Page 1: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects

Ilaria Losa (RSE), Gareth Bissell (ENEL)

TOOLS TO SUPPORT THE EUROPEAN ELECTRICITY GRID INITIATIVE: THE ROLL-OUT OF SMART GRIDS - 24th June 2014

Page 2: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Smart grids projects in EU

R&D (45%) almost as numerous as Demo & Deployment (55%)

More National (63%) than Multinational

Numbers: 459 smart grid projects

mostly Demo & Deployment (73%)

National funding (57%) weighing a bit more than Multinational (43%)

Investment: € 3 150 million

2 Source: JRC DATABASE 2013

Page 3: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Structure of the EEGI roadmap (distribution)

Cluster 1: Integration of

Smart customers

D1. Active Demand Response

D2. Energy Efficiency from integration

with Smart Homes

Cluster 2: integration of DER

and new users

D3. DSO integration of small DER

D4. System integration of medium DER

D5:Integration of storage in network

mgt

D6: Infrastructure to host EV/PHEV

Cluster 3: Network

operation

D7: Monitoring and control of LV network

D8. Automation and control of MV

network

D9. Network management tools

D10. Smart metering data processing

Cluster 4: network planning

and asset management

D11. New planning approaches

D12. Asset management

D13. New approaches for market design

Page 4: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Structure of the EEGI roadmap (transmission)

Cluster 1: Grid Architecture

T1 -Definition of scenarios for pan-European network

expansion

T2 - Planning methodology for

future pan-European

transmission system

T14 -Towards increasing public

acceptance of transmission

infrastructure

Cluster 2: Power technologies

T3 - Demonstration of power technology

to increase network flexibility

and operation means

T4-Demonstration of novel network

architectures

T5 -Interfaces for large-scale demos of RES integration

Cluster 3: Network

Operation

T6 - Innovative tools and methods to

observe and control the pan-European

network

T7 - Innovative tools and methods for

coordinated operation with stability margin

evaluation

T8 - Improved training tools and methods to

ensure better coordination at the regional and pan-Eu

levels

T9 - Innovative tools and approaches for

pan-European network reliability

assessment

Cluster 4: Market rules

T10 - Advanced pan-European

market tools for ancillary services

and balancing, including active

demand management

T11 - Advanced tools for capacity

allocation and congestion

management

T12 - Tools & market

mechanisms for ensuring system

adequacy and efficiency

integrating very large amounts of

RES

Cluster 5: Asset Management

T15 - Developing approaches to

determine and to maximize the

lifetime of critical power

components for existing and

future networks

T16 -Development

and validation of tools which

optimize asset maintenance at

the system level, based on

quantitative CBA

T17 - Demonstrations

of new asset management

approaches at EU level

Joint TSO/DSO projects

TD1 - Increased observability of the distribution system

for transmission network MNGT &

control;

TD2 - The integration of demand side

management at DSO level into TSO

operations

TD3 - Ancillary services provided

through DSOs

TD4 - Improved defense and

restoration plan

TD5 - Methodologies for scaling-up and

replicating

Page 5: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

GRID+

Gap analysis: methodology-1

• To highlight transversal issues with respect to key aspects for the large scale

deployment of the innovations tested in pilot projects

• To assess the maturity level of each Functional Objective with respect to the EEGI

priorities

• To compare the results achieved by ongoing and past demos with the relevant EEGI

priorities and to identify research priorities for future research programmes

DOMAIN EEGI ROADMAP Priorities EXPECTED RESULTS

Hardware

Software tools Toolbox to build scenarios.

• Tools to perform network simulations at Pan EU level integrating new emerging technologies.

Integration into the system

To define pan-European network expansion scenarios; identify maximum volume of RES and DER for pan-European network; identify investments required to achieve 2050 vision

To provide methods for identifying rates of storage needed at European level to

develop a sustainable and efficient network

Page 6: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Gap analysis: methodology-2 Maturity categories- transmission

Hardware

Software tools

Integration into the system

Cost-benefit analysis

Regulation of grid services

Stakeholders involvement

System reliability

Data privacy

Maturity categories- distribution

Hardware

Software tools

Integration into the system

Business model

Cost-benefit analysis

Regulation of grid services

Stakeholders involvement

System reliability

6

the maturity categories are a limited set metrics orthogonal (independent) to the structure of the EEGI clusters and functional objectives, applicable to a large set of objectives, able to assess as closely as possible the key goals of each objective without redundancy. Maturity categories consider incremental smart grid characteristics and capabilities that represent key elements defined in the roadmap: grid planning, development, operation, management

Page 7: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Gap analysis: methodology-3

