LEED-NC v2.1 FACTS LEED SILVER 35 of 69 Sustainable Sites : 10 of 14 Water Efficiency : 3 of 5 Energy and Atmosphere : 1 of 17 Materials and Resources : 6 of 13 Indoor Environmental Quality : 10 of 15 Innovation and Design : 5 of 5 LEED ACCOMPLISHMENTS Sustainable Sites Site required remediation of contamination prior to development Preferred parking for low-emitting, fuel-efficient and carpool vehicles 100% of parking is covered to reduce heat island effect Water Efficiency Drought-tolerant plants and high-efficiency irrigation systems were installed to reduce the use of potable water for irrigation by 70% High-efficiency water closets and lavatory faucets were installed to reduce water use for the building by 32% Energy and Atmosphere Enhanced commissioning verifies optimal performance of building systems Materials and Resources Over 24% of total building materials were manufactured locally (within 500 miles) Over 22% of total building materials contain recycled content Indoor Environmental Quality Interior finishes (including carpet, paint, coatings, adhesives and sealants) were selected with low levels of volatile organic compounds (VOC’s) to reduce indoor air contamination High level of individual occupant controls for lighting and thermal comfort systems to promote productivity, comfort and well-being 90% of all regularly occupied indoor spaces have views that provide a connection to the outdoors W HOLLYWOOD HOTEL & RESIDENCES HOLLYWOOD, CA 70% 600+ 87% reduction in irrigation was achieved through drought-tolerant plants and water efficient technology public transportation rides available per day though Metro stations, Greyhound and bus lines of construction waste was diverted from landfills PROJECT TEAM Owner : Gatehouse Capital Architect : HKS Architects General Contractor : Webcor Builders Mechanical Engineer : Critchfield Mechanical Electrical Engineer : Rosendin Electric Plumbing Architect : Pan Pacific Landscape Architect : Rios Clementi Hale Studios LEED Consultant : Gaia CASE STUDY : GATEHOUSE CAPITAL | W HOLLYWOOD HOTEL & RESIDENCES 1 , 040 , 000 sq ft Boutique Hotel : 305 Rooms | Luxury Condos : 143 Condos Retail | Restaurant | Conference | Spa | Fitness | Nightclub P 310.591.8172 | 4051 Glencoe Avenue, Suite 5, Marina del Rey, CA 90292 | www.gaiadevelopment.com profitability through sustainability LEED + ENERGY MODELING + COMMISSIONING

Upload: others

Post on 22-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

  • LEED-NC v2.1 FACTSLEED SILVER 35 of 69

    Sustainable Sites : 10 of 14

    Water Efficiency : 3 of 5

    Energy and Atmosphere : 1 of 17

    Materials and Resources : 6 of 13

    Indoor Environmental Quality : 10 of 15

    Innovation and Design : 5 of 5

    LEED ACCOMPLISHMENTSSustainable Sites• Site required remediation of contamination prior to development

    • Preferred parking for low-emitting, fuel-efficient and carpool vehicles

    • 100% of parking is covered to reduce heat island effect

    Water Efficiency• Drought-tolerant plants and high-efficiency irrigation systems were installed to reduce the use of potable water for irrigation by 70%

    • High-efficiency water closets and lavatory faucets were installed to reduce water use for the building by 32%

    Energy and Atmosphere• Enhanced commissioning verifies optimal performance of building systems

    Materials and Resources • Over 24% of total building materials were manufactured locally (within 500 miles)

    • Over 22% of total building materials contain recycled content

    Indoor Environmental Quality • Interior finishes (including carpet, paint, coatings, adhesives and sealants) were selected with low levels of volatile organic compounds (VOC’s) to reduce indoor air contamination

    • High level of individual occupant controls for lighting and thermal comfort systems to promote productivity, comfort and well-being

    • 90% of all regularly occupied indoor spaces have views that provide a connection to the outdoors

    W HollyWood HoTEl & REsidEncEs HOLLYWOOD, CA

    70% 600+87%

    reduction in irrigation was achieved through drought-tolerant plants and water efficient technology

    public transportation rides available per day though Metro stations, Greyhound and bus lines

    of construction waste was diverted from landfills

    PROJECT TEAMOwner : Gatehouse Capital

    Architect : HKS Architects

    General Contractor : Webcor Builders

    Mechanical Engineer : Critchfield Mechanical

    Electrical Engineer : Rosendin Electric

    Plumbing Architect : Pan Pacific

    Landscape Architect : Rios Clementi Hale Studios

    LEED Consultant : Gaia

    case study : GATEHOUSE CAPITAL | W HOLLYWOOD HOTEL & RESIDENCES

    1,040,000 sq ftBoutique Hotel : 305 Rooms | Luxury Condos : 143 Condos

    Retail | Restaurant | Conference | Spa | Fitness | Nightclub

    P 310.591.8172 | 4051 Glencoe Avenue, Suite 5, Marina del Rey, CA 90292 | www.gaiadevelopment.com

