ ..-\, p \~~

I

[

fl~

-~

''-to,. ··r~;$:,

1.>4

~2011i -~~Map'~ @2!)11 ~. Sant;Qlfll ~ i E'JJf~ :: ..:. ~ t,J.:;e • i£.'l!t rn G.;..:.gle- ~-1:.;.p ,,~::.te- 1 . Repo:. ..

Veolia Energy

Site Vicinity Map

Page 23: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

?\ N. --'f'~

P\.'li"it fn· •• -..... "'

~

~ ft ,._,., l..llllir'l l.r....- J'l'ftl

C-tntlry ~.a iQ'f,'(IJ'I' &

L=J

\ <f:'

Sui' ~lli!C' •

I c;__. ~,~.:{11 1a~

On.. -¢:.}ff,r

p

011fli; <1. s Anl'I"~!Ol

l1 <1;.111~ !;: '"''"

~l(!Hil'l Drain: ~

Dr.i lr.s to 'V" ~ P aci1i c 0 cean

c.;.. ?~-

..-;).

~.,. ~

MH#4 • 1(;,~-o

.. if:i. .... ,;;,'(r 't\o~·

El

- ~i:J. -~~

(j:o'\~ c

~ 1 • r q,

-:-~~~ ;it!'¢·

~&~ '

-t.""

' ':!,.>J.o$.·~~ ::.~0·1

[

~ 100 I. I 120m I

~~ 1@201-1 ~ • Mapd:ala@2lt11 Google, Sal1bom • Te~~.o, ':.J:::>? • Elit !.-, ::_..:::<~-:]!2 !/-~ !r'.)l;c·r ·Rep:

Figure 1.6 Veolia Energy

- Century City - Vault Location Site Vicinity Map

Page 24: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

?\ N

..... ~ftr·~;, " I+ ,....