Ranking scheme

7

Page 8: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

DISTRIBUTION

Based on EEGI roadmap 2012 Maturity levels assigned in cooperation with the members of EDSO4SG

GAP ANALYSIS : preliminary outcomes

D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13

Hardware 0 2 2 1 2 2 1 0 2 0 -1 3 -1

Software tools 3 1 3 1 3 3 2 2 2 2 2 2 3

Integration into the system 2 3 3 2 2 2 2 1 -1 1 2 2 0

Business model 2 2 2 2 3 2 2 -1 -1 2 -1 3 2

Assessment of system reliability 2 3 2 1 2 2 3 0 2 2 2 3 1

Regulatory framework 2 2 2 2 2 1 1 3 -1 2 1 3 2

Stakeholders involvement 2 2 3 2 3 2 1 -1 -1 2 3 3 2

Data privacy 1 2 2 1 -1 3 2 -1 -1 2 -1 -1 2

PRIORITIES 2014 PRIORITIES 2015

Page 9: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Link With EEGI implementation plan

• requires fundamental research for: software tools; business model; stakeholders involvement

• Requires moderate development for: Hardware, Business model, Assessment of system reliability, Regulatory framework

D5 - Integration of storage in network management

• Requries moderate development for: Business model; Assessment of system reliability; Regulatory framework; Stakeholders involvement; Data privacy

• Need more demonstration for Integration into the system

D10 - Smart metering data processing

• Requires fundamental research for : Hardware; Business model; Assessment of system reliability; Regulatory framework; Stakeholders involvement; Data privacy

• Requries moderate development for: Software tools; Integration into the system;

D12 - Asset management

DSO Topics 2014 DSO Topics 2015

• requires fundamental research for: software tools; Integration into the system; stakeholders involvement

• Requires moderate development for: Hardware, Business model, Assessment of system reliability, Regulatory framework; data privacy

D3 - Integration Small DER

• Requries moderate development for: Integration into the system; Business model; Regulatory framework; Stakeholders involvement;

• Need more demonstration for Hardware; software tools; System reliability; data privacy

D4 - Integration medium DER

• Requires fundamental research for : Assessment of system reliability;

•Requries moderate development for: Software tools; Integration into the system; Business model; Data privacy; •Need more demonstration for Hardware; Regulatory framework; Stakeholders involvement;

D7 - Monitoring and Control LV network

Page 10: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

TRANSMISSION

• Based on EEGI roadmap 2012 • Maturity levels assigned in cooperation with the members of ENTSO-E • Validation with external stakeholders on 24° March 2014

GAP ANALYSIS : preliminary outcomes

T1 T2 T14 T3 T4 T5 T6 T7 T8 T9 T10 T11 T12 T15 T16 T17

Hardware -1 -1 3 1 3 2 1 -1 -1 -1 -1 -1 -1 3 -1 2

Software tools -1 2 3 2 2 2 2 3 2 3 2 2 3 2 3 -1

Integration into the

system 3 1 -1 2 2 2 3 2 2 3 2 3 2 2 3 2

Business model -1 2 -1 -1 -1 -1 -1 -1 -1 2 3 3 3 -1 -1 -1

Cost-benefit analysis 2 2 3 2 2 2 -1 -1 -1 2 3 2 2 3 3 2

Regulation of grid

services -1 1 3 -1 -1 2 -1 1 -1 3 3 2 3 -1 -1 3

Stakeholders

involvement -1 2 3 -1 -1 1 -1 -1 2 2 3 2 2 2 -1 3

System reliability -1 3 3 2 3 2 2 3 -1 3 3 2 2 3 3 2

PRIORITIES 2014 PRIORITIES 2015

Page 11: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Link With EEGI implementation plan

• Requires moderate development for: software tools, Integration into the system, Cost Benefit Analysis, Business model, Assessment of system reliability, Regulatory framework

• Need more demonstration for: Hardware

T3 - Demonstration of power technology to increase network flexibility and operation means

• requires fundamental research for; Integration into the system;

• Requries moderate development for: Software tools involvement; Data privacy

• Need more demonstration for Hardware

T6 - Innovative tools and methods to observe and control the pan-European network

TSO Topics 2014- 1 Demonstration of future smart HV substations

TSO Topics 2014- 2: Novel cross border balancing market mechanisms and tools for ensuring system reliability

• requires fundamental research for: Business model; CBA; Assessment of system reliability, Regulatory framework; stakeholders involvement

• Requires moderate development for: software tools, Integration into the system

T10- Advanced pan-European market tools for ancillary services and balancing, [..]

