hybrid coiled tubing development drilling technology. drillwell_forum_1-12-11_ori… · hybrid...

12
Sydney 8 th December, 2011 Hybrid Coiled Tubing Development Drilling Technology Scott Andreas – CSG Development Drilling & Completions Manager Origin Energy

Upload: doannhan

Post on 04-Jun-2018

310 views

Category:

Documents


17 download

TRANSCRIPT

Sydney 8th December, 2011

Hybrid Coiled Tubing Development Drilling Technology

Scott Andreas – CSG Development Drilling & Completions Manager Origin Energy

Sydney 8th December, 2011

APLNG CSG to LNG Development Project

Location

Legend All permits

APLNG CSG

Other CSG permits

Bowen Basin

Surat Basin

2

Sydney 8th December, 2011

APLNG Phase 1

Lease Construction

Drill 1,000+ Wells

Walloons Pre Perf (87%)

Spring Gully Frac (13%)

Complete 1,000+ Wells

Free Flow (40%)

Pumping (60%)

3

The APLNG Project scope = the need for innovative technology...

• Very repetitive development well “manufacturing project” • Long term project to be executed over 5 years • Fit for purpose technology required to deliver maximum development efficiency

Sydney 8th December, 2011

Walloons CSG Development Well Design

• 12-1/4” surface hole drilled to ~100mRT • 9-5/8” surface casing cemented to surface • 8-3/4” vertical production hole drilled to ~800 mRT • 7” production casing with pre-perforated casing spaced out across coal intervals • Production casing cemented above top coal seam to surface

• Uncemented open hole production interval across coal seams

Sydney 8th December, 2011

Savanna Hybrid Coiled Tubing Drilling Rig Specs • 1st of its type in Australia • Hybrid functionality – coil or conventional drilling capability

• 100,000 lb derrick rating • 1100m CSG development well depth rating • 3-1/2”, 6.7ppf, GT-80X coiled tubing string

• Hydraulic trailer mounted • PLC automation

• Volant CRT implementation

Sydney 8th December, 2011

Hybrid Coiled Tubing Drilling Rig Advantages

• Reduced Health & Safety risk exposure

• Enables Environmental improvement

• Increased operational efficiency • Hybrid Functionality promoting well type flexibility • Improved hole conditioning

• Reduced noise exposure

• Improved rig move strategy & flexibility

Sydney 8th December, 2011

Innovative Technology Improvements

Sydney 8th December, 2011

Rig Package Lease Layout

Sydney 8th December, 2011 9

Origin Conventional ADR vs. Coiled Tubing Development Drilling Rig Performance

ActivityConventional ADR Drilling

RigHybrid Coiled Tubing

Drilling RigImprovement

Rig Move & R/U (days) 1.5 0.5 67%

Drilling - Production hole

(hours) 16 11 31%Running

Production Casing (hours) 12 6 50%

Total Well Duration (days) 4.6 3 35%

Sydney 8th December, 2011

Enabling Environmental Improvement

• Continuous drive to reduce landowner disturbance, environmental foot print, & avoid spills

• Implemented of MDL’s

where possible • HCT Drilling Rig equipped

with hydraulic self-levelling rams

• Reduced equipment footprint

• Reduced fluid leak paths

• Reduced potential wellbore contaminants

Sydney 8th December, 2011

Questions?

Sydney 8th December, 2011

Thank you