L:J

200fl 50:m

-

''¥'

~~~.}~ vr;"'

:!)

~ I" 6,.,

~ .Nr.H~~..;.toru . ~~It!! lllf. ...

Figure 1.7

(~I IU~ Cn.JIN'J.

C'J,Jrr1'11"'j C:t, & :;t~c u~i~ MH #6

5l'Jir1Jud.i U p

Pblloti¢

Sugt'Oll p •

. 1:-t!r Pfal,r T(ly;,~u.

l1llrrll or $ An'let<ta

T1 CJilla Ct,u ,,

Ccr.:..y .tt._ ?t.u.n Tar.-ffil l!l

StQ rm D•ain~ Drains to

P.acific O ce.a.n

13 ~;: ~\-.!4h ~~(/_

~~0 r:,. 'h

~.

' \ Ll'. P r..,ll' ~ A

F= IQrJII D.'!-.Jl9'1o E.!J,

Veolia Energy Century City

- Vault Location Site Vicinity Map

'1/>t:'X..C.Co .I

\ o.,. ~

""'?. :t~

Page 25: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

~

'100ft

20m

--

\l"~ac.~e ~ ' p

Ct..:."1' Un1~l mL

r, C'IJITorn OIJ.:IJ\ £. Tea l~a.1

""AlM ~ MH #7 A .. . ~ H #7 "I! ~:,~~~~c-lb

" <> ~f.: Storm Dr~ in. ,dt) ;;). -o

!;,· ~ ll)fo!Jin~ to ' (:'-

- • .IJ. . C•-;~1 P- a ol1tc Oee an .qr ~~~ CalliiLd ~<::-

#~ cl'~

,.l' - :::=::o,;.. ---- -----==~=

Figure 1.8 Veolia Energy Century City

Vault Lo~cations Site Vicinity Map

I

Page 26: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

~ N

~

l:J

.~ .... 12GO·n 1 "" q 100111

,_ ,_

Cu~r

'' Cllf'l'le...~ Swood:t~ ri

J.Cf~ iC!J

l 1l Gon-:tle'lo

..,.~

(":~

~~ '

g..:~ ~ ~,j' B

~~ ·

fJ ~.,.

l.~~

• MH #S .~ f)

II !.:IIl ii

~ &~11:' ~ '., :;z,

~ffl.;i , JO Ftt:>oli .:.. · t;.nr

Figure 1.9

\1\..:1..'11 ~~~~ I'm ~·r.

Reol'ot'lfl 1-dlto Clt!J. 'StQ rm Dr•d n: . 1;

~ r .!I I ns: to () B llil~~~. P a cine Oee a

#,f ~f.

elf

!' ~ C !IVrll'

~~ ,_!,.-

c~.,co~·~ ..;).. ~~ $rlt.1{ IJQ £!:11

C!!~, ~2" l{ ..... >:f1

(,{·nl:t..J'!I -P\v.; 1'voiiotll t!'!l

~ltlv~p Sfi;,oe-t! r~ PIIOl«lJ1llOIJ"t

Century City Vault Location

l3 fJ

't %

...;_ 8

~~

~ ...... ('! '!.l

"'\. :1.-,(1

~ .... -"t"~

~-·

·~ "b

\ ~ "J;. ~

"4 ~-

Qls'li'~

~~ "~ /

13

...~

1m

~ ~ Jt 0 .... - .... ..... ....

I [

WOtymj e

i 0. 5 liD

~

~~

0201' ~-~ mte «aOn ~. ~- T .;rn~ u1 u~--= I ~~o

Veolia Energy

Site Vicinity Map

Page 27: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

~I I

'

~\ " II J:>lf\U•t'll''

N l I

.. H f_P,

,EI.,.._,. ir'.,;r.;:J',I:'(ll

IIG~

~ .... (}

is ~ o,... ~ ~ ~ m;

-:.:~/} ~

ell MH#SB

1;} f)

.:;~ "''P~•• c .. ,~

Cetthll~ •• Cot, ~0~'<1t6

c; ... -t:.s ~ f'IJ'I iol f(t'li~]fj

I

... _--t.

>f• ~

s..t~:tt~H #8~1 fl C•.tl'l G ·1.'!1 ,,., fir! lf'JJ~tlll l•m ~ llo

fl El

· .. ~ ...

.... I '(I! t:;:• .. -~ ..

..... ...;)

~ .. ~;< . .l

:.C)

l~ - J ..___,

Ctllh...-y e<tv C.·?rr~et c!!l

5l'H)t(ll~f••J Ct•li[

A:<

n r.11~Ae"'1

Sto•m Oraln!

Dr a ins to /'\

R .o oifio 'fJ ot an~ o$~tt:t a

~~-cP.t:O

{l

1(• ..

,f.. fJI

e~~~}fl Pl.,.

a 1..1

,._,J> ~ .. or}> rl"v ..,

~,,~

~ ~

tli

ti"!irJ Ren. ;tA;:J!r ~

I. a_;; ~~-~ II 11""' .\

~~ ~,.

1 \,.-4. .~

--

Figure 1.10

Century City Vault Location

BINI/ ...... ·t>-· · 8-

~.0:-. ~ • .. v '""-

n ''"~

Tr-.e ;.,..-u!rber n ~'!'-»te 1c•

~"rlil..o:.JI~I•I II';: ~~ ~

-:r-~

"1t,.. ~ "~ Q

~=v.~

0 ~ I~ IS'~ ("I

~ ~'1.

. "\) ~ .. . / / ' ~ Q I ~ ~

. ~

~

.J,1 ' Goop -~ <IM'll ~11 OoO{IIe. 'SarWIOrn - t ~m· r .r 1 1 .. Fl'cpo

Veolia Energy

Site Vicinity Map

Page 28: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

A ., ~~ II ? ,,,,.,,

N u~•o~~u IJ \i;Vl IP:.t< tH:"If

.-. ~%

~l .-,)

·' - ~:.~,

..,~

lt~­L:J

C:orA•hlfr C.,. C•tfr.l•l ~ m.-.• ,~ct·ltlll.•

;C.

1~ t., ... .n.Onn

Sto rllili Dra in:

Dr.!!ln~w A P a ol~ c Oce a n;;t'

~~ ~'l>'" El

'!f .. ~.,.

~-~ ~~ ft . . 1q_(fm :"t I

-?1

~ ~

"t$"

ri G~

f...nlt..,tettt<J

rVii=i"#9m•

IC'11 .r-.. ICl

(.;Ro~~ Pll<~

.-t\~

.0. .. ·-~ #'~~- .... ~-.

<§:'..,.r c~

~tteu- 'II:"

RMt A C.nr 0!1-1.5'% ,.._" \

Figure 1.11

-- Century City Vault Location