• requires fundamental research for: Software tools; Integration in the system; Assessment of system reliability, Regulatory framework

• Requries moderate development for: Business model; CBA; Stakeholders involvement;

T9 - Innovative tools and approaches for pan-Eu ntwk reliability asses.

• Requires fundamental research for : Integration into the system; Business model

•Requries moderate development for: Software tools; CBA; Assessment of system reliability, Regulatory framework; stakeholders involvement

T11 - Monitoring and Control LV network

Page 12: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

TRANSMISSION / DISTRIBUTION INTERFACE

GAP ANALYSIS : preliminary outcomes

TD1 TD2 TD3 TD4 TD5

Hardware -1 2 1 -1 -1

Software tools 2 2 2 3 -1

Integration into the system 2 3 2 3 3

Business model -1 3 3 -1 -1

Cost-benefit analysis -1 3 3 -1 3

Regulation of grid services 2 3 3 3 3

Stakeholders involvement 2 2 3 2 3

System reliability 2 3 2 2 -1

• Based on EEGI roadmap 2012 • Maturity levels assigned in cooperation with the members of ENTSO-E • RESULTS WILL BE VALIDATED DURING A WEBINARS

PRIORITIES 2014

PRIORITIES 2015

Page 13: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Link With EEGI implementation plan

• Requires fundamental research for: Integration into the system; Business model; Cost-benefit analysis; Regulation of grid services

• Requires moderate development for: Hardware, Software tools, Stakeholders

involvement;

TD2 - Integration of demand side management at DSO level into TSO operation.

TSO/DSO Topics 2014 TSO/DSO Topics 2015

• requires fundamental research for: Software tools; Integration into the system; Cost-benefit analysis; Regulation of grid services; Stakeholders involvement

• Requires moderate development for:

Assessment of system reliability,

TD5 - Demonstration of Power Load Control Mechanisms at TSO and DSO levels

• requires fundamental research for: Integration into the system; Cost-benefit analysis; Regulation of grid services; Stakeholders involvement;

TD1 - Increased Observability of the Distribution Systems for Transmission Network Management

Page 14: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Validation with external stakeholders 24 March 2014 in Brussels (ENTSO-E)

• Workshop with stakeholders about Gap analysis results and Identification of R&I priorities

09 April 2014 in Madrid (IBERDROLA)

• Interaction Workshop on Network Planning & Asset management (DSO) – Configuring the systems, transforming the networks

27 May 2014 in Copenhagen (ENERGINET.DK)

• Interaction Workshop with Nordic projects – In cooperation with ENERGINET.DK, SINTEF and Norwegian Smart Grid Centre

10 June 2014 in Rome (GSE)

• Interaction Workshop on Market design Issues (DSO) – Market Design for a future European energy system -

19 June 2014, Rome (T&D EUROPE)

• Workshop with manufacturers related to WP1 Mapping and Gap Analysis

Page 15: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

EEGI Project Labelling Scheme

15 300 projects ~

Page 16: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

www.gridplus.eu

What are the criteria?

16

Page 17: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

www.gridplus.eu

Who has got a Label?

17

Page 18: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Why should I apply?

18

Knowledge sharing

Dissemination

Collaboration

Community

Page 19: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Online Application Form

19

www.gridplus.eu

Page 20: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Project results EEGI Roadmap objectives

20

www.gridplus.eu

R&I Roadmap Objectives

Cluster NameFunctional

ObjectiveFull names of Functional Objectives

T1 Definition of scenarios for pan-European network expansion

T2 Planning methodology for future pan-European transmission system

T14 Towards increasing public acceptance of transmission infrastructure

T3 Demonstration of power technology to increase network flexibility and operation means

T4 Demonstration of novel network architectures

T5 Interfaces for large-scale demonstration of renewable integration

T6 Innovative tools and methods for pan-European network observability and controllability

T7 Innovative tools and methods for coordinated operation with stability margin evaluation

T8Improved training tools and methods to ensure better coordination at the regional and pan-

European levels

T9 Innovative tools and approaches for pan-European network reliability assessment

T10Advanced pan-European market tools for ancillary services and balancing, including active demand

management

T11 Advanced tools for capacity allocation and congestion management

T12Tools and market mechanisms for ensuring system adequacy and efficiency in electric systems

integrating very large amounts of RES generation

T15ObjectivesDeveloping approaches to determine and to maximize the lifetime of critical power

components for existing and future networks

T16Development and validation of tools which optimize asset lifetime at the system level, based on

quantitative cost/benefit analysis

T17 Demonstrations of potential at EU level for new approaches to asset management

