How DOORS Helps JPL Get to Mars and Beyond Best Practices in Metrics, V&V and Traceability Margaret H. Smith Jim M. Grimes Ross M. Jones Trisha Jansma Jet Propulsion Laboratory California Institute of Technology

Upload: bill-duncan

Post on 18-Nov-2014

1.054 views

Category:

Technology


1 download

DESCRIPTION

This paper was presented on June 4, 2012 at the IBM Rational Innovate Conference in Orlando Florida by Margaret Smith, NASA Jet Propulsion Laboratory.

TRANSCRIPT

Page 1: How DOORS Helps JPL Get to Mars & Beyond

How DOORS Helps JPL Get to Mars and Beyond

Best Practices in Metrics,

V&V and Traceability

Margaret H. Smith

Jim M. Grimes

Ross M. Jones

Trisha Jansma

Jet Propulsion Laboratory

California Institute of Technology

Page 2: How DOORS Helps JPL Get to Mars & Beyond

Outline

Overview of DOORS Use at JPL

Metrics

Verification and Validation (V&V)

Traceability

5/24/2012 M. Smith - 2 Caltech – Jet Propulsion Laboratory

Topic 1

Topic 2

Topic 3

Page 3: How DOORS Helps JPL Get to Mars & Beyond

JPL use of DOORS at JPL Statistics

– 800+ users – 600+ users have taken our in-house DOORS training. – 50 DOORS licenses – 50 projects have used DOORS, 22 are active – 15 years using DOORS, preceded by 8 years using in-

house TRACER tool. – 5 years of a standard process with in-house training – 2 System Analysts for daily project support – 1 Full-time Equivalent (FTE) Systems Engineer for

defining the method, teaching and project consultation

5/24/2012 M. Smith - 3 Caltech – Jet Propulsion Laboratory

Page 4: How DOORS Helps JPL Get to Mars & Beyond

5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 4

JPL

TRACER

(1988)

QSS

DOORS

(1996)

IBM Rational

DOORS

(2008)

DOORS Provenance – According to JPL

Source code and User Guide were

distributed from NASA COSMIC site from

1990 to ~1995. Developed by the Cassini

Project and used by JPL and ESA

Telelogic

DOORS

(2000)

JPL TRACER

mothballed

(1995)

DOORS

adopted at

JPL(1996)

Page 5: How DOORS Helps JPL Get to Mars & Beyond

Sample Project Sizes

5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 5

Large legacy infrastructure project

Medium complexity earth orbiting mission

Smaller complexity lunar mission (JPL managed)

Large complexity deep space mission (JPL managed)

Measurements were generated by

the JPL Trace Tree Tool (TTT)

Flagship mission

Project # objects # links # Modules installed

TTT website size (GB)

DSN 98995 5709 125 1.9

SMAP 17278 13311 91 1.9

GRAIL 36031 30650 123 2.7

SES_JUNO 84844 43526 227 3.6

MSL 25641 5808 106 1.2

Note: Number of objects includes all objects in formal modules: table cells, headers, regular objects with or without text or OLE content. The number of

requirements is about one-third the number of objects.

0 50 100 150 200 250

0 20 40 60 80 100 120

DSN

SMAP

GRAIL

SES_JUNO

MSL

# Modules

# Links, Objects (Thousands)

# links

# objects

# Modules

Page 6: How DOORS Helps JPL Get to Mars & Beyond

Why Have a Standard Process?

• DOORS is a general purpose tool and there are many possible ways to use it.

• For the first 15 years we used DOORS, each new project reinvented the wheel. – Big projects could afford to invent their own method and have internal support.

• We learned a lot from what the big projects did wrong and did right.

– We now have more small projects and fewer big projects.

• Small projects cannot afford to reinvent. Need a ready-made solution.

• The most common mistake: trying to run the old document-centric process in DOORS and not taking advantage of the tool’s capabilities.

• Projects were making mistakes, blaming DOORS, and delaying import of requirements into tool as late as possible. – Managing requirements in spreadsheets and not getting the benefits of early

sharing and collaboration.

