Page 1: How to destroy a project in one month or less

1

How to destroy a project in one month… or less?

Seminars ∙ Post Graduation Project Management ∙ ISBB Helder Ferreira ∙ PMO Director, ISA ∙ [email protected]

13.04.2013

Page 2: How to destroy a project in one month or less

2

• Experiência:

– 16 anos execução de projectos IT;

– 10 anos em Gestão de Programas e Projectos;

– 6 anos a liderar Gabinetes de Gestão de Projecto;

– PMBoK, SCRUM, CMMI5, Lean, 6-sigma e ITSM;

• Certificado em:

– Project Management Professional, PMP

– Scrum Master, CSM

– ITIL IT Service Management, ITSM

• Formação:

– Licenciado em Engª Electrotécnica, FEUP

– Mestrado em Engª Informática, FEUP

– Pós-Graduado em Gestão de Projectos, ISBB

Quem sou?

• Currently PMO Director at Intelligent Sensing Anywhere, SA; • Certifications: PMP - Project Management Professional, CSM – Certified Scrum Master and ITSM – ITIL v3 Service

Management; • License Degree in Electrotechnical Engineering, Masters in Computer Science and Post-Graduation in Project

Management; • 16 years executing projects; • 10 years doing Program/Project Management (Retail, IT, Production, Energy, Internet/Web, Usability, R&D); • 6 years leading Project Management Offices (PMO); • PMBoK, SCRUM, XP, CMMI5, Lean, 6-sigma and ITIL.

Page 3: How to destroy a project in one month or less

3

Do you know what is

the current project’s

success rate?

Page 4: How to destroy a project in one month or less

4

CHAOS Report

Page 5: How to destroy a project in one month or less

5

CHAOS Report

Failed Delayed / Overbudget Success

Source:

Page 6: How to destroy a project in one month or less

6

We keep doing

an awful job

managing

projects!

Page 7: How to destroy a project in one month or less

7

CHAOS Report

• Projects with high budgets • Have success rates really low

• Projects with low budgets • Have success rates very high

Page 8: How to destroy a project in one month or less

8

As more

money gets

involved,

more is the

tendency

(probability)

to do

mistakes!

Page 9: How to destroy a project in one month or less

9

CHAOS Report

Average % of temporal delay in challenged projects

Page 10: How to destroy a project in one month or less

10

When we get delayed,

we REALLY get

delayed!

Page 11: How to destroy a project in one month or less

11

Conclusion:

67% of the worldwide projects

end up like this…

Page 12: How to destroy a project in one month or less

12

So, what is causing

such big disasters on

our projects?

Page 13: How to destroy a project in one month or less

13

35 reasons for these problems to happen

(by no special order or preference)

Page 14: How to destroy a project in one month or less

14

#1 – The choice of the Project Manager

Page 15: How to destroy a project in one month or less

15

The wrong person on the right project.

The choice should be made on the most proper resource to the project in question, having in mind: - Seniority; - Motivations; - Personality.

Page 16: How to destroy a project in one month or less

16

Can a project manager with less “Soft/People Skills” be a good leader?

Page 17: How to destroy a project in one month or less

17

Can a project manager with less “Soft/People Skills” be a good leader?

Sure. Specially in projects with very strong technical components. As technical guru, will lead by example and

peers will respect him/her.

Page 18: How to destroy a project in one month or less

18

But pay attention: Just because someone excels at technical lead, that doesn’t mean it can be as good as a manager or vice-versa.

Hallo Effect

Page 19: How to destroy a project in one month or less

19

#2 – Frequent and uncontrolled scope

changes

Page 20: How to destroy a project in one month or less

20

The expectation gap between: the scope that the project manager believes he/she has to fulfill and the scope from the client side, causes a phenomenon of frequent and continuous changes in the project that at the end will cause huge deviations from the original vision.

Scope Creep

Page 21: How to destroy a project in one month or less

21

The expectation gap between: the scope that the project manager believes he/she has to fulfill and the scope from the client side, causes a phenomenon of frequent and continuous changes in the project that at the end will cause huge deviations from the original vision.

Scope Creep

What causes this behavior?

Page 22: How to destroy a project in one month or less

22

Some probable causes: - Missing the identification of an important stakeholder; - The project need or the problem is not clear; - Sometimes, the client doesn’t know what he/she wants; - Bad requirements definition.