4fr ,·,, (!]

n e:r.)r::

~4,~ ("-

'!<.~ 4f,~

(j

.,rJi' ~~· ~ 011,. "'o

C~p- CII'I ""' ~:.~ SP-<·w.-••r. ~

c. ftflti..t) •·urol 1•~tt"'~ "

Ct-litl~'l'...~:... P!;).J.(t fvrrillt 'E!ll

ltll" /lm.:r«""O Seine~ I~ PnrtiU!Jfilr;l'f,

f)

0

m w

•. 'lt::r;

~1 j,--9

~1: ~

' ... o,

"i: ':). ~ ~~

o I

... c..;

I -• .-. v

I I

a tu ·'-­~P - til'lf(l ~elQ~-1 GOO!ife, Slll'4i0tn- T'-'"111•' rJr II ~~ tlept:;t

Veolia Energy

Site Vicinity Map

Page 29: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

?\; II "'"'''"' N __ ,f ~· ... \ .r...w, i'i<~<!l'"lf'll

n ·a.~

rt f.l"

~ ~

~ ~ , o -.f'~ •. ._ . If)

'11· e Su'.Jl..merH::.o .., '1. 1._ · '"'· fl c~ .. ,

Cl!"lll~ • · ' It ··

B CJ•ftb.ar lt:IH\11Ji]l

{4~ C:t?f'illl'!' .&!a ~~'J •Ct.•rr[~ #<I' .[~.;:~--e.MH #·1 0

#~ ~ (Jt:J.

~.

·~ ~,

-~~ U Tnko:-A!Bll•) .... ')

or,lJ

~~ ~..=J

-~~~

. . ........

1 '200.~ I~ : 11~,. ."t II

--

It'-• E:toiin II) ra ln ~ .... (:Ji

~~ ltlt-!!U" 'F.

R.l!fil A·G.nr ~ Drains io /"'\

~ l!l~itig ~~(I I)~~ .. '/JrP 1'31

~~·· rf G

{T! -~-

\. 1

(:~oiffoJ.,bolll Pine•

,4~~-4,

Figure 1.12

~

'\

Century City Vault Location

Brt-r/1" il.!!i ·~ ~

..-;,~ -<9'

~" ~>!!' G

Tr. Cir';r:-~

-1£-€}\.

o.,.. ~ t.. ~ %

,,pf _,lt. L .• I)':'~I,al

• cA••11"''1-

Cffilut)' C.-r~ ~ ::lf .. .-~ !J""!'oK ...

t"::l!!r.:.S¥ Pt.~z.1 i~.-'o't-.!1'1

.(;i;~th,. ' iM Pt&lll t l_o\1'(-r-f ..

1h::- . .=...,tmbern­"'& ~."t- ... IN

flbo·.r. ·JI•L•I!..,

If)

('I 1[1

~~ _,(,

[9

;'I~{.C

- ~~ ~ . // ~-

r' .. ~ .. c• '1'" ~?~

•G_;,., -~..(J.

7.).,-f ¥'>. -r..~

::..,

... 1 I Goop- Mtip ·d~tl'l MU Oo~. 'SorWiorn - l~•r:·~ l:or I J ~ ..

Veolia Energy

Site Vicinity Map

., A _, r:> ~

I

,A'(! F)'~·

Page 30: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

~

l9

~~0 -r;.;~

~0~ ~ ...... ~

s'li-

EJ ~~0 ~ ;...,c'i}

• Loeb & l oeb llP

~ ~O" -s;:-'-~

t::>'l>

$ Wells Fargo Bank

EJ

B

ft., ~..,.

11'1 Consulate - General o f Italy

vc» q ...

0. (Q&

Figure 1.13

~ <:)>~

= Century City

Vault Location

El

A1oreno Dr

• McGuireWoods LLP - l os Angeles._

%~· 7B :::2-

..<:) . ~ Watt Plaza <.<' t:J

~0 <Q

· 0(::--~ ~

~ c.P"

EJ

Greenleaf Gourmet Chops hop

'ft

David Barton Gym

~ ~~

::2--..<:)

~ <.<'

~ % ~

..<) c;)l_..._

Veolia Energy

Site Vicinity Map

I I = 200 tt

~ ~

-sr ~

Page 31: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

....... -

I!!!!! l!!!!!!!!!!!l '!!!!!!I!!''· 1!!!!!!!!1 '!!!!!!!!!

'""' ' \

'

. ¢::

0 ~

Page 32: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

APPENDIX B- Vault Pumping Procedure: BMS-03-EP-0100-CA and Exhibit A: Pump out Checklist

G)VEOLIA ENERGY Page 13

Page 33: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

PROCEDURE NO. PAGE

(i)veoL.IA - ~~.-... ··N~.·.· IR·.·.~~.--.·v.

BMS-03-EP-0100- CA 1 of 5

PREPARED BY

~,.- 1~1 1~1, Michael Stoppa

APPROVED BY

Regional Environmental Program

ORIGINATION DATE

September 2011

DATE

09/2012

06/2015

SUBJECT: Vault Pumping Practices REVISION DATE

June 2015

REVIEWED BY:

Michael Stoppa

Tina Heath ~l~.y~s o~~(>

0.¥~$ [jij~

..

COMMENTS I REVISIONS

Annual review

Slight modifications to cover the Los Angeles Sites procedures under the California State Water Resources Control Board, Order #2014-0174-DWQ, NPDES CAG990002

REV.#

03

REVISIONS APPROVED

BY:

MDS

TBH

All Revisions must be approved by; Corporate Safety Manager, Regional Environmental, Health, and Safety Manager; and the facility General Manager

Page 34: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

Vault Pumping Procedure

1.0 Purpose

PAGE

2 of5

