GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION Use www.johnsoncitytn.org for an active website Legend: Internal Hyperlink to this document/ External Hyperlink to the internet To obtain a development permit (hereinafter called “permit”) from the City of Johnson City for a residential construction project, specific plans pertaining to your project must be submitted to the Johnson City Codes Division for review and approval. The user is cautioned that not all plan requirements are discussed in this Guide, only the most common. Activities that Require a Permit 1. Building a new single-family dwelling (house), or a new two-family dwelling (duplex), or a new townhouse requires a permit to be issued prior to beginning construction. Link to Townhouse Definition or see Appendix A. 2. An addition of a new room(s) to an existing house, duplex, or townhouse requires a permit. 3. Alterations to a dwelling may require a permit depending on the extent of the alteration. For example, if walls are to be moved, a permit is required. If a kitchen counter top is to be replaced and no plumbing other than the sink drain will be replaced, no permit is required. Call the Codes Division (423-434-6047) for clarification. 4. The construction of multi-family dwellings is not covered by these Residential Construction guidelines. Multi- family dwelling construction must follow Commercial Development guidelines and codes. For a definition of “multi-family dwelling” link to Zoning Code Article II, Definitions or see Appendix B. Contractor License Requirements 1. A homeowner may act as his own contractor and obtain a permit for a new single-family dwelling if the dwelling will be used as his own personal residence. The homeowner is allowed to be the contractor on one house in the City of Johnson City every two years. The homeowner must sign an affidavit stating that this requirement has been met. The signature must be witnessed by personnel at the Codes Division. Link to Example Affidavit or see Appendix C. 2. Homeowners may perform electrical, plumbing, and mechanical work if the homeowner passes the Johnson City Codes Division’s evaluation of competency in the respective trade that the homeowner desires to work. Otherwise, the work must be performed by a licensed contractor. 3. A contractor licensed by the State of Tennessee may build a house, duplex, or townhouse if they meet the requirements of the Codes Division: Link to Contractor Information or see Appendix D. Link to Insurance Form or see Appendix E. Permit Approval Process 1. Submit one complete set of all plans for the entire project to the Plans Examiner’s Office of the Codes Division for review. Contact the Plans Examiner at 423-434-6055 for all questions and further information. 2. A completed Plan Review Application must be submitted with the plans. See Appendix F. 3. The Plan Review Fee must be paid when the plans are submitted for review. Link to Plan Review Fee Schedule or see Appendix H. 4. After submittal of plans to the Codes Division, the Plans Examiner will contact you (usually within three working days) if additional information is required or if the plans are approved. Page 1 of 2

Upload: lamphuc

Post on 06-Jun-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION

Use www.johnsoncitytn.org for an active website Legend: Internal Hyperlink to this document/ External Hyperlink to the internet

To obtain a development permit (hereinafter called “permit”) from the City of Johnson City for a residential construction project, specific plans pertaining to your project must be submitted to the Johnson City Codes Division for review and approval. The user is cautioned that not all plan requirements are discussed in this Guide, only the most common.

Activities that Require a Permit

1. Building a new single-family dwelling (house), or a new two-family dwelling (duplex), or a new townhouse requires a permit to be issued prior to beginning construction. Link to Townhouse Definition or see Appendix A.

2. An addition of a new room(s) to an existing house, duplex, or townhouse requires a permit.

3. Alterations to a dwelling may require a permit depending on the extent of the alteration. For example, if walls are to be moved, a permit is required. If a kitchen counter top is to be replaced and no plumbing other than the sink drain will be replaced, no permit is required. Call the Codes Division (423-434-6047) for clarification.

4. The construction of multi-family dwellings is not covered by these Residential Construction guidelines. Multi- family dwelling construction must follow Commercial Development guidelines and codes. For a definition of “multi-family dwelling” link to Zoning Code Article II, Definitions or see Appendix B.

Contractor License Requirements

1. A homeowner may act as his own contractor and obtain a permit for a new single-family dwelling if the dwelling will be used as his own personal residence. The homeowner is allowed to be the contractor on one house in the City of Johnson City every two years. The homeowner must sign an affidavit stating that this requirement has been met. The signature must be witnessed by personnel at the Codes Division. Link to Example Affidavit or see Appendix C.

2. Homeowners may perform electrical, plumbing, and mechanical work if the homeowner passes the Johnson City Codes Division’s evaluation of competency in the respective trade that the homeowner desires to work. Otherwise, the work must be performed by a licensed contractor.

3. A contractor licensed by the State of Tennessee may build a house, duplex, or townhouse if they meet the requirements of the Codes Division: Link to Contractor Information or see Appendix D. Link to Insurance Form or see Appendix E.

Permit Approval Process

1. Submit one complete set of all plans for the entire project to the Plans Examiner’s Office of the Codes Division for review. Contact the Plans Examiner at 423-434-6055 for all questions and further information.

2. A completed Plan Review Application must be submitted with the plans. See Appendix F.

3. The Plan Review Fee must be paid when the plans are submitted for review. Link to Plan Review Fee Schedule or see Appendix H.

4. After submittal of plans to the Codes Division, the Plans Examiner will contact you (usually within three working days) if additional information is required or if the plans are approved.

Page 1 of 2

Page 2: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

5. Water and sewer taps must be purchased at the Water and Sewer Services Department or Codes Division after July 1, 2012. A receipt for the water and sewer tap must be given to the Codes Division before the permit can be issued. Link to City of Johnson City Water and Sewer Fee Schedule or see Appendix I.

6. If the project has a new driveway, a fee for the driveway access must be paid at the Codes Division office before the permit can be issued. Link to Driveway Access Fee Schedule or see Appendix J.

7. After all plans have been approved and water, sewer, and driveway fees paid, the permit fee can be paid. Link to Permit Fee Schedule or see Appendix H. After the permit fee is paid, the permit will be issued.

8. Separate fees for electrical, mechanical, and plumbing work must be paid before commencing the respective work. These fees may be paid after the permit is issued.

Plan Requirements

1. All single-family dwelling, two-family dwelling, and townhouse construction must follow the 2012 International Residential Code and City of Johnson City Amendments. Link to Design Criteria Table or see Appendix K and link to City of Johnson City Amendments or see Appendix L.

