i-1 review of lean topics dewey warden. i-2 lean basics value stream mapping the seven wastes 5s’s...
TRANSCRIPT
I-I-11
Review of Lean TopicsReview of Lean Topics
Dewey WardenDewey Warden
I-I-22
Lean BasicsLean Basics
Value stream mappingValue stream mapping
The seven wastesThe seven wastes
5S’s5S’s
Processes and operationsProcesses and operations
Process flow and cell designProcess flow and cell design
Process standardizationProcess standardization
Overview of quick changeoversOverview of quick changeovers
I-I-33
Value Stream MappingValue Stream Mapping
It is the simple process of It is the simple process of directly observing the directly observing the flows of information and flows of information and materials as they occur, materials as they occur, summarizing them visually, summarizing them visually, and then envisioning a and then envisioning a future state with a much future state with a much better performance.better performance.
I-I-44
Value Stream MappingValue Stream Mapping
Levels of mappingLevels of mapping
ProcessProcess
Single plantSingle plant
Multiple plantMultiple plant
Across companiesAcross companies
I-I-55
Value Stream MappingValue Stream Mapping
Creating the value stream maps Creating the value stream maps
Walk along the value streamWalk along the value stream
Look forLook for– Which steps create value?Which steps create value?
– Which steps are waste?Which steps are waste?
– Why is order flow so erratic?Why is order flow so erratic?
– Why is quality so erratic?Why is quality so erratic?
– How can value be enhanced for the end-customer?How can value be enhanced for the end-customer?
I-I-66
Value Stream MappingValue Stream Mapping
Creating the value stream maps Creating the value stream maps
Identify all the physical actions requiredIdentify all the physical actions required
Identify information actions currently required to Identify information actions currently required to manage the value streammanage the value stream
I-I-77
The Seven WastesThe Seven Wastes
OverproductionOverproduction
Excessive inventoryExcessive inventory
Unnecessary conveyanceUnnecessary conveyance
Over processingOver processing
Excessive motionExcessive motion
WaitingWaiting
CorrectionsCorrections
I-I-88
The Five SsThe Five Ss
Set in Order
ShineStandardize
Sort
Sustain
I-I-99
Processes and OperationsProcesses and Operations
ProcessesProcesses– A continuous flow in A continuous flow in
which raw materials are which raw materials are converted to finished converted to finished productsproducts
OperationsOperations– Any action performed by Any action performed by
workers or machines on workers or machines on materials, WIP, or materials, WIP, or finished productsfinished products
I-I-1010
Processes and OperationsProcesses and Operations
Quality processQuality process– Focuses on meeting requirements and on minimizing Focuses on meeting requirements and on minimizing
warranty costswarranty costs
Cost processCost process– Seeks to remove excess cost or waste in an organizationSeeks to remove excess cost or waste in an organization
Delivery processDelivery process– Manages the elements of time and quantity in sourcing Manages the elements of time and quantity in sourcing
materials, producing and getting product and service to the materials, producing and getting product and service to the customer as requiredcustomer as required
InnovationInnovation– Maximizes an organization’s success rateMaximizes an organization’s success rate
I-I-1111
Processes and OperationsProcesses and Operations
In a lean enterpriseIn a lean enterprise– Value stream maps help to focus an organization on their Value stream maps help to focus an organization on their
processes to promote optimization of the whole company’s processes to promote optimization of the whole company’s performance by aligning interests across the companyperformance by aligning interests across the company
– Process-focused strategies unleash new levels of Process-focused strategies unleash new levels of productivityproductivity
I-I-1212
Process Flow and Cell DesignProcess Flow and Cell Design
Wastes in an operation based layoutWastes in an operation based layout
Source: Productivity Press
I-I-1313
Process Flow and Cell DesignProcess Flow and Cell Design
Benefits of a process flow layoutBenefits of a process flow layout– Positioning equipment in the process sequence for a Positioning equipment in the process sequence for a
smooth flowsmooth flow
– Minimal inventory and delaysMinimal inventory and delays
Source: Productivity Press
I-I-1414
Process StandardizationProcess Standardization
Establishes Establishes predictabilitypredictabilityThree elementsThree elements– Standard cycle timeStandard cycle time– Standard work Standard work
sequencesequence– Standard in-process Standard in-process
inventoryinventory
Source: Productivity Press
I-I-1515
Quick ChangeoversQuick Changeovers
Separate internal setup from external setupSeparate internal setup from external setup
Convert internal setup to external setupConvert internal setup to external setup
Streamline all aspects of setupStreamline all aspects of setup
Source: Productivity Press