1.1 The purpose of this procedure is to provide an effective means of identifying the appropriate and in some cases regulatory requirements necessary for distribution personnel to use in the event a vault in a public area becomes flooded with any material either liquid or solid. This Vault Pumping Program also establishes administrative and PPE practices and requirements for employees subject to its implementation.

2.0 Scope

2.1 This procedure applies to all employees working in or at a location owned, operated or managed by VEnNA that requires that they perform vault pumping or .cleaning due to foreign material entering our vault system or that of our customer should we be liable for maintenance of those vaults.

3.0 References

3.1 VEnNA Personal Protective Equipment program

3.2 VEnNA Confined space entry program

3.3 VEnNA Energy Control (Lock out I Tag Out) Program

3.4 VEnNA Welding, Cutting and Hot Work

3.5 VEnNA Work Zone Safety Policy

3.6 Site specific NPDES or other applicable permitting requirements

4.0 Responsibilities

4.1 Plant Manager shall ensure uniform implementation and compliance with this program by all employees and assume the responsibilities of managers and supervisors if the facility does not support such positions.

4.2 Human Resources representative maintains all employee medical and personnel records.

4.3 Department Managers shall ensure that,personnel under their direction receive training and that they maintain compliance with this program at all times.

4.4 Site Safety Managers shall ensure the training of facility supervision to this program is completed and documented, to a level that will ensure understanding.

4.5 Shift and/or Distribution Supervisors shall ensure the training of facility supervision to this program is completed and documented, to a level that will ensure understanding.

4.6 Department Supervisors shall be responsible for ensuring that only trained employees assume active roles and perform related work(s) in accordance with this program.

Page 35: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

(i)VEOLIA ENERGY

Vault Pumping Procedure PAGE

3 of 5

4.7 Employees must ensure that they understand and comprehend this program and maintain full compliance with this program and its contents. Only trained employees shall assume active. roles and perform work in accordance with this program.

5.0 Definitions

5.1 Contractor- For the purposes of this procedure any contractor brought on site to work within the scope of this procedure shall adhere to all specific requirements of Veolia Energy NA in regards to vault maintenance and vault pumping.

5.2 Distribution System - For the purposes of this procedure any reference to a distributions system shall include public thoroughfare manholes, piping above and below ground, manholes on or in private property managed by Veolia Energy personnel.

5.3 Qualified Employee - A Veolia Energy employee that has been trained in the specific practices and procedures of a particular task and/or job. This training can be but is not limited to classroom, computer based, lecture, text book, video based, interactive, Power Point and discussion groups.

6.0 Generallnformation

6.1 Each site shall verify whether there are any federal, state or local regulations that require a stormwater run-off permit and whether their site maintains a current site specific stormwater permit, NPDES permit or other regulated program as appropriate.

6.2 If a specific stormwater, NPDES permit or other applicable permit exists for the site, then the site shall;

6.2.1 Review the requirements established in that permit 6.2.2 Ensure adherence to those specific and general permit effluent or release

requirements at all times.