    profitability through sustainability

    LEED + ENERGY MODELING + COMMISSIONING

  • Indoor E

    nvironmental Q

    uality

    POSSIB

    LE PO

    INTS 15

    Materials &

    Resources

    PO

    SSIBLE

    POIN

    TS 13

    Energ

    y & A

    tmosp

    here

    POSSIB

    LE PO

    INTS 17

    Water E

    fficiency

    POSSIB

    LE PO

    INTS 5

    Prereq 1

    Ero

    sion &

    Sedim

    ent Co

    ntrol

    Cred

    it 1Site Selectio

    n1

    Cred

    it 2U

    rban R

    edevelo

    pm

    ent1

    Cred

    it 3B

    row

    nfield

    Red

    evelop

    ment

    1

    Cred

    it 4.1 A

    lternative Transpo

    rtation, Pub

    lic Transportation A

    ccess1

    Cred

    it 4.2A

    lternative Transpo

    rtation, B

    icycle Storage &

    Chang

    ing Room

    s1

    Cred

    it 4.3A

    lternative Transpo

    rtation, A

    lternative Fuel Vehicles1

    Cred

    it 4.4A

    lternative Transpo

    rtation, Parking

    Cap

    acity & C

    arpooling

    1

    Cred

    it 5.1R

    educed

    Site Disturb

    ance, Protect & Restore O

    pen Sp

    ace1

    Cred

    it 5.2R

    educed

    Site Disturb

    ance, Develop

    ment Footp

    rint1

    Cred

    it 6.1Sto

    rmw

    ater Manag

    ement, Rate &

    Quantity

    1

    Cred

    it 6.2Sto

    rmw

    ater Manag

    ement, Treatm

    ent1

    Cred

    it 7.1H

    eat Island E

    ffect, Non-Roof

    1

    Cred

    it 7.2H

    eat Island E

    ffect, Roof1

    Cred

    it 8Lig

    ht Po

    llution R

    eductio

    n1

    Prereq 1

    Minim

    um IA

    Q P

    erform

    ance

    Prereq 2

    Enviro

    nmental To

    bacco

    Smo

    ke (ETS) C

    ontro

    l

    Cred

    it 1C

    arbo

    n Dio

    xide M

    onito

    ring1

    Cred

    it 2V

    entilation E

    ffectiveness1

    Cred

    it 3.1 C

    onstructio

    n IAQ

    Manag

    ement P

    lan, During

    Construction

    1

    Cred

    it 3.2C

    onstructio

    n IAQ

    Manag

    ement P

    lan, Before O

    ccupancy

    1

    Cred

    it 4.1Lo

    w-E

    mitting

    Materials, A

    dhesives &

    Sealants1

    Cred

    it 4.2Lo

    w-E

    mitting

    Materials, Paints &

    Coating

    s1

    Cred

    it 4.3Lo

    w-E

    mitting

    Materials, C

    arpet System

    s1

    Cred

    it 4.4Lo

    w-E

    mitting

    Materials, C

    omp

    osite Wood

    & A

    grifib

    er Products

    1

    Cred

    it 5Ind

    oo

    r Chem

    ical & P

    ollutant So

    urce Co

    ntrol

    1

    Cred

    it 6.1C

    ontro

    llability o

    f Systems, Perim

    eter1

    Cred

    it 6.2C

    ontro

    llability o

    f Systems, N

    on-Perimeter

    1

    Cred

    it 7.1Therm

    al Co

    mfo

    rt, Com

    ply w

    ith ASH

    RAE 55-1992

    1

    Cred

    it 7.2Therm

    al Co

    mfo

    rt, Permanent M

    onitoring System

    1

    Cred

    it 8.1D

    aylight &

    View

    s, Daylig

    ht 75% of Sp

    aces1

    Cred

    it 8.2D

    aylight &

    View

    s, View

    s for 90% of Sp

    aces1

    Prereq 1

    Storag

    e & C

    ollectio

    n of R

    ecyclables

    Cred

    it 1.1B

    uilding

    Reuse, M

    aintain 75% of Existing

    Walls, Floors &

    Roof1

    Cred

    it 1.2B

    uilding

    Reuse, M

    aintain 100% of Existing

    Walls, Floors &

    Roof1

    Cred

    it 1.3 B

    uilding

    Reuse, M

    aintain 100% Shell &

    50% N

    on-Shell1

    Cred

    it 2.1C

    onstructio

    n Waste M

    anagem

    ent, Divert 50%