2. Drawings that show all proposed building construction must be submitted. All floor levels must be shown and all rooms properly labeled.

3. A site plan must be submitted: link to Site Plan Example or see Appendix M and link to Engineering General Notes or see Appendix N. The site plan must show:

A. The name and location of the street(s) that the property adjoins.

B. Maximum building heights and setbacks from all property lines. Links to Zoning Map & Summary of Zoning Requirements Table or see Appendix O. Contact the Planning Department at 423-434-6071 for Zoning Information.

C. The direction of storm water runoff before and after construction.

D. Some residential land parcels within subdivisions that were developed after February of 2008 have storm water quality requirements recorded with the deed. Contact the Site Plans Reviewer at 423-232- 1226 for assistance in determining if your property has any storm water quality requirements attached to it.

E. If the property contains or is adjacent to a river, stream, or other storm water conveyance, then show the location of the channel at normal flow, the floodway, and the 100-year floodplain. The elevation(s) of the 100-year floodplain must also be shown. Link to Floodplain Requirements. Contact the Floodplain Manager at 423-232-5191 for assistance.

F. Additional information may be required if the property contains a sinkhole. Contact the Engineering Division at 423-232-5191 for assistance.

G. Location and width of driveway. The maximum allowable width is 24 feet. The width is determined at a location two feet away from the city’s right-of-way line on the property owner’s side.

H. Retaining walls with four feet or more in height of exposed wall must be shown. These walls shall be designed by a licensed professional engineer with experience in designing retaining walls. Signed and sealed calculations must be submitted with the site plan as required by the Chief Building Official.

4. The property address as listed by 9-1-1 must be submitted. Contact the Planning Department at 423-434-6071 for assistance.

Page 2 of 2

Page 3: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

I

Appendix A

DEFINITIONS

SLOPE. The fall (pitch) of a line of pipe in reference to a

horizonal plane. In drainage, the slope is expressed as the fall in

units vertical per units horizontal (percent) for a length of pipe.

SMOKE-DEVELOPED RATING. A numerical index indi­

cating the relative density of smoke produced by burning

assigned to a material tested in accordance with ASTM E 84.

SOIL STACK OR PIPE.A pipe that conveys sewage contain­

ing fecal material.

SOLAR HEAT GAIN COEFFICIENT (SHGC). The solar

heat gain through a fenestration or glazing assembly relative to

the incident solar radiation (Btulh · ft2 · °F).

SOLID MASONRY. Load-bearing or nonload-bearing con­

struction using masonry units where the net cross-sectional

area of each unit in any plane parallel to the bearing surface is not less than 75 percent of its gross cross-sectional area. Solid

masonry units shall conform to ASTM C 55, C 62, C 73, C 145 or C 216.

STACK. Any main vertical DWV line, including offsets, that

extends one or more stories as directly as possible to its vent

tenninal.

STACK BOND. The placement of masonry units in a bond

pattern is such that head joints in successive courses are verti­

cally aligned. For the purpose of this code, requirements for

stack bond shall apply to all masonry laid in other than running

bond.

STACK VENT.The extension of soil or waste stack above the

highest horizontal drain connected.

STACK VENTING.A method of venting a fix.ture or fixtures

through the soil or waste stack without individual fix.ture vents.

STANDARD TRUSS. Any construction that does not permit

the roof/ceiling insulation to achieve the required R-value over

the exterior walls.

STATIONARY FUEL CELL POWER PLANT. A self-con­

tained package or factory-matched packages which constitute

an automatically-operated assembly of integrated systems for

generating useful electrical energy and recoverable thermal

energy that is permanently connected and fixed in place.

STORM SEWER, DRAIN. A pipe used for conveying rain­

water,surface water, subsurface water and similar liquid waste.

STORY.That portion of a building included between the upper

surface of a floor and the upper surface of the floor or roof next

above.

STORY ABOVE GRADE.Any story having its finished floor

surface entirely above grade, except that a basement shall be

considered as a story above grade where the finished surface of

the floor above the basement is:

1. More than 6 feet (1829 mm) above grade plane.

2. More than 6 feet (1829 mm) above the finis hed ground

level for more than 50 percent of the total building per­

imeter.

3. More than 12 feet (3658 mm) above the finished ground

level at any point.

20061NTERNATIONAL RESIDENTIAL CODE®

STRUCTURAL INSULATED PANELS (SIPS). Factory

fabricated panels of solid core insulation with structural skins

of oriented strand board (OSB) or plywood.

STRUCTURE. That which is built or constructed.

SUMP. A tank or pit that receives sewage or waste, located

below the normal grade of the gravity system and that must be

emptied by mechanical means.

SUMP PUMP. A pump installed to empty a sump. These

pumps are used for removing storm water only. The pump is

selected for the specific head and volume of the load and is usu­

ally operated by level controllers.

SUNROOM.A one-story structure attached to a dwelling with I a glazing area in excess of 40 percent of the gross area of the structure's exterior walls and roof.

SUPPLY AIR. Air delivered to a conditioned space through

ducts or plenums from the heat exchanger of a heating, cooling

or ventilating system.

SUPPORTS. Devices for supporting, hanging and securing

pipes, fixtures and equipment.

SWEEP. A drainage fitting designed to provide a change in

direction of a drain pipe of less than the angle specified by the

amount necessary to establish the desired slope of the line.

Sweeps provide a longer turning radius than bends and a less

turbulent flow pattern (see "Bend" and "Elbow").

TEMPERATURE- AND PRESSURE-RELIEF (T AND P)

VALVE. A combination relief valve designed to function as

both a temperature-relief and pressure-relief valve.

TEMPERATURE-RELIEF VALVE. A temperature-actu­

ated valve designed to discharge automatically at the tempera­

ture at which it is set.

THERMAL ISOLATION. Physical and space conditioning

separation from conditioned space(s). The conditioned space(s) shall be controlled as separate zones for heating and

cooling or conditioned by separate equipment.

THERMAL RESISTANCE, R-VALUE. The inverse of the

time rate of heat flow through a body from one of its bounding

surfaces to the other for a unit temperature difference between

the two surfaces, under steady stateconditions, per unit area (h ·

ft2 ·°F/Btu).