Page 23: How to destroy a project in one month or less

23

Some probable causes: - Missing the identification of an important stakeholder; - The project need or the problem is not clear; - Sometimes, the client doesn’t know what he/she wants; - Bad requirements definition.

Are all changes bad?

Page 24: How to destroy a project in one month or less

24

Not all changes are bad, as long as they contribute positively for the project goal, and as long as there is a control mechanism in place.

Change Control Board

Page 25: How to destroy a project in one month or less

25

The scope change control system also helps to avoid unecessary work in the project.

Gold Plating

Page 26: How to destroy a project in one month or less

26

#3 – Effort Estimation Errors

Page 27: How to destroy a project in one month or less

27

Why do we do

so many errors

estimating?

Page 28: How to destroy a project in one month or less

28

Some of the common causes: - One-time estimate; - Padding; - Forget past history; - Don’t use a WBS; - Don’t validate scope with stakeholders; - Lack of buy-in from the team.

Page 29: How to destroy a project in one month or less

29

Some of the common causes: - One-time estimate; - Padding; - Forget past history; - Don’t use a WBS; - Don’t validate scope with stakeholders; - Lack of buy-in from the team.

How can we

improve?

Page 30: How to destroy a project in one month or less

30

- Create a WBS with the team and the client;

- Use 3-point estimate;

- Use Delphi Technique;

- Use the historical data;

- Apply reserves.

Page 31: How to destroy a project in one month or less

31

- Create a WBS with the team and the client;

- Use 3-point estimate;

- Use Delphi Technique;

- Use the historical data;

- Apply reserves.

Estimating will always be a Guessing Game.

But it should be an Educated Guess.

Page 32: How to destroy a project in one month or less

32

#4 – Lack of communication or

miscommunication

Page 33: How to destroy a project in one month or less

33

Page 34: How to destroy a project in one month or less

34

Why does this

happen so

often?

Page 35: How to destroy a project in one month or less

35

Why does this

happen so

often?

Communication is a complex subject.

Page 36: How to destroy a project in one month or less

36

The human being communicates: - 7% through words; - 38% with voice; - 55% with the body.

Each one of us has 3 communication channels: - Auditive; - Visual; - Kinesthetic; And one of them is dominant…

Page 37: How to destroy a project in one month or less

37

65% of the world population retains Visual information better than Auditive information.

Page 38: How to destroy a project in one month or less

38

Any communication system has one transmitter, one receiver and a channel, through which the transmitter sends a message that should be perceived by the receiver.

Page 39: How to destroy a project in one month or less

39

Any communication system has one transmitter, one receiver and a channel, through which the transmitter sends a message that should be perceived by the receiver. But there is noise.

Page 40: How to destroy a project in one month or less

40

Noise can be caused by: - Nº of transmitters and receivers; - Usage of the wrong communication channel; - Environment where we are; - Attitude of the transmitter and the receiver; - Lack of communication skills; - Culture; - Level of expertise about the message contents.

Page 41: How to destroy a project in one month or less

41

Noise can be caused by: - Nº of transmitters and receivers; - Usage of the wrong communication channel; - Environment where we are; - Attitude of the transmitter and the receiver; - Lack of communication skills; - Culture; - Level of expertise about the message contents.

How can we improve

the communication?

Page 42: How to destroy a project in one month or less

42

Pay attention! Observe. Learn. Imitate. Act.

Page 43: How to destroy a project in one month or less

43

#5 – Lack of risk management

Page 44: How to destroy a project in one month or less

44

Not managing your risks is like walking with your eyes closed.

Page 45: How to destroy a project in one month or less

45

And those that do not see…

Page 46: How to destroy a project in one month or less

46

Common problems in risk management: - Ignore that risks exist; - Don’t consult all the

stakeholders; - Unknowing the risk

tolerances; - Not adding contingency and

management reserves; - Not using the risk register

frequently; - Ignore common sense; - Trust in luck.

Page 47: How to destroy a project in one month or less

47

#6 – Resources are scarce, shared or stolen

Page 48: How to destroy a project in one month or less

48

Sharing is difficult, especially when the resources are scarce and there are opposing

interests. Matrix Organizations

Page 49: How to destroy a project in one month or less

49

Most organizations in the world follow a matrix hierarchy, where resources deal daily with conflict of interests between project management and functional managers.