NOTE: Nothing within this document authorizes or directs any site to knowingly violate or disregard any federal, state or local permit or permitting program in order to comply with this procedure.

6.3 Due to rain fall, snow melt, landscape runoff and other localized spills, vaults can and do flood and/or fill with water, hazardous materials, sediment or other foreign material. As such, employees are required to adhere to strict guidelines and regulations established for the removal and disposal of that material contained below in section 7.0.

6.4 Employees working in or on our distribution team shall adhere to the following VEnNA internal safety programs at all time:

6.4.1 Confined Space Entry 6.4.2 Energy Control (Lock out I Tag Out) 6.4.3 Welding, Cutting and Hot Work

Page 36: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

G)VEOLIA. ENERGY

Vault Pumping Procedure PAGE

4 of 5

6.4.4 Personal Protective Equipment 6.4.5 Work Zone Safety

6.5 Employees working on or in our distribution system shall be vigilant to the environment around them at all times.

7.0 Procedures

7.1 Vault Inspection & Monitoring

7.1.1 Vaults shall be inspected on a regular scheduled basis as established by the facility maintenance program.

7.1.2 A vault inspection shall be initiated anytime a site is notified by any reputable party that a spill of any material has occurred within the general area of the vault, where topographical layout would indicate a likely or possible migration to our vault.

7.2 Vault Pumping

7.2.1 At a minimum, the following practices shall be observed by all distribution personnel without exception:

7.2.1.1 Visually inspect stormwater, ground water or any other material that has migrated into a vault.

7.2.1.2 If the material is clear and appears to be uncontaminated and non­hazardous, then it can be pumped from the manhole into the nearest storm sewer catch basin, using the following parameters.

7.2.1.2.1 A drain hose must be fitted to the pump and run the entire length terminating directly into the catch basin.

7.2.1.2.2 A sock shall be attached to the end of the drain line with the capacity to catch any solid materials or foreign bodies and prevent them from entering the storm sewer.

7.2.1.3 If the material is found to be unnaturally discolored or have excess turbidity or the presence of known hazardous materials (i.e. diesel fuel, gasoline, oil or other spilled material) then it shall NOT be pumped into any storm drain or sewer. It shall be

7.2.1.3.1 Pumped to a holding tank of a reputable contractor 7.2.1.3.2 Properly disposed of according to state and federal

requirements

7.2.1.4 If a manhole I vault requires the removal of ay solid material such as sediment, metal, wood or other foreign object, it shall be removed in accordance with state and federal regulations (OSHA, EPA, DNR, etc.) and disposed of in accordance with the same. All precautions shall be made prior to the removal of any foreign object.

Page 37: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

(i)VEOLIA ENERGY

Vault Pumping Procedure PAGE

5 of5

NOTE: Under no circumstances shall foreign objects from our manhole I vaults be discarded into or upon a public way.

7.2.1.5

8.0 Training

An ongoing working log shall be maintained at the site for each manhole I vault that requires evacuation of stormwater, ground water, or other spilled foreign material. (An example is contained in Exhibit A attached to this document)

7.2. 1 .5. 1 The log shall contain start time, stop time, duration, and pumping rate.

8. I Employees covered by this program will participate in an initial and periodic training program geared towards educating the employees in the hazards of working to extract liquids or other foreign materials from manholes I vaults.