THERMAL TRANSMITTANCE, U-FACTOR.The coeffi­

cient of heat transmission (air to air) through a building enve­

lope component or assembly, equal to the time rate of heat flow

per unit area and unit temperature difference between the warm

side and cold side air films (Btu/h · ft2 · °F).

TOWNHOUSE. A single-family dwelling unit constructed in

a group of three or more attached units in which each unit

extends from foundation to roof and with open space on at least

two sides.

TRAP.A fitting, either separate or built into a fixture, that pro­

vides a liquid seal to prevent the emission of sewer gases with­

out materially affecting the flow of sewage or waste water

through it.

TRAP ARM. That portion of a fixture drain between a trap

weir and the vent fitting.

19

Page 4: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Appendix B

DRIP LINE: A vertical line extending from the outer edge of the canopy of a tree to

the ground.

DWELLING, MULTI-FAMILY: A building designed, constructed, or reconstructed

and used for more than two (2) dwelling units, with each dwelling unit having a

common structural or load-bearing wall of at least ten (10) lineal feet with any other

dwelling unit on the same floor or building level.

DWELLING, SINGLE-FAMILY: A building designed, constructed, and used for

one dwelling unit.

A. DETACHED: A one-family dwelling which is completely surrounded by

open spaces.

B. SEMI-DETACHED: A one-family dwelling that is connected on one side by

means of a common dividing structural or load-bearing wall of at least ten

(10) lineal feet to another one-family dwelling, each dwelling on its own

individual lot.

C. ATTACHED: A one-family dwelling that is connected on two sides by

means of a common dividing structural or load bearing wall of at least ten

(10) lineal feet of two or more other one-family dwellings, or the end dwelling

of a series of such dwellings, each dwelling unit on its own individual lot.

D. DWELLING GROUP, ONE-FAMILY ATTACHED: A line of one-family

attached dwellings, joined at the sides by means of common structural or load

bearing walls, comprising an architectural whole.

DWELLING, TWO-FAMILY OR DUPLEX: A building designed, constructed, or

reconstructed and used for two dwelling units that are connected by a common

structural or load-bearing wall of at least ten (10) lineal feet.

DWELLING UNIT: One room, or rooms, connected together, constituting a

separate, independent housekeeping establishment for owner occupancy, or rental, or

lease on a weekly, monthly, or longer basis, and physically separated from any other

rooms or dwelling units which may be in the same structure, and containing

independent cooking and sleeping facilities for permanent residential occupancy by

one family.

ELEVATED BUILDING: A non-basement building: 1) built to have the bottom of

the lowest horizontal structure member of the elevated floor elevated above the

ground level by means of pilings, columns (posts and piers), or shear walls and 2)

adequately anchored so as not to impair the structural integrity of the building during

a flood of up to the magnitude of the base flood. In the case of Flood Zones A1-30,

AE, A, A99, AO, AH, B, C, X, or D, elevated building also includes a building

Page 5: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Appendix C

Tennessee Board for Licensing Contractors 500 James Robertson Parkway; Nashville, TN 37243

(615) 741-8307 or 800-544-7693 / http://tn.gov/commerce/boards/contractors/

HOMEOWNER’S AFFIDAVIT FOR BUILDING PERMIT

Notice: This is to make you aware of the practice of unlicensed contractors requiring the homeowner to obtain a building permit in order to circumvent the licensing law and from being liable for any injuries on the jobsite, nonpayment (which may result in liens), and local code requirements. Licensed contractors must provide proof of insurance, financial solvency and pass exams.

Pursuant T.C.A. § 62-6-103, an owner of property may construct a single residence once every two (2) years, for their own use, and not for resale, lease or rent. Anyone hired by the homeowner would be considered a prime contractor or a construction manager, and they are not exempt from the license requirements. To ensure they are properly licensed with the correct license classification and monetary limit, please check with the Contractor’s Board at: 1-800- 544-7693 or the License Roster Search at: http://licsrch.state.tn.us/

PLEASE CHECK AND SIGN:

D 1. I have not applied for a homeowner permit within the last two (2) years.

D 2. I will perform all the work for which the building permit was issued except where otherwise

noted, and those hired must show proof of license.

D 3. If I hire a construction manager to oversee the project, the construction manager will be

properly licensed.

D 4. Should I cease to act as the owner-builder of the project, and hire a contractor to complete the project, I will request the permit to be voided and the contractor will apply for a new permit.

D 5. I am responsible for any required workers compensation and general liability insurance.

I, _________________________________ certify reading the above statements and understand [Homeowner Name(s)]

the requirements and responsibilities that accompany a Homeowner’s Permit.

Property Owner(s):_________________________________________________________________________

Signed:________________________________________________________ Date:_____________________

Page 6: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Development Services Department Administration • Codes • Planning

Community Development • GIS • MTPO

Appendix D

Codes Division

CONTRACTOR INFORMATION NEEDED

PRIOR TO OBTAINING PERMITS

To become an approved contractor doing business In Johnson City, the following Information must be submitted prior to Issuance of a permit:

A. Copy of Workers Compensation Insurance Certificate (if you or your organization

employs full time workers).

B. Business License with the City of Johnson City, (please call the Tax Department

423·434-6248 to determine If this Is needed).

C. $10,000 Surety bond between you and/or your organization and the City of Johnson

City (copy of bond form may be faxed upon request) call 423-434-6047. Form must be

completed by an Insurance company of your choice and returned to the Codes

Enforcement Office.

D. (1) General Contractor: If job exceeds $25,000 in value (materials & labor) copy of

your State of Tennessee Contractor's License is required, along with other information

listed below". If under $25,000, only information listed below is required.

(2) Sub-Contractor: All sub contractors must submit a copy of your State of TN

Contractor's License or a letter from the state confirming you have taken and passed

their trades' exam, along with information below. Commercial plans must be submitted

for a review a minimum of five (5) days prior to Issuance of a permit. Residential plans

must be submitted a minimum of three (3) days prior to issuance of a permit. If additional

information is needed, you may call the Codes Enforcement Office at one of the

numbers below.

“ The Johnson City Development Services Department is committed to

a comprehensive approach to guide and shape quality development in our region.”

