  • Human Factor in Project Management www.cs.put.poznan.pl/jnawrocki/require Requirements Eng. & Project Management Lecture 10 Jerzy Nawrocki Prince Jozef Poniatowski Battle of Leipzig, 1813
  • Slide 2
  • J.Nawrocki, XPrince (2) Agile software development 90s People & communication Customer collaboration Responding to change Tommorow or never! O K Working software
  • Slide 3
  • J.Nawrocki, XPrince (2) XP Prince 2 Kierownik Zespou XPrince Team Project Board Senior user ExecutiveSenior Supplier Manager Project Assurance Developers Architect Analyst
  • Slide 4
  • J.Nawrocki, XPrince (2) Agenda MTV Impact Background and Font Animation Project Presentation Coveys Principles Situational Leadership Introduction XPrince Team Project Lifecycle The Analyst Role The Architect Role The Project Manager Role Scaling up Conclusions Prince Jozef Poniatowski
  • Slide 5
  • J.Nawrocki, XPrince (2) MTV Impact 50% 45% Trust Merit Voice
  • Slide 6
  • J.Nawrocki, XPrince (2) MTV Impact Trust 50% 45% Merit Voice
  • Slide 7
  • J.Nawrocki, XPrince (2) MTV Impact Trust Voice 50% 45% Merit
  • Slide 8
  • J.Nawrocki, XPrince (2) MTV Impact Trust Voice Merit 50% 45%
  • Slide 9
  • J.Nawrocki, XPrince (2) Agenda MTV Impact Background and Font Animation Project Presentation Coveys Principles Introduction XPrince Team Project Lifecycle The Analyst Role The Architect Role The Project Manager Role Scaling up Conclusions Prince Jozef Poniatowski
  • Slide 10
  • J.Nawrocki, XPrince (2) Black Background This is a sample text The impression is NO background
  • Slide 11
  • J.Nawrocki, XPrince (2) Blue Background This is a sample text A blue background makes a nice impression
  • Slide 12
  • J.Nawrocki, XPrince (2) Times New Roman This is a sample text Times New Roman is too thin.
  • Slide 13
  • J.Nawrocki, XPrince (2) Bold Times New Roman This is a sample text Bold Times New Roman is slightly better.
  • Slide 14
  • J.Nawrocki, XPrince (2) Bold Arial This is a sample text Bold Arial is very readable.
  • Slide 15
  • J.Nawrocki, XPrince (2) Bold Arial Narrow This is a sample text There is a trade-off between readablity and text size. Bold Arial Narrow seems the optimum choice.
  • Slide 16
  • J.Nawrocki, XPrince (2) Arial Narrow 32 Arial Narrow 28 Arial Narrow 24 Arial Narrow 20 Standard text: Arial Narrow 28 Font Size
  • Slide 17
  • J.Nawrocki, XPrince (2) Advantages of Light Background It is easy to prepare handouts
  • Slide 18
  • J.Nawrocki, XPrince (2) Agenda MTV Impact Background and Font Animation Project Presentation Coveys Principles Introduction XPrince Team Project Lifecycle The Analyst Role The Architect Role The Project Manager Role Scaling up Conclusions Prince Jozef Poniatowski
  • Slide 19
  • J.Nawrocki, XPrince (2) Animation This is a sample text Too many moving elements = chaos
  • Slide 20
  • J.Nawrocki, XPrince (2) Simple Animation This is a sample text Animation should support perception.