Grid architectureC1

Power technologiesC2

Network operationC3

Market designsC4

Asset managementC5

Cluster NameFunctional

ObjectiveFull names of Functional Objectives

TD1Increased observability of the distribution system for transmission network management and

control

TD2 The integration of demand side management at DSO level into TSO operations

TD3 Ancillary services provided through DSOs

TD4 Improved defense and restoration plan

TD5 Tools for scaling-up and replicating at EU level

TDJoint TSO/DSO

Activities

Cluster NameFunctional

ObjectiveFull names of Functional Objectives

D1 Active demand for increased flexibility

D2 Energy Efficiency from integration with Smart Homes

D3 DSO integration of small DER

D4 System integration of medium DER

D5 Integration of storage in network management

D6 Infrastructure to host EV/PHEV

D7 Monitoring and control of MV network

D8 Automation and control of MV network

D9 Network management tools

D10 Smart metering data processing

D11 New planning approaches for distribution networks

D12 Asset management

C5 Market Design D13 Novel approaches for market design analysis

C1Integration of smart

customers

C2

C3

C4

Integration of DER and

new users

Network Operations

Network Planning and

asset management

EEGI Key Performance Indicators

Page 21: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

www.gridplus.eu 21

Two Categories

• Implementation Effectiveness

• Impact KPIs

5,7% 11,8% 4,9% 10,6% 3,6%

17,2% 7,0% 19,6%

29,6%

13,0% 11,2%

1,8% 14,0% 0,7%

0,3%

75,4%67,3%

74,8%59,4%

87,0% 85,2%

0%

20%

40%

60%

80%

100%

R&D Plan Cluster 1 Cluster 2 Cluster 3 Cluster 4 Cluster 5

Progress of the ENTSO-E R&D Plan

Not started yet

Under proposal

Ongoing

Completed

Budget

Results

Page 22: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

www.gridplus.eu 22

Implementation Effectiveness

R&I Roadmap Objectives

5,7% 11,8% 4,9% 10,6% 3,6%

17,2% 7,0% 19,6%

29,6%

13,0% 11,2%

1,8% 14,0% 0,7%

0,3%

75,4%67,3%

74,8%59,4%

87,0% 85,2%

0%

20%

40%

60%

80%

100%

R&D Plan Cluster 1 Cluster 2 Cluster 3 Cluster 4 Cluster 5

Progress of the ENTSO-E R&D Plan

Not started yet

Under proposal

Ongoing

Completed

EXAMPLE FIGURES

Current investment with respect to the allocated budget

Page 23: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

www.gridplus.eu 23

Impact KPIs

Page 24: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Objective of Impact KPIs Expected benefits of R&I activities vs BaU approach

www.gridplus.eu 24

Expected benefits

R&I

BaU

Page 25: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Impact KPIs

www.gridplus.eu 25

Overarching KPIs

“To allow European electricity networks continuously deliver effective

flexible capacities to integrate actions of grid users at affordable costs”

Overarching Goal:

1. Increased network capacity at affordable cost

2. Increased network flexibility at affordable cost

Page 26: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Impact KPIs

www.gridplus.eu 26

Specific KPIs

1. Increased RES and DER hosting capacity

2. Reduced energy curtailment of RES and DER

3. Power quality and quality of supply

4. Extended asset life time

5. Increased flexibility from energy players

6. Improved competitiveness of the electricity

market

7. Increased hosting capacity for electric vehicles

(EVs) and other new loads

Page 27: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Impact KPIs

www.gridplus.eu 27

Scalability & Replicability

KPIs covered by projects used to evaluate EEGI Programme and Cluster Level KPIs

The definition of these are out of the scope of the GRID+ project

Page 28: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

Results of R&I projects aggregated using Scalability and Replicability studies

www.gridplus.eu

28

Project KPIs

%100&%

BAU

BAUIR

HC

HCHCEHC

Project A

%100&%

BAU

BAUIR

HC

HCHCEHC

Project A

%100&%

BAU

BAUIR

HC

HCHCEHC

Project A

%100&%

BAU

BAUIR

HC

HCHCEHC

Project A

EEGI Programme

‘Specific’ KPI

%100&%

BAU

BAUIR

HC

HCHCEHC

Scalability and

replicability studies

Evolution of technology

Modularity

Interface design

Technological standardization

Interoperability

Plug & play characteristics

Availability

Regulatory conditions

Page 29: GRID+ Mapping and Gap Analysis, KPIs, EEGI labelled projects...GAP ANALYSIS : preliminary outcomes TD1 TD2 TD3 TD4 TD5 Hardware-1 2 1 -1 -1 Software tools 2 2 2 3 -1 Integration into

EEGI Programme KPIs

29

• Evaluation

• Scalability and Replicability

• Validation of EEGI KPIs

• Definition of EEGI KPIs – D3.4