5/24/2012 M. Smith - 6 Caltech – Jet Propulsion Laboratory

Page 7: How DOORS Helps JPL Get to Mars & Beyond

What Has and Hasn’t Been Standardized? Has

• Ownership, allocation and negotiation mechanism

• Attributes and their definitions – for requirements and V&V planning/tracking

• Views – requirements traceability, allocation status, requirements to V&V traceability

• High-level requirements template, boilerplate material

• Scripts – Requirement Maturity Metrics, and V&V Burndown and Statistics, and numerous housekeeping scripts used by DOORS System Analysts (SAs).

• Tools – Trace Tree Tool for graphically displaying individual requirements traceability and project requirements flow-down.

• Practices – the JPL Systems Engineering practices that culminate in requirements.

• Licensing and Support – the JPL institution purchases DOORS licenses for use by all projects and funds two Systems Analysts (support).

• Training/Deployment – Engineers who are involved in requirements work attend a JPL developed course that teaches basic DOORS skills and the JPL standard method for development requirements and tracking verification in DOORS.

Hasn’t

• Requirements levels and element decomposition

• Detailed requirements templates

• DOORS collaboration method with partners and subcontractors

We owe the success of the JPL Institutional Requirements and V&V Tracking process and training program to Richard Stoller (retired), and Karen Boyle (who sadly passed away in February, 2011).

5/24/2012 M. Smith - 7 Caltech – Jet Propulsion Laboratory

Page 8: How DOORS Helps JPL Get to Mars & Beyond

Metrics

• Maturity Definition: + V&V Method/Approach defined + Rationale defined + Linked to parent(s) + Links exist to this requirement from Satisfiers (including V&V activities) + Satisfier (lower level owner) accepts allocated requirement – TBD, TBR, TBCs

• Requirement Maturity Metric script:

– Implemented in DOORS Extension Language (DXL) – Generates per module statistics across all modules in a Project, one module per

row – Produces .csv file of statistics. – Project can customize output to suit their Project Management/reporting needs. – Provides a quick summary of requirement progress and facilitates comparison

between modules.

5/24/2012 M. Smith - 8 Caltech – Jet Propulsion Laboratory

Topic 1

Page 9: How DOORS Helps JPL Get to Mars & Beyond

Example

5/24/2012 M. Smith - 9 Caltech – Jet Propulsion Laboratory

Gold

plating?

Allocations

undecided or under

negotiation

Unknown

capability?

219

3

Page 10: How DOORS Helps JPL Get to Mars & Beyond

What Has Changed Today?

5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 10

Assessing Requirements activity and churn

Type of change

Module name

Requirement number

Daily email to Project’s requirements owner

Requirements are marked Modified if any

attribute, with the setting Affect change dates

turned on, has been changed since the last time

this report was generated.

Page 11: How DOORS Helps JPL Get to Mars & Beyond

• Initial benefit -- requirements changes were immediately visible to engineers responsible for verifying requirements because verification activity artifacts and verification events were now linked directly to requirements

• Projects can use as-is or customize a generic DXL script to generate verification statistics and graphics.

• JPL Projects have been recording Verification information in DOORS for the last 10 years.

Verification Planning and Tracking

Other benefits:

• Lower tooling cost– use existing institutionally supported tool and support

• Enables useful views of requirements, verification planning & status, and verification events.

• Saves projects money through reuse of tooling and method.

5/24/2012 M. Smith - 11 Caltech – Jet Propulsion Laboratory

Topic 2

Page 12: How DOORS Helps JPL Get to Mars & Beyond

Verification Process Project

Verification Planning

Verification Activity Planning

Verification Activity

Execution

Verification Status

Reporting

Requirements Development

Get DOORS Training / consulting

Reqmts to VA mapping captured

Plans and procedures developed outside DOORS and hyper-

linked from the DOORS VA

Verification Activity Groups

defined

Execute VA procedure, analyze

results and determine status

Record status of the VA (procedure)

run and create problem/failure

reports (if needed)

Cognizant person approves VA

execution result

Cognizant person approves that the requirement has

been verified

Generate V&V burndown charts and statistics and

present at management

meetings

Take corrective action (if

necessary)

Schedule VA activity

completion (need by) date

Develop V&V method, venue and approach

5/24/2012 M. Smith - 12 Caltech – Jet Propulsion Laboratory

Page 13: How DOORS Helps JPL Get to Mars & Beyond

Verification Event (VE) Verification Item (VI) 1..M

1..M

Verification Activity Group (VAG)

1

1..M

1

0..M

1 1

0..1

1

VE data elements originate in the AR and are pushed to VE to complete the status picture.

