how to design a corrosion pipe loop study

31
Emily Tummons, PhD, PE Black & Veatch OAWWA Virtual Education Summit September 29, 2020 How to Design a Corrosion Pipe Loop Study

Upload: others

Post on 15-Oct-2021

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: How to Design a Corrosion Pipe Loop Study

Emily Tummons, PhD, PEBlack & Veatch

OAWWA Virtual Education SummitSeptember 29, 2020

How to Design a Corrosion Pipe Loop Study

Page 2: How to Design a Corrosion Pipe Loop Study

Black &Veatch

Agenda

• Purpose of Pipe Loop Testing • Harvesting Materials & Conditioning • Pipe Loop Case Studies

• Batch Systems (2)• Online Chemical Feed Systems• Multiple Pipe Loops Throughout a

System• Conclusions

Page 3: How to Design a Corrosion Pipe Loop Study

Black &Veatch

Purpose of Pipe Loop Testing

3

Page 4: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Captures hydraulic effects; reflects full-scale conditions

• Longer testing period, can capture seasonal results

• Can use new or harvested materials

• Increase confidence of the outcomes

EPA’s proposed LCR states that pipe loop testing would be required before changing corrosion control treatment

4

Purpose of Pipe Loop Testing

Page 5: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Considering change in corrosion control treatment

• Changing coagulants, disinfectants, or other processes

• Optimize chemical use

• Adding a new source water

• Changing source waters

5

Reasons for Pipe Loop Testing

Page 6: How to Design a Corrosion Pipe Loop Study

Black &Veatch

Harvesting Materials for Testing & Conditioning

6

Page 7: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Benefit of examining impact on existing pipe scale

• Analysis of scale could highlight analytes to test for

• Notes:• Limit disturbances to pipe

• Mark direction of flow

• Prepare for conditioning time

• Best to harvest and then install in pipe loop

Harvesting materials best mimics full-scale conditions

7

Harvesting Materials

Page 8: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Pipe scale needs to equilibrate after harvesting

• Expose the pipes to the same water quality

• Stagnation and flowing periods (same as testing plan)

• Collect baseline samples

• Build pipe loop before harvesting materials to decrease conditioning

Conditioning length depends on care taken during harvestingTypically 1-3 months

8

Conditioning is Critical

Page 9: How to Design a Corrosion Pipe Loop Study

Black &Veatch

Poll Question 1

9

Page 10: How to Design a Corrosion Pipe Loop Study

Black &Veatch

Case Study 1 – Batch Pipe Loop

10

Page 11: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Two water sources (only one available at pipe loop location)

• Examined impact of:• Seasonally switching sources

• Raising pH

• 4 replicate loops

• 3 months of conditioning

• 6 months of testing

11

Case Study 1 – Batch Pipe Loop

Page 12: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Materials (triplicate):• Harvested ¾-inch galvanized iron

• Harvested brass meters (pre-2014)

• New ¾-inch copper pipe

• Timer controls created flowing & stagnation periods

• Weekly samples• Forward flow after materials

12

Case Study 1 – Batch Pipe LoopBrass Meter

Copper Pipe

Galvanized Iron

Page 13: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• 4 treatment conditions• 2 sources

• 2 sources with increased pH

• Water chemistry adjusted 2x/week• Target pH and Cl2

• Flowrate = 1 gpm

• Once through flow design

13

Case Study 1 – Batch Pipe Loop

Page 14: How to Design a Corrosion Pipe Loop Study

Black &Veatch 14

Pipe Loop Testing Results

BBS = Control

Switching sources resulted in a 45% increase in copper

Increasing pH:• Mitigated source switch• Decreased copper

Page 15: How to Design a Corrosion Pipe Loop Study

Black &Veatch

Case Study 2 – Batch Pipe Loop

15

Page 16: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Adding new source & evaluating changes in chemistry

• New water not available at site• Examined impact of:

• Changing pH and calcium• Reversal of flow• Switching sources

• 2 sets of 4 replicate pipe loops• 3 months of conditioning • 6 months of testing

16

Case Study 2 – Batch Pipe Loop

Page 17: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Materials (triplicate):• Harvested 2-inch galvanized iron• new ½-inch copper pipe with lead

solder

• Once through flow design

17

Case Study 2 – Batch Pipe Loop

Page 18: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Materials (duplicate):• Harvested 6-inch cast iron (20 ft)

• Tested reversal of flow• Recirculated flow

• Limited water volume

18

Case Study 2 – Batch Pipe Loop

Page 19: How to Design a Corrosion Pipe Loop Study

Black &Veatch

Poll Question 2

19

Page 20: How to Design a Corrosion Pipe Loop Study

Black &Veatch

Case Study 3 – Online Chemical Dosing Pipe Loop

20

Page 21: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Evaluating changes in treatment at WTP (only source)• Online chemical dosing improved consistency of water quality

• Examined impact of:• Changing pH and adding polyphosphate

• 2 replicate pipe loops• 2 months of conditioning • 8 months of testing

21

Case Study 3 – Online Chemical Dosing Pipe Loop

Page 22: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Materials (triplicate):• Harvested ¾-inch galvanized iron• new ½-inch copper pipe with lead solder

• Weekly samples • Aesthetics and metals release

• Once through flow design

22

Case Study 3 – Online Chemical Dosing Pipe Loop

Galvanized Iron

Copper Pipe with Lead

Solder

Page 23: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Online Chemical Feed System• Chemical Storage Tanks• Metering Pumps• Sample Ports

• Requires calibration and frequent monitoring

• Throttling valves minimized changes in flow

23

Case Study 3 – Online Chemical Dosing Pipe Loop

Page 24: How to Design a Corrosion Pipe Loop Study

Black &Veatch 24

Pipe Loop Testing Results

Control• Fluctuations in

pH – increased copper

Increasing pH decreased copper

Page 25: How to Design a Corrosion Pipe Loop Study

Black &Veatch

Case Study 4 – Pipe Loops Throughout A Water System

25

Page 26: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• 2 test materials (triplicate)• Copper pipe with lead solder

• Brass meter (harvested) and copper pipe

• No changes to water quality at pipe loops

• Evaluating impact of water age & reaction with pipe materials

• Captures seasonal results• 1 year testing period

26

Case Study 4 – Pipe Loops Throughout A Water System

Brass Meter with Copper Pipe

Copper Pipe with Lead

Solder

Page 27: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Water Treatment Plant (WTP)

• Gezon Pump Station (Gezon)

• Clean Water Plant (CWP)

27

3 Pipe Loop Locations

• Evaluate WQ changes throughout the system

• Same design and materials at each location

Page 28: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• pH stable throughout distribution system

• Consistent pH through 6 months of testing

• Source water is Lake Michigan – prone to changes in pH

28

pH at Pipe Loop Testing Locations

Preliminary Data

Page 29: How to Design a Corrosion Pipe Loop Study

Black &Veatch

Conclusions

29

Page 30: How to Design a Corrosion Pipe Loop Study

Black &Veatch

• Pipe loop testing increases confidence for full-scale implementation

• Harvesting materials provides ability to understand impacts on existing pipe scale

• Conditioning phase is critical to getting valuable results

• Online chemical dosing is preferable if water is available at site

• Analyte testing frequency should be more frequent around changes in treatment

• Replicate pipes allows for ability to identify outliers

30

Conclusions

Page 31: How to Design a Corrosion Pipe Loop Study

Emily Tummons, PhD, PEBlack & [email protected]

Thank You