  • Slide 21
  • J.Nawrocki, XPrince (2) Perception Management
  • Slide 22
  • J.Nawrocki, XPrince (2) Perception Management
  • Slide 23
  • J.Nawrocki, XPrince (2) Perception Management
  • Slide 24
  • J.Nawrocki, XPrince (2) Agenda MTV Impact Background and Font Animation Project Presentation Coveys Principles Introduction XPrince Team Project Lifecycle The Analyst Role The Architect Role The Project Manager Role Scaling up Conclusions Prince Jozef Poniatowski
  • Slide 25
  • J.Nawrocki, XPrince (2) Text and Visualization
  • Slide 26
  • J.Nawrocki, XPrince (2) Presentation Structure Cover slide (project title, presenters)
  • Slide 27
  • J.Nawrocki, XPrince (2) Presentation Structure Cover slide (project title, presenters) trust Customer - trust
  • Slide 28
  • J.Nawrocki, XPrince (2) Presentation Structure Cover slide (project title, presenters) trust Customer - trust
  • Slide 29
  • J.Nawrocki, XPrince (2) Presentation Structure Cover slide (project title, presenters) Customer - trust Problem and its importance (motivation) Problem: Traditional selling is ineffective: slow & costly. Affected people: Customers & Funny-Soft owners Idea: Web-base shop
  • Slide 30
  • J.Nawrocki, XPrince (2) Presentation Structure Cover slide (project title, presenters) Customer - trust Problem and its importance (motivation) Outline of the solution (a very general view).
  • Slide 31
  • J.Nawrocki, XPrince (2) Presentation Structure Up to 3 most important use cases (in a visual form) Skills useful in the project (already possessed and new) What are main benefits of participating in the project? Contacts and the team (pictures) For a short presentation (up to 15) agenda is superfluous. Cover slide (project title, presenters) Customer - trust Problem and its importance (motivation) Outline of the solution (a very general view).
  • Slide 32
  • J.Nawrocki, XPrince (2) Agenda MTV Impact Background and Font Animation Project Presentation Coveys Principles Introduction XPrince Team Project Lifecycle The Analyst Role The Architect Role The Project Manager Role Scaling up Conclusions Prince Jozef Poniatowski
  • Slide 33
  • J.Nawrocki, XPrince (2) Seven habits of highly effective people Be proactive Begin with the end in mind Put first things first Private Think win / win Seek first to understand.. Synergize Public Sharpen the saw
  • Slide 34
  • J.Nawrocki, XPrince (2) Stewardship delegation Desired results Guidelines Resources Accountability Consequences
  • Slide 35
  • J.Nawrocki, XPrince (2) Synergize Synergy: to build on and to build on strengths and to compensate for. to compensate for weaknesses.
  • Slide 36
  • J.Nawrocki, XPrince (2) Agenda MTV Impact Background and Font Animation Project Presentation Coveys Principles Situational Leadership Introduction XPrince Team Project Lifecycle The Analyst Role The Architect Role The Project Manager Role Scaling up Conclusions Prince Jozef Poniatowski
  • Slide 37
  • J.Nawrocki, XPrince (2) Management Styles Democratic, people-oriented Autocratic, result-oriented
  • Slide 38
  • J.Nawrocki, XPrince (2) Effective Management Goal setting Praising Reprimanding
  • Slide 39
  • J.Nawrocki, XPrince (2) Goal Setting Specific Measurable Atractive Realistic Timed SMART
  • Slide 40
  • J.Nawrocki, XPrince (2) Goal Setting Specific and measurable Motivating Attainable Relevant Tracktable SMART
  • Slide 41
  • J.Nawrocki, XPrince (2) Praising Catch people doing things right. Praise them. Do it frequently.
  • Slide 42
  • J.Nawrocki, XPrince (2) Reprimanding Critisize the behaviour, not the person. Talk about the facts. Gossips and impressions must be checked. Concentrate on most important aspects of the problem. 1. Present the problem. 2. Say what you feel. 3. Break for a moment. 4. Express your positive attitude towards the person.
  • Slide 43
  • J.Nawrocki, XPrince (2) Motivation Dynamics Time Motivation
  • Slide 44
  • J.Nawrocki, XPrince (2) Skills and Knowledge Time Skills
  • Slide 45
  • J.Nawrocki, XPrince (2) Management Dynamics Directive MotivatingDetached Motivation Skills Time
  • Slide 46
  • J.Nawrocki, XPrince (2) Team roles Driver (developer, director, innovator) Planner (strategist, estimator, scheduler) Enabler (resource manager, promoter, negotiator) Exec (producer, coordinator, maintainer) Controller (monitor, auditor, evaluator) Error
  • Slide 47
  • J.Nawrocki, XPrince (2) Summary Effective presentations: Trust + voice Stewardship delegation Synergy Situational leadership
  • Slide 48
  • J.Nawrocki, XPrince (2) Questions?