1

Verification Activity (VA)

Activity Report (AR)

Test Data Directory

1

Test Plan Test

Procedure 1..M 0..1

1

In DOORS

In Other Tools

VI – Verification Item, is anything that needs to be verified. All requirements become Vis when they are being verified. VA – Verification Activity. The testing activities described in a single Test Plan, Procedure or Analysis. A group of associated VAs are a VA Group (VAG) VE – Verification Event. A run or execution of a VA.

Definitions

Verification Elements

5/24/2012 M. Smith - 13 Caltech – Jet Propulsion Laboratory

Page 14: How DOORS Helps JPL Get to Mars & Beyond

VE • VA id (a reference) • …. data imported from AR • url of Activity Report • url of test data directory

VI or ITL item •object identifier (ID) •statement of requirement •rationale •…. •method •verification approach •audit status •audit completed on (date) •audited by

1..M 1..M 1

0..M

1

0..M

1 1

0..1

1

1

VA • activity name or activity

group name • VA priority • VA status • VA owner • venue • date scheduled (for

completion) • date completed • plans and procedures • PFRs

Activity Report (AR)

Test Data Directory

0..1

1..M

Test Plan • version

Test Procedure • version

1

V&V Activity Planning V&V Activity Execution

V&V Status Reporting

Requirements Development

Verification Attributes

5/24/2012 M. Smith - 14 Caltech – Jet Propulsion Laboratory

Page 15: How DOORS Helps JPL Get to Mars & Beyond

Project Module Configurations VIM – Verification Item (Requirements) Module VAM – Verification Activity Module VEM – Verification Event Module

VEM VAM

VIM

VIM VIM

VIM VIM VIM

A single VAM for the Project’s complete requirement tree • partition VAM to give owners

granular write access

VEM

VIM

VIM VIM

VIM VIM VIM

VAM

VAM VAM

VAM VAM VAM

Multiple VAMs reflecting the Project’s requirements structure or V&V organization.

VAM / VEM

VIM

VIM VIM

VIM VIM VIM

Combined VAM and VEM for projects that only need information on the latest run/execution.

5/24/2012 M. Smith - 15 Caltech – Jet Propulsion Laboratory

Page 16: How DOORS Helps JPL Get to Mars & Beyond

Verification Item (VI) Burndown

0

50

100

150

200

250

1/8

/2008

1/2

2/2

008

2/5

/2008

2/1

9/2

008

3/4

/2008

3/1

8/2

008

4/1

/2008

4/1

5/2

008

4/2

9/2

008

5/1

3/2

008

5/2

7/2

008

6/1

0/2

008

6/2

4/2

008

7/8

/2008

7/2

2/2

008

8/5

/2008

8/1

9/2

008

9/2

/2008

9/1

6/2

008

9/3

0/2

008

10/1

4/2

008

10/2

8/2

008

11/1

1/2

008

11/2

5/2

008

12/9

/2008

12/2

3/2

008

1/6

/2009

Nu

mb

er

of

Item

s t

o b

e V

eri

fied

Interval End Date

Cu

rre

nt d

ate

Scheduled

Not Confirmed

Count of VIs (modules included selected from pick list): Scheduled = total number of VIs remaining to be completed per schedule Not Completed = total number of VIs remaining to be completed actually Not Confirmed = total number of VIs remaining to be Confirmed-Final = total number of VIs remaining to be completed but not scheduled

Not Scheduled

Scheduled Actual

Not Confirmed

Not Scheduled

Actual (auto status)

A pick list allows selection of any group of VIMs for this chart.

5/24/2012 R. Stoller, K. Boyle - 16 Caltech – Jet Propulsion Laboratory

Page 17: How DOORS Helps JPL Get to Mars & Beyond

Verification Activity Burndown

0

2

4

6

8

10

12

14

16

Nu

mb

er

of

Act

ivit

ies

to b

e V

eri

fie

d

Scheduled - Count of not completed linked VAs scheduled to be completed

Not Completed - Count of not completed linked VAs remaining to be completed Not Scheduled - completed-NF or not scheduled

Scheduled

Actual

Not Scheduled

(Actual)

A pick list allows selection of any group of VAs for this chart.