    from Land

    fill1

    Cred

    it 2.2C

    onstructio

    n Waste M

    anagem

    ent, Divert 75%

    from Land

    fill1

    Cred

    it 3.1M

    aterials Reuse, 5%

    1

    Cred

    it 3.2M

    aterials Reuse, 10%

    1

    Cred

    it 4.1R

    ecycled C

    ontent, 5%

    (Post-Consum

    er + 1/2 Post-Ind

    ustrial)1

    Cred

    it 4.2R

    ecycled C

    ontent, 10%

    (Post-Consum

    er + 1/2 Post-Ind

    ustrial)1

    Cred

    it 5.1R

    egional M

    aterials, 20% M

    anufactured Locally 1

    Cred

    it 5.2R

    egional M

    aterials, of 20% A

    bove, 50% H

    arvested Locally 1

    Cred

    it 6R

    apid

    ly Renew

    able M

    aterials1

    Cred

    it 7C

    ertified

    Wo

    od

    1

    Prereq 1

    Fundam

    ental Co

    mm

    issioning

    of the B

    uilding

    Energ

    y Systems

    Prereq 2

    Minim

    um E

    nergy P

    erform

    ance

    Prereq 3

    Fundam

    ental Refrig

    erant Manag

    ement

    Cred

    it 1 O

    ptim

    ize Energ

    y Perfo

    rmance, 10.5%

    - 42.5% (45.5%

    )1-10

    Cred

    it 2O

    n-site Renew

    able E

    nergy, 2.5%

    , 7.5%, 12.5%

    , (17.5%)

    1-3

    Cred

    it 3E

    nhanced C

    om

    missio

    ning1

    Cred

    it 4O

    zone P

    rotectio

    n1

    Cred

    it 5M

    easurement &

    Verifi

    cation

    1

    Cred

    it 6G

    reen Po

    wer

    1

    Cred

    it 1.1Inno

    vation in D

    esign, 100%

    Parking U

    nderg

    round1

    Cred

    it 1.2Inno

    vation in D

    esign, Exem

    plary Recycled

    Content 20%

    1

    Cred

    it 1.3Inno

    vation in D

    esign, Exem

    plary A

    lternative Transportation

    1

    Cred

    it 1.4 Inno

    vation in D

    esign, Exem

    plary Reg

    ional Materials

    1

    Cred

    it 2LE

    ED

    Accred

    ited P

    rofessio

    nal1

    Y1111111

    1

    1

    1

    11

    11

    YY

    11

    1

    1

    111

    1

    11111

    1

    1

    YYY

    103

    1

    111

    Y

    111

    11

    11

    1111

    11

    11111

    1

    11

    11

    Cred

    it 1.1W

    ater Effi

    cient Landscap

    ing, Red

    uce by 50%

    1

    Cred

    it 1.2W

    ater Effi

    cient Landscap

    ing, N

    o Potable U

    se or No Irrig

    ation1

    Cred

    it 2Inno

    vative Wastew

    ater Technolo

    gies

    1

    Cred

    it 3.1W

    ater Use R

    eductio

    n, 20% Red

    uction1

    Cred

    it 3.2W

    ater Use R

    eductio

    n, 30% Red

    uction1

    Y ? N

    Y ? N

    Y ? N

    Y ? N

    Y ? N

    Y ? N

    Sustainable Sites

    POSSIB

    LE PO

    INTS 14

    Innovation & D

    esign

    PO

    SSIBLE

    POIN

    TS 5

    Project Totals

    POSSIB

    LE PO

    INTS 69

    LEED-N

    C v2.1 SC

    OREC

    ARD

    Ow

    ner : Gatehouse C

    apital

    Pro

    ject : W H

    ollywood

    Hotel &

    Residences

    Locatio

    n : Hollyw

    ood, C

    A

    Certifi

    cation : LEED

    Silver

    10 0 4

    3 0 2

    1 0 16

    6 0 7

    10 0 5

    5 0 0

    35 0 34

    Required

    Required

    Required

    Required

    Required

    Required

    Required

    {EB

    } - Cred

    it Can A

    ssist in Certification U

    nder LEED

    for Existing B

    uilding

    sC

    ertified

    : 26-32 Points Silver: 33-38 Points Go

    ld: 39-51 Points P

    latinum: 52-69 Points

    This handout is made from 100% post consumer recycled materials and is printed with dry toner ink.www.gaiadevelopment.com