601 East Main Street • P.O. Box 2150 • Johnson City, TN 37605 • (423) 434‐6047 • Fax: (423) 461‐1636

Page 7: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Appendix E

Effective Date: Bond No.:

BUILDING LICENSE BOND

Johnson City, Tennessee

KNOW ALL MEN BY THESE PRESENTS That we,

(hereinafter called the Principal)

(hereinafter called the Surety)

, as Principal and

, as Surety

are held and firmly bound unto the CITY OF JOHNSON CITY, TN, the Obligee, in the sum of Ten Thousand Dollars

($10,000) lawful money of the United States of America, for the payment of which we hereby bond ourselves, our

respective heirs, personal representatives, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, said Principal has applied for a license as a building contractor in the City of Johnson City, Tennessee and

under provisions of Ord. No. 3442, Art. 1, Sec. 7.2 of the Code of said City, is called upon to furnish this bond as a

condition precedent to engaging in the building contracting business in said City.

NOW THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully observe all the

laws pertaining to building construction, blasting, and excavating, constructing or reconstructing and shall indemnify

and save harmless the Obligee from all claim arising from accidents and damage of any character whatsoever caused by

the negligence of the Principal while engaged in said building contracting business or caused by any other unfaithful

inadequate work done either by the Principal or the Principal’s agents or employees and if the Principal shall further

maintain in a safe condition for a period of one (1) year all ditches and excavation which may be opened in the

performance of any construction work and shall replace all excavated dirt and other material in a good condition with

similar materials (it being understood that where such excavation is made in an unpaved street, or any street paved with

chert or macadam, the word “street” as herein used, shall apply to sidewalks, curbs, gutters, parkways, storm & sanitary

sewers and appurtenances, and street paving) then this obligation shall be void, otherwise to remain in full force and

effect.

PROVIDED, HOWEVER, this Bond is executed upon the following express conditions:

FIRST: Regardless of the period of time this Bond shall remain in force, or the number of premiums paid

therefor, the liability of the Surety shall not be cumulative and the aggregate liability of the Surety

for any and all claims, suits or actions under this Bond shall in no evident exceed the sum of Ten

Thousand Dollars ($10,000).

SECOND: This Bond may be cancelled at any time by the Surety upon giving thirty (30) days written notice

to the City of Johnson City, TN, in which event the liability of the Surety shall terminate at the end

of said thirty (30) day period, and which said period shall commence on the first regular business day

following actual receipt of the City of said notice, except as to any default or defaults under this Bond

occurring prior to the expiration of said thirty (30) day period.

THIRD: No right of action shall accrue upon or by reason of this Bond, to or for the use or benefit of anyone

whatsoever other than the Obligee named herein.

SIGNED, SEALED, AND DATED THIS day of _,

Principal:_ Surety:_

Representative Attorney in Fact

Page 8: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Codes Division

Development Services Department Administration • Codes • Planning

Community Development • GIS • MTPO

APPLICATION FOR BUILDING PERMIT

(see “Contractor Requirements” info sheet prior to application)

Appendix F

Project Address:

Name of Business/ Complex / Subdivision:

Contractor:

E‐mail:

Phone:

Client/Owner:

E‐mail:_

Phone:

Project Type (Check only one):

* 1 or 2 Family Res Commercial Mixed Use Condo/ Apt/ Townhouse: #Units

*(only 1 or 2 Fam Res)……*#Bedrooms

Proposed Use:

*# Baths_

Stories/Ht:

Total Sq. ft.

Cost of Job (materials & labor) $

Construction Type (Check all that apply –New construction only):

New structure Renovation Addition Site work / excavation

Shell only Deck / porch Foundation only Paving

Interior build out Garage /Storage Pool Other (explain below)

Driveway: Width at Street (1)

(2)

Temp power needed?: (Y_N_ )

Lower Lev Construction.…. Slab on grade Crawl space Basement

(ALWAYS CALL 811, OR VISIT WWW.TENN811.COM, PRIOR TO DIGGING TO LOCATE UNDERGROUND UTILITIES – PER T.C.A 65-31)

Briefly explain project:

Applicant certifies that the above information is true to the best of his/her knowledge and understands that this permit

may become null and void if information listed is found to be in error.

Applicant Name Date Phone / Email

Codes Division Date Planning Division

“ The Johnson City Development Services Department is committed to

a comprehensive approach to guide and shape quality development in our region.”

601 East Main Street • P.O. Box 2150 • Johnson City, TN 37605 • (423) 434‐6047 • Fax: (423) 461‐1636

Page 9: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Appendix H

Development Services Department Administration x Codes x Planning

Community Development x GIS x MTPO

Codes Division

BUILDING PERMIT FEE SCHEDULE

TOTAL VALUATION FEES

$1,000 OR LESS NO FEE UNLESS INSPECTION REQUIRED,

IN WHICH CASE A $15.00 FEE FOR EACH INSPECTION SHALL BE CHARGED.

$1,000 TO $50,000 $15.00 FOR THE FIRST $1,000

PLUS $5.00 FOR EACH ADDITIONALTHOUSAND OR FRACTION THEREOF. TO AND INCLUDING $50,000.00.

$50,001 TO $100,000 $260.00 FOR THE FIRST $50,000.00

PLUS $4.00 FOR EACH ADDITIONALTHOUSAND OR FRACTION THEREOF. TO AND INCLUDING $100,000.00.

$100,001 TO $500,000 $460.00 FOR THE FIRST $100,000.00

PLUS $3.00 FOR EACH ADDITIONALTHOUSAND OR FRACTION THEREOF. TO AND INCLUDING $500,000.00.

$500,001 AND UP $1,660.00 FOR THE FIRST $500,000.00

PLUS $2.00 FOR EACH ADDITIONALTHOUSAND OR FRACTION THEREOF.

WHEN WORK FOR WHICH A PERMIT IS REQUIRED BY CODE IS STARTED PRIOR TO OBTAINING

SAID PERMIT, THE PERMIT FEE SPECIFIED SHALL BE DOUBLED.

REINSPECTION FEE $ 25.00 DEMOLITION OF SINGLE FAMILY RESIDENTIAL $ 50.00 DEMOLITION OF OTHER STRUCTURES $ 100.00 MOVING OF STRUCTURE $ 55.00

PLANS REVIEW FEE (to be rounded up to the nearest dollar)

MINIMUM $25.00

RESIDENTIAL $25.00 PER UNIT (Single family, duplexes & townhouses.)