Scheduled = total number of VAs remaining to be completed per schedule

Actual = total number of VAs remaining to be completed actually

Not Scheduled = total number of VAs that are not completed and are not

scheduled

5/24/2012 R. Stoller, K. Boyle - 17 Caltech – Jet Propulsion Laboratory

Page 18: How DOORS Helps JPL Get to Mars & Beyond

Verification Item Statistics from V&V Burndown Script that generates data to Excel

"Bad" if > 0

"Neutral"

"Good"

"Normal"

Count of VIs in VIMs (shall statements only)

A: B: C: D: E: F: G: H: I: J: K: L M: N:

VIM NAME Total VIs

VIs Linked to

VAM

VIs Linked to

VAGs

VIs Linked to

VAs VIs Auto

Verif VIs Conf

Verif

VIs Not Linked to

VAM

VIs Linked to

Reject

VIs Not Linked to

a VA

VIs Not Auto Verif

VIs Not Conf Verif

VIs Not Verif and

Late

V&V Engr Responsible for this VIM

VIM1 625 600 15 575 200 150 25 10 50 425 450 5 John Jones

VIM2 500 500 10 485 100 75 0 5 15 400 etc 5 Susie Jones

VIM3 1000 1000 0 1000 0 0 0 0 0 1000 etc 0 Mary Smith

… … … etc etc etc etc etc etc etc etc etc etc

VIM n 200 200 5 190 25 5 0 5 10 175 etc 0

Total 2325 2300 30 2250 325 230 25 20 75 1975 etc 10

Relationships: B=C+H; I is not included in D; E=C-I-D; J=B-E=H+I+D; K=B-F; L=B-G

M = VIs not auto verified AND scheduled completion date is missed or has not been scheduled or is not

linked. Any object containing the word “shall” enclosed in quotes (“shall”) is not included in any statistic.

5/24/2012 R. Stoller, K. Boyle - 18 Caltech – Jet Propulsion Laboratory

Page 19: How DOORS Helps JPL Get to Mars & Beyond

* VAs are organized in VAM under VAGs and sub-header VAGs, but tabulated separately here.

** Identifies if there is an http entry in the Plan and Procedure attribute.

VA NAME*

# of VI Parent Links

Are VAs Fully Linked to VIs

? VA Status VA Sched-

uled?

** Is there a VA Plan &/or a Procedure?

Are there any Suspicious VI

Links?

Schedule Days Remaining (if not

completed) V&V Engineer /

Owner of VA

VA-x 25 Yes Blank 08/10/09 No Yes 10 Jack Jones

VA-y 20 Yes Completed-NF 07/26/09 Yes No -5 Mary Jones

VA-z 100 Yes Completed No Yes No Susie Que

… 350 … Blank No No No Not Sched Tom Smith

VA-n 55 Yes Blank 08/20/09 Yes Yes 20 Susie Smith

Verification Activity Statistics from V&V Burndown Script that generates data to Excel

"Bad" if > 0

"Neutral"

"Good"

"Normal"

5/24/2012 R. Stoller, K. Boyle -19 Caltech – Jet Propulsion Laboratory

Page 20: How DOORS Helps JPL Get to Mars & Beyond

DOORS Trace Tree Tool (T3)

• Primary Motivations – Provide JPL users with an alternative graphical presentation of

requirement flow (links) – Allows navigation of requirements based on hierarchy or flow – Enables seamless navigation between modules following flow-

down/links – Provides easy access via Web-based, platform independent interface

• Secondary Motivation - evolved with implementation – Provide an indication of timeliness of requirements flow-down – Provide an efficient way to checkout verification planning

• History – Conceived and developed by a JPL Software Systems Engineer (James

Grimes) in 2006 – Enthusiastically used by 8 JPL Flight Projects

5/24/2012 J. Grimes - 20 Caltech – Jet Propulsion Laboratory

Topic 3

JPL has parent-to-child requirements relationships where a parent has 1 to tens of children, and links between levels can be many-to-many. We have trouble seeing the forest for the trees and navigating requirements flow within DOORS.