8.2 All new or transferred employees who will be assigned to jobs where they may become a . subject to this activity shall receive training within 30 days of their initial employment or reassignment.

8.3 The training program shall include at a minimum:

8.3. 1 A brief review of the requirements for manhole I vault entry. 8.3.2 29 CFR 1910 general Duty Clause 8.3.3 Monitoring equipment design and use 8.3.4 Safety hazards associated with manhole and vault entry 8.3.5 This written program and its requirements.

9.0 Documentation

9.1 Training - Attendance rosters of all training sessions shall include date, department, name/signature of employee, and instructor's name. The Safety Manager or designee for each site shall maintain all training records.

9.2 All records and test results pertaining to this program will be made available to the employees upon written request. Only information related to the individual employee shall be released to him or her or their designated representative. Such representation must be made in writing.

9.3 Program Evaluation - This program shall be evaluated periodically by VEnNA Environmental, Safety & Health Department. Changes shall be made as necessary to maintain program effectiveness

9.4 An ongoing working log

9.5 Site Specific NPDES or other applicable regulatory documentation requirements.

Page 38: I II....o PLAN Originator: Tina Heath, EHS Corporate Director o Email: tina.heath@veolia.com o Phone: 909-614-2701 The Veolia Team also includes all of the Veolia personnel working

G)veouA ENERGY

Vault Pumpout Procedure BMS-03-EP-1 0 I • Exhibit A

VAULT# __ _

DATE: __ ~- TIME: ___ _ VAULT SIZE:------ESTIMATED WATER DEPTH: AMOUNT (GAL) ___ _

Discharge destination (alley, etc.) Describe conditions: Is vault water cloudy, discolored, and/or has odor? Yes No Any oil and/or tar? Yes __ No __ Are there solids being discharged into the stonn sewer? Yes No Recent Rain: Yes No

Name & Signature

DATE: TIME: VAULT SIZE: _____ _

ESTIMATED WATER DEPTH: AMOUNT (GAL) ___ _

Discharge destination (alley, etc.) Describe conditions: Is vault water cloudy, discolored, and/or has odor? Yes No Any oil and/or tar? Yes __ No __ Are there solids being discharged into the storm sewer? Yes No Recent Rain: Yes No

Name & Signature

DATE: TIME: VAULT SIZE: _____ _

ESTIMATED WATER DEPTH: AMOUNT (GAL) ___ _

Discharge destination (alley, etc.) Describe ·conditions: Is vault water cloudy, discolored, and/or has odor? Yes No Any oil and/or tar? Yes __ No __ Are there solids heing discharged into the storm sewer? Yes No Recent Rain: Yes No

Name & Signature

DATE: TIME: VAULT SIZE: _____ _

ESTIMATED WATER DEPTH: AMOUNT (GAL) ___ _

Discharge destination (alley, etc.) Describe conditions: Is vault water cloudy, discolored, and/or has odor? Yes No Any oil and/or tar? Yes __ No __ Are there solids being discharged into the storm sewer? Yes No Recent Rain: Yes No

Name & Signature

DATE: TIME: VAULTSlZE: _____ _

ESTIMATED WATER DEPTH: AMOUNT(GAL) ___ _

Discharge destination (alley, etc.) Describe conditions: Is vault water cloudy, discolored, and/or has odor? Yes No Any oil and/or tar? Yes __ No __

Are there solids being discharged into the storm sewer? Yes No Recent Rain: Yes No

Name & Signature

ESTIMATED WATER DEPTH: AMOUNT(GAL) ___ _

Discharge destination (alley, etc.) Describe conditions: Is vault water cloudy, discolored, and/or has odor? Yes No Any oil and/or tar? Yes __ No __ Are there solids being discharged into the storm sewer? Yes No Recent Rain: Yes No

Name & Signature Updated November 22, 2013