COMMERCIAL .0005 x CONSTRUCTION VALUE (to include apts. & condos)

*****NOTE: WATER & SEWER TAP FEES MUST BE PAID PRIOR TO ISSUANCE OF BUILDING PERMIT. (NEW HOUSES OR NEW COMMERCIAL)******

“ The Johnson City Development Services Department is committed to

a comprehensive approach to guide and shape quality development in our region.”

601 East Main Street x P.O. Box 2150 x Johnson City, TN 37605 x (423) 434-6047 x Fax: (423) 461-1636

Page 10: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Appendix I

CITY OF JOHNSON CITY WATER AND SEWER DEPARTMENT

CITY RATE SCHEDULE EFFECTIVE JULY 1, 2013 INSIDE CORPORATE LIMITS WATER & SEWER RATE TABLE

WATER RATE SEWER RATE

BASE CHARGE PER BILL $4.29 BASE CHARGE PER BILL $5.17

RATE 1 0-20,000 GAL $3.34/M GALLONS

RATE 2 20,001 - 190,000 GAL $2.67/M GALLONS

RATE 3 190,001 - 490,000 GAL $2.40/M GALLONS

RATE 4 OVER 490,000 GAL $2.17/M GALLONS

RATE 1 0-20,000 GAL

RATE 2 20,001 - 190,000 GAL

RATE 3 190,001 - 490,000 GAL

RATE 4 OVER 490,000 GAL

$5.19/M GALLONS

$5.19/M GALLONS

$5.19/M GALLONS

$5.19/M GALLONS

Effective 7-1-13 Effective 7-1-13

WATER CONNECTION FEES

5/8" METER AND CONNECTION CHARGE $750.00 FIRE HYDRANT $2,100.00

1" METER AND CONNECTION CHARGE $900.00 3" FIRE LINE $2,230.00 / NO MON FEE

1" Fire Service METER AND CONNECTION CHARGE $980.00 4" FIRE LINE $2,545.00 / NO MON FEE

1 1/2" METER AND CONNECTION CHARGE $1,180.00 6" FIRE LINE $2,855.00 / NO MON FEE

2" METER AND CONNECTION CHARGE $1,360.00 8" FIRE LINE $3,325.00 / NO MON FEE

2" Fire Service METER AND CONNECTION CHARGE $1,555.00 10" FIRE LINE $3,640.00 / NO MON FEE

2" Compound METER AND CONNECTION CHARGE $2,395.00 12" FIRE LINE $4,420.00 / NO MON FEE

3" METER AND CONNECTION CHARGE $3,740.00 4" METER AND CONNECTION CHARGE $6,000.00

6" METER AND CONNECTION CHARGE $9,550.00

8" METER AND CONNECTION CHARGE $13,150.00

5/8"

TEMPORARY METER

$150.00

3" TEMPORARY METER $325.00

**All Connections Larger Than 8" To Be Figured at Cost Including Labor, Materials, and Overhead

SANITARY SEWER CONNECTION FEES

Boones Creek Drainage Area

(A) Single Family Residence $1,550 $2,745

(B) Small Commercial Users (I.E. Service Stations, Office Building, Other Non-Residential $1,550 $2,745

(C) Car Wash $1,550 First Bay,

$900 each additional Bay

$2,745 First Bay, $1,610 Each

Additional Bay

(D) Apartments, Condominiums, Multi-Unit Family Complexes, Etc., Per Unit;Trailer Courts, $1,550 For the first $2,745 For the first unit, $1,610

Trailer or Unit

(E) Factories, Shopping Centers, Schools, Warehouses, Parking Garages

unit, $900 for the next

(50) units Plus $550 for

each additional unit

$1,550 For the first

10,000 Sq Ft of floor

space, Plus $900 for each

for the next (50) units, Plus $850

for each additional unit

$2,745 For the first 10,000 Sq Ft

of floor space, Plus $1,610 for

each additional 10,000 Sq Ft of

additional 10,000 Sq Ft of floor space

floor space

(F) Motels, Hotels, Hospitals, Nursing Homes and Dormitories (1)Each Rental Unit/Room

with NO In-Room Kitchen Facilities

(G) Rental Housing with Private Bathroom Facilities per Bedroom

$1,550 For the first

unit, $550 for each

additional unit

$1,550 For the first

unit, $550 for each

additional unit

$2,745 For the first unit, $1,000

for each additional unit

$2,745 For the first unit, $1,000

for each additional unit

(H) Additional existing units on same lot or parcel of land with existing residenceand

connected to the same sewer tap

$1,550 $2,745

(I) New Residences-Located in areas developed under the regulations governing the

subdivision of land of the Johnson City Regional Planning Commission in which adequate

and proper sewer lines constructed in conformity with applicable statuses of the State of

Tennessee and Ordinances of the City pertaining to sanitation have been constructed as a

part of private subdivision development

(J) On-site residential pump (Requires evaluation & written approval)

$1,050 $2,745

(1) Standard

(2) Extra Volume

$3500

$4,900

$3,920

$5,420

Effective 7-1-13

Page 11: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Appendix J

DRIVEWAY PERMIT – FEE SCHEDULE

Driveway up to 15 ft Flat Rate $ 5.50

Driveway 16 ft to 30 ft Flat Rate $ 11.00

Driveway 31 ft to 40 ft Flat Rate $ 16.50

**MAXIMUM WIDTH FOR RESIDENTIAL DRIVEWAYS – TWENTY-FOUR (24) FEET** **MAXIMUM WIDTH FOR COMMERCIAL DRIVEWAYS – FORTY (40) FEET**

Page 12: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Appendix K

Development Services Department Administration • Codes • Planning

Community Development • GIS • MTPO

Codes Division

Johnson City, TN – Design Criteria :

Ground Snow Load = 15 psf

Seismic Design Category = B

Frost Line Depth = 12 inches

Winter Design Temperature = 14 degrees

Mean Annual Temperature = 55 degrees

Wind Speed = 90 mph

Weathering = Severe

Termite = Severe-Moderate

Ice Barrier Underlayment Required = No

Air Freezing Index = > 0 – 1000

“Development Services…guiding today, shaping tomorrow.”

