  • 8/3/2019 High Temp PCP

    1/16

    High

    TemperatureTechnology

    Journes du ptrole, Atelier 10, Huiles Lourdes, 11 Oct 2007

    Nicolas Parise, PCM, Directeur Business Unit Oil&Gas

    Lionel Lemay, PCM, Responsable de projet Innovation Oil&Gas

    OIL WELL ARTIFICIAL LIFT / SYSTEMES DACTIVATION DE PUITS:

  • 8/3/2019 High Temp PCP

    2/16

    GEVELOT

    Founded in 1820

    200 M, 1820 pers.

    FLUID HANDLING

    70 M, 450 Employees

    Founded in 1932 by

    RENE MOINEAU

  • 8/3/2019 High Temp PCP

    3/16

    FIRST ADAPTATION TO OIL&GAS in 1980s

    INNOVATION ON ELASTOMER

    PATENT IN 1932 FOR PUMPS & COMPRESSORS

    KNOW CONSIDERED AS A RELIABLE ANDCOST EFFECTIVE ARTIFICIAL LIFT SYSTEM

    In 1930, following his theory onIn 1930, following his theory on

    capsulism, the world's firstcapsulism, the world's first

    Progressive Cavity Pump wasProgressive Cavity Pump was

    designed by Ren Moineau, thedesigned by Ren Moineau, the

    founder of PCMfounder of PCM

    RENE MOINEAU

  • 8/3/2019 High Temp PCP

    4/16

    PCM NETWORK

    USA - HOUSTON

    CANADA KUDU

    CHINA MPS

    SHANGHAI

    FRANCE

  • 8/3/2019 High Temp PCP

    5/16

    CONVENTIONALPROGRESSING CAVITY PUMP

    STATORELASTOMER

    PUMPING TEMPERATURE < 120C

    Drive head + Motor

    Sucker rods

    Production tubing

    Casing

  • 8/3/2019 High Temp PCP

    6/16

    ARTIFICIAL LIFT MARKET IN COLD PRODUCTION

    SRP

    77%

    ESP

    14%

    GL3%

    PCP

    6%

    900 000 ACTIVATED WELLSAROUND 50 000 WITH PCP

    PROGRESSING CAVITY PUMP+20% / YEAR SINCE 2002

    SRP: Sucker Rod PumpsESP : Electrical Submersible PumpGL: Gas Lift

  • 8/3/2019 High Temp PCP

    7/16

    Expected

    recovery rate: up to 20%Expected

    recovery rate: up to 50 %

    SAGD(STEAM ASSISTED GRAVITY DRAINAGE)

    CSS(Cyclic steam stimulation)

    PUMPING CHALLENGE: TEMPERATURE UP TO 350C

    ARTIFICIAL LIFT MARKET IN THERMAL RECOVERY

  • 8/3/2019 High Temp PCP

    8/16

    HIGH TEMPERATURE TECHNOLOGY

    Innovation challenge initiated in1994 in partnership with TOTAL

    New PCP technology for extractingheavy oil where thermal recoveryis used

    A Patented Technology

    Test loop / First prototype in 2004

  • 8/3/2019 High Temp PCP

    9/16

    HIGH TEMPERATUREPROGRESSING CAVITY PUMP

    PCM Vulcain

    STATORMETAL TEMPERATURE UP TO 350C

    STEAM

  • 8/3/2019 High Temp PCP

    10/16

    PCM Vulcain RANGE

    XXXX : Capacity in m3/d @ 500 rpm & 0barYYYY : Max pump head in mWC

    DESIGNATION: XXXX MET YYYY

    0

    20 0

    40 0

    60 0

    80 0

    1000

    1200

    1400

    1600

    0 200 400 600 800 1000 1200

    Pump capacity (m3/d)

    Pumphead

    (mWC)

    3 1/2" EU - 150 MET 1500

    4" NU - 400 MET 1000

    4" NU - 550 MET 750

    4 1/2" EU - 1100 MET 500

  • 8/3/2019 High Temp PCP

    11/16

    FIELD PROVEN - SAGD

    SAGD: 100C to 180C

    Started 10th October, 2006: operated 9000 hours till now Set at 330mMD / 100mVD: 86 Deviation 800Bfpd - 250rpm Head: 25b / 350psi Power: 15KW

    PCM Vulcainwell pads in Joslyn, Alberta, operated by TOTAL

    550MET750

  • 8/3/2019 High Temp PCP

    12/16

    SAGD - OBSERVATIONS

    ESP creates High oil/wateremulsions that needsurface treatment

    Low-shear action thanks toclosed cavity design

    100755025255075100

    LOW EMULSIONS

    ESP efficiency dropsdramatically at higher

    viscosity

    Vol. efficiency remains highdespite variations in

    pressure and viscosity

    100755025255075100

    EFFICIENCY AT COMISSIONING / LOW PRESSURE

    Maximum observed is 2.5months in same conditions

    Maximum observed is 9000hours, ie 1 year (to date)

    100755025255075100

    PRODUCTION TIME

    ESP motor and electronicsrated at 218 C

    All-metal components, ratedfor 350 C operations

    100755025255075100

    MAX OPERATING TEMPERATURE

    ESPPCM Vulcain

  • 8/3/2019 High Temp PCP

    13/16

    FIELD PROVEN - CSS

    CSS: BHT From 315C down to 100C Installed November, 2005

    Started January, 2006 3rd steam cycle operated 5500 hours

    end 2006 Set at 600mMD / 420mVD: 79

    Deviation 1,500Bfpd - 300rpm Head: 30b / 450psi Power: 15KW

    PCM Vulcainwells in Cold Lake, operated by IMPERIAL OIL

    550MET750

  • 8/3/2019 High Temp PCP

    14/16

    CSS - OBSERVATIONS

    Pump jacks are 2 to 3 times

    bigger than PCP

    Reduced construction time

    and installation footprint

    100755025255075100

    VISUAL IMPACT ON ENVIRONMENT

    Leakage unavoidable dueto up and down motion ofrod

    Rotary shaft easier to sealwith patented Oryx Seal HTsystem

    100755025255075100

    WELL HEAD LEAKAGE

    SRP prone to rod fallfailures due to increases inviscosity

    Running 5000 hours, with 3steam cycles at 450 rpm(135 million cycles)

    100755025255075100

    PRODUCTION CYCLE LIFESPAN

    SRP design for operationalenvironment of approx.300 C

    Pump remained downholeduring steaming

    100755025255075100

    FIRST STEAM CYCLE TEMPERATURE = 315C

    SRPPCM Vulcain

  • 8/3/2019 High Temp PCP

    15/16

    INDICATORS

    NUMBER OF PUMP INSTALLED

    AVERAGE LIFE TIME (hours)

    MAXIMUM LIFE TIME TO DATE

    19

    3 000

    9 000

    UPDATE: OCT 20071st INSTALL: JAN 2006