Page 21: How DOORS Helps JPL Get to Mars & Beyond

Trace Tree Tool View – Example Index Page

• • •

ProjX

ProjX

ProjX

ProjX

ProjX

5/24/2012 J. Grimes - 21 Caltech – Jet Propulsion Laboratory

Page 22: How DOORS Helps JPL Get to Mars & Beyond

Project Map

5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 22

Number of links/flowed-down requirements appear on edges

Page 23: How DOORS Helps JPL Get to Mars & Beyond

Module Page

• • •

…….

ProjX

5/24/2012 J. Grimes - 23 Caltech – Jet Propulsion Laboratory

Page 24: How DOORS Helps JPL Get to Mars & Beyond

Requirement Page

Attributes continue below

…….. ………………….

5/24/2012 J. Grimes - 24 Caltech – Jet Propulsion Laboratory

Page 25: How DOORS Helps JPL Get to Mars & Beyond

Object Text Graphic

Attributes continue below

………….. ……………………… ……………….. …………..

………….. ……………….. ……………………….

………………………

……………………… ………………………

5/24/2012 J. Grimes - 25 Caltech – Jet Propulsion Laboratory

Page 26: How DOORS Helps JPL Get to Mars & Beyond

Verification Approach Graphic

Attributes continue below

………………………………………………………………

…………………………………………………………

……………

…………………………………………………………

…………… …………………………………………………………

5/24/2012 J. Grimes - 26 Caltech – Jet Propulsion Laboratory

Page 27: How DOORS Helps JPL Get to Mars & Beyond

Typical DOORS T3 User Scenarios • Quickly obtain the contents of a requirement with a known ID

– Main page Module page Requirement number

• Scan a particular Project module for a specific requirement

– Main page Module page, then

• Scroll up and down at web browser speeds

• Use browser’s find capability (not as flexible as DOORS, but faster)

• Trace requirements flow-down starting at any requirement

– Click on boxes in graph going up- or downstream in requirements flow

– Go from there to text, attributes

• Obtain immediate visual indication of timeliness of flow-down

– E.g., has upstream requirement X been updated more recently than my requirement? If yes, then it’s red. Actual date is shown on X’s page.

– Is flow-down complete? Does the requirement have a parent?

• Provide supportive evidence during Project Reviews

– Quickly show existence of flow-down

– Quickly show V&V attribute, implementation status (if in attribute) 5/24/2012 J. Grimes - 27 Caltech – Jet Propulsion Laboratory

Page 28: How DOORS Helps JPL Get to Mars & Beyond

DOORS Trace Tree Tool (T3) High-Level Process/Execution Flow

5/24/2012 Caltech – Jet Propulsion Laboratory T. Jansma - 28

Page 29: How DOORS Helps JPL Get to Mars & Beyond

Development Tools Used • DXL – DOORS eXtension Language, a DOORS proprietary C-like, object-

oriented language available within the DOORS client

• Perl – a scripting language widely available on UNIX, Mac OS X, Linux, Windows

• Graphviz – open source Graph Visualization software developed at AT&T

that includes the Dot language and dot program for drawing directed graphs

• XML and Perl/C-based XML parsing software – open source software

• Java for processing images

• Standard UNIX utilities such as date, rm, ls, rsync, etc.

• SVN – Subversion open-source version control tool

5/24/2012 J. Grimes - 29 Caltech – Jet Propulsion Laboratory

Page 30: How DOORS Helps JPL Get to Mars & Beyond

JPL’s Direction with DOORS • Systems Engineers on JPL Projects are starting to infuse Model Based

Systems Engineer / SysML.

– Modeling includes architecture, behavior and resources.

– Many pockets of discipline specific modeling tools exist in the Spacecraft subsystem organizations

– Vision is to use a central, standards based repository to interconnect and exchange model data.

– Requirements will still be important but there is now an opportunity to augment requirements with more extensive and formal designs.

• Small and technology development Projects may need a lighter weight DOORS-based process.

• JPL is working on more partnership projects. Module exchange needs to be negotiated and piloted early.

• We are piloting a Requirements Architecture, table-top review that will occur before Project and System requirements are developed.

• We have begun teaching just-in-time DOORS and process classes directly to and with Flight Projects.

5/24/2012 Caltech – Jet Propulsion Laboratory M. Smith - 30

Aimed at

influencing,

sharing

Lessons

Learned and

emerging best

practices.