601 East Main Street • P.O. Box 2150 • Johnson City, TN 37605 • (423) 434-6047 • Fax: (423) 461-1636

Page 13: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Appendix L

(1 of 6)

ORDINANCE NO. 4509-13

AN ORDINANCE TO AMEND THE JOHNSON CITY MUNICIPAL CODE

BY DELETING THE PRESENT SECTION 12-301 OF SAID CODE IN

ITS ENTIRETY AND SUBSTITUTING A NEW SECTION 12-301 IN

LIEU THREOF AND TO ADOPT THE INTERNATIONAL BUILDING

CODE 2012 EDITION, THE INTERNATIONAL RESIDENTIAL CODE

2012 EDITION, THE INTERNATIONAL EXISTING BUILDING CODE 2012

EDITION, THE INTERNATIONAL FIRE CODE 2012 EDITION,

THE INTERNATIONAL MECHANICAL CODE 2012 EDITION, THE

INTERNATIONAL FUEL GAS CODE 2012 EDITION, THE

INTERNATIONAL PLUMBING CODE 2012 EDITION, THE 2010 ADA EDITION

STANDARDS FOR ACCESSIBLE DESIGN, THE NATIONAL ELECTRICAL CODE 2011

EDITION,

THE INTERNATIONAL ENERGY CONSERVATION CODE 2006 EDITION,THE

INTERNATIONAL PROPERTY MAINTENANCE CODE 2012 EDITION, AND

REPEALING ALL ORDINANCES AND PARTS OF ORDINANCES IN

CONFLICT HEREWITH.

NOW THEREFORE BE IT ORDAINED BY THE CITY OF JOHNSON CITY

as follows:

SECTION I. BE IT FURTHER ORDAINED that Section 12-301 of the Johnson City

Municipal Code is hereby repealed in its entirety, and a new Section 12-301 is adopted in lieu

thereof, which section shall provide as follows:

12-301. Codes adopted. The following codes are hereby adopted by reference as though they

were copied herein fully:

International Building Code- 2012 Edition with Appendix D Fire District attached thereto.

Section -903.2.3 GroupE is amended by deleting the entire section therein and replacing it with

the following: "An automatic sprinkler system shall be provided throughout all GroupE

occupancies."

Section 907.2.1 Group A is amended by changing "300" to "100" for Group A-2 occupancies as

defined in section 903.2.1.2.

Section 1018.1 Corridors, Exceptions is amended by adding #6, "In lieu of a fire rated corridor

required in Group B, fire areas exceeding 3,000 square feet but not exceeding 5,000 square feet

may have a fire alarm system installed per NFPA 72 with smoke detectors installed as required

by the fire official. The fire alarm signal shall be transmitted to an approved central station.

Occupant notification shall be by hom/strobes installed per NFPA 72."

Delete chapter 13 and replace it with the 2006 International Energy Conservation Code.

Page 14: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with
Page 15: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Appendix L

(3 of 6)

garages or other outside, non-heated, non-residential, low-rise occupancies, taking into

consideration the added response time and its effect on occupancy characteristics of the building.

Section 907.2.1 Group A is amended by changing "300" to "1 00" for Group A-2 occupancies as

defined in section 903.2.1.2.

International Mechanical Code- 2012 Edition.

No amendments

International Fuel Gas Code- 2012 Edition.

Section 404.3 is amended by adding a sentence as follows: "The gas line must be installed in a

ditch separate from other utility lines unless approved by the authority having jurisdiction."

International Plumbing Code- 2012 Edition.

Section 604.8 is amended by adding a sentence at the end of the section as follows: "A listed

water pressure regulator with strainer shall be installed inside of all buildings and structures."

2010 ADA Edition Standards for Accessible Design.

No amendments.

National Electrical Code- 2011 Edition as published by the National Fire Protection

Association.

Article 210.3 is amended by adding a sentence at the end of the section as follows: "All interior

wiring shall be at a minimum size number twelve (12) AWG copper conductor sized for a

maximum of ten (10) outlets permitted on a 20 amperes branch circuit."

Amend Article 210.5 (C) add:

"Means of identification ofungrounded conductors shall be color coded as follows:

120/208 Volt wiring systems

Phase 1 Black

Phase 2 Red

Phase 3 Blue

Neutral White

277/480 Volt wiring systems

Phase 1 Brown

Phase 2 Orange

Phase 3 Yellow

Neutral Gray

Ground Wire Green

Page 16: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

.. Appendix L

(4 of 6)

All boxes and enclosures for emergency systems and fire alarm systems shall be permanently

marked. The color red shall be used for fire alarm systems (NEC Article 760.30). The color

orange shall be used for emergency systems."

Article 230.70 (A3) is amended by adding a sentence at the end of the section as follows:

"Service panels or switch gears shall have an interim service disconnect device such as a main

circuit breaker or fused disconnect. When such device is located on the interior of a structure and

in excess of 10 feet from an exterior door, a shunt trip device shall be installed with a Knox key

switch at a location specified by the fire official. All conductors installed for operation of the

SHUNT TRIP BREAKER for main services or to shut down generators serving emergency

power shall be installed in a metallic conductor system. This conduit system shall be continuous

from end to end without junction boxes or splices and shall be identified by the same color code

as for emergency circuits."

Article 230.71 (A) is amended by adding a sentence at the end ofthe section as follows: "Meter

centers installed for multiple occupancy residential structures with more than six meters shall

require a main breaker or disconnect be installed. Structures with multiple meter centers shall

have shunt trip breakers and Knox switches installed to disconnect all services from each

location."

Article 334.12 is amended by adding #11: "Cable NM. type NMC NMB and type NMS as

defined in Article 334 of the National Electrical Code shall not be permitted for use in the

following applications:

A. Group Rl Residential Hotels and Motels;

B. Buildings, other than Residential;

C. Other building types where prohibited by the National Electrical Code;

D. All buildings over three stories; and

E. All buildings located in the fire district as defined by the City Zoning Code.

Conduit, raceways and wire-ways shall be metallic for all non residential buildings unless for

special applications."

International Energy Conservation Code, 2006 edition.Section 101.4.3 is amended by

adding the following exceptions:

5. Reroofing for roofs where neither the sheathing nor the insulation is exposed. Roofs

without insulation in the cavity and where the sheathing or insulation is exposed during

reroofing shall be insulated either above or below the sheathing.