Page 50: How to destroy a project in one month or less

50

Most organizations in the world follow a matrix hierarchy, where resources deal daily with conflict of interests between project management and functional managers.

Depending on the matrix organization, we might have: - Resources that give priority to their department tasks

instead of project tasks; - Project Managers negotiating for the best resources with

functional managers or other project managers; - Masked costs; - Delays caused by low / shared availability; - Low morale in Projects.

Page 51: How to destroy a project in one month or less

51

Deal for the best resources. Meet with the functional managers. Make your project their project too.

Page 52: How to destroy a project in one month or less

52

#7 – Scope isn’t clear

Page 53: How to destroy a project in one month or less

53

Page 54: How to destroy a project in one month or less

54

Frequently, the client doesn’t really know what he/she wants. What should we do?

Page 55: How to destroy a project in one month or less

55

Frequently, the client doesn’t really know what he/she wants. What should we do?

We should help the client define the requirements and guarantee that everyone has the same understanding on the scope.

WBS, WBS Dictionary Traceability Matrices

Focus Groups, Brainstorming, Interviews …

Page 56: How to destroy a project in one month or less

56

Page 57: How to destroy a project in one month or less

57

#8 – A poor business proposal

Page 58: How to destroy a project in one month or less

58

Some of the common problems are: - Communication Gaps between business, project managers and technical team; - Wrong assumptions made from unclear bid documents; - Bad estimations without risk reserves; - Risks not identified and quantified; - Anxiety to sell at any cost; - Wrong type of contract; - Some ingenuity.

Page 59: How to destroy a project in one month or less

59

Some of the common problems are: - Communication Gaps between business, project managers and technical team; - Wrong assumptions made from unclear bid documents; - Bad estimations without risk reserves; - Risks not identified and quantified; - Anxiety to sell at any cost; - Wrong type of contract; - Some ingenuity.

BETTER

Page 60: How to destroy a project in one month or less

60

When you have good bidding documents and the contract is well structured and documented… … in case of doubt, always read well the documents, your answer is usually there.

Page 61: How to destroy a project in one month or less

61

Any business proposal should be seen as a project.

The team is the commercial, project manager and technical resources.

Don’t ignore the business proposal!

Page 62: How to destroy a project in one month or less

62

#9 – The absent project manager

Page 63: How to destroy a project in one month or less

63

If the project manager doesn’t follow up with the team and the project…

Page 64: How to destroy a project in one month or less

64

Do you know the symptoms: “no time”, “not now”, “I’ll catch you up later”, “send me in an email”, “just speak with…”?

Page 65: How to destroy a project in one month or less

65

Do you know the symptoms: “no time”, “not now”, “I’ll catch you up later”, “send me in an email”, “just speak with…”?

A project manager needs to ensure availability to: - Follow the team; - Control the project; - Do regular meetings; - Collect status; - Manage expectations; - Update the plan; - Do forecasts; - Observe.

Page 66: How to destroy a project in one month or less

66

A project without project manager is like a ship on high sea without its commander.

Page 67: How to destroy a project in one month or less

67

And when there’s no commander…

Page 68: How to destroy a project in one month or less

68

#10 – Lack of sponsor commitment

Page 69: How to destroy a project in one month or less

69

Organizations run several projects, all the time, and not all of them have the same priority or attention from the Sponsor.

Page 70: How to destroy a project in one month or less

70

Organizations run several projects, all the time, and not all of them have the same priority or attention from the Sponsor.

Lack of attention from the sponsor leads to: - Delays on decisions; - Favoring other projects; - Lack of support to

project management; - Lost of motivation.

Page 71: How to destroy a project in one month or less

71

Keep the sponsor on your side. Keep him updated. Protect your project.

Page 72: How to destroy a project in one month or less

72

#11 – Roles and Responsibilities are not

clear

Page 73: How to destroy a project in one month or less

73

Several roles exist on a project team. Being able to clearly define the roles and responsibilities on the project is a determinant factor on the project success.

Page 74: How to destroy a project in one month or less

74

The lack of responsibilities definition causes: - Increase of conflicts; - Lack of commitment from the team actions; - Decrease of productivity;

Page 75: How to destroy a project in one month or less

75

Clearly define the roles and responsibilities of all persons associated to the project.

RACI Matrices Stakeholder Register & Analysis

Page 76: How to destroy a project in one month or less

76

#12 – Ignore the corporate culture

Page 77: How to destroy a project in one month or less

77

Each organization has its own culture, according to its vision and mission.

Page 78: How to destroy a project in one month or less

78

Ignoring the corporate culture can cause some problems, such us: - Resources alienation; - Resistance to change; - Impact on task execution; - Boycotting the project.

Page 79: How to destroy a project in one month or less

79

Page 80: How to destroy a project in one month or less

80

Identify the corporate culture and use it as benefict for your project.

Experimentation & Piloting Lead by Example

Page 81: How to destroy a project in one month or less

81

#13 – Dealing with complex work without

decomposition

Page 82: How to destroy a project in one month or less

82

Let’s build the starship Enterprise.

Page 83: How to destroy a project in one month or less

83

How can I estimate a task of 50 months?

Page 84: How to destroy a project in one month or less

84

How can I estimate a task of 50 months? How can I assess the work progress on a task with 1100 days duration?

Page 85: How to destroy a project in one month or less

85

How can I estimate a task of 50 months? How can I assess the work progress on a task with 1100 days duration? I can’t. At least not in an efficient and realistic way.

Page 86: How to destroy a project in one month or less

86

All complex work needs to be decomposed on smaller tasks, estimated and controllable. These decomposition should roll-out through the project execution.

Decomposition & Progressively Elaborated

Page 87: How to destroy a project in one month or less

87

#14 – “Quick Shot” decisions

Page 88: How to destroy a project in one month or less

88

Taking “on-the-fly” or “quick shot” decisions without first assessing the impact of those actions or with little information, usually end up in: - Conflicts; - Additional delays and costs; - Stakeholders dissatisfaction.

Page 89: How to destroy a project in one month or less

89

Always judge first the impact before get into action.

Ask for more information. Run a simulation. Impact Analysis.

Forecasting (Monte Carlo, EVM)

Page 90: How to destroy a project in one month or less

90

#15 – Not managing expectations

Page 91: How to destroy a project in one month or less

91

What’s the first thing that comes to your mind when someone mentions nuns?

Page 92: How to destroy a project in one month or less

92

Was this your expectation?

Page 93: How to destroy a project in one month or less

93

Aligning the stakeholder's expectations with the project reality bring us some benefits: - No surprises; - Prevention instead of

reaction; - Commitment; - Adjusted and Realistic Goals.

Page 94: How to destroy a project in one month or less

94

Always do expectation’s management. Communication Plan

Stakeholders Register

Page 95: How to destroy a project in one month or less

95

#16 – Bureaucracy and useless meetings

Page 96: How to destroy a project in one month or less

96

Do you know that: - Most company workers participate on 62

monthly meetings; - Half of those meetings are considered waste of

time; - In average, in one month, they spend 31h in non

productive meetings;

* Based on a study made to hundreds of north-american companies.

Page 97: How to destroy a project in one month or less

97

Do you know that: - Most company workers participate on 62

monthly meetings; - Half of those meetings are considered waste of

time; - In average, in one month, they spend 31h in non

productive meetings; - And, in average, the participants of those

meetings: - 91% are day dreaming; - 96% skipped the meeting; - 39% slept during the meeting; - 45% are stunned with the quantity of

meetings they have; - 73% worked on other tasks during the

meeting; - 47% complained it was a pure waste of time.

* Based on a study made to hundreds of north-american companies.

Page 98: How to destroy a project in one month or less

98

Be Agile. Focus the team on what is really important for the project.

Work Performance Information

Tailoring

Page 99: How to destroy a project in one month or less

99

#17 – Lack of documentation

Page 100: How to destroy a project in one month or less

100

Page 101: How to destroy a project in one month or less

101

How did you feel with the “non” explanation on the previous slide?

Page 102: How to destroy a project in one month or less

102

How did you feel with the “non” explanation on the previous slide?

The absence of documentation in the project usually translates into: - Requirements not documented or updated; - Lack of decision records; - No commitment from the team; - Lack of control on the triple constraint; - Additional delays and costs; - Lack of information for customer support; - Frustration.

Page 103: How to destroy a project in one month or less

103

Use common sense but document your project.

Project Charter Project Scope Statement

Risk Register Stakeholders Register

Project Meeting Minutes

Page 104: How to destroy a project in one month or less

104

#18 – No recognition or reward system

Page 105: How to destroy a project in one month or less

105

Every human being needs motivation.

Page 106: How to destroy a project in one month or less

106

Every human being needs motivation. Without motivation the effective and efficient collaboration of a team member is an illusion.

Page 107: How to destroy a project in one month or less

107

One way to increase motivation is the existence of a reward or recognition system, focusing each team member individually.

Page 108: How to destroy a project in one month or less

108

One way to increase motivation is the existence of a reward or recognition system, focusing each team member individually.

Simple systems could be: - Saying “Thank you”; - Give monetary prizes; - Recommend for raises; - Laud in public; - Celebrate milestones; - Give training on a certain

technology.

Page 109: How to destroy a project in one month or less

109

Work with your organization in the sense to reward your team.

Human Resource Management Plan

Page 110: How to destroy a project in one month or less

110

#19 – Intentional decrease of quality

Page 111: How to destroy a project in one month or less

111

Quality – degree to which we fullfill the specified requirements

Page 112: How to destroy a project in one month or less

112

Decreasing quality on the project deliverables usually translates into: - Customer dissatisfaction; - Increase on rework costs; - Delays on releases; - Team with low morale; - Added risks to the project.

Page 113: How to destroy a project in one month or less

113

Define the acceptable quality. Collect metrics. Adjust.

Quality Management Plan Inspection. Audits. Fishbone. Control Charts.

Page 114: How to destroy a project in one month or less

114

#20 – Tendency to “Make” instead of “Buy”

Page 115: How to destroy a project in one month or less

115

It’s Human! We like to reinvent the wheel.

Page 116: How to destroy a project in one month or less

116

It’s Human! We like to reinvent the wheel.

This tendency bring us consequences: - More effort to achieve the

results; - Not reusing existing

products; - Introducing new problems; - Added costs to the project.

Page 117: How to destroy a project in one month or less

117

Do an analysis on what is important or strategic to the project.

Keep the strategic parts in-house. Outsource the rest.

Procurement Management Plan

Page 118: How to destroy a project in one month or less

118

#21 – Making wrong assumptions

Page 119: How to destroy a project in one month or less

119

It’s normal that 2 persons have different interpretations over the same artifact.

Page 120: How to destroy a project in one month or less

120

It’s normal that 2 persons have different interpretations over the same artifact. However assuming only our interpretation without validation usually lead us to costly mistakes.

Page 121: How to destroy a project in one month or less

121

Don’t assume! Read the business proposal. Talk to the stakeholders. Get requirements confirmation.

Page 122: How to destroy a project in one month or less

122

#22 – “One size fits all”

Page 123: How to destroy a project in one month or less

123

All projects are, by nature and definition, different. One methodology or technique that worked well on a certain project might not have application on a different one.

Page 124: How to destroy a project in one month or less

124

Reuse techniques that had produced good results in the past, but be self-critic to

recognize you might need to re-adjust.

Continuous Improvement

Page 125: How to destroy a project in one month or less

125

#23 – Plan by using resources with 100%

availability

Page 126: How to destroy a project in one month or less

126

Did you knew that, in average: - Each worker is interrupted 56 times along the

day; - Work 3 minutes in one task and then change

context to another one; - Spend 2h per day just to recover focus from

distractions; - 80% of the interruptions are considered trivial

and without necessity.

* Based on a study made to hundreds of north-american companies.

Page 127: How to destroy a project in one month or less

127

Did you knew that, in average: - Each worker is interrupted 56 times along the

day; - Work 3 minutes in one task and then change

context to another one; - Spend 2h per day just to recover focus from

distractions; - 80% of the interruptions are considered trivial

and without necessity.

No resource works at 100%. Only 60% ou less from the working schedule is spent productively.

* Based on a study made to hundreds of north-american companies.

Page 128: How to destroy a project in one month or less

128

Plan for less than 100% available resources. It will be more realistic.

Estimating Durations. Project Planning.

Page 129: How to destroy a project in one month or less

129

#24 – Ignoring dependencies

Page 130: How to destroy a project in one month or less

130

Projects are complex and have multiple dependencies between tasks, resources and other projects.

Page 131: How to destroy a project in one month or less

131

Projects are complex and have multiple dependencies between tasks, resources and other projects.

Not respecting these dependencies will cause additional costs and delays and could cause the whole project to be at risk.

Page 132: How to destroy a project in one month or less

132

Discuss the dependencies with the project team. Ask for help and identify risks.

Sequence Activities. Estimate Activity Resources.

Page 133: How to destroy a project in one month or less

133

#25 - Micromanaging

Page 134: How to destroy a project in one month or less

134

Some micromanagement is accepted by junior teams. But it will never be tolerated by more mature teams.

Page 135: How to destroy a project in one month or less

135

Some micromanagement is accepted by junior teams. But it will never be tolerated by more mature teams.

Page 136: How to destroy a project in one month or less

136

Delegate. Do Mentoring and Coaching. Develop Project Team.

Page 137: How to destroy a project in one month or less

137

#26 – Ignoring the problems

Page 138: How to destroy a project in one month or less

138

Hiding or ignoring the problems solves nothing, and can even increase the problem’s impact. The responsibility for the project outcome is always from the Project Manager.

Page 139: How to destroy a project in one month or less

139

Face the problems. Don’t be scare. It’s an opportunity to improve.

Problem Solving.

Page 140: How to destroy a project in one month or less

140

#27 – Managing without a defined

methodology or process

Page 141: How to destroy a project in one month or less

141

Managing a project without a project management methodology is like conducting an orchestra without a stave or baton. Nothing will come out harmonious.

Page 142: How to destroy a project in one month or less

142

Choose the methodology that best applies to the project in question and apply it!

PMBoK SCRUM

Page 143: How to destroy a project in one month or less

143

#28 – Not learning from mistakes

Page 144: How to destroy a project in one month or less

144

Doing mistakes is only human. Important is to recognize it and try again.

Page 145: How to destroy a project in one month or less

145

Doing mistakes is only human. Important is to recognize it and try again.

Page 146: How to destroy a project in one month or less

146

Study project’s historical data. Do lesson learned sessions and distribute them.

Lessons Learned. Historical Data.

Page 147: How to destroy a project in one month or less

147

I also do mistakes and I will keep doing them in the future. This presentation is a portion of my lesson learned data base!

Page 148: How to destroy a project in one month or less

148

#29 – 9 pregnant women conceive and give

birth to a child in 1 month

Page 149: How to destroy a project in one month or less

149

X 9 When project execution delays, some schedule compression techniques are applied. One of the project manager’s tendency is to inject as many resources as possible to try to recover the delay.

Page 150: How to destroy a project in one month or less

150

X 9 When project execution delays, some schedule compression techniques are applied. One of the project manager’s tendency is to inject as many resources as possible to try to recover the delay. However, every time we inject more and more effort into a task, the more complex it gets to manage. Efficiency and productivity decrease.

Page 151: How to destroy a project in one month or less

151

Pay attention to the impact of injecting too many resources in a task to recover delays.

Don’t always pays-off. Law of Diminishing Returns.

Crashing.

Page 152: How to destroy a project in one month or less

152

#30 – I have a plan but I don’t follow it

Page 153: How to destroy a project in one month or less

153

No plan is executed as it is originally described on the business proposal. The need for adjustments is constant. However not doing regular updates to the project plan will lead to project failure.

Page 154: How to destroy a project in one month or less

154

Consequences from not using or updating the project plan: - Team discredit face to planning; - Difficulty doing forecasts; - Stakeholders frustration; - Probably there’s no other project documentation; - Project’s deviations are not calculated.

Page 155: How to destroy a project in one month or less

155

Page 156: How to destroy a project in one month or less

156

#31 – Being vulnerable to top management

interference

Page 157: How to destroy a project in one month or less

157

Page 158: How to destroy a project in one month or less

158

What went wrong

here?

Page 159: How to destroy a project in one month or less

159

The refuge in the “comfort” of the top management’s decisions is an illusion and it’s temporary.

Page 160: How to destroy a project in one month or less

160

The refuge in the “comfort” of the top management’s decisions is an illusion and it’s temporary. The decision must be questioned and assessed, as if it was any other stakeholder. The project manager should do: - Impact analysis; - Validate this impact with the top management; - Redefine project goals in case it’s a go for

execution.

Page 161: How to destroy a project in one month or less

161

The refuge in the “comfort” of the top management’s decisions is an illusion and it’s temporary. The decision must be questioned and assessed, as if it was any other stakeholder. The project manager should do: - Impact analysis; - Validate this impact with the top management; - Redefine project goals in case it’s a go for

execution. The YES-MAN/WOMAN behavior does not lead to commitment, autonomy or even the personal development of the project manager and its team.