6. Replacement of existing doors that separate conditioned space from the exterior shall not

require the installation of a vestibule or revolving doors, provided, however, that an existing

vestibule that separates a conditioned space from the exterior shall not be removed.

Page 17: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with
Page 18: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

( . .. ., ......

Appendix L

(6 of 6)

Page 19: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

DATE

SCALE

DRAWNBY:

SE

TB

AC

K

SE

TB

AC

K

WID

TH

W

IDT

H

WID

TH

PR

OP

ER

TY

LIN

E

PR

OP

. D

RA

INA

GE

P

RO

P.

DR

AIN

AG

E

SE

TB

AC

K

DR

IVE

WA

Y

PR

OP

ER

TY

LIN

E

ST

RE

ET

NA

ME

EXAMPLESITEPLAN

FORONEANDTWOFAMILY

RESIDENTIALCONSTRUCTION

PROPERTYLINE

SETBACK

ACCESSORY

BUILDING

SETBACK

LENGTH SETBACK

LENGTH

DECK

HOUSE CARPORT

FLOOR

ELEV.

PORCH

PROP. DRAINAGE

PROP. DRAINAGE

PROPERTYLINE

WIDTH

STREETNAME DIST.

Appendix M

OWNERDEVELOPER'SNAME

ANDCURRENTADDRESS

CITY,STATE,ZIP

DAYTIMETELEPHONENO.

SUBDIVISIONNAME

LOTNO.,BLOCKNO.(IFANY)

ADDRESSOFNEWBUILDING

Page 20: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

Rev. 10/24/2000 Residential (1 and 2 Family)

GENERAL NOTES PUBLIC WORKS DEPARTMENT

ENGINEERING DIVISION

Appendix N

1.00 SITE PLAN: A site plan is required for all building construction. The site plan shall be submitted on paper of a minimum

size of 8 1/2" x 11". Acceptable scales for the drawing are 1" =10', 1" =20', 1" =30', 1”=40’, 1" = 50'. 1.20 The site plan shall show the existing and proposed drainage paths by using directional arrows.

1.21 The site plan must show the location of the proposed building as referenced to property lines and existing buildings on the building site.

1.30 The site plan must show the location of the driveway as referenced to property lines and existing public utilities such as fire hydrants and power poles.

2.00 SITE DRAINAGE: Higher ground has an implied easement to drain to and across lower ground, but the lower ground is

not obligated to receive surface water in different quantities or at different velocities than what did exist before development of the higher ground.

2.10 Natural drainage pathways may not be relocated without prior approval of the Engineering Division.

Proposed changes to natural drainage pathway must be shown on the site plan. 2.20 The location that surface water enters and exits the building site may not be relocated, nor shall several natural

drainage paths be combined at one exit point on the building site. Exceptions will be given only when the owner and/or the developer can show through engineering and legal research that the lower property will not be effected.

2.30 The cost of altering natural drainage paths on the building site will be the responsibility of the owner and/or developer.

3.00 SITE GRADING: Adjoining property has the right to expect lateral support from neighboring property.

3.10 The steepest slope allowed will be 2 feet of run to 1 foot of rise. 3.20 When it is necessary to place permanent excavation closer to adjoining property, than a 2 to 1 slope will allow then a

retaining wall may be used to provide lateral support to the adjoining property. However, no portion of the wall may encroach onto adjoining property without a private written agreement with the adjoining property owner.

4.00 EROSION CONTROL: Adjoining property owners have the right to expect that erosion from the building site will not

encroach onto their property.

4.10 Erosion control barriers must be used to contain mud and silt. The location of the barriers must be determined in the field by the owner and or developer and will be inspected by the building inspectors. Erosion control barriers must be maintained on a regular basis and kept intact and effective.

4.30 In the event that erosion material should encroach onto adjoining property, the owner and/or developer will be responsible for the clean up.

4.40 Keep the public street clear of mud, debris, and building materials. The owner and/or developer is responsible for removing any building site material from the public right-of-way. If the owner and/or developer fail to clear the street, the building inspector may ask city crews to clear the street and then invoice the owner and/or developer.

5.00 DRIVEWAY: City driveway code must be followed on all driveway construction. Tennessee Department of

Transportation driveway regulations will apply to construction along state highway routes. 5.10 All driveway connections to public streets and highways must receive a separate permit from the Building Division and

be inspected during construction by the Engineering Division of the Public Works Department. The permit application is made at the Building Division of the Public Works Department.

5.20 The Tennessee Department of Transportation regulates through permits driveway connections along state routes. Drawings of the driveway connection are required for the review and approval by Tennessee Department of Transportation and the City of Johnson City.

5.30 Forms for the Tennessee Department of Transportation permit are available at the Building Division office, located in the Municipal & Safety Building. Instructions on how to file this permit are attached to the T-DOT permit form.

5.40 Before cutting any curb for a driveway, call the Engineering Division for a curb inspection then call again for a final inspection when the driveway construction is complete.

6.00 OTHER COMMENTS: This Engineering review is not all inclusive, and does not relieve the permitee from complying

with all City Codes, and this review is not giving approval to supersede any applicable City Codes.

Page 21: GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION · GUIDE FOR OBTAINING A PERMIT FOR RESIDENTIAL CONSTRUCTION ... density of smoke produced by burning ... to roof and with

SUMMARY OF ZONING REQUIREMENTS Appendix O

Zoning

District

Minimum

Lot Size

Minimum

Lot Width

Maximum

Density

Front Yard Setbacks M Side Yard Setbacks Rear Yard Setbacks Maximum Lot

Coverage

Height Regulations

Arterial Collector Others Principal Accessory Principal Accessory Principal Accessory

R-1 21,780 sq ft 100 ft 70 ft 60 ft 50 ft N 7.5 ft 30 ft 7.5 ft 30% 35 ft 15 ft

R-2 15,000 sq ft 90 ft 25 ft 25 ft 20 ft 10 ft 7.5 ft 30 ft 7.5 ft 30% 35 ft 15 ft

R-2A 12,000 sq ft 80 ft 25 ft 25 ft 20 ft 10 ft 7.5 ft 30 ft 7.5 ft 30% 35 ft 15 ft

R-2B 9,000 sq ft 75 ft 25 ft 25 ft 20 ft 8 ft 7.5 ft 30 ft 7.5 ft 35% 35 ft 15 ft

R-2C 6,000 sq ft 60 ft 25 ft 25 ft 20 ft 8 ft 7.5 ft 25 ft 7.5 ft 40% 35 ft 15 ft

R-3 9,000 sq ft 75 ft 7 units/acre 25 ft 25 ft 20 ft 8 ft 7.5 ft 30 ft 7.5 ft 35% 35 ft 15 ft

R-4 7,000 sq ft 50 ft 14 units/acre 25 ft 25 ft 20 ft 8 ft 7.5 ft 30 ft 7.5 ft 35% 35 ft 15 ft

R-5 6,000 sq ft 50 ft 22 units/acre 25 ft 25 ft 20 ft 8 ft 7.5 ft 30 ft 7.5 ft 35% 65 ft 65 ft

R-6 6,000 sq ft 50 ft 25 units/acre 25 ft 25 ft 20 ft 8 ft 7.5 ft 30 ft 7.5 ft 35% 65 ft 65 ft

RP-2 6,000 sq ft A 60 ft A 3.4 units/acre 25 ft A 25 ft A 10 ft A B B B B - 35 ft 35 ft

RP-3 6,000 sq ft A 60 ft A 8.5 units/acre 25 ft A 25 ft A 10 ft A B B B B - 35 ft 35 ft

RP-4 6,000 sq ft A 60 ft A 15.3 units/acre 25 ft A 25 ft A 10 ft A B B B B - none none

RP-5 6,000 sq ft A 60 ft A 27.2 units/acre 25 ft A 25 ft A 10 ft A B B B B - none none

RM-3 5 acres K 30 ft 4 units/acre C 10 ft 10 ft 10 ft 10 ft 7.5 ft 30 ft 7.5 ft - 15 ft 15 ft

RM-4 5 acres K 30 ft 8 units/acre C 10 ft 10 ft 10 ft 10 ft 7.5 ft 30 ft 7.5 ft - 15 ft 15 ft

RM-5 5 acres K 30 ft 10 units/acre C 10 ft 10 ft 10 ft 10 ft 7.5 ft 30 ft 7.5 ft - 15 ft 15 ft

RO-1 6,000 sq ft 50 ft 35 units/acre 25 ft 25 ft 10 ft 8 ft 7.5 ft 30 ft 7.5 ft 35% none none

RO-2 6,000 sq ft 50 ft 14 units/acre 25 ft 25 ft 10 ft 8 ft 7.5 ft 30 ft 7.5 ft 35% 65 ft none

MS-1 none 50 ft 45 ft 35 ft 25 ft E 7.5 ft 30 ft 7.5 ft 50% none none

B-1 none 50 ft 45 ft 35 ft 25 ft G G 25 ft 5 ft 35% 35 ft 15 ft

B-2 none 50 ft none none none none none none none none none none

B-3 none 50 ft 35 units/acre 15 ft 15 ft none none none none none none none none

B-4 none 50 ft 45 ft 35 ft 25 ft F F 25 ft com/

40 ft res

25 ft com/

40 ft res

40%>1 acre

50%<1 acre

none none

B-5 none 50 ft 45 ft 35 ft 25 ft F F 25 ft com/

40 ft res

25 ft com/

40 ft res

40%>1 acre

50%<1 acre

none none

I-1 none 50 ft 45 ft 35 ft 25 ft D 10 ft com/

40 ft res

D 10 ft com/

40 ft res

25 ft com/

40 ft res

25 ft com/

40 ft res

50% 35 ft H 35 ft H

I-2 none 50 ft 60 ft 45 ft 25 ft 25 ft com/

40 ft res

25 ft com/

45 ft res

25 ft com/

40 ft res

25 ft com/

40 ft res

50% 35 ft H 35 ft H

A-1 3 acres - res

1 acre -com

125 ft 50 ft 40 ft 30 ft 25 ft 25 ft 50 ft 50 ft 30% 35 ft 15 ft I

HC none 50 ft 45 ft 35 ft 25 ft G G 25 ft 25 ft 35% 35 ft 15 ft

BP 1 acre 150 ft 50 ft 50 ft 50 ft 30 ft 30 ft 30 ft 30 ft 35% J J

PB none 50 ft 45 ft 35 ft 25 ft F F 25 ft com/

40 ft res

25 ft com/

40 ft res

40%>1 acre

50%<1 acre

60 ft 60 ft

MX none none 22 units/acre 15 max/

75 max

15 max/

75 max

15 max/

75 max

none none none none none 35/45/60 L 35/45/60 L

MX-1 none none 14 units/acre 0 0 0 0 7.5 ft 0 7.5 ft 75 ft 35 ft 15 ft

RTP 3 acres 250 ft 50 ft 50 ft 50 ft 25 ft 25 ft 50 ft 50 ft 25% J J

A For single-family residential only. Multi-family residential regulations determined at the time of site plan review by Johnson City Regional Planning Commission. B See 6.10.4 – Side Yard/ no side yard setback shall be required; Rear Yard/ the rear yard setback on exterior lots shall be equal to the required setback in the adjacent non-RP zoning district. C Net acre: Total area minus all access roads, driveways, common parking areas, and accessory building space. D 10 feet or one half of the principal building height whichever is greater except with an approved interior sprinkling system, then 10 feet. E One-story building: 12 feet total side yards plus 8 feet for each additional story. At least 1/3 of the total depth shall be provided on the smaller side, provided that neither side is less than 6 feet. F Adjacent to R-1 thru R-2C: 12.5 feet for a one-story building; plus 10 times the number of additional stories. Adjacent to R-3 thru R-6, RP, RM, RO-1, or MS-1, same as adjacent zone. Adjacent to B-1,

B-2, B-3, I-1, I-2, or A-1: No minimum. G No minimum required. If a sideyard is provided it must be at least 10 feet. H All structures which exceed 35 feet and located within 100 ft of a residential zone must be approved as a Special Exception. I Excluding agricultural buildings. J No max. height, provided all min. yards are increased 5 ft for each story over 35 ft. K Minimum size of entire development L See Zoning Code for further explanation. M Front facing garages shall have a minimum of 25 ft setback in all zones. N Minimum side yard setback shall be 15 feet for a one-story building, 20 feet for a two-story building, and 25 feet for a three story building. zonecode/tables/zonesum.doc