Page 162: How to destroy a project in one month or less

162

Avoid YES-MAN/WOMAN behvior. Always assess impacts.

Keep the top management up-to-date. Managing Stakeholders Expectations.

Page 163: How to destroy a project in one month or less

163

#32 – Poor outsourcing control

Page 164: How to destroy a project in one month or less

164

It’s frequent to perform outsourcing to execute a project. However not following up the work of these outsourcers will lead to project failure.

Page 165: How to destroy a project in one month or less

165

Outsourcing is not synonymous of lack of responsibilities.

Define rules and milestones for your partners, and then follow up.

Monitoring & Control Processes.

Page 166: How to destroy a project in one month or less

166

#33 – Reaction instead of prevention

Page 167: How to destroy a project in one month or less

167

Bad planning associated with a weak risk identification are facts that lead project managers to spend most time reacting instead of preventing those issues.

Page 168: How to destroy a project in one month or less

168

Bad planning associated with a weak risk identification are facts that lead project managers to spend most time reacting instead of preventing those issues.

Do Risk Management! Avoiding most problems is a way to get more time to perform other tasks in the project.

Page 169: How to destroy a project in one month or less

169

It’s always better to prevent. Expert Judgement.

Risk Management Processes.

Page 170: How to destroy a project in one month or less

170

#34 – Allowing team conflicts

Page 171: How to destroy a project in one month or less

171

The perfect world

with no conflicts

and everyone is

happy!

Page 172: How to destroy a project in one month or less

172

Conflicts can rarely be avoided. They will naturally pop-up, as a result of the several interactions within the organization. However we should solve them as quickly as we can before they affect the whole project team.

But the perfect

world doesn’t

existe…

Page 173: How to destroy a project in one month or less

173

There are several factors that can contribute to the conflits appearance in projects: - Scheduling tasks; - Projects priorities; - Resources; - Technical opinions; - Administrative procedures; - Money; - Personality.

Page 174: How to destroy a project in one month or less

174

Keep the team harmony. Quickly resolve any conflits.

Conflict Management Techniques

Page 175: How to destroy a project in one month or less

175

#35 – Courage to cancel a project

Page 176: How to destroy a project in one month or less

176

When a project is headed into the abyss, we must assess the capacity and the necessity to keep it running for a bit longer. In extreme cases, we must have the courage to take the tough decision and cancel it.

Page 177: How to destroy a project in one month or less

177

Be able to predict the future, recognize the mistakes, and take the hard decisions.

Expert Judgment.

Page 178: How to destroy a project in one month or less

178

19. Intentional decrease of quality

20. Tendency to “Make” instead of “Buy”

21. Making wrong assumptions

22. “One size fits all”

23. Plan by using resources with 100% availability

24. Ignoring dependencies

25. Micromanaging

26. Ignore the problems

27. Managing without a defined methodology or process

28. Not learning from mistakes

29. 9 pregnant women conceive and give birth to a child in 1 month

30. I have a plan but I don’t follow it

31. Being vulnerable to top management interference

32. Poor outsourcing control

33. Reaction instead of prevention

34. Allowing team conflicts

35. Courage to cancel a project

1. The choice of the project manager

2. Frequent and uncontrolled scope changes

3. Effort estimation errors

4. Lack of communication or miscommunication

5. Lack of risk management

6. Resources are scarce, shared or stolen

7. Scope isn’t clear

8. A poor business proposal

9. The absent project manager

10. Lack of Sponsor commitment

11. Roles and Responsibilities are not clear

12. Ignore the corporate culture

13. Dealing with complex work without decomposition

14. “Quick Shot” decisions

15. Not managing expectations

16. Bureaucracy and useless meetings

17. Lack of documentation

18. No recognition or reward system

Summary

* My top10.

Page 179: How to destroy a project in one month or less

179

Before ending: daily business on projects

http://www.youtube.com/watch?v=HDu5Wo8Yh1k

Page 180: How to destroy a project in one month or less

“Operations keeps the lights on, strategy provides a light at the end of the tunnel, but project management is the train engine that moves the organization forward.”

– Joy Gumz, PMI Technology Advisory Member